Inspected By: Phillip O’Keefe Date: 03 / 24 / 2021
Repaired By: ……………………………………………………….. Date Repaired: ……………………………………….
Comments:……………………………………………………………………………………………………………………………………….
Thermograph Inspection At
Michael E. DeBakey Veterans Affairs Medical Center
Houston, Texas
Date:
March 24, 2021
Job No.
WO-08391082
Thermo Gram: 03 / 17 /21
Analysis & Recommended Actions:
Object Parameters: Values
Atmos Temperature: 23.0°C
Humidity %: 54%
Reflective Temperature: °C
Reference Temperature: 24.0°C
Emissivity: .95
Image Date: 03 / 17 / 2021
IR Photo No.: 0301
Page No.: 65
Location: VA’s Medical Center, Bldg. 109
Floor Level: 1st. Floor Level
Room No. 122
Type Equipment: Disconnect Switch
FLN: CWP-4
Voltage Rating: 480/277V
Current Rating: 100 Amp
Brk. / Cir. / Size: N/A
Phase(s): A Phase
Actual Cir. Load: A: 56.1A / B: 56.2A, / C; 54.6A
Disc. Type: Non Fused
Fuse Size: N/A
Fuse Type: N/A
Digital Photo No. 0302z
Severity: Minor
Possible Causes:
Possible Loose Connection
Recommended Actions:
Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.
Warrants Further investigations into current loads.
Spot No.
Spot No.
Tan Delta
Phase Loads
Spot 1 43.3°C Spot 1&2 7.7°C
AØ
56.1 Amps Spot 2 35.6°C
Spot 3 30.6°C Spot 1&3 12.7°C
BØ
56.2 Amps Spot 4 °C
Spot 5 °C °C
CØ
54.6 Amps Spot 6 °C
Michael E. DeBakey Veterans Affairs Medical Center
Houston, Texas
Date:
March 24, 2021
Job No.
Thermo Gram: 03 / 18 /21
Humidity %: 54%
Reflective Temperature: °C
Reference Temperature: 23.0°C
Image Date: 03 / 18 / 2021
IR Photo No.: 0311
Page No.: 66
Location: VA’s Medical Center, Bldg. 109
Floor Level: 2nd. Floor Level
Room No. NW Electrical Closet
Type Equipment: Panel
FLN: EL2B
Voltage Rating: 208/120V
Current Rating: 50 Amp Max
Brk. / Cir. / Size: Cir. 17 / 20A / 2 - #12 AWG
Phase(s): C Phase
Actual Cir. Load: Unable to measure current
Disc. Type: N/A
Digital Photo No. 0312
Possible Causes:
Possible Loose Connection
Recommended Actions:
Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.
Warrants Further investigations into current loads.
Spot No.
Spot No.
Tan Delta
Phase Loads
Spot 1 26.1°C Spot 1&2 0.1°C
AØ
Unknown Spot 2 26.2°C
Spot 3 25.2°C Spot 1&3 .09°C
BØ
Unknown Spot 4 °C
Spot 5 °C °C
Unknown Spot 6 °C
Michael E. DeBakey Veterans Affairs Medical Center
Houston, Texas
Date:
March 24, 2021
Job No.
Thermo Gram: 03 / 18 /21
Humidity %: 54%
Reflective Temperature: °C
Image Date: 03 / 18 / 2021
IR Photo No.: 0313
Page No.: 67
Location: VA’s Medical Center, Bldg. 109
Floor Level: 2nd. Floor Level
Room No. NW Electrical Closet
Type Equipment: Panel
FLN: EL2B
Voltage Rating: 208/120V
Current Rating: 50 Amps Max
Brk. / Cir. / Size: Cir. 20 / 20A / #12 AWG
Phase(s): A Phase
Actual Cir. Load: 11.1 Amps
Disc. Type: N/A
Digital Photo No. 0314
Possible Causes:
Possible Loose Connection
Recommended Actions:
Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.
100A Main Breaker for a 50 Amp Max PNL Warrants Further investigations into current loads.
Spot No.
Spot No.
Tan Delta
Phase Loads
Spot 1 34.4°C Spot 1&2 3.8°C
AØ
11.1 Amps Spot 2 30.7°C
Spot 3 °C °C
BØ
Spot 4 °C
Spot 5 °C °C
Spot 6 °C
Michael E. DeBakey Veterans Affairs Medical Center
Houston, Texas
Date:
March 24, 2021
Job No.
