View the file

Other files

File Type Posted
Exhibit N - PT-12 BLDG 29 Test Report.pdf PDF
Exhibit G - Chiller Water XFMR Test Report.pdf PDF
Exhibit AF - USS-L Test Report.pdf PDF
Exhibit P - SESG Test Report.pdf PDF
Exhibit AA - USS-10 Test Report.pdf PDF
Exhibit V - USS-5 Test Report.pdf PDF
Exhibit D - Building 108 Visor Clininc IR Sheet.pdf PDF
Exhibit C - Bldg. 122, IR Sheets.pdf PDF
Exhibit K - MSG Circuit B1 XFMR and Breakers Test Reports.pdf PDF
Exhibit W - USS-6 Test Report.pdf PDF
Exhibit H - CHP Bldg. Test Report.pdf PDF
Exhibit AC - USS-12 Test Report.pdf PDF
Exhibit AE - USS-14 Test Report.pdf PDF
Exhibit T - USS-3 Test Report.pdf PDF
Exhibit M - PT-1 and PT-14 Oil report.pdf PDF
Exhibit R - USS-1 Test Report.pdf PDF
Exhibit X - USS-7 Test Report.pdf PDF
Exhibit AD - USS-13 Test Report.pdf PDF
Exhibit E - Building 109 Lab IR Sheets.pdf PDF
Exhibit L - MSG Test Report.pdf PDF
Exhibit Y - USS-8 Test report.pdf PDF
Exhibit AB - USS-11 Test Report.pdf PDF
Exhibit U - USS-4 Test Report.pdf PDF
Exhibit Z - USS-9 Test Report.pdf PDF
Exhibit Q - USS L Laundry Report.pdf PDF
Exhibit A - Bldg. 104A Test Report.pdf PDF
Exhibit J - MBSG Test Report.pdf PDF
Exhibit F - Building 110 IR Sheets.pdf PDF
Exhibit S - USS-2 Test Report.pdf PDF
Exhibit B - Bldg. 105 IR Sheet (1).pdf PDF
36C25623Q0012.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

580-23-1-5161-0001

36C256 Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 N. Keystone Crossing Fayetteville AR 72703

36C256

SAME AS BLOCK 6

To all Offerors/Bidders

36C25623Q0012 10-26-2022

X

THE SOLICITATION IDENTIFIED IN BLOCK 9A ABOVE IS HEREBY AMENDED TO ANWER QUESTIONS AND PROVIDE ADDITIONAL INFORMATION

IN THE FORM OF EXHIBITS. BY:

a. Providing a list of questions submitted, with answers, as indicated on pages 2-4 of this amendment. And,

b. Providing exhibits A-AF (a total of 30) as have been posted with this amendment. These exhibits will NOT become part of any resultant contract.

c. Correcting the “OFFER DUE DATE/LOCAL TIME” in block 8 of the Standard Form (SF) 1449 to read “2:00PM CT”. This is to clarify the time is local time of the office identified in block 9 of the SF 1449.

James Hunt Contracting Officer

No.
Question
Answer
1
If available, please provide a copy of the most recent arc flash study will have a one-line diagram, incident energy values and circuit breaker settings.

All available files/reports have been posted

2
If available, please provide a copy of the settings for the emergency power transfer scheme/equipment settings (drop out values, pick up values, transfer timer, retransfer timers, etc.)

All available files/reports have been posted

3
If available, copies of the most recent electrical inspections and testing service reports for the equipment that is in this scope of work.

All available files/reports have been posted

4
Ref. VAAR 852.215-70 and Sol. Sect. C.7 & E.6:

Question: Please clarify the interrelationship between these references. Specifically, how will a small business who intends to 100% self-perform this work be evaluated?

If two or more quotes are received with all other evaluation factors considered equal, preference will be given to a Service-Disabled, Veteran-Owned Small Business (SDVOSB) first, a Veteran-Owned Small Business (VOSB) second, and a small business last. If two quotes from small businesses are evaluated as equal, then SDVOSB/VOSB subcontracting will be evaluated per paragraph (c) of VAAR 852.215-70.

5
Ref. various inc. Sol. Sect. B.1, C.1, C.2, C.3 & E.3 - ID/IQ, Type of Contract & Pricing:

Question: The Section B pricing does not appear to be conducive to placing task orders. Considering this, how/on what basis will task orders be placed, e.g., per monthly amount in Section B?

This is a solicitation for a service contract. Task orders will be issued for a specific number of months (normally 12 but that is at the Government’s discretion) at the monthly rate identified in the contract.

