1614720dwg11of16_Plumbing.pdf
PDF 6 MB Posted
- Solicitation number
- N4008521R2507
About this file
This solicitation is for an indefinite-delivery, indefinite-quantity, multiple award construction contract to provide large general construction projects primarily in the Hampton Roads Area of Responsibility in Virginia. The Navy seeks to award up to five contracts for a five-year base period and a five-year option. The total contract value is not to exceed $500 million per awardee. Work will include new construction, repair, alteration, and renovation of facilities. Response date is August 6, 2021. The Department of the Navy Naval Facilities Engineering Command is the issuing agency.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VENT THROUGH ROOF - DIAGRAMMATIC
WATER HAMMER ARRESTOR
'A'
DOMESTIC COLD WATER
DOMESTIC HOT WATER (120°F)
DOMESTIC HOT WATER RECIRCULATING
HIGH VOLUME WATER PIPING
UNION
WALL HYDRANT (WH)
HOSE BIBB (HB)
OVERFLOW RAINLEADER PIPINGORL
RAINLEADER PIPINGRL
VENT PIPING
PIPE TURNING DOWN
PIPE TURNING UP
PITCH DOWN IN DIRECTION OF ARROW
NATURAL GAS PIPINGNG
A COMPRESSED AIR RISER DESIGNATION - BREATHING
WALL CLEANOUTWCO
CLEANOUT PLUGCOP
WASTE RISER DESIGNATION - INDUSTRIAL
WATER RISER DESIGNATION - DOMESTIC
VALVES AND ACCESSORIES
BACKFLOW PREVENTER (BFD)
BALL VALVE
CAPPED PIPE
CHECK VALVE
DIRECTION OF FLOW
FLEXIBLE CONNECTION
MANUAL AIR VENT
HOT WATER BALANCING STATION
PLUG VALVE
PIPE GUIDE
PRESSURE REDUCING VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE (T&P)
PRESSURE GAUGE WITH GAUGE COCK
STRAINER
THERMOMETER
VACUUM BREAKER
GENERAL
LEGEND
FLOOR DRAIN/SINK WITH DEEP SEAL P-TRAPFD
CLEANOUT, GRADE TYPE
GCO
CLEANOUT, FLOOR TYPE
FCO
BRANCH SIDE CONNECTION
BRANCH TOP CONNECTION
BRANCH BOTTOM CONNECTION
STORM DRAINAGE PIPINGST
HVW
A
A
V
PUMPED DISCHARGE PIPINGPD
GAS RISER DESIGNATION#
# CONSTRUCTION NOTE IDENTIFICATION
INDUSTRIAL WASTE PIPINGIW
SOLUTION MIX PIPINGSMS
FS
BREATHING AIR PIPINGBA
SHOP AIR PIPINGSA
SUMP PUMP/PIT DISCHARGE PIPINGSPD
# COMPRESSED AIR RISER DESIGNATION - SHOP
WASTE RISER DESIGNATION - SANITARY#
WATER RISER DESIGNATION - INDUSTRIALA
STORM WATER RISER DESIGNATION#
HIGH PRESSURE PIPINGHP
ROOM NUMBER007
SOLUTION MIX PIPINGSM
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
L E
G E
N D
MRK
12822666
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
P-001
ABA ARCHITECTURAL BARRIERS ACT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AP ACCESS PANEL
ATM ATMOSPHERE
BA BREATHING AIR
DIA DIAMETER
DN DOWN
DWG DRAWING
FF FINISHED FLOOR
FS FLOOR SINK
GA GAUGE
GFCI GOVERNMENT FURNISHED/CONTRACTOR INSTALLED
GPM GALLONS PER MINUTE
HB HOSE BIBB
IW INDUSTRIAL WASTE
M3 CUBIC METERS
MG MILLIGRAM
OD OVERFLOW DRAIN
PPM PARTS PER MILLION
RBJ RUN THRU JOISTS
RD ROOF DRAIN
RL RAINLEADER
RP RECIRCULATION PUMP
S.S. STAINLESS STEEL
SA SHOP AIR
SPD SUMP PUMP DISCHARGE
TA TOOL AIR
TMV THERMOSTATIC MIXING VALVE
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
WHA-'A' WATER HAMMER ARRESTOR AND SIZE
WSV WATER STACK VENT
WVB WATER VALVE BOX
1. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH PLUMBING DRAWING OF THIS SET. NOTES SPECIFIC TO
INDIVIDUAL PLUMBING DRAWINGS WILL BE SHOWN ON THE RESPECTIVE PLUMBING DRAWINGS.
2. PROVIDE LABOR, MATERIAL, AND EQUIPMENT REQUIRED FOR THE COMPLETION AND OPERATION OF SYSTEMS IN THIS SECTION OF WORK IN ACCORDANCE WITH CONTRACT PLANS, SPECIFICATIONS AND APPLICABLE STATE AND LOCAL CODES.
3. PROVIDE A COMPLETE SYSTEM OF HOT AND COLD WATER, AND WASTE AND VENT PIPING TO FIXTURES WITHIN THE BUILDING.
4. WATER, SOIL, WASTE, VENT, NATURAL GAS, AND COMPRESSED AIR PIPING LINES MUST BE CONCEALED IN THE BUILDING CONSTRUCTION, EXCEPT WHERE INDICATED OTHERWISE. IN SPACES WITH NO CEILINGS, MECHANICAL SPACES, INDUSTRIAL AREAS, AND PIPING RUN AT PRE-FABRICATED WALLS LOCATIONS, ROUTE PIPING TO HOLD TIGHT TO CEILING, WALL OR FLOOR.
5. CONTRACTOR MUST PREPARE AND MAINTAIN ACCURATE RECORD DRAWINGS AT THE PROJECT SITE.
6. MAKE PROPER PIPING CONNECTIONS TO FIXTURES AND EQUIPMENT EVEN THOUGH ALL BRANCH MAINS, ELBOWS AND
CONNECTIONS ARE NOT SHOWN.
7. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES.
8. ROUTING OF PIPING MUST BE COORDINATED WITH OTHER TRADES.
9. DESIGN SHOWS ALL PLUMBING VENTS TERMINATING THROUGH THE WALL, WHEN A PLUMBING VENT PIPE MUST EXIT THROUGH THE ROOF AND THE PLUMBING VENT PIPE EXITS THROUGH THE ROOF WITHIN A 15'-0" RADIUS OF A ROOF TOP UNIT OR FRESH AIR
INTAKE THE VENT PIPE MUST BE OFFSET TO CLEAR OUTSIDE THE RADIUS.
10. PROTECT COPPER PIPING AGAINST CONTACT WITH MASONRY OR DISSIMILAR METALS. HANGERS, SUPPORTS, ANCHORS AND
CLIPS MUST BE COPPER OR COPPER PLATED.
11. PROVIDE SHUT-OFF VALVES AND BACKFLOW PREVENTION DEVICES AT CONNECTIONS TO NON-POTABLE WATER SYSTEMS AND
EQUIPMENT.
12. INSTALL CLEANOUTS AT THE BASE OF DRAINAGE STACKS.
13. PROVIDE UL LISTED THROUGH WALL FIRE STOPPING ASSEMBLIES FOR EACH PENETRATION OF FIRE-RATED WALLS AND
ASSEMBLIES.
14. PROVIDE DISCONNECT SWITCHES, VFD'S, STARTERS AND OTHER COMPONENTS REQUIRED FOR OPERATION OF THE PLUMBING EQUIPMENT AS DESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS. THE ELECTRICAL CONTRACTOR MUST PROVIDE CONDUIT AND WIRING FROM THE POWER SOURCE TO THE DISCONNECT SWITCH, FROM THE DISCONNECT SWITCH TO THE STARTER OR VFD, AND FROM THE STARTER OR VFD TO THE FINAL PLUMBING EQUIPMENT CONNECTION.
15. COORDINATE PIPING WITH ELECTRICAL PANELS AND EQUIPMENT. RUN PLUMBING PIPING SUCH THAT IT DOES NOT RUN ABOVE
ELECTRICAL PANELS, SWITCH GEAR, AND SIMILAR ELECTRICAL EQUIPMENT.
16. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE LISTING REQUIREMENTS.
17. COORDINATE FLOOR DRAIN(S) WITH EQUIPMENTS HOUSE KEEPING PAD.
18. LOCATE AND SIZE CONCRETE HOUSEKEEPING PADS IN ACCORDANCE WITH ACTUAL EQUIPMENT PURCHASED. EXTEND PAD
BEYOND EQUIPMENT FOR 6" IN ALL DIRECTIONS.
19. EQUIPMENT OF HIGHER CHARACTERSTICS MAY BE FURNISHED PROVIDED SUCH PROPOSED EQUIPMENT IS APPROVED IN WRITING AND CONNECTING ELECTRICAL SERVICE, CIRCUIT BREAKERS AND CONDUIT SIZES ARE APPROPRIATELY MODIFIED AT
NO COST TO THE OWNER.
20. WHEN CONSTRUCTION IS COMPLETE, THOROUGLY CLEAN EQUIPMENT, FIXTURES AND MATERIALS PRIOR TO TURN-OVER TO THE
OWNER.
21. ALL PIPING AND EQUIPMENT MUST BE LABELED AND ALL VALVES MUST BE TAGGED.
22. COORDINATE FLOOR DRAINS LOCATED UNDER TOILET PARTITION WITH TOILET PATITION FLOOR MOUNTING HARDWARE.
23. REFER TO STRUCTURAL DRAWINGS FOR CHAMFER REQUIREMENTS FOR HOUSE CLEANING PADS.
24. LOCATE WATER HAMMER ARRESTORS IN ACCESSIBLE LOCATIONS, OR PROVIDE ACCESS AS REQUIRED. SEE DETAIL B2 SHEET P-503.
25. PROVIDE ACCESS PANELS FOR VALVES AND EQUIPMENT LOCATED WITHIN WALLS AND ABOVE HARD CEILINGS.
26. HOSE REELS MUST BE MOUNTED AT 14'-0"ABOVE FINISHED FLOOR TO CENTER LINE OF HOSE REEL.
27. CONTRACTOR MUST PROVIDE THE REQUIRED EQUIPMENT, VALVES, FITTINGS, ETC. AS NEEDED FOR FINAL CONNECTION TO ALL EQUIPMENT REQUIRING A PLUMBING CONNECTION. REFER TO DRAWINGS, PLUMBING SCHEDULES AND INTERIOR DRAWINGS FOR
EQUIPMENT REQUIRING PLUMBNING CONNECTIONS.
28. EXPOSED PIPING WILL BE RUN PARALLEL AND STACKED IN A NEAT AND ORDERLY MANNER IN THE BAYS: FOR CLARITY, DRAWINGS
SHOW PIPING AWAY FROM THE WALL FOR INFORMATION ONLY.
29. EVERY EFFORT HAS BEEN MADE DURING DESIGN TO IDENTIFY MAJOR BLOCK-OUTS AND HOLES OVER 2" ROUND THROUGH THE PRE-CAST CONCRETE WALL PANELS ABOVE AND BELOW THE SLAB-ON GRADE FLOOR. IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE THE VARIOUS CONSTRUCTION TRADES UNDER HIS CONTRACT TO REVIEW AND CONFIRM THOSE , AS WELL AS LOCATE, COORDINATE AND MARK-UP THOSE NOT SHOWN THAT ARE GREATER THEN THE ALLOWED 2" ROUND FIELD CORE DRILL ON THE PRE-CAST CONCRETE SHOP DRAWINGS, PRIOR TO SUBMISSION TO THE ARCHITECT/ENGINEER.
30 REFER TO DRAWING IW001 FOR COORDINATION OF WORK BETWEEN THE INDUSTRIAL WASTE SYSTEM AND THE PLUMBING
SYSTEM.
31 WIRELESS CONNECTIONS MUST BE PROVIDED ON EQUIPMENT NOTED FOR SUCH A CONNECTION IN THE CYBERSECURITY DOCUMENTS. NO OTHER DEVICE OR EQUIPMENT SHALL BE PROVIDED WITH A WIRELESS CONNECTION.
32 PROVIDE PRESSURE REGULATOR FOR EQUIPMENT REQUIRING A DIFFERENT PRESSURE THAN SYSTEMS SUPPLIED PRESSURE.
GENERAL NOTESABBREVIATIONS
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
MATCHLINE
PF102
IW
IW
SANSAN SAN
SAN
S A
N
S A
N
IW
IW
IW
IW
S A
N
3" IW
3"
4"
2" IW
2" IW2" IW 2" IW 2" IW
FINISHED FLOOR ELEVATION = 10.00'
4"
4"
3"
3"
4"
3" IW
2" IW
3"
4"
3"
4"
4"
4"
4"
4"4"
1 1/2" IW
4" 4"
S A
N
S A
N
S A
N
S A
N
2"
S A
N
S A
N
3" IW
N G
2" IW
A
2"
4"
S A
N
3"
2"
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F O
U N
D A
TI
O
N P
LA
N
A
R E
A A
MRK
12822667
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PF101
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FOUNDATION PLAN - AREA A
1 REFER TO CIVIL DRAWING CU101 FOR CONTINUATION.
2 4" SANITARY SEWER INVERT ELEVATION AT 5'-0" BEYOND EXTERIOR WALL =
6.00' (48" BELOW FINISHED FLOOR).
3 4" WASTE PIPE FROM GRADE CLEANOUT ABOVE.
4 2" VENT PIPE UP.
5 4" WASTE PIPE FROM FLOOR DRAIN ABOVE.
6 4" WASTE PIPE FROM ABOVE.
7 1-1/2" VENT PIPE UP.
8 3" WASTE PIPE FROM FLOOR DRAIN ABOVE SEE DETAIL A1, SHEET P-503
(TYPICAL).
9 2" WASTE PIPE FROM FLOOR DRAIN ABOVE.
10 4" WASTE PIPE FROM FLOOR CLEANOUT ABOVE.
11 2" GAS PIPE FROM ABOVE.
12 REFER TO CIVIL DRAWING CU101 FOR CONTINUATION OF GAS PIPING TO
EMERGENCY GENERATOR.
13 REFER TO FLEXIBLE PIPE CONNECTION BELOW SLAB DETAIL C2/P-504.
SOIL CONDITIONS ARE UNSTABLE, UNDERFLOOR PIPING MUST BE
SUPPORTED TO THE STRUCTURAL SUPPORTED FLOOR SLAB
ABOVE. SEE DETAIL B3 ON DRAWING P-501.
REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL
GENERAL NOTES.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PF103
MATCHLINE
PF101
IW
IW
IW
IW
IWS
A
N
IW
IW
FINISHED FLOOR ELEVATION = 10.00'
4"
4"
3"
4"
4"
4"
4"
3"
2" V
4"
4" 2
2" IW
1 1/2" IW
4"
3"
2"
IW
IW
IW
IW
4"
A
B
C C
C
4"
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F O
U N
D A
TI
O
N P
LA
N
A
R E
A B
MRK
12822668
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PF102
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FOUNDATION PLAN - AREA B
1 3" WATER SERVICE UP, PROVIDE SHUT-OFF VALVE 12" ABOVE FINISHED FLOOR
IN VERTICAL.
2 4" WASTE PIPE FROM FLOOR CLEANOUT ABOVE.
3 3" WASTE PIPE FROM FLOOR DRAIN ABOVE SEE DETAIL A1, SHEET P-503
(TYPICAL).
4 1-1/2" VENT PIPE UP.
5 2" VENT PIPE UP.
6 REFER TO CIVIL DRAWING CU101 FOR CONTINUATION.
7 4" WASTE PIPE FROM FLOOR DRAIN ABOVE.
8 4" WASTE PIPE FROM WALL CLEANOUT ABOVE.
9 REFER TO FLEXIBLE PIPE CONNECTION BELOW SLAB DETAIL C2/P-504.
SOIL CONDITIONS ARE UNSTABLE, UNDERFLOOR PIPING MUST BE
SUPPORTED TO THE STRUCTURAL SUPPORTED FLOOR SLAB
ABOVE. SEE DETAIL B3 ON DRAWING P-501.
REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL
GENERAL NOTES.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PF102
MATCHLINE
PF104
IW
IW
IW
IW
IW
IW
IW
IW
FINISHED FLOOR ELEVATION = 10.00'
4"
4"
4"
4"
4"
4"
4"
2" IW
2"
4"
4"
IW
IW
4"
3"
3"
6"
4"
3" 3"
IW
IW
IW
IW
4"
C
C
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F O
U N
D A
TI
O
N P
LA
N
A
R E
A C
MRK
12822669
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PF103
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
SCALE: 1/8" = 1'-0"
PLUMBING FOUNDATION PLAN - AREA C
AREA
A
AREA
B
AREA
D
AREA C
V-147
1 4" WASTE PIPE FROM FLOOR DRAIN ABOVE.
2 3" WASTE PIPE FROM FLOOR DRAIN ABOVE SEE DETAIL A1, SHEET P-503
(TYPICAL).
3 1-1/2" VENT PIPE UP.
4 4" WASTE PIPE FROM WALL CLEANOUT ABOVE.
5 2" VENT PIPE UP.
6 4" WASTE PIPE FROM FLOOR CLEANOUT ABOVE.
7 COORDINATE VENT PIPE ROUTING WITH MECHANICAL EQUIPMENT/DUCTWORK
ABOVE.
SOIL CONDITIONS ARE UNSTABLE, UNDERFLOOR PIPING MUST BE
SUPPORTED TO THE STRUCTURAL SUPPORTED FLOOR SLAB
ABOVE. SEE DETAIL B3 ON DRAWING P-501.
REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PF103
IW
IW
IW
IW
SPD
FINISHED FLOOR ELEVATION = 10.00'
6"
4"
4"
6"3"
4"
4"
3"
3" IW
2" IW
4" SPD
4"
4"
6"
6"
6" 6"
R L
3"
3"
2"
4" 4"
4"4"
4"
6"
8"
3"
6"6"
3"
6" 6"
6"
6"
4"
IWP-1 IWP-1
BWV-1
C3 P-401
C4 P-401
IW
R L
RLRL
R L
R L
R L
RL RL
RL
SPD
3 D
D
1 1/4"
32 32
3"
TYP
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F O
U N
D A
TI
O
N P
LA
N
A
R E
A D
MRK
12822670
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PF104
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FOUNDATION PLAN - AREA D
1 REFER TO CIVIL DRAWING CU101 FOR CONTINUATION.
2 4" WASTE PIPE FROM GRADE CLEANOUT ABOVE.
3 4" WASTE PIPE FROM FLOOR DRAIN ABOVE.
4 4" WASTE PIPE FROM TRENCH DRAIN ABOVE.
5 2" VENT PIPE UP.
6 1-1/2" VENT PIPE UP.
7 3" WASTE PIPE FROM FLOOR DRAIN ABOVE SEE DETAIL A1, SHEET P-503
(TYPICAL).
8 4" WASTE PIPE FROM FLOOR CLEANOUT ABOVE.
9 NATURAL GAS PIPE UP TO SERVICE METER ABOVE.
10 4" WASTE PIPE DOWN, 2" VENT PIPE UP.
11 EQUIPMENT FLOOR PIT. REFER TO STRUCTURAL DRAWINGS FOR SIZE.
12 4" WASTE PIPE FROM TRENCH DRAIN ABOVE. PROVIDE TRENCH DRAIN
ASSEMBLY WITH SUMP BASIN AT OUTLET LOCATION, SUMP BASIN TO HAVE
REMOVABLE SEDIMENT BUCKET.
13 4" SANITARY SEWER INVERT ELEVATION AT 5'-0" BEYOND EXTERIOR WALL =
7.50' (30" BELOW FINISHED FLOOR).
14 8" STORM PIPE FROM ABOVE.
15 8" STORM PIPE INVERT ELEVATION AT 5'-0" BEYOND EXTERIOR WALL = 7.00'(36"
BELOW FINISHED FLOOR)
16 4" SUMP PUMP DISCHARGE PIPE UP.
17 3" VENT PIPE UP.
18 1-1/2" STORM PIPE FROM HANGAR DOOR TRACK DRAINAGE ABOVE TYPICAL.
19 6" STORM PIPE INVERT ELEVATION = 8.00' (24" BELOW FINISHED FLOOR).
20 6" STORM PIPE INVERT ELEVATION AT 5'-0" BEYOND EXTERIOR WALL = 7.00' (36"
BELOW FINISHED FLOOR).
21 3" INDUSTRIAL WASTE PIPE FROM WALL CLEANOUT ABOVE.
22 1 1/4" GAS PIPE FROM ABOVE.
23 1 1/4" GAS PIPE TO MECHANICAL EQUIPMENT HV-1.
24 CONNECT GAS PIPING, SIZE AS NOTED TO MECHANICAL EQUIPMENT, REFER TO
GAS CONNECTION DETAIL C3/P-502.
25 4" SUMP PUMP DISCHARGE PIPE UP FROM IWP DUPLEX PUMP SYSTEM BELOW.
26 PIPING SLOPED AT 1/2" PER FOOT.
27 PIPE INVERT IS -72" (6'-0) BELOW FINISHED FLOOR ELEVATION 10.00'
28 BACKWATER VALVE ACCESS.
29 SPD PIPE TO BE RUN 8" BELOW BOTTOM ELEVATION OF WASH BAY SLAB
FLOOR.
30 REFER TO FLEXIBLE PIPE CONNECTION BELOW SLAB DETAIL C2/P-504.
31 6" STORM PIPE FROM GRADE CLEANOUT ABOVE.
32 END OF 6" PIPE SHALL NOT PROTRUDE INTO LIFT TABLE PIT NO MORE THAN 3"
AND INVERT ELEVATION MUST BE LEVEL WITH PIT FLOOR ELEVATION.
COORDINATE EXACT PIPE LOCATION AND DEPTH OF PROTRUSION WITH
ACTUAL LIFT TABLE BEING INSTALLED.
SOIL CONDITIONS ARE UNSTABLE, UNDERFLOOR PIPING MUST BE
SUPPORTED TO THE STRUCTURAL SUPPORTED FLOOR SLAB
ABOVE. SEE DETAIL B3 ON DRAWING P-501.
REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PL103
FD-2
FD-2
FD-2
P-4B
P-4B
P-11A
CORR.
AIR DRY
PMB BAY
SUPPLY
AIR
PLENUM
114C
FILTER
STORAGE
MEN'S
LOCKER
ROOM
(CLEAN)
BLAST
MEDIA
STORAGE
BLAST
MEDIA
RECOVERY
ELEC.
P-401 A3
FD-2
P-11A
GCO
WH-1
FD-2 FD-2
FCO
FCO
WH-1
SA
BA
SA
BA
BA
SA
BA
SA
PMB BAY
EXHAUST
AIR
PLENUM
PMB
STORAGE
LOCKER
ROOM
(DIRTY)
WH-1
FD-1
FINISHED FLOOR ELEVATION = 10.00'
COMM.
HB-1
1 1/2" V
SAC-1
BAC-1
BAC-2
SAC-2
BAD-2 BAD-1SAD-2 SAD-1
3/4" 1 1/2"
1 1/2"
3/4"
1 1/2"
1 1/2"
2"
2"
1 1/2"
3/4"
2"
2" 4"
3/4"
1/2"
1/2"
3/4"
1"
FD-2
FD-2
BFP-2
OWS-1 OWS-1
BA
SA
VC-1
2"
3"
5"15
FCO
VC-1
2" 2" 2"
4"2"
AHU-1
UH-4
NG
N G
N G
NGNG
HR-1 HR-1 HR-1
HR-1 HR-1
HR-1 HR-1HR-1 HR-1
4"
HR-1
25 4"2 25
3/4"
3/4"
CCC-1
N G
2"
N G
B
N G
A
AA
A
A
2A
1 A 1
A
COMPRESSOR
ROOM
2"FD-2
34 34 34 34 34
37 37
1 1/2"
1/2"
3/4"
1"
1"
1"
1 1/2" 1 1/2" 1"
1"3/4"
1" 1"
DC-1
DC-2
DC-3 DC-4
41 41
UH-3
DUST
COLLECTOR
YARD
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F
LO
O R
P
LA
N
A R
E A
A
LO
W
E R
L E
V E
L
MRK
12822671
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PL101
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FLOOR PLAN - AREA A - LOWER LEVEL
1 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
2 BREATHING AIR HOSE REEL CONNECTION, REFER TO DETAIL A4/P-501 FOR
REQUIREMENTS.
3 2" VENT PIPE FROM BELOW.
4 BREATHING AIR RECEIVER TANK.
5 SHOP AIR RECEIVER TANK.
6 5" SHOP AIR PIPE UP.
7 3" BREATHING AIR PIPE UP.
8 3/4" COLD WATER MAKE-UP, REFER TO MECHANICAL DRAWINGS FOR
CONTINUATION. SEE BACKFLOW PREVENTOR DETAIL D4, SHEET P-503.
9 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
10 1-1/2" VENT PIPE FROM BELOW.
11 2" VENT PIPE UP.
12 REFER TO A1 DRAWING P-801 FOR SHOP AIR PIPING DIAGRAM.
13 REFER TO B1 DRAWING P-801 FOR BREATHING AIR PIPING DIAGRAM.
14 4" SHOP AIR PIPE UP.
15 1/2" COLD WATER DOWN TO HOSE BIBB BELOW.
16 3/4" COLD WATER PIPE UP.
17 1/2" COLD WATER PIPE UP.
18 2" BREATHING AIR PIPE UP.
19 1/2" SHOP AIR PIPE FOR EQUIPMENT #429 AIR WASTE COMPACTOR, REFER TO
INTERIORS DRAWING FOR EQUIPMENT REQUIREMENTS.
20 HOT WATER RETURN BALANCING STATION, SET FLOW TO 1.25 GPM. SEE DETAIL
C1, SHEET P-502.
21 HOT WATER RETURN BALANCING STATION, SET FLOW TO 0.5 GPM. SEE DETAIL
C1, SHEET P-502.
22 COORDINATE ALL PIPE ROUTING AND LOCATION WITH EQUIPMENT PLATFORM
ABOVE.
23 3" SHOP AIR PIPE UP.
24 CONNECT GAS PIPING, SIZE AS NOTED TO MECHANICAL EQUIPMENT, REFER TO
GAS CONNECTION DETAIL C3/P-502.
25 SHOP AIR HOSE REEL CONNECTION. REFER TO DETAIL A2/P-501 FOR
REQUIREMENTS.
26 RUN PIPING EXPOSED ABOVE FINISHED GRADE AT HVAC PIPING ELEVATION.
27 ISOLATION VALVE IN VERTICAL RISE OF PIPE AT MIMNIMUM 6'-0" ABOVE
FINISHED FLOOR.
28 HEAT TAPE AND INSULATE ALL EXPOSED WATER PIPING. HEAT TAPE MUST BE
SELF-REGULATING, 8 WATT OUTPUT PER LINEAR FOOT, 277V, RATED FOR
EXTERIOR INSTALLATION, PROVIDE COMPLETE OPERATIONAL SYSTEM.
INSULATE WITH 2" EXTERIOR RATED INSULATION.
29 2" GAS PIPE DOWN ON WALL.
30 GAS PIPE THROUGH WALL AT 18" ABOVE FINISHED FLOOR.
31 2" GAS PIPE DOWN TO BELOW GRADE. PROVIDE TRANSITION FITTING BETWEEN
STEEL PIPE AND PLASTIC PIPE MIN. 18" BELOW FINISHED GRADE. FITTING TO
MEET OR EXCEED THE REQUIREMENTS OF ASTM D-2513, CATEGORY 1 ANSI
B1.20, NFPA-58.
