43-Sec 01 57 14 Erosion Control Blanket.pdf

PDF 135 KB Posted

Attached to
82 W. Indian Lane - FEMA Demolition
Solicitation number
US.230082
Issued by
Montgomery County, Pennsylvania

About this file

This is a technical specification document for erosion control blanket materials related to a FEMA-funded demolition project at 82 West Indian Lane in West Norriton Township, Montgomery County, Pennsylvania. The specification details the requirements for furnishing and placing a biodegradable erosion control blanket as temporary erosion control to establish seeded areas following site preparation. The erosion control blanket shall be a machine-produced mat composed of a 70% agricultural straw and 30% coconut fiber blend with approximately 18 months of functional longevity, covered on both top and bottom sides with 100% biodegradable woven natural organic fiber netting in a Leno weave pattern with approximately 0.50 x 1.00-inch mesh. The specified product is SC150 BN manufactured by North American Green or equivalent, with precise material content requirements including 0.35 lbs per square yard of straw fiber and 0.15 lbs per square yard of coconut fiber, topped and bottomed with jute fiber netting.

Installation procedures require site preparation through raking, seeding, and fertilizing, followed by placement beginning at the top of slopes with blanket anchoring in a 6-inch deep by 6-inch wide trench secured with staples spaced approximately 12 inches apart. Parallel blankets must be overlapped with 3-inch seams and stapled accordingly, while consecutive blankets spliced down the slope shall be placed in shingle-style fashion with similar overlap and stapling specifications. Storage requirements mandate that erosion control blanket rolls be wrapped for moisture protection, elevated if stored outdoors with waterproof covering, and protected from ultraviolet light exposure exceeding 14 days. The specification notes that staple lengths greater than 6 inches may be necessary in loose soil conditions to ensure proper blanket securitization.

View the file

Other files

File Type Posted
8-Doc 00 21 13 Instructions to Bidders.pdf PDF
14-Doc 00 61 13.16 Payment Bond.pdf PDF
1-00 82 W. Indian Lane FEMA Plans.pdf PDF
39-Sec 01 33 00 Submittals.pdf PDF
35-Sec 01 42 13 Organization and Reference Acronyms.pdf PDF
33-Sec 01 32 16 Construction Project Schedule.pdf PDF
42-Sec 01 70 00 Contract Closeout.pdf PDF
29-Doc 00 73 00 04 Appendix D - Hazard Mitigation Grant Conditions.pdf PDF
41-Sec 01 55 26 Traffic Regulation.pdf PDF
12-Doc 00 45 10 Bidders Acknowledgement Form.pdf PDF
9-Doc 00 45 13 Bidder Qualification Statement.pdf PDF
10-Doc 00 45 53 Agreement of Surety Company.pdf PDF
18-Doc 00 62 16 Certificate of Insurance.pdf PDF
27-Sec 01 11 13 Summary of Work.pdf PDF
7-Doc 00 21 13.1 Instructions for Electronic Bidding.pdf PDF
2-Doc 00 01 15 List of Drawing Sheets.pdf PDF
21-Doc 00 73 00 Supplementary Conditions.pdf PDF
28-Doc 00 73 00 01 Appendix A - Prevailing Wage Rates.pdf PDF
32-Sec 01 31 00 Coordination and Meetings.pdf PDF
31-Sec 01 29 00 Contract Considerations.pdf PDF
24-Doc 00 91 13 Addenda.pdf PDF
17-Doc 00 65 19.13 Contractors Affidavit.pdf PDF
15-Doc 00 61 19 Maintenance Bond.pdf PDF
49-Sec 32 92 00 Finish Grading, Seeding and Sodding.pdf PDF
26-Doc 00 73 00 - Supplementary Conditions.pdf PDF
50-Sec 31 23 33 Excavation, Backfill and Compaction.pdf PDF
4-Doc 00 01 10 Table of Contents.pdf PDF
13-Doc 00 52 00 Agreement.pdf PDF
16-Doc 00 61 13.13 Performance Bond.pdf PDF
45-Sec 02 41 16 Demolition.pdf PDF
40-Sec 01 56 39 Landscape Protection.pdf PDF
34-Sec 01 35 16 Alteration Project Procedures.pdf PDF
22-Doc 00 72 00 General Conditions.pdf PDF
19-Doc 00 65 19.19 Consent of Surety.pdf PDF
5-Doc 00 43 13 Bid Bond.pdf PDF
6-Doc 00 11 13 Advertisement for Bids.pdf PDF
25-Sec 01 00 00 Basic Requirements.pdf PDF
37-Sec 01 50 00 Construction Facilities and Temporary Controls.pdf PDF
23-Doc 00 73 00 02 Appendix B - Public Works Employment Verification Form.pdf PDF
46-Sec 31 11 00 Clearing and Grubbing.pdf PDF
48-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
44-Sec 01 60 00 Material and Equipment.pdf PDF
20-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
3-Doc 00 01 01 Project Title Page.pdf PDF
38-Sec 01 40 00 Quality Control.pdf PDF
36-Sec 01 22 00 Measurement and Payment.pdf PDF
11-Doc 00 45 19 Non-Collusion Affidavit.pdf PDF
47-Sec 31 20 00 Earthwork.pdf PDF
30-Doc 00 73 00 03 Appendix C - Chapter 106 Permit.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EROSION CONTROL BLANKET

