This is a Summary of Work document for a FEMA demolition project in West Norriton Township, Montgomery County, Pennsylvania. The project encompasses the complete demolition of the existing single-family home located at 82 West Indian Lane, including removal of all associated impervious surfaces, with the site to be restored to grass upon completion. The Contractor bears full responsibility for erosion control, demolition activities, grading, soil compaction, debris and material removal, and all local permitting requirements. The Contractor must provide all necessary materials, equipment, tools, and labor while maintaining complete supervision and ensuring performance completion in accordance with project drawings, specifications, special provisions, and contract requirements. The Contractor is required to submit a comprehensive construction schedule prior to commencing work and must maintain Lori Lane and Surrey Lane open to the public throughout construction operations without impact from the Contractor's activities. The Owner intends to conduct normal operations on adjacent fields, courts, and playground areas during the entire construction period.
The Contractor shall confine all operations within designated limits of disturbance as directed by the Township Engineer and must protect all existing water, gas, electric, communications, sanitary sewer, storm sewer, and other utilities in accordance with Pennsylvania Act 287. The Contractor is obligated to notify all affected property owners and residents at least twenty-four hours prior to commencing work and must comply strictly with OSHA Construction Workplace Safety Standards. All damage to property outside specified construction limits remains the Contractor's responsibility, with restoration required at the Contractor's expense. Upon project completion, the Contractor shall clean and restore the operational area to conditions at least equal to original conditions. No work by the Owner or other parties is anticipated in the immediate vicinity during construction, no Owner-supplied products will be provided, and no future work is associated with this contract.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF WORK
01 11 13-1
SECTION 01 11 13
PART 1 GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Description of Work.
2. Work by Owner.
3. Work by other parties.
4. Owner supplied Products.
5. Contractor use of site.
6. Future work.
7. Work sequence of construction.
8. Owner occupancy.
1.02 DESCRIPTION OF WORK
A. The project involves the demolition of the existing property 82 West Indian Lane in West Norriton Township, Montgomery County, PA. The building and associated impervious surfaces will be removed and replaced with grass. The Contractor is responsible for all erosion control, demolition, grading, soil compaction, trash/material removal, and local permitting. The Contractor shall provide all materials, equipment, tools, labor and work, unless otherwise provided and shall be responsible for the complete supervision, performance and completion of all work in accordance with the drawings, specifications, special provisions and contract.
1.03 WORK BY OWNER
A. No work by the Owner is anticipated in the immediate vicinity during construction of the Work under this contract.
1.04 WORK BY OTHER PARTIES
A. No work by the Other Parties is anticipated in the immediate vicinity during construction of the Work under this contract.
1.05 OWNER SUPPLIED PRODUCTS
A. No supplies will be provided by the Owner.
1.06 CONTRACTOR USE OF SITE AND PREMISES
A. Contractor shall confine his operations so that all work is performed within the limit of disturbance areas to the maximum extent possible, and must be within the limits as directed
01 11 13-2 by the Township Engineer, unless written permission is obtained to occupy additional ground.
Lori Lane and Surrey Lane shall remain open to the public during construction, and must not be impacted by the Contractor’s operations. Upon completion of the Work, the Contractor shall clean-up and restore the area of his operations to a condition at least equal to the original conditions. Damage to property outside of specified construction limits shall be the responsibility of the Contractor and restoration of same shall be made at the Contractor’s expense.
B. Contractor shall take all necessary precautions to protect all existing water, gas, electric, communications, sanitary sewer, storm sewer, or other facilities encountered during the course of his operations, to guard against disruption of service. Before beginning Work, Contractor shall determine the location of each facility which is questionable. The location of utilities shown on the Drawings represents the best information available; however, it is the responsibility of Contractor to establish the exact location in accordance with the requirements of Pennsylvania Act 287 (1974) as last amended by Act 121 (2008). A Utility User's List is noted on the Drawings.
C. Contractor will be responsible to notify all property owners and residents at least twenty-four
(24) hours prior to the start of construction on or near their properties.
D. Contractor shall conduct all Work in strict compliance with OSHA Construction Workplace
Safety Standards.
E. Contractor shall cooperate with Owner to minimize conflict, and to facilitate Owner’s operations.
1.07 FUTURE WORK
A. There is no future work associated with this contract.
1.08 WORK SEQUENCE OF CONSTRUCTION
A. The Contractor shall submit a complete construction schedule based on the construction sequence provided on the plans for review prior to the start of any construction.
1.09 OWNER OCCUPANCY
A. Owner intends to conduct normal operations on the fields, courts, and playground areas to the north of the project site during the entire period of construction.
B. Contractor shall cooperate with Owner to minimize conflict, and to facilitate Owner’s operations.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION