View the file

Other files

File Type Posted
Exhibit N - PT-12 BLDG 29 Test Report.pdf PDF
Exhibit G - Chiller Water XFMR Test Report.pdf PDF
Exhibit AF - USS-L Test Report.pdf PDF
Exhibit P - SESG Test Report.pdf PDF
Exhibit AA - USS-10 Test Report.pdf PDF
Exhibit V - USS-5 Test Report.pdf PDF
Exhibit D - Building 108 Visor Clininc IR Sheet.pdf PDF
Exhibit C - Bldg. 122, IR Sheets.pdf PDF
Exhibit K - MSG Circuit B1 XFMR and Breakers Test Reports.pdf PDF
Exhibit W - USS-6 Test Report.pdf PDF
Exhibit H - CHP Bldg. Test Report.pdf PDF
Exhibit AC - USS-12 Test Report.pdf PDF
Exhibit AE - USS-14 Test Report.pdf PDF
Exhibit T - USS-3 Test Report.pdf PDF
Exhibit M - PT-1 and PT-14 Oil report.pdf PDF
36C25623Q0012 0001.docx DOCX document
Exhibit R - USS-1 Test Report.pdf PDF
Exhibit X - USS-7 Test Report.pdf PDF
Exhibit AD - USS-13 Test Report.pdf PDF
Exhibit L - MSG Test Report.pdf PDF
Exhibit Y - USS-8 Test report.pdf PDF
Exhibit AB - USS-11 Test Report.pdf PDF
Exhibit U - USS-4 Test Report.pdf PDF
Exhibit Z - USS-9 Test Report.pdf PDF
Exhibit Q - USS L Laundry Report.pdf PDF
Exhibit A - Bldg. 104A Test Report.pdf PDF
Exhibit J - MBSG Test Report.pdf PDF
Exhibit F - Building 110 IR Sheets.pdf PDF
Exhibit S - USS-2 Test Report.pdf PDF
Exhibit B - Bldg. 105 IR Sheet (1).pdf PDF
36C25623Q0012.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inspected By: Phillip O’Keefe Date: 03 / 24 / 2021

Repaired By: ……………………………………………………….. Date Repaired: ……………………………………….

Comments:……………………………………………………………………………………………………………………………………….

Thermograph Inspection At

Michael E. DeBakey Veterans Affairs Medical Center

Houston, Texas

Date:

March 24, 2021

Job No.

WO-08391082

Thermo Gram: 03 / 17 /21

Analysis & Recommended Actions:

Object Parameters: Values

Atmos Temperature: 23.0°C

Humidity %: 54%

Reflective Temperature: °C

Reference Temperature: 24.0°C

Emissivity: .95

Image Date: 03 / 17 / 2021

IR Photo No.: 0301

Page No.: 65

Location: VA’s Medical Center, Bldg. 109

Floor Level: 1st. Floor Level

Room No. 122

Type Equipment: Disconnect Switch

FLN: CWP-4

Voltage Rating: 480/277V

Current Rating: 100 Amp

Brk. / Cir. / Size: N/A

Phase(s): A Phase

Actual Cir. Load: A: 56.1A / B: 56.2A, / C; 54.6A

Disc. Type: Non Fused

Fuse Size: N/A

Fuse Type: N/A

Digital Photo No. 0302z

Severity: Minor

Possible Causes:

Possible Loose Connection

Recommended Actions:

Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.

Warrants Further investigations into current loads.

Spot No.

Spot No.

Tan Delta

Phase Loads

Spot 1 43.3°C Spot 1&2 7.7°C

AØ

56.1 Amps Spot 2 35.6°C

Spot 3 30.6°C Spot 1&3 12.7°C

BØ

56.2 Amps Spot 4 °C

Spot 5 °C °C

CØ

54.6 Amps Spot 6 °C

Michael E. DeBakey Veterans Affairs Medical Center

Houston, Texas

Date:

March 24, 2021

Job No.

Thermo Gram: 03 / 18 /21

Humidity %: 54%

Reflective Temperature: °C

Reference Temperature: 23.0°C

Image Date: 03 / 18 / 2021

IR Photo No.: 0311

Page No.: 66

Location: VA’s Medical Center, Bldg. 109

Floor Level: 2nd. Floor Level

Room No. NW Electrical Closet

Type Equipment: Panel

FLN: EL2B

Voltage Rating: 208/120V

Current Rating: 50 Amp Max

Brk. / Cir. / Size: Cir. 17 / 20A / 2 - #12 AWG

Phase(s): C Phase

Actual Cir. Load: Unable to measure current

Disc. Type: N/A

Digital Photo No. 0312

Possible Causes:

Possible Loose Connection

Recommended Actions:

Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.

Warrants Further investigations into current loads.

Spot No.

Spot No.

Tan Delta

Phase Loads

Spot 1 26.1°C Spot 1&2 0.1°C

AØ

Unknown Spot 2 26.2°C

Spot 3 25.2°C Spot 1&3 .09°C

BØ

Unknown Spot 4 °C

Spot 5 °C °C

Unknown Spot 6 °C

Michael E. DeBakey Veterans Affairs Medical Center

Houston, Texas

Date:

March 24, 2021

Job No.

Thermo Gram: 03 / 18 /21

Humidity %: 54%

Reflective Temperature: °C

Image Date: 03 / 18 / 2021

IR Photo No.: 0313

Page No.: 67

Location: VA’s Medical Center, Bldg. 109

Floor Level: 2nd. Floor Level

Room No. NW Electrical Closet

Type Equipment: Panel

FLN: EL2B

Voltage Rating: 208/120V

Current Rating: 50 Amps Max

Brk. / Cir. / Size: Cir. 20 / 20A / #12 AWG

Phase(s): A Phase

Actual Cir. Load: 11.1 Amps

Disc. Type: N/A

Digital Photo No. 0314

Possible Causes:

Possible Loose Connection

Recommended Actions:

Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.

