48-Sec 01 57 13 Soil Erosion and Sediment Control.pdf

PDF 130 KB Posted

Attached to
82 W. Indian Lane - FEMA Demolition
Solicitation number
US.230082
Issued by
Montgomery County, Pennsylvania

About this file

This is a Soil Erosion and Sediment Control specification document for a FEMA-funded demolition project in West Norriton Township, Montgomery County, Pennsylvania. The specification outlines the contractor's responsibilities for implementing and maintaining erosion and sediment control measures throughout the demolition of a single-family home at 82 West Indian Lane and associated impervious surfaces, with the site being restored to grass. The contractor must implement temporary and permanent control measures before, during, and after construction in accordance with the project drawings, the Erosion and Sediment Control Report, and Pennsylvania Department of Environmental Protection standards. Temporary measures include stabilized construction entrances, perimeter swales, inlet protection, silt fence, compost filter socks, and temporary seeding, all of which must be inspected weekly and after storm events and maintained throughout the project duration. Upon completion and stabilization of disturbed areas, the contractor is responsible for removing all temporary control devices.

The specification references Pennsylvania Department of Environmental Protection Soil Erosion and Sediment Pollution Control Manual and Pennsylvania Department of Transportation Publication 408 Specifications as governing standards. Materials required include compost filter socks, silt fence, super silt fence with chain link backing, coarse aggregate for construction entrances, and inlet protection devices, all specified according to applicable publication sections. The contractor must limit removal of natural ground cover to minimum required areas, perform dewatering through sediment traps or filter bags rather than direct discharge into ditches or watercourses, and perform permanent seeding and mulching of disturbed areas following final grading. The specification grants the owner the right to require modifications to sediment control measures and mandates prompt implementation of any measures recommended or required by the County Conservation District.

View the file

Other files

File Type Posted
8-Doc 00 21 13 Instructions to Bidders.pdf PDF
14-Doc 00 61 13.16 Payment Bond.pdf PDF
1-00 82 W. Indian Lane FEMA Plans.pdf PDF
39-Sec 01 33 00 Submittals.pdf PDF
35-Sec 01 42 13 Organization and Reference Acronyms.pdf PDF
33-Sec 01 32 16 Construction Project Schedule.pdf PDF
42-Sec 01 70 00 Contract Closeout.pdf PDF
29-Doc 00 73 00 04 Appendix D - Hazard Mitigation Grant Conditions.pdf PDF
41-Sec 01 55 26 Traffic Regulation.pdf PDF
12-Doc 00 45 10 Bidders Acknowledgement Form.pdf PDF
9-Doc 00 45 13 Bidder Qualification Statement.pdf PDF
10-Doc 00 45 53 Agreement of Surety Company.pdf PDF
18-Doc 00 62 16 Certificate of Insurance.pdf PDF
27-Sec 01 11 13 Summary of Work.pdf PDF
7-Doc 00 21 13.1 Instructions for Electronic Bidding.pdf PDF
2-Doc 00 01 15 List of Drawing Sheets.pdf PDF
21-Doc 00 73 00 Supplementary Conditions.pdf PDF
28-Doc 00 73 00 01 Appendix A - Prevailing Wage Rates.pdf PDF
32-Sec 01 31 00 Coordination and Meetings.pdf PDF
31-Sec 01 29 00 Contract Considerations.pdf PDF
24-Doc 00 91 13 Addenda.pdf PDF
17-Doc 00 65 19.13 Contractors Affidavit.pdf PDF
15-Doc 00 61 19 Maintenance Bond.pdf PDF
49-Sec 32 92 00 Finish Grading, Seeding and Sodding.pdf PDF
26-Doc 00 73 00 - Supplementary Conditions.pdf PDF
50-Sec 31 23 33 Excavation, Backfill and Compaction.pdf PDF
4-Doc 00 01 10 Table of Contents.pdf PDF
13-Doc 00 52 00 Agreement.pdf PDF
16-Doc 00 61 13.13 Performance Bond.pdf PDF
45-Sec 02 41 16 Demolition.pdf PDF
40-Sec 01 56 39 Landscape Protection.pdf PDF
34-Sec 01 35 16 Alteration Project Procedures.pdf PDF
22-Doc 00 72 00 General Conditions.pdf PDF
19-Doc 00 65 19.19 Consent of Surety.pdf PDF
5-Doc 00 43 13 Bid Bond.pdf PDF
6-Doc 00 11 13 Advertisement for Bids.pdf PDF
25-Sec 01 00 00 Basic Requirements.pdf PDF
37-Sec 01 50 00 Construction Facilities and Temporary Controls.pdf PDF
23-Doc 00 73 00 02 Appendix B - Public Works Employment Verification Form.pdf PDF
46-Sec 31 11 00 Clearing and Grubbing.pdf PDF
44-Sec 01 60 00 Material and Equipment.pdf PDF
20-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
3-Doc 00 01 01 Project Title Page.pdf PDF
38-Sec 01 40 00 Quality Control.pdf PDF
43-Sec 01 57 14 Erosion Control Blanket.pdf PDF
36-Sec 01 22 00 Measurement and Payment.pdf PDF
11-Doc 00 45 19 Non-Collusion Affidavit.pdf PDF
47-Sec 31 20 00 Earthwork.pdf PDF
30-Doc 00 73 00 03 Appendix C - Chapter 106 Permit.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOIL EROSION AND SEDIMENT CONTROL

01 57 13-1

SECTION 01 57 13

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Contractor shall implement and maintain the Soil Erosion and Sediment Control Plan prepared for the Project and/or Work as shown on the Drawings, in the Erosion and Sediment Control Report, and described in this Section.

