3-Offeror's Experience in Similar Projects_OSS.pdf

PDF 337 KB Posted

Attached to
Mechanical Street Sweeping Services - Phoenix Metropolitan Area
Solicitation number
BPM006937
Issued by
Maricopa County, Phoenix City, Arizona

About this file

This is an offeror's experience document submitted by Offsite Sweeping LLC in response to the Arizona Department of Transportation's (ADOT) mechanical broom sweeping services solicitation (BPM006937) for the Phoenix Metropolitan Area. The document demonstrates Offsite Sweeping LLC's qualifications through documentation of current and past project experience. The offeror is the incumbent contractor, having provided sweeping services to ADOT in the Metro Phoenix area for the past 10 years. Additional relevant experience includes ongoing mechanical sweeping services since October 2024 for the Sundt/CS Construction Joint Venture on the Loop 202 Santan Freeway project (9 miles in Chandler and Gilbert), current services for FNF Construction on the Loop 101 project (6.5 miles in Scottsdale), and completed work for the Pulice-FNF-Flatiron Joint Venture on the Interstate 10 Broadway Curve project from May 2022 through December 2022.

Offsite Sweeping LLC's project portfolio additionally includes completed large debris collection and highway sweeping for the Ames/Coffman Specialties Joint Venture on the Loop 101 Design Build project from I-17 to Pima Road (2019-2022), and services provided on the Connect 202 project involving Interstate-10 and Loop 202 South Mountain construction zones between 2017 and 2021. The offeror provided multiple project contacts representing various general contractors and joint ventures, establishing a track record of consistent service delivery across multiple high-profile Arizona Department of Transportation and construction projects. The document demonstrates continuous operational capability, including sustained service delivery during the COVID-19 pandemic period.

View the file

Other files

File Type Posted
3-Equipment Maintenance.pdf PDF
Capacity Planning.pdf PDF
Pricing - Negotiation Meeting.xlsx XLSX spreadsheet
Equipmnet list.pdf PDF
3-ADOT Price Increase.pdf PDF
3-ADOT Attach 3.pdf PDF
BAFO Response.pdf PDF
3-2-Boycott_of_Israel_Disclosure_OSS.pdf PDF
3-Schedule and Staffing.pdf PDF
3-5-Confidentiality_and_Trade_Secrets_OSS.pdf PDF
3-6-Price_Increase_Percentages_OSS.pdf PDF
3-4-Equipment List_OSS.pdf PDF
3-3-SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban_OSS.pdf PDF
3-Sweepers offer and acceptance.pdf PDF
3-Forced Labor Sweepers.pdf PDF
3-Capcity sweepers.pdf PDF
BPM006937_Award_Documents.pdf PDF
BPM006937_Evaluation_Documents.pdf PDF
3-Capacity Planning.pdf PDF
3-Attachment 4 - Equipment List.pdf PDF
Sample Work Schedule.pdf PDF
3-ADOT Attach 2.pdf PDF
3-ADOT Sample Work Schedule.pdf PDF
3-scheduling sweeping.pdf PDF
BPM006937_Solicitation_Instructions.pdf PDF
BPM006937_Solicitation_Amendment_Summary_One__1_.pdf PDF
Exhibit_12_Urban_Curb_Sweeping.pdf PDF
Pricing - BAFO.xlsx XLSX spreadsheet
3-Attachment 3 - Forced Labor of Ethnic Uyghurs Ban.pdf PDF
3-Attachment 2 - Boycott of Israel Disclosure.pdf PDF
3-Attachment 6 - Price Increase Percentages.pdf PDF
3-Attachment 5 - ADOT Confidentiality and Trade Secrets.pdf PDF
Scheduling and Staffing.pdf PDF
3-Financial Envelope-Proposal # 1-prop_answer.xls XLS spreadsheet
3-ADOT Offer & Acceptance.pdf PDF
3-ADOT Equipment Maintenance.docx DOCX document
3-ADOT Equipment List and Shortages.docx DOCX document
3-ADOT Experience in Similar Projects.docx DOCX document
3-ADOT Scheduling and Staffing.pdf PDF
Offsite Negotiation Response 7.21.2025.pdf PDF
3-Confidentiality and trade secrest sweepers.pdf PDF
3-Equipment list sweepers.pdf PDF
3-Method of Approach work schedule.docx DOCX document
3-Experience sweeper contract.pdf PDF
3-Boycott of Israel disclosure sweepers.pdf PDF
BPM006937_Pre-Solicitation_Documents.pdf PDF
BPM006937_Solicitation_Requirements_per_Amendment_One__1_.pdf PDF
3-Attachment 1 - Offer and Acceptance.pdf PDF
3-Sample Work Schedule.pdf PDF
3-Scheduling and Staffing.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADOT | BPM006937 | MECHANICAL BROOM SWEEPING SERVICES

OFFSITE SWEEPING LLC

EXPERIENCE WITH SIMILAR PROJECTS

Offsite Sweeping LLC currently provides the services within this contract to ADOT in the

Metro Phoenix area, as we are an incumbent contractor and have been accomplishing these tasks as contracted by the state for the past 10 years.

Sundt/CS Construction Joint Venture – Loop 202 Santan Freeway from Loop 101 to Val-

Vista Drive.

o Offsite Sweeping currently provides the exact same service as required in this contract to the Sundt/CS Construction Joint Venture throughout the 9-mile-long construction zone of this project located in Chandler and Gilbert within the

Phoenix Metro freeway system. This service has been ongoing since October of

2024. Contacts listed below.

Abigal Sandoval | Project Engineer | 480.435.5235 asandoval@sundt.com

Camden Radu | Field Engineer | 480.973.2241 | czradu@sundt.com

FNF Construction – Loop 101 from Shea Blvd to Scottsdale Rd.

o Like our work for ADOT and Sundt/CS Construction Joint Venture, Offsite

Sweeping currently provides the exact same service as required in this contract along the 6.5 miles of construction taking place in Scottdale within the Phoenix

Metro freeway system. Contacts listed below.

James Dygert | Project Engineer | 602.561.8170 | jdygert@fnfinc.com

Diego Romero | Project Engineer | 520.223.7574 | dromero@fnfinc.com

Pulice-FNF-Flatiron Joint Venture – Interstate 10 Broadway Curve.

o When this project initially started, Offsite Sweeping LLC was contracted to provide the same services as this ADOT RFP. We accomplished that task between

ADOT | BPM006937 | MECHANICAL BROOM SWEEPING SERVICES

May of 2022 and December of 2022. Our services were ended due to the general contractor needing to obtain services from a DBE provider to meet the federal funding goals set out by the project.

Juan Cantano | Field Engineer | 602.622.7341 | jcatano@pffjv.com

Ames/Coffman Specialties Joint Venture – Loop 101 Design Build from I-17 to Pima Rd.

o This project occurred between 2019 and 2022. Offsite Sweeping provided the large debris collection and highway sweeping through these 13 miles of highway in Phoenix and Scottsdale. Activities for a large portion of this project occurred during the height of the COVID pandemic which we were able to navigate through and provide our client with the services as they required.

Matt Trembly |Project Manager|602.619.2502| matttrembly@amesco.com

Trinity Johnson | Field Office | 602.341.6573 | tjohnson@coffmanspecialties.com

Connect 202 – This included the portions of Interstate-10 and the new Loop 202 South

Mountain that were under construction during construction.

o We provided our services along the very congested sections of I-0 between

35thAvenue and 79th Avenue multiple times a week to keep the debris from building up along the construction barrier walls. We also provided full range sweeping of the Loop 202 South Mountain Freeway for the first few months after it was opened. This work occurred between 2017 and 2021 for Offsite Sweeping.

James Dygert | Project Engineer | 602.561.8170 | jdygert@fnfinc.com

File details come from the government source that posted it. Updated .