This is a Summary of Work document for a FEMA demolition project in West Norriton Township, Montgomery County, Pennsylvania. The project encompasses the complete demolition of the existing single-family home located at 82 West Indian Lane, including removal of all associated impervious surfaces, with the site to be restored to grass upon completion. The Contractor bears full responsibility for erosion control, demolition activities, grading, soil compaction, debris and material removal, and all local permitting requirements. The Contractor must provide all necessary materials, equipment, tools, and labor while maintaining complete supervision and ensuring performance completion in accordance with project drawings, specifications, special provisions, and contract requirements. The Contractor is required to submit a comprehensive construction schedule prior to commencing work and must maintain Lori Lane and Surrey Lane open to the public throughout construction operations without impact from the Contractor's activities. The Owner intends to conduct normal operations on adjacent fields, courts, and playground areas during the entire construction period.

The Contractor shall confine all operations within designated limits of disturbance as directed by the Township Engineer and must protect all existing water, gas, electric, communications, sanitary sewer, storm sewer, and other utilities in accordance with Pennsylvania Act 287. The Contractor is obligated to notify all affected property owners and residents at least twenty-four hours prior to commencing work and must comply strictly with OSHA Construction Workplace Safety Standards. All damage to property outside specified construction limits remains the Contractor's responsibility, with restoration required at the Contractor's expense. Upon project completion, the Contractor shall clean and restore the operational area to conditions at least equal to original conditions. No work by the Owner or other parties is anticipated in the immediate vicinity during construction, no Owner-supplied products will be provided, and no future work is associated with this contract.

View the file

Other files

File Type Posted
8-Doc 00 21 13 Instructions to Bidders.pdf PDF
14-Doc 00 61 13.16 Payment Bond.pdf PDF
1-00 82 W. Indian Lane FEMA Plans.pdf PDF
39-Sec 01 33 00 Submittals.pdf PDF
35-Sec 01 42 13 Organization and Reference Acronyms.pdf PDF
33-Sec 01 32 16 Construction Project Schedule.pdf PDF
42-Sec 01 70 00 Contract Closeout.pdf PDF
29-Doc 00 73 00 04 Appendix D - Hazard Mitigation Grant Conditions.pdf PDF
41-Sec 01 55 26 Traffic Regulation.pdf PDF
12-Doc 00 45 10 Bidders Acknowledgement Form.pdf PDF
9-Doc 00 45 13 Bidder Qualification Statement.pdf PDF
10-Doc 00 45 53 Agreement of Surety Company.pdf PDF
18-Doc 00 62 16 Certificate of Insurance.pdf PDF
7-Doc 00 21 13.1 Instructions for Electronic Bidding.pdf PDF
2-Doc 00 01 15 List of Drawing Sheets.pdf PDF
21-Doc 00 73 00 Supplementary Conditions.pdf PDF
28-Doc 00 73 00 01 Appendix A - Prevailing Wage Rates.pdf PDF
32-Sec 01 31 00 Coordination and Meetings.pdf PDF
31-Sec 01 29 00 Contract Considerations.pdf PDF
24-Doc 00 91 13 Addenda.pdf PDF
17-Doc 00 65 19.13 Contractors Affidavit.pdf PDF
15-Doc 00 61 19 Maintenance Bond.pdf PDF
49-Sec 32 92 00 Finish Grading, Seeding and Sodding.pdf PDF
26-Doc 00 73 00 - Supplementary Conditions.pdf PDF
50-Sec 31 23 33 Excavation, Backfill and Compaction.pdf PDF
4-Doc 00 01 10 Table of Contents.pdf PDF
13-Doc 00 52 00 Agreement.pdf PDF
16-Doc 00 61 13.13 Performance Bond.pdf PDF
45-Sec 02 41 16 Demolition.pdf PDF
40-Sec 01 56 39 Landscape Protection.pdf PDF
34-Sec 01 35 16 Alteration Project Procedures.pdf PDF
22-Doc 00 72 00 General Conditions.pdf PDF
19-Doc 00 65 19.19 Consent of Surety.pdf PDF
5-Doc 00 43 13 Bid Bond.pdf PDF
6-Doc 00 11 13 Advertisement for Bids.pdf PDF
25-Sec 01 00 00 Basic Requirements.pdf PDF
37-Sec 01 50 00 Construction Facilities and Temporary Controls.pdf PDF
23-Doc 00 73 00 02 Appendix B - Public Works Employment Verification Form.pdf PDF
46-Sec 31 11 00 Clearing and Grubbing.pdf PDF
48-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
44-Sec 01 60 00 Material and Equipment.pdf PDF
20-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
3-Doc 00 01 01 Project Title Page.pdf PDF
38-Sec 01 40 00 Quality Control.pdf PDF
43-Sec 01 57 14 Erosion Control Blanket.pdf PDF
36-Sec 01 22 00 Measurement and Payment.pdf PDF
11-Doc 00 45 19 Non-Collusion Affidavit.pdf PDF
47-Sec 31 20 00 Earthwork.pdf PDF
30-Doc 00 73 00 03 Appendix C - Chapter 106 Permit.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF WORK

