2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf

PDF 72 KB Posted

Attached to
Flagler County Beach Nourishment Project - Reach II FPN 429573-1-38-01
Solicitation number
25-ITB-078
Issued by
Glades County, Brownsville CDP, Florida

About this file

This is a bid schedule for the Flagler County Beach Nourishment Project - Reach II, a beach and dune restoration initiative in Flagler County, Florida. The project involves restoring approximately 5.5 miles of critically eroded coastline across Painter's Hill, Beverly Beach, and northern Flagler Beach to improve community resilience. The work encompasses placing approximately 1.8 million cubic yards of offshore beach-compatible sand, with primary bid line items including mobilization/demobilization, beach and dune fill (1,800,000 cubic yards), mechanical screening and spreading (1,800,000 cubic yards), structure inspection and vibration monitoring, beach tilling and decompaction, turbidity monitoring, endangered species observations, sea turtle trawling services (3 days at day rate), vegetation dune planting (364,200 units), sand fencing (12,900 linear feet), dune posts and rope (600 linear feet), project signage, environmental monitoring, and construction bonding. The schedule indicates that unit cost quantities for fill and mechanical screening are estimates, with contractor unit costs remaining valid for actual quantities placed up to 20 percent above or below estimated amounts.

The bid schedule does not display unit prices or total item prices, as all cost fields are marked as blank with dashes. Contractors are required to identify fill and vegetation quantities separately for FEMA reporting (140,190 cubic yards and 146,835 plants within specific reaches) and for FDOT reporting within the City of Flagler Beach limits. Standby time is defined as dredge time directed by the County or Engineer for reasons outside contract requirements and is billed at an hourly rate. The project is referenced as FPN 429573-1-38-01 and identified as Project No. 25-ITB-078, indicating it is competitively bid through an invitation to bid process.

View the file

Other files

File Type Posted
Flagler_County_Beach_Nourishment_Project_-_Reach_II_FPN_429573-1-38-01_(Addendum_#7_Revision).pdf PDF
Example_Photography_of_Concrete_Debris.pdf PDF
Contract_Form.pdf PDF
Contract_Form.pdf PDF
Federal_Requirements.pdf PDF
Federal_Requirements.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT26.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT26.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
2025-03_BeachProfiles_NAVD88.CSV CSV file
2025-03_BeachProfiles_NAVD88.CSV CSV file
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
2019-05_BorrowArea_NAVD88.txt TXT text file
2019-05_BorrowArea_NAVD88.txt TXT text file
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
README.txt TXT text file
README.txt TXT text file
Project_Contract_Forms.pdf PDF
Project_Contract_Forms.pdf PDF
2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf PDF
2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
Flagler_Reach_2_Tech_Specs_Formatted.pdf PDF
24-PC-01778_Flagler_Final_Report_[July_2024].pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item No. & Description Technical Specifications

Reference 2 Quantity Unit Unit Price

Total Item

Price

1. Mobilization / Demobilization Section 20 1 LS $ - $ -

2. Beach / Dune Fill 3,4 Sections 21, 37, & 42 1,800,000 CY $ - $ -

3. Mechanical Screening and Spreading 3,4 Sections 22 & 41 1,800,000 CY $ - $ -

4. MEC Support Sections 23 & 41 1 LS $ - $ -

5. Structure Inspection & Vibration Monitoring Sections 12 & 24 1 LS $ - $ -

6. Beach Tilling / Decompaction Sections 25 & 42 1 LS $ - $ -

7. Turbidity Monitoring Sections 26 & 47 1 LS $ - $ -

8. Endangered Species Observations Sections 35 & 49 1 LS $ - $ -

9. Sea Turtle Trawling: MOB/DEMOB Sections 27 & 49 1 LS $ - $ -

10. Sea Turtle Trawling: DAY RATE Sections 28 & 49 3 DAY $ - $ -

11. Vegetation – Dune Planting Units Sections 29 & 56 364,200 EA $ - $ -

12. Sand Fencing Sections 30 & 57 12,900 LF $ - $ -

13. Project Signs Sections 32 & 59 1 LS $ - $ -

14. Dune Post and Rope Sections 31 & 58 600 LF $ - $ -

15. Environmental Monitoring Sections 36 & 49 1 LS $ - $ -

16. Standby Time 1 Sections 33 24 HR $ - $ -

17. Construction Bond Sections 34 1 LS $ - $ -

On Contractor's Pay Applications, the Contractor shall specifically identify, for reporting purposes, the total quantities of Fill (Item 2) and Vegetation (Item 11) placed within R-47.9 to R-65 for reporting to FEMA (140,190 CY and 146,835 plants), and within the City of Flagler Beach (from the southern project limit to approximately R-65) for reporting to FDOT.

The unit cost quantities for Line Items 2 and 3 are only estimates. The unit costs provided in this bid shall remain valid for actual Fill and Mechanical Screening and Spreading placed up to

20% above or below these estimated quantities.

Technical Specification reference is provided for convenience. The Contractor shall be responsible for adherence to all contract requirements.

Beach and Dune Restoration Project - Reach 2

Flagler County, FL

Base Bid

Total Construction Cost

Project No.: 25-ITB-078

Standby Time is defined as time spent by the dredge, at the direction of the County or Engineer, for reasons outside of the requirements in the contract.