100A Main Breaker for a 50 Amp Max PNL Warrants Further investigations into current loads.

Spot No.

Spot No.

Tan Delta

Phase Loads

Spot 1 34.4°C Spot 1&2 3.8°C

AØ

11.1 Amps Spot 2 30.7°C

Spot 3 °C °C

BØ

Spot 4 °C

Spot 5 °C °C

Spot 6 °C

Michael E. DeBakey Veterans Affairs Medical Center

Houston, Texas

Date:

March 24, 2021

Job No.

Thermo Gram: 03 / 22 / 2021

Humidity %: 54%

Reflective Temperature: °C

Image Date: 03 / 22 / 2021

IR Photo No.: 0317

Page No.: 68

Location: VA’s Medical Center, Bldg. 109

Floor Level: Penthouse Level

Room No. Penthouse

Type Equipment: Panel

FLN: DPA

Voltage Rating: 208/120V

Current Rating: 400 Amp Max

Brk. / Cir. / Size: Main Lugs

Phase(s): A Phase

Actual Cir. Load: Unable to measure current

Disc. Type: N/A

Digital Photo No. 0318

Possible Causes:

Possible Loose Connection Possible Load Imbalance

Recommended Actions:

Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.

Warrants Further investigations into current loads.

Spot No.

Spot No.

Tan Delta

Phase Loads

Spot 1 49.1°C Spot 1&2 15.1°C

AØ

Unknown Spot 2 34.0°C

Spot 3 31.3°C Spot 1&3 17.8°C

BØ

Unknown Spot 4 °C

Spot 5 °C °C

Michael E. DeBakey Veterans Affairs Medical Center

Houston, Texas

Date:

March 24, 2021

Job No.

Thermo Gram: 03 / 22 / 21

Humidity %: 54%

Reflective Temperature: °C

IR Photo No.: 0319

Page No.: 69

Location: VA’s Medical Center, Bldg. 109

Floor Level: 1st. Floor Level

Room No. NE Electrical Closet

Type Equipment: Panel

FLN: L1A

Voltage Rating: 208/120V

Current Rating: 50 Amp Max

Brk. / Cir. / Size: Cir. 7 / 20A / #10 AWG

Phase(s): A Phase

Actual Cir. Load: 13.6 Amps

Disc. Type: N/A

Digital Photo No. 0320

Possible Causes:

Possible Loose Connection

Recommended Actions:

Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.

Warrants Further investigations into current loads.

Spot No.

Spot No.

Tan Delta

Phase Loads

Spot 1 31.7°C Spot 1&2 2.8°C

AØ

13.6 Spot 2 28.9°C

Spot 3 °C °C

BØ

Spot 4 °C

Spot 5 °C °C

Spot 6 °C

Michael E. DeBakey Veterans Affairs Medical Center

Houston, Texas

Date:

March 24, 2021

Job No.

Thermo Gram: 03 / 22 / 21

Humidity %: 54%

Reflective Temperature: °C

IR Photo No.: 0327

Page No.: 70

Location: VA’s Medical Center, Bldg. 109

Floor Level: 1st. Floor Level

Room No. SE Corner Electrical Closet

Type Equipment: Disconnect Switch

FLN: No FLN #

Voltage Rating: 480/277V

Current Rating: 100 Amp Max

Brk. / Cir. / Size: N/A

Phase(s): A Phase (Bottom) Load Side

Actual Cir. Load: Unable to take measurements

Disc. Type: Fused

Fuse Size: FRS-R-100

Fuse Type: Timdelay

Digital Photo No. 0328

Possible Causes:

Possible loose Connection

Recommended Actions:

Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.

Warrants Further investigations into current loads.

Spot No.

Spot No.

Tan Delta

Phase Loads

Spot 1 30.9°C Spot 1&2 3.8°C

AØ

Unknown Spot 2 26.5°C

Spot 3 25.8°C Spot 1&3 4.1°C

BØ

Unknown Spot 4 °C

Spot 5 °C °C

Michael E. DeBakey Veterans Affairs Medical Center

Houston, Texas

Date:

March 24, 2021

Job No.

Thermo Gram: 03 / 23 / 21

Humidity %: 54%

Reflective Temperature: °C

Image Date: 03 / 23 / 2021

IR Photo No.: 0331

Page No.: 71

Location: VA’s Medical Center, Bldg. 109

Floor Level: Basement Level

Room No. NW Electrical Closet

Type Equipment: Disconnect Cir Brk Switch

FLN: No FLN #

Voltage Rating: 208/120V

Current Rating: 90 Amp Max

Brk. / Cir. / Size: 90 Amp

Phase(s): C Phase

Actual Cir. Load: A: 51.1A / B: 46.1A / 47.9A

Disc. Type: Non-Fused

Digital Photo No. 0332

Possible Causes:

Possible Loose Connection

Recommended Actions:

Remove conductor(s). Clean conductor(s) & termination point(s). Re-install conductor(s) to termination point(s) and tighten to proper torque settings.

Warrants Further investigations into current loads.

Spot No.

Spot No.

Tan Delta

Phase Loads

Spot 1 47.3°C Spot 1&2 1.7°C

AØ

51.1 Amps Spot 2 45.7°C

Spot 3 42.7°C Spot 1&3 4.6°C

BØ

46.1 Amps Spot 4 °C

Spot 5 °C °C

47.9 Amps Spot 6 °C

Michael E. DeBakey Veterans Affairs Medical Center

Houston, Texas

Date:

March 24, 2021

Job No.