32 OFFSET VENT PIPE AROUND WALL LOUVER.
33 FLOOR DRAIN FD-2 FOR DRAINAGE OF HOSE REEL AUTOMATIC DRIP VALVES
FROM ADJACENT BAY 114.
34 ROUTE 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING TO FD-2 IN SOUTHWEST
CORNER OF ADJACENT COMPRESSOR ROOM 113.
35 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR
REQUIREMENTS.
36 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING CAN BE TIED TOGETHER WITH UP TO
8 DRAIN VALVES ON A 1/2" PIPE MAIN.
37 ROUTE 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING TO FD-2 IN ADJACENT PAINT
BAY 120 SERVING PLUMBING FIXTURE P-11 ON NORTH WALL.
38 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE REEL
AT 14'-0" ABOVE FINISHED FLOOR.
39 1/2" SHOP AIR PIPE UP.
40 1" SHOP AIR PIPE RISER.
41 3/4" SHOP AIR PIPE RISER.
42 1-1/2" SHOP AIR PIPE RISER.
1. REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL
GENERAL NOTES.
2. FOR CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS THIS
SHEET REFER TO DRAWING PF101.
ALL PIPING BELOW GRADE MUST BE SUPPORTED TO THE
STRUCTURAL FLOOR SLAB. SEE DETAIL B3, DRAWING P-501.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PL104
S A
B A
B A
S A
B A
S A
B A
S A
S A
B A
S A
B A
3/4"
5"3"
3"
4"
2"
4"
2"
4"
3/4"
5 6 7
7 7
V
SA
VC-1
2"
1/2"
1/2"
VC-1
A
A 2
A
2 A
1414 15 15
1" 1 1/2"
1 1/2"
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F
LO
O R
P
LA
N
A R
E A
A
U P
P E
R L
E V
E L
MRK
12822672
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PL102
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FLOOR PLAN - AREA A - UPPER LEVEL
1 2" VENT PIPE UP.
2 3/4" COLD WATER PIPE DOWN.
3 1/2" COLD WATER DOWN TO HOSE BIBB BELOW.
4 1/2" COLD WATER PIPE DOWN.
5 1/2" SHOP AIR PIPE DOWN.
6 2" BREATHING AIR PIPE DOWN.
7 4" SHOP AIR PIPE DOWN.
8 3" SHOP AIR PIPE DOWN.
9 3" BREATHING AIR PIPE DOWN.
10 5" SHOP AIR PIPE DOWN TO 2,000 GALLON SHOP AIR STORAGE TANK.
11 3" BREATHING AIR PIPE DOWN TO 1,500 GALLON BREATHING AIR STORAGE
TANK.
12 2" VENT PIPE FROM BELOW.
13 1-1/2" SHOP AIR PIPE DOWN.
14 1" SHOP AIR PIPE DOWN.
15 3/4" SHOP AIR PIPE DOWN.
1 2" VENT PIPE UP.
2 3/4" COLD WATER PIPE DOWN.
3 1/2" COLD WATER DOWN TO HOSE BIBB BELOW.
4 1/2" COLD WATER PIPE DOWN.
5 1/2" SHOP AIR PIPE DOWN.
6 2" BREATHING AIR PIPE DOWN.
7 4" SHOP AIR PIPE DOWN.
8 3" SHOP AIR PIPE DOWN.
9 3" BREATHING AIR PIPE DOWN.
10 5" SHOP AIR PIPE DOWN TO 2,000 GALLON SHOP AIR STORAGE TANK.
11 3" BREATHING AIR PIPE DOWN TO 1,500 GALLON BREATHING AIR STORAGE
TANK.
12 2" VENT PIPE FROM BELOW.
13 1-1/2" SHOP AIR PIPE DOWN.
14 1" SHOP AIR PIPE DOWN.
15 3/4" SHOP AIR PIPE DOWN.
REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PL101
MATCHLINE
PL105
P-4A
PAINT BAY
EXHAUST
AIR
PLENUM
PAINT BAY
SUPPLY
AIR
PLENUM
120C
BREAK
ISSUE
P-11
FD-2
FD-2
P-11
MEN'S
LOCKER
ROOM
(CLEAN)
105P-401 A1
2 P-4B
P-8
FCO
BA
SA
BA
SA
N G
N G
MECH
104A
FINISHED FLOOR ELEVATION = 10.00'
BA
2 1/2"
3/4" 3/4" SA
2"
2 1/2"
3"
3/4"
3/4" 1 1/2"
1 1/2"
2 1/2"
1 1/2" SA BA SA SA BA
3 3
3"
2 1/2"
3"
2 1/2"2
4 4
3/4"
SA
WH-1
WSB-1WSB-1
1"1 1/2"
HR-1
HR-1HR-1HR-1HR-1HR-1HR-1
HR-1
HR-1
HR-1
HR-1 HR-1
HR-1
HR-1
2 1/2"
3"
1" 1 1/4"
3/4"
2"
1 1/2"
2 1/2"
1"
1/2"
1 1/2"
1"
N G
N G
V
3/4"
1 1/2" 1 1/2"
A
A 2
A
SA
A
3 A 3 A
C
B
A
C
B
12 12 12
12 12
13 13
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F
LO
O R
P
LA
N
A R
E A
B
LO
W
E R
L E
V E
L
MRK
12822673
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PL103
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FLOOR PLAN - AREA B LOWER LEVEL
1 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
2 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
3 BREATHING AIR HOSE REEL CONNECTION, REFER TO DETAIL A4/P-501 FOR
REQUIREMENTS.
4 PAINTING AIR HOSE REEL CONNECTION, REFER TO DETAIL B4/P-501.
5 HOT WATER BALANCING STATION SET FLOW TO 0.75 GPM. SEE DETAIL C1,
SHEET P-502.
