3-Attachment 6 - Price Increase Percentages.pdf

PDF 184 KB Posted

Attached to
Mechanical Street Sweeping Services - Phoenix Metropolitan Area
Solicitation number
BPM006937
Issued by
Maricopa County, Phoenix City, Arizona

About this file

This is an attachment containing pricing and renewal terms guidance for a solicitation issued by the State of Arizona Department of Transportation (ADOT) for Mechanical Street Sweeping Services in the Phoenix Metropolitan Area. The attachment specifies the process by which offerors must identify their requested maximum price increase percentages for each of four optional renewal periods. Offerors are required to provide proposed increase percentages in the designated spaces for the 1st, 2nd, 3rd, and 4th renewal periods, with pre-filled examples showing potential increases of 1%, 2%, 3%, and 4% respectively. The document emphasizes that each renewal period's increase percentage shall be calculated against the original contract price rather than compounded against previous renewal prices, and provides a detailed example demonstrating this calculation methodology.

The attachment explicitly cautions offerors that failure to provide information in the designated spaces will result in prices remaining unchanged from the original contract term. Additionally, the State of Arizona reserves the right to deny any requested price increase upon renewal, regardless of the percentages submitted, and requires offerors to provide documentation justifying the need for any increase at the time of renewal. This pricing structure ensures transparency and allows ADOT to maintain cost control while providing offerors clarity on the formula for calculating allowable increases across the contract's renewal options.

View the file

Other files

File Type Posted
3-Equipment Maintenance.pdf PDF
Capacity Planning.pdf PDF
Pricing - Negotiation Meeting.xlsx XLSX spreadsheet
Equipmnet list.pdf PDF
3-ADOT Price Increase.pdf PDF
3-ADOT Attach 3.pdf PDF
BAFO Response.pdf PDF
3-2-Boycott_of_Israel_Disclosure_OSS.pdf PDF
3-Schedule and Staffing.pdf PDF
3-5-Confidentiality_and_Trade_Secrets_OSS.pdf PDF
3-6-Price_Increase_Percentages_OSS.pdf PDF
3-4-Equipment List_OSS.pdf PDF
3-3-SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban_OSS.pdf PDF
3-Sweepers offer and acceptance.pdf PDF
3-Forced Labor Sweepers.pdf PDF
3-Capcity sweepers.pdf PDF
BPM006937_Award_Documents.pdf PDF
Pricing - BAFO.xlsx XLSX spreadsheet
3-Attachment 3 - Forced Labor of Ethnic Uyghurs Ban.pdf PDF
3-Attachment 2 - Boycott of Israel Disclosure.pdf PDF
3-Attachment 5 - ADOT Confidentiality and Trade Secrets.pdf PDF
Scheduling and Staffing.pdf PDF
3-Financial Envelope-Proposal # 1-prop_answer.xls XLS spreadsheet
3-ADOT Offer & Acceptance.pdf PDF
3-ADOT Equipment Maintenance.docx DOCX document
3-ADOT Equipment List and Shortages.docx DOCX document
3-ADOT Experience in Similar Projects.docx DOCX document
3-ADOT Scheduling and Staffing.pdf PDF
3-Offeror's Experience in Similar Projects_OSS.pdf PDF
Offsite Negotiation Response 7.21.2025.pdf PDF
3-Confidentiality and trade secrest sweepers.pdf PDF
3-Equipment list sweepers.pdf PDF
3-Method of Approach work schedule.docx DOCX document
3-Experience sweeper contract.pdf PDF
3-Boycott of Israel disclosure sweepers.pdf PDF
BPM006937_Pre-Solicitation_Documents.pdf PDF
BPM006937_Solicitation_Requirements_per_Amendment_One__1_.pdf PDF
BPM006937_Evaluation_Documents.pdf PDF
3-Capacity Planning.pdf PDF
3-Attachment 4 - Equipment List.pdf PDF
Sample Work Schedule.pdf PDF
3-ADOT Attach 2.pdf PDF
3-ADOT Sample Work Schedule.pdf PDF
3-scheduling sweeping.pdf PDF
BPM006937_Solicitation_Instructions.pdf PDF
BPM006937_Solicitation_Amendment_Summary_One__1_.pdf PDF
Exhibit_12_Urban_Curb_Sweeping.pdf PDF
3-Attachment 1 - Offer and Acceptance.pdf PDF
3-Sample Work Schedule.pdf PDF
3-Scheduling and Staffing.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT SIX (6)

PRICE INCREASE PERCENTAGES

Solicitation No: BPM006937 Available online at https://appstate.az.gov/

Rev. 03/2025

The offeror should use the space below to identify the maximum price increase percentage that they may want to request at the time of renewal if ADOT exercises its option per the applicable provisions under any resultant contract(s).

1st Renewal Period ________1% ________% Maximum Increase

2nd Renewal Period _______2%_________% Maximum Increase

3rd Renewal Period ______ 3%_____ __% Maximum Increase

4th Renewal Period _______4% ___ _____% Maximum Increase

The offeror is cautioned that each renewal period’s increase percentage shall be computed against the

ORIGINAL contract price. If information is not provided in the space above, prices shall remain the same as the original contract term. Please see the following example for further clarification.

Example: If the offeror anticipates requesting a 2% increase at each renewal period per

Special Terms and Conditions, they should enter 2%, 4%, 6%, and 8% in the attachment.

Each percentage increase is calculated using the original contract price. See example in table below.

Renewal Period

% Maximum Increase from Attachment

Original Contract

Price

Maximum Increase Allowed

Maximum Contract

Price

1 2% $100.00 $2.00 $102.00

2 4% $100.00 $4.00 $104.00

3 6% $100.00 $6.00 $106.00

4 8% $100.00 $8.00 $108.00

Furthermore, the offeror is advised that the State of Arizona does not automatically grant any increase when renewing the contract. If an increase is requested, documentation of need must be provided at the time of renewal.

https://appstate.az.gov/

File details come from the government source that posted it. Updated .