01 11 13-1

SECTION 01 11 13

PART 1 GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Description of Work.

2. Work by Owner.

3. Work by other parties.

4. Owner supplied Products.

5. Contractor use of site.

6. Future work.

7. Work sequence of construction.

8. Owner occupancy.

1.02 DESCRIPTION OF WORK

A. The project involves the demolition of the existing property 82 West Indian Lane in West Norriton Township, Montgomery County, PA. The building and associated impervious surfaces will be removed and replaced with grass. The Contractor is responsible for all erosion control, demolition, grading, soil compaction, trash/material removal, and local permitting. The Contractor shall provide all materials, equipment, tools, labor and work, unless otherwise provided and shall be responsible for the complete supervision, performance and completion of all work in accordance with the drawings, specifications, special provisions and contract.

1.03 WORK BY OWNER

A. No work by the Owner is anticipated in the immediate vicinity during construction of the Work under this contract.

1.04 WORK BY OTHER PARTIES

A. No work by the Other Parties is anticipated in the immediate vicinity during construction of the Work under this contract.

1.05 OWNER SUPPLIED PRODUCTS

A. No supplies will be provided by the Owner.

1.06 CONTRACTOR USE OF SITE AND PREMISES

A. Contractor shall confine his operations so that all work is performed within the limit of disturbance areas to the maximum extent possible, and must be within the limits as directed

01 11 13-2 by the Township Engineer, unless written permission is obtained to occupy additional ground.

Lori Lane and Surrey Lane shall remain open to the public during construction, and must not be impacted by the Contractor’s operations. Upon completion of the Work, the Contractor shall clean-up and restore the area of his operations to a condition at least equal to the original conditions. Damage to property outside of specified construction limits shall be the responsibility of the Contractor and restoration of same shall be made at the Contractor’s expense.

B. Contractor shall take all necessary precautions to protect all existing water, gas, electric, communications, sanitary sewer, storm sewer, or other facilities encountered during the course of his operations, to guard against disruption of service. Before beginning Work, Contractor shall determine the location of each facility which is questionable. The location of utilities shown on the Drawings represents the best information available; however, it is the responsibility of Contractor to establish the exact location in accordance with the requirements of Pennsylvania Act 287 (1974) as last amended by Act 121 (2008). A Utility User's List is noted on the Drawings.

C. Contractor will be responsible to notify all property owners and residents at least twenty-four

(24) hours prior to the start of construction on or near their properties.

D. Contractor shall conduct all Work in strict compliance with OSHA Construction Workplace

Safety Standards.

E. Contractor shall cooperate with Owner to minimize conflict, and to facilitate Owner’s operations.

1.07 FUTURE WORK

A. There is no future work associated with this contract.

1.08 WORK SEQUENCE OF CONSTRUCTION

A. The Contractor shall submit a complete construction schedule based on the construction sequence provided on the plans for review prior to the start of any construction.

1.09 OWNER OCCUPANCY

A. Owner intends to conduct normal operations on the fields, courts, and playground areas to the north of the project site during the entire period of construction.

B. Contractor shall cooperate with Owner to minimize conflict, and to facilitate Owner’s operations.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION