This is a Table of Contents document for West Norriton Township Contract No. 2025-01243, which outlines the procurement and contracting requirements for the FEMA Demolition project located at 82 West Indian Lane in West Norriton Township, Montgomery County, Pennsylvania. The project involves the complete demolition of an existing single-family home and associated impervious surfaces, with replacement grading and seeding. The contractor is responsible for all erosion control measures, demolition work, grading, soil compaction, material removal, and local permitting. The contract documents are organized into divisions covering procurement and contracting requirements, general requirements, and facility construction work, including demolition, earthwork, clearing and grubbing, excavation, backfill, compaction, and finish grading with seeding and sodding.

The contract structure includes standard bidding documents such as an Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Bond, Bidder's Acknowledgment Form, and Bidder Qualification Statement, along with required affidavits and bonds including Performance Bond, Payment Bond, and Maintenance Bond. The contract documents reference prevailing minimum wage determination requirements, Public Works Employment Verification, Chapter 106 Permit requirements, and Hazard Mitigation Grant Program Terms & Conditions as appendices. The contractor must provide all materials, equipment, tools, and labor necessary for complete supervision, performance, and completion of work in accordance with the project drawings, specifications, and special provisions. Certificate of Insurance and Contractor's Affidavit are required, along with a Release of Liens and Consent of Surety to Final Payment prior to project closeout.

View the file

Other files

File Type Posted
8-Doc 00 21 13 Instructions to Bidders.pdf PDF
14-Doc 00 61 13.16 Payment Bond.pdf PDF
1-00 82 W. Indian Lane FEMA Plans.pdf PDF
39-Sec 01 33 00 Submittals.pdf PDF
35-Sec 01 42 13 Organization and Reference Acronyms.pdf PDF
33-Sec 01 32 16 Construction Project Schedule.pdf PDF
42-Sec 01 70 00 Contract Closeout.pdf PDF
29-Doc 00 73 00 04 Appendix D - Hazard Mitigation Grant Conditions.pdf PDF
41-Sec 01 55 26 Traffic Regulation.pdf PDF
12-Doc 00 45 10 Bidders Acknowledgement Form.pdf PDF
9-Doc 00 45 13 Bidder Qualification Statement.pdf PDF
10-Doc 00 45 53 Agreement of Surety Company.pdf PDF
18-Doc 00 62 16 Certificate of Insurance.pdf PDF
27-Sec 01 11 13 Summary of Work.pdf PDF
7-Doc 00 21 13.1 Instructions for Electronic Bidding.pdf PDF
2-Doc 00 01 15 List of Drawing Sheets.pdf PDF
21-Doc 00 73 00 Supplementary Conditions.pdf PDF
28-Doc 00 73 00 01 Appendix A - Prevailing Wage Rates.pdf PDF
32-Sec 01 31 00 Coordination and Meetings.pdf PDF
31-Sec 01 29 00 Contract Considerations.pdf PDF
24-Doc 00 91 13 Addenda.pdf PDF
17-Doc 00 65 19.13 Contractors Affidavit.pdf PDF
15-Doc 00 61 19 Maintenance Bond.pdf PDF
49-Sec 32 92 00 Finish Grading, Seeding and Sodding.pdf PDF
26-Doc 00 73 00 - Supplementary Conditions.pdf PDF
50-Sec 31 23 33 Excavation, Backfill and Compaction.pdf PDF
13-Doc 00 52 00 Agreement.pdf PDF
16-Doc 00 61 13.13 Performance Bond.pdf PDF
45-Sec 02 41 16 Demolition.pdf PDF
40-Sec 01 56 39 Landscape Protection.pdf PDF
34-Sec 01 35 16 Alteration Project Procedures.pdf PDF
22-Doc 00 72 00 General Conditions.pdf PDF
19-Doc 00 65 19.19 Consent of Surety.pdf PDF
5-Doc 00 43 13 Bid Bond.pdf PDF
6-Doc 00 11 13 Advertisement for Bids.pdf PDF
25-Sec 01 00 00 Basic Requirements.pdf PDF
37-Sec 01 50 00 Construction Facilities and Temporary Controls.pdf PDF
23-Doc 00 73 00 02 Appendix B - Public Works Employment Verification Form.pdf PDF
46-Sec 31 11 00 Clearing and Grubbing.pdf PDF
48-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
44-Sec 01 60 00 Material and Equipment.pdf PDF
20-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
3-Doc 00 01 01 Project Title Page.pdf PDF
38-Sec 01 40 00 Quality Control.pdf PDF
43-Sec 01 57 14 Erosion Control Blanket.pdf PDF
36-Sec 01 22 00 Measurement and Payment.pdf PDF
11-Doc 00 45 19 Non-Collusion Affidavit.pdf PDF
47-Sec 31 20 00 Earthwork.pdf PDF
30-Doc 00 73 00 03 Appendix C - Chapter 106 Permit.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

00 01 10-1

WEST NORRITON TOWNSHIP

CONTRACT NO. 2025-01243

82 WEST INDIAN LANE FEMA DEMOLITION

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

Division 00 – Procurement and Contracting Requirements Introductory Information 00 01 01 Project Title Page 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets

Procurement Requirements 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 21 13.1 Supplemental Instructions for Submitting Electronic Bids 00 41 00 Bid Form 00 43 13 Bid Bond 00 45 10 Bidder’s Acknowledgment Form 00 45 13 Bidder Qualification Statement 00 45 19 Non-Collusion Affidavit 00 45 53 Agreement of Surety Company

Contracting Requirements 00 52 00 Agreement 00 61 13.13 Performance Bond 00 61 13.16 Payment Bond 00 61 19 Maintenance Bond 00 62 16 Certificate of Insurance 00 65 19.13 Contractor’s Affidavit 00 65 19.16 Contractor’s Release of Liens 00 65 19.19 Consent of Surety to Final Payment 00 72 00 General Conditions 00 73 00 Supplementary Conditions APPENDIX A Prevailing Minimum Wage Determination APPENDIX B Public Works Employment Verification Form APPENDIX C Chapter 106 Permit APPENDIX D Hazard Mitigation Grant Program – Terms & Conditions 00 91 13 Addenda

SPECIFICATIONS GROUP

GENERAL REQUIREMENTS SUBGROUP

Division 01 – General Requirements 01 00 00 Basic Requirements 01 11 13 Summary of Work 01 22 00 Measurement and Payment 01 29 00 Contract Considerations 01 31 00 Coordination and Meetings 01 32 16 Construction Project Schedule 01 33 00 Submittals 01 35 16 Alteration Project Procedures

00 01 10-2

01 40 00 Quality Control 01 42 13 Organization and Reference Acronyms 01 50 00 Construction Facilities and Temporary Controls 01 55 26 Traffic Regulation 01 56 39 Landscape Protection 01 57 13 Soil Erosion and Sediment Control 01 57 14 Erosion Control Blanket 01 60 00 Material and Equipment 01 70 00 Contract Closeout

FACILITY CONSTRUCTION SUBGROUP

Division 02 – Existing Conditions 02 41 16 Demolition

Division 31 - Earthwork 31 11 00 Clearing and Grubbing 31 20 00 Earthwork 31 23 33 Excavation, Backfill and Compaction

Division 32 – Exterior Improvements 32 92 00 Finish Grading, Seeding and Sodding

File details come from the government source that posted it. Updated .