2. Contractor shall carry out the construction operations in such a manner that soil erosion and resulting turbid stormwater runoff and sedimentation are minimized.

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 31 11 00: Clearing and Grubbing.

2. Section 31 20 00: Earthwork.

3. Section 31 23 16.26: Rock Removal.

4. Section 31 23 33: Excavation, Backfill and Compaction.

5. Section 32 92 00: Finish Grading, Seeding, and Sodding.

1.03 QUALITY ASSURANCE

A. Reference Standards:

1. Pennsylvania Department of Environmental Protection Soil Erosion and Sediment Pollution Control Manual.

2. Pennsylvania Department of Transportation Publication 408 Specifications

1.04 JOB CONDITIONS

A. The associated work activities include but are not limited to the following items:

1. Temporary and permanent measures will have to be undertaken before, during and after construction to control sediment from being carried onto adjoining properties and into swales or watercourses as a result of stormwater runoff.

2. The use of temporary control devices as shown on the Drawings and as described in these Specifications are for providing the trapping of sediment resulting from construction activities and to reduce the velocities of the temporary stormwater courses to minimize erosion.

3. The erosion and sediment control devices shall be inspected on a weekly basis and after every storm event and shall be maintained throughout the life of this project.

These shall include, but are not limited to, stabilized construction entrance(s), perimeter swales, inlet protection, silt fence(s)/compost filter sock(s), and temporary and permanent seeding as shown on the Drawings or other measures that are required for the construction of the Project and/or Work.

01 57 13-2

4. Upon completion of the Project and/or Work, and stabilization of disturbed areas, the temporary control devices shall be removed by Contractor.

5. Soil erosion and sediment control practices shall be consistent with the procedures outlined in the latest edition of the "Soil Erosion and Sediment Pollution Control Manual", Commonwealth of Pennsylvania, Department of Environmental Protection.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Compost Filter Sock:

1. Section 867, Publication 408 Specifications.

B. Silt Fence:

1. Section 865, Publication 408 Specifications.

C. Super Silt Fence:

1. Fabric attached to chain link fence in accordance with the Drawings.

D. Coarse Aggregate (Stabilized Construction Entrance)

1. AASHTO #1, Table C, Section 703.2, Publication 408 Specifications.

E. Inlet Protection Devices

F. Temporary Seeding

1. See Section 32 92 00.

G. Permanent Seeding

1. See Section 32 92 00.

PART 3 - EXECUTION

3.01 TEMPORARY CONTROL MEASURES

A. Site Stabilization:

1. Install erosion and sediment control measures in accordance with the Drawings and

Sequence of Construction as approved by the County Conservation District.

2. Limit the removal of natural ground cover to the minimum area required for demolition, grading, and construction.

3. Perform temporary seeding and mulching immediately upon completion of earthmoving, within seasonal constraints, of disturbed areas which are not actively being regraded until final grading and stabilization can be accomplished. Temporary seeding is covered in Section 32 92 00.

01 57 13-3

4. Dewatering or pumping out of excavated areas directly into existing storm ditches or natural channels which causes silt deposition, turbidity and/or possible erosion of banks is prohibited. Contractor must make use of sediment traps, pumped water filter bags, or other methods acceptable to the Resident Project Representative and County Conservation District.

5. Sediment must be removed from all silt fence and compost filter socks when accumulations reach ½ the above ground height of the fence/sock.

6. Sediment must be removed from all rock filter outlets when accumulations reach 1/3 the height of the outlets.

7. Filter fabric fence and/or compost filter socks should be inspected daily and after each runoff event. Needed repairs should be initiated immediately after the inspection.

B. Utility Demolition/Construction:

1. Install erosion and sediment control measures in accordance with the Drawings and sequence of construction as approved by the County Conservation District.

2. Excavated material resulting from the demolition or installation of the utility line(s), associated appurtenances, and stormwater system shall be completely surrounded by silt fence, compost filter sock, or completely covered with a plastic sheet during non-work periods.

3. Limit the removal of natural ground cover to the minimum area required for demolition/construction within non-paved areas.

4. Perform temporary seeding and mulching immediately upon completion of earthmoving, within seasonal constraints, of disturbed areas which are not actively being regraded until final grading and stabilization can be accomplished. Temporary seeding is covered in Section 32 92 00.

5. Dewatering or pumping out of excavated areas directly into existing storm ditches or natural channels which causes silt deposition, turbidity and/or possible erosion of banks is prohibited. Contractor must make use of sediment traps, filters, or other methods acceptable to the Resident Project Representative.

3.02 PERMANENT CONTROL MEASURES

A. Non-Paved Areas:

1. Perform permanent seeding and mulching of any disturbed areas immediately following final grading of any non-paved areas within seasonal constraints. Seeding is covered in Section 32 92 00.

3.03 FIELD MODIFICATIONS

A. Owner reserves the right to require modifications to any or all sediment control measures provided in order to establish proper soil erosion and sedimentation control. In addition, any measures recommended or required by the County Conservation District shall be promptly implemented.

END OF SECTION