01 57 14-1

SECTION 01 57 14

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. This Work shall consist of furnishing and placing a biodegradable erosion control blanket for use as a temporary control to establish seeded areas.

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 31 11 00: Clearing and Grubbing

2. Section 32 92 00: Finish Grading, Seeding and Sodding

PART 2 - PRODUCTS

2.01 MATERIALS

A. The erosion control blanket shall be a machine produced 100% biodegradable mat of 70% agricultural straw and 30% coconut fiber blend matrix with a functional longevity of approximately

18 months. The blanket shall be of consistent thickness with the straw and coconut fiber evenly distributed over the entire area of the mat. The blanket shall be covered on the top and bottom sides with 100% biodegradable woven natural organic fiber netting. The netting shall consist of machine directional strands formed from two intertwined yarns with cross directional strands interwoven through the twisted machine strands (commonly referred to as a Leno weave) to form an approximate 0.50 x 1.00-inch mesh. The blanket shall be sewn together on 1.50-inch centers (50 stitches per roll width) with biodegradable thread.

B. The straw / coconut fiber erosion control blanket shall be SC150 BN as manufactured by North

American Green, or equivalent. The straw / coconut erosion control fiber blanket shall have the following properties:

Material Content:

Matrix: 70% Straw Fiber (0.35 lbs / sq. yd.)

30% Coconut Fiber (0.15 lbs / sq. yd.)

Netting: Top – Leno woven 100% Biodegradable organic jute fiber (9.3 lbs / 1,000 sq. ft.

approximate weight)

Bottom - 100% Biodegradable organic jute fiber (7.7 lbs / 1,000 sq. ft. approximate weight)

Thread: Biodegradable

01 57 14-2

PART 3 - EXECUTION

3.01 SHIPPING & STORAGE

A. The erosion control blanket rolls shall be furnished with suitable wrapping for protection against moisture in a manner that protects them from the elements. If stored outdoors, they shall be elevated and protected with a waterproof cover. At no time shall the erosion control blanket be exposed to ultraviolet light for a period exceeding 14 days.

3.02 SITE PREPARATION

A. Prepare the seedbed by raking, seeding, and fertilizing

3.03 GEOTEXTILE PLACEMENT

A. Begin at the top of slope by anchoring the blanket in a 6” deep by 6” wide trench with approximately 12” of blanket extended beyond the up-slope portion of the trench. Anchor the blanket with a row of staples approximately 12” apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12” portion of the blanket back over seed and compacted soil. Secure blanket over compacted soil with a row of staples spaced approximately 12” apart across the width of the blanket.

B. Roll the blankets down the slope. Blankets will unfold with appropriate side against the soil surface. All blankets must be securely fastened to soil surface by placing staples in appropriate locations as specified by the manufacturer.

C. The edges of parallel blankets must be stapled with approximately 3” overlap. To ensure proper seam alignment, place the edge of the overlapping blanket even with the colored seam stitch on the previously installed blanket.

D. Consecutive blankets spliced down the slope must be placed end over end (shingle style) with an approximate 3” overlap. Staple through overlapped area, approximately 12” apart across the entire blanket width.

*NOTE: In loose soil conditions, the use of staple lengths greater than 6” may be necessary to properly secure the blankets.

END OF SECTION

File details come from the government source that posted it. Updated .