Thermo Gram: 03 / 22 / 2021
Humidity %: 54%
Reflective Temperature: °C
Image Date: 03 / 22 / 2021
IR Photo No.: 0317
Page No.: 68
Location: VA’s Medical Center, Bldg. 109
Floor Level: Penthouse Level
Room No. Penthouse
Type Equipment: Panel
FLN: DPA
Voltage Rating: 208/120V
Current Rating: 400 Amp Max
Brk. / Cir. / Size: Main Lugs
Phase(s): A Phase
Actual Cir. Load: Unable to measure current
Disc. Type: N/A
Digital Photo No. 0318
Possible Causes:
Possible Loose Connection Possible Load Imbalance
Recommended Actions:
Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.
Warrants Further investigations into current loads.
Spot No.
Spot No.
Tan Delta
Phase Loads
Spot 1 49.1°C Spot 1&2 15.1°C
AØ
Unknown Spot 2 34.0°C
Spot 3 31.3°C Spot 1&3 17.8°C
BØ
Unknown Spot 4 °C
Spot 5 °C °C
Michael E. DeBakey Veterans Affairs Medical Center
Houston, Texas
Date:
March 24, 2021
Job No.
Thermo Gram: 03 / 22 / 21
Humidity %: 54%
Reflective Temperature: °C
IR Photo No.: 0319
Page No.: 69
Location: VA’s Medical Center, Bldg. 109
Floor Level: 1st. Floor Level
Room No. NE Electrical Closet
Type Equipment: Panel
FLN: L1A
Voltage Rating: 208/120V
Current Rating: 50 Amp Max
Brk. / Cir. / Size: Cir. 7 / 20A / #10 AWG
Phase(s): A Phase
Actual Cir. Load: 13.6 Amps
Disc. Type: N/A
Digital Photo No. 0320
Possible Causes:
Possible Loose Connection
Recommended Actions:
Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.
Warrants Further investigations into current loads.
Spot No.
Spot No.
Tan Delta
Phase Loads
Spot 1 31.7°C Spot 1&2 2.8°C
AØ
13.6 Spot 2 28.9°C
Spot 3 °C °C
BØ
Spot 4 °C
Spot 5 °C °C
Spot 6 °C
Michael E. DeBakey Veterans Affairs Medical Center
Houston, Texas
Date:
March 24, 2021
Job No.
Thermo Gram: 03 / 22 / 21
Humidity %: 54%
Reflective Temperature: °C
IR Photo No.: 0327
Page No.: 70
Location: VA’s Medical Center, Bldg. 109
Floor Level: 1st. Floor Level
Room No. SE Corner Electrical Closet
Type Equipment: Disconnect Switch
FLN: No FLN #
Voltage Rating: 480/277V
Current Rating: 100 Amp Max
Brk. / Cir. / Size: N/A
Phase(s): A Phase (Bottom) Load Side
Actual Cir. Load: Unable to take measurements
Disc. Type: Fused
Fuse Size: FRS-R-100
Fuse Type: Timdelay
Digital Photo No. 0328
Possible Causes:
Possible loose Connection
Recommended Actions:
Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.
Warrants Further investigations into current loads.
Spot No.
Spot No.
Tan Delta
Phase Loads
Spot 1 30.9°C Spot 1&2 3.8°C
AØ
Unknown Spot 2 26.5°C
Spot 3 25.8°C Spot 1&3 4.1°C
BØ
Unknown Spot 4 °C
Spot 5 °C °C
Michael E. DeBakey Veterans Affairs Medical Center
Houston, Texas
Date:
March 24, 2021
Job No.
Thermo Gram: 03 / 23 / 21
Humidity %: 54%
Reflective Temperature: °C
Image Date: 03 / 23 / 2021
IR Photo No.: 0331
Page No.: 71
Location: VA’s Medical Center, Bldg. 109
Floor Level: Basement Level
Room No. NW Electrical Closet
Type Equipment: Disconnect Cir Brk Switch
FLN: No FLN #
Voltage Rating: 208/120V
Current Rating: 90 Amp Max
Brk. / Cir. / Size: 90 Amp
Phase(s): C Phase
Actual Cir. Load: A: 51.1A / B: 46.1A / 47.9A
Disc. Type: Non-Fused
Digital Photo No. 0332
Possible Causes:
Possible Loose Connection
Recommended Actions:
Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.
Warrants Further investigations into current loads.
Spot No.
Spot No.
Tan Delta
Phase Loads
Spot 1 47.3°C Spot 1&2 1.7°C
AØ
51.1 Amps Spot 2 45.7°C
Spot 3 42.7°C Spot 1&3 4.6°C
BØ
46.1 Amps Spot 4 °C
Spot 5 °C °C
47.9 Amps Spot 6 °C
Michael E. DeBakey Veterans Affairs Medical Center
Houston, Texas
Date:
March 24, 2021
Job No.