6
Ref. Sol. Sect. E.6, Past Performance:

Question: please clarify whether Past Performance is required w/offeror’s quotes?

No past performance information is required to be submitted with quotes. The Government may utilize any and all information available to assist in making a responsibility determination.

7
Ref. SF 1449, block 17a. EFT:

Question – what goes in this block?

Block 17 is not required to be completed with a quote. However, it may be used to provide any of the information required from the cover page (Special Instructions) paragraph 4.a-f.

8
Section 5, para. 5.4. Most of the parts listed in Appendix B are obsolete and are no longer available for purchase. Several are proprietary to GE-Zenith and suitable replacements are not commercially available. Would the government consider modifying the affected equipment with new commercially available materials and components, maintaining the identical salient performance characteristics as those they are replacing?

There is still a need for these parts on the list as half of the ATSs are existing GE-Zenith which need to be maintained and repaired as needed and the remining are the new ATSs from Mustang CAT. Not being able to support both types of ATS and existing and remaining Paralleling Switch Gear is not acceptable.

9
Section 9. Are the hours stated in 9.1, 9.2, and 9.3 manhours as in 10 students in a class for 8 hours equals 80 hours of training or just hours as in 8 hours equals one day?

The 120 hours is user and onsite training. 240 hours is based on 6 Techs x 40 hours=240 hours each per year OEM factory or equivalent training.

10
Section 9. GE-Zenith was purchased by ABB back in 2020. ABB has elected to discontinue the Zenith product line and therefore factory training is no longer provided on the “Zenith” line of ATSs. Would the government consider on/off site training classes by a Zenith technician with a pre-approved course outline documentation? Likewise, CAT-ISO switchgear does not offer factory training classes, however we can provide a senior Switchgear engineer to cover the requirement of this specification with regards to operation and maintenance to VA personnel. All course material will be presented to the Government for approval prior to the start of the first class.

The new training shall cover and be compatible with all the existing Zenith and Mustang CAT ATS and Switch Gear. The training should cover troubleshooting and repair of all gear.

36C25623Q0012 0001

SOLICITATION AMENDMENT 0001

Solicitation 36C25623Q0012 for automatic transfer switches and paralleling switchgear preventive maintenance, testing, and inspection services at the Michael E. DeBakey VA Medical Center located in Houston, TX is amended to to answer questions submitted in response to the solicitation and provide additional information requested.

This amendment includes a list of questions submitted, with answers, and additional exhibits to assist in answering those questions submitted. These exhibits will NOT become part of the resultant contract award.

The closing date and time, as indicated in block 8 of the Standard Form 1449 will NOT be extended as a result of this amendment.

See attached document: Exhibit A - Bldg. 104A Test Report.

See attached document: Exhibit B - Bldg. 105 IR Sheet (1).

See attached document: Exhibit C - Bldg. 122, IR Sheets.

See attached document: Exhibit D - Building 108 Visor Clininc IR Sheet.

See attached document: Exhibit E - Building 109, Lab IR Sheets.

See attached document: Exhibit F - Building 110 IR Sheets.

See attached document: Exhibit G - Chiller Water XFMR Test Report.

See attached document: Exhibit H - CHP Bldg. Test Report.

See attached document: Exhibit J - MBSG Test Report.

See attached document: Exhibit K - MSG Circuit B1 XFMR _ Breakers Test Reports.

See attached document: Exhibit L - MSG Test Report.

See attached document: Exhibit M - PT-1 and PT-14 Oil report.

See attached document: Exhibit N - PT-12 BLDG 29 Test Report.

See attached document: Exhibit P - SESG Test Report.

See attached document: Exhibit Q - USS L Laundry Report.

See attached document: Exhibit R - USS-1 Test Report.

See attached document: Exhibit S - USS-2 Test Report.

See attached document: Exhibit T - USS-3 Test Report.

See attached document: Exhibit U - USS-4 Test Report.

See attached document: Exhibit V - USS-5 Test Report.

See attached document: Exhibit W - USS-6 Test Report.

See attached document: Exhibit X - USS-7 Test Report.

See attached document: Exhibit Y - USS-8 Test report.

See attached document: Exhibit Z - USS-9 Test Report.

See attached document: Exhibit AA - USS-10 Test Report.

See attached document: Exhibit AB - USS-11 Test Report.

See attached document: Exhibit AC - USS-12 Test Report.

See attached document: Exhibit AD - USS-13 Test Report.

See attached document: Exhibit AE - USS-14 Test Report.

See attached document: Exhibit AF - USS-L Test Report.

File details come from the government source that posted it. Updated .