6 3/4" SHOP AIR PIPE PIPE FOR EQUIPMENT #412 BLAST FILTER CLEANER, REFER
TO INTERIORS DRAWINGS FOR EQUIPMENT REQUIREMENTS.
7 3" SHOP AIR PIPE UP.
8 2-1/2" BREATHING AIR PIPE UP.
9 HOT WATER BALANCING STATION SET FLOW TO 2.0 GPM. SEE DETAIL C1, SHEET
P-502.
10 3/4" SHOP AIR PIPE UP.
11 FLOOR DRAIN TO RECEIVE DISCHARGE FROM AUTOMATIC DRIP VALVE DRAIN
PIPING FROM HOSE REELS AUTOMATIC DRIP VALVE PIPING LOCATED ON THE
NORTH WALL OF PAINT BAY 120 (THIS ROOM) AND FROM HOSE REELS
AUTOMATIC DRIP VALVE IN ADJACENT PMB BAY 114 SOUTH WALL.
12 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING
FIXTURE P-11 BELOW ON SOUTH WALL.
13 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING
FIXTURE P-11 BELOW ON NORTH WALL.
14 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR
REQUIREMENTS.
15 FLOOR DRAIN FD-2 TO RECEIVE DRAINAGE FROM AUTOMATIC DRIP VALE
DRAINS ABOVE ON SOUTH WALL OF PAINT BAY 120.
16 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE REEL
AT 14'-0" ABOVE FINISHED FLOOR, REFER TO DRAWINGS AE302 AND AE303.
17 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING CAN BE TIED TOGETHER WITH UP TO
8 DRAIN VALVES ON A 1/2" PIPE MAIN.
18 2" VENT PIPE UP.
1 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
2 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
3 BREATHING AIR HOSE REEL CONNECTION, REFER TO DETAIL A4/P-501 FOR
REQUIREMENTS.
4 PAINTING AIR HOSE REEL CONNECTION, REFER TO DETAIL B4/P-501.
5 HOT WATER BALANCING STATION SET FLOW TO 0.75 GPM. SEE DETAIL C1,
SHEET P-502.
6 3/4" SHOP AIR PIPE PIPE FOR EQUIPMENT #412 BLAST FILTER CLEANER, REFER
TO INTERIORS DRAWINGS FOR EQUIPMENT REQUIREMENTS.
7 3" SHOP AIR PIPE UP.
8 2-1/2" BREATHING AIR PIPE UP.
9 HOT WATER BALANCING STATION SET FLOW TO 2.0 GPM. SEE DETAIL C1, SHEET
P-502.
10 3/4" SHOP AIR PIPE UP.
11 FLOOR DRAIN TO RECEIVE DISCHARGE FROM AUTOMATIC DRIP VALVE DRAIN
PIPING FROM HOSE REELS AUTOMATIC DRIP VALVE PIPING LOCATED ON THE
NORTH WALL OF PAINT BAY 120 (THIS ROOM) AND FROM HOSE REELS
AUTOMATIC DRIP VALVE IN ADJACENT PMB BAY 114 SOUTH WALL.
12 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING
FIXTURE P-11 BELOW ON SOUTH WALL.
13 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING
FIXTURE P-11 BELOW ON NORTH WALL.
14 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR
REQUIREMENTS.
15 FLOOR DRAIN FD-2 TO RECEIVE DRAINAGE FROM AUTOMATIC DRIP VALE
DRAINS ABOVE ON SOUTH WALL OF PAINT BAY 120.
16 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE REEL
AT 14'-0" ABOVE FINISHED FLOOR, REFER TO DRAWINGS AE302 AND AE303.
17 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING CAN BE TIED TOGETHER WITH UP TO
8 DRAIN VALVES ON A 1/2" PIPE MAIN.
18 2" VENT PIPE UP.
1 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
2 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
3 BREATHING AIR HOSE REEL CONNECTION, REFER TO DETAIL A4/P-501 FOR
REQUIREMENTS.
4 PAINTING AIR HOSE REEL CONNECTION, REFER TO DETAIL B4/P-501.
5 HOT WATER BALANCING STATION SET FLOW TO 0.75 GPM. SEE DETAIL C1,
SHEET P-502.
6 3/4" SHOP AIR PIPE PIPE FOR EQUIPMENT #412 BLAST FILTER CLEANER, REFER
TO INTERIORS DRAWINGS FOR EQUIPMENT REQUIREMENTS.
7 3" SHOP AIR PIPE UP.
8 2-1/2" BREATHING AIR PIPE UP.
9 HOT WATER BALANCING STATION SET FLOW TO 2.0 GPM. SEE DETAIL C1, SHEET
P-502.
10 3/4" SHOP AIR PIPE UP.
11 FLOOR DRAIN TO RECEIVE DISCHARGE FROM AUTOMATIC DRIP VALVE DRAIN
PIPING FROM HOSE REELS AUTOMATIC DRIP VALVE PIPING LOCATED ON THE
NORTH WALL OF PAINT BAY 120 (THIS ROOM) AND FROM HOSE REELS
AUTOMATIC DRIP VALVE IN ADJACENT PMB BAY 114 SOUTH WALL.
12 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING
FIXTURE P-11 BELOW ON SOUTH WALL.
13 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING
FIXTURE P-11 BELOW ON NORTH WALL.
14 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR
REQUIREMENTS.
15 FLOOR DRAIN FD-2 TO RECEIVE DRAINAGE FROM AUTOMATIC DRIP VALE
DRAINS ABOVE ON SOUTH WALL OF PAINT BAY 120.
16 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE REEL
AT 14'-0" ABOVE FINISHED FLOOR, REFER TO DRAWINGS AE302 AND AE303.
17 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING CAN BE TIED TOGETHER WITH UP TO
8 DRAIN VALVES ON A 1/2" PIPE MAIN.
18 2" VENT PIPE UP.
1. REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL
GENERAL NOTES.
2. FOR CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS THIS
SHEET REFER TO DRAWING PF102.
ALL PIPING BELOW GRADE MUST BE SUPPORTED TO THE
STRUCTURAL FLOOR SLAB. SEE DETAIL B3, DRAWING P-501.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PL102
S A
B A
S A
B A
B A
S A
S A
SA
B A
S A
S A
MATCHLINE
PL106
3"
2 1/2"
4" SA
3" BA
3/4"
2"
3"
2 1/2"
3"
2 1/2" 2 1/2"
3" 2"
SA
3A
3A2A
3A
3/4"
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F
LO
O R
P
LA
N
A R
E A
B
U P
P E
R L
E V
E L
MRK
12822674
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PL104
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FLOOR PLAN - AREA B - UPPER LEVEL
1 3" SHOP AIR PIPE DOWN.
2 2 1/2" BREATHING AIR PIPE DOWN.
3 3/4" SHOP AIR PIPE RISER.
REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PL107
P-11
WH-1
FD-1
FD-2
FD-2
PAINT
STORAGE
PAINT
MIXING
MATERIAL
STORAGE
TOOL CRIB
STENCIL
ROOM
EQUIPMENT
CLEANING
CORR.
MOTHER'S
ROOM
ADMIN
MECHANICAL
ROOM
ADMIN
CLOSET
101A
CORR.
P-4
MATCHLINE
PL103
N G
N G
NG NG
S A
NG
WCO
WH-1
FINISHED FLOOR
ELEVATION = 10.00'
2"
1/2"
2"
3/4"
3/4" 1 1/4" 2"
1 1/2"
2 1/2"
1/2"
3/4" 1 1/2"
3/4"
V
FD-2
V
VV
SA SA
2"
1 1/2" 2 1/2"
3/4"3/4"
2"
3/4"1 1/2" 2 1/2"
VC-1
VC-1
FD-2
FD-2
FD-2
FCO
BFP-2
8 9
VC-1
2"
1/2"
HB-1
NG
N G
S A
C
C
C
HB-1
AHU-3
2"
2"2"
4" WCO
P-3P-2P-1
3/4"
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F
LO
O R
P
LA
N
A R
E A
C
LO
W
E R
L E
V E
L
MRK
12822675
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PL105
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FLOOR PLAN - AREA C - LOWER LEVEL
1 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
2 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
3 1/2" SHOP AIR OUTLET FOR PAINT SHAKERS #403. COORDINATE PIPE
CONNECTION, PROVIDE PRESSURE REGULATOR AS REQUIRED FOR ADJUSTING
PRESSURE TO EQUIPMENTS REQUIREMENT. REFER TO INTERIORS DRAWINGS
FOR EQUIPMENTS SPECIFIC REQUIREMENTS.
4 2" VENT PIPE FROM BELOW.
5 1-1/2" VENT PIPE FROM BELOW.
6 CONNECT GAS PIPING, SIZE AS NOTED TO MECHANICAL EQUIPMENT, REFER TO
GAS CONNECTION DETAIL C3/P-502.
7 3" VENT PIPE UP.
8 3" VENT PIPE FROM BELOW.
9 3/4" COLD WATER PIPE FROM ABOVE.
10 2" SHOP AIR PIPE UP.
11 2" COLD WATER PIPE UP.
12 1 1/2" HOT WATER PIPE UP.
13 2 1/2" COLD WATER PIPE UP.
14 1" HOT WATER PIPE UP.
15 1 1/4" COLD WATER PIPE UP.
16 2" COLD WATER MAKE-UP FOR HVAC EQUIPMENT, REFER TO MECHANICAL
DRAWINGS FOR CONTINUATION. SEE BACKFLOW PREVENTOR DETAIL D4,
SHEET P-503
17 1/2" COLD WATER PIPE DOWN.
1 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
2 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
3 1/2" SHOP AIR OUTLET FOR PAINT SHAKERS #403. COORDINATE PIPE
CONNECTION, PROVIDE PRESSURE REGULATOR AS REQUIRED FOR ADJUSTING
PRESSURE TO EQUIPMENTS REQUIREMENT. REFER TO INTERIORS DRAWINGS
FOR EQUIPMENTS SPECIFIC REQUIREMENTS.
4 2" VENT PIPE FROM BELOW.
5 1-1/2" VENT PIPE FROM BELOW.
6 CONNECT GAS PIPING, SIZE AS NOTED TO MECHANICAL EQUIPMENT, REFER TO
GAS CONNECTION DETAIL C3/P-502.
7 3" VENT PIPE UP.
8 3" VENT PIPE FROM BELOW.
9 3/4" COLD WATER PIPE FROM ABOVE.
10 2" SHOP AIR PIPE UP.
11 2" COLD WATER PIPE UP.
12 1 1/2" HOT WATER PIPE UP.
13 2 1/2" COLD WATER PIPE UP.
14 1" HOT WATER PIPE UP.
15 1 1/4" COLD WATER PIPE UP.
16 2" COLD WATER MAKE-UP FOR HVAC EQUIPMENT, REFER TO MECHANICAL
DRAWINGS FOR CONTINUATION. SEE BACKFLOW PREVENTOR DETAIL D4,
SHEET P-503
17 1/2" COLD WATER PIPE DOWN.
1. REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL
GENERAL NOTES.
2. FOR CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS THIS
SHEET REFER TO DRAWING PF103.
ALL PIPING BELOW GRADE MUST BE SUPPORTED TO THