This is a Quality Control specification section document for a state and local contract opportunity involving the demolition of a single-family home at 82 West Indian Lane in West Norriton Township, Montgomery County, Pennsylvania. The specification establishes quality assurance and control requirements that the contractor must maintain throughout the project execution, including control of installation, adherence to tolerances, compliance with referenced standards, mock-up procedures, testing laboratory services, observation services, and manufacturers' field services. The contractor is responsible for monitoring quality control over suppliers, manufacturers, products, services, site conditions, and workmanship to produce work meeting specified quality standards. All work must comply with manufacturers' instructions and specified standards, with fabrication and installation tolerance control performed to prevent tolerance accumulation. The specification requires that products be adjusted to appropriate dimensions and secured in place with positive anchorage devices before final installation.
The specification mandates that the contractor furnish duplicate certified copies of all routine tests performed by mills, shops, or factories where materials or equipment are fabricated or manufactured. An independent testing firm will perform tests and services as specified in individual specification sections, with reports submitted to the Engineer in duplicate regarding compliance or non-compliance with contract documents. The contractor is responsible for paying all testing and laboratory services costs and must cooperate with construction observers and manufacturers' field personnel by providing safe access and incidental labor assistance. Testing and observation services do not relieve the contractor of responsibility to perform work to contract requirements. Examination of existing site conditions and substrate surfaces is required before beginning new work, with verification that existing conditions are acceptable for subsequent work and that substrate surfaces are properly prepared through cleaning, sealing, and application of manufacturer-required primers or sealers prior to applying new materials.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY CONTROL
01 40 00-1
SECTION 01 40 00
PART 1 GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Quality assurance - control of installation.
2. Tolerances.
3. References and standards.
4. Mock-up.
5. Testing laboratory services.
6. Observation services.
7. Manufacturers' field services.
8. Examination.
9. Preparation.
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere:
1. Document 00 72 00: General Conditions: References to Standards and
Specifications of Technical Societies; Reporting and Resolving Discrepancies.
2. Document 00 73 00: Supplementary Conditions: Duties, Responsibilities and Limitations of Authority of the Resident Project Representative.
3. Section 01 33 00: Submittals.
4. Section 01 42 13: Organization and Reference Acronyms.
5. Section 01 60 00: Material and Equipment.
6. Section 01 75 00: Starting of Systems.
1.03 QUALITY ASSURANCE-CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply fully with manufacturers' instructions, including each step-in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification
01 40 00-2 from Engineer before proceeding.
D. Comply with specified standards as minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Perform Work by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion or disfigurement.
1.04 TOLERANCES
A. Monitor fabrication and installation tolerance control of Products to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply with manufacturers’ tolerances. Should manufacturers’ tolerances conflict with
Contract Documents, request clarification from Engineer before proceeding.
C. Adjust Products to appropriate dimensions; position before securing Products in place.
1.05 REFERENCES AND STANDARDS
A. For Products or workmanship specified by association, trade or other consensus standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Conform to reference standard by date of issue current on date for receiving bids, except where a specific date is established by code.
C. Obtain copies of standards where required by Product specification sections.
D. Should specified reference standard conflict with Contract Documents, request clarification from Engineer before proceeding.
E. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Engineer shall be altered from the Contract Documents by mention or inference otherwise in any reference document.
1.06 MOCK-UP
A. Tests will be performed under provisions identified in this section and identified in the respective Product specification sections.
B. Assemble and erect specified items with specified attachment and anchorage devices, flashings, seals, and finishes.
C. Accepted mock-ups shall be a comparison standard for the remaining Work.
D. Where mock-up has been accepted by Engineer and is specified in Product specification sections to be removed; remove mock-up and clear area when directed to do so.
01 40 00-3
1.07 TESTING LABORATORY SERVICES
A. Contractor shall furnish to Engineer duplicate certified copies of all routine tests made by the mill, shop or factory at which material or equipment is fabricated or manufactured for the Work when so specified in individual specification sections.
B. An independent firm will perform tests and other services when so specified in individual specification sections and as required by Engineer.
C. Testing and source quality control may occur on or off the Project site. Perform off-site testing as required by Engineer.
D. Reports will be submitted by the independent firm to Engineer, in duplicate, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents.
E. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access and assistance by incidental labor as requested.
1. Notify Engineer and independent firm 24 hours prior to expected time for operations requiring services.
2. Make arrangements with independent firm and pay for additional samples and tests required for Contractor's use.
F. Testing does not relieve Contractor to perform Work to contract requirements.
G. Retesting required because of non-conformance to specified requirements shall be performed by the same independent firm on instructions by Engineer.
H. Contractor shall pay for all testing and laboratory services and/or test reports as are required in individual specification sections.
1.08 OBSERVATION SERVICES
A. Owner will employ and pay for observation services during construction of the Project.
B. Cooperate with construction observer; furnish safe access and assistance by incidental labor as requested.
1. Notify construction observer 24 hours prior to expected time for operations requiring services.
C. Observation does not relieve Contractor to perform Work to contract requirements.
1.09 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or Product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance of equipment, and to initiate instructions when necessary.
B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers’ written instructions.
01 40 00-4
C. Refer to Section 01 33 00 - Submittals, Manufacturer’s field reports article.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent
Work. Beginning new Work means acceptance of existing conditions.
B. Verify that existing substrate is capable of structural support or attachment of new Work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Verify that utility services are available, of the correct characteristics, and in the correct locations.
3.02 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.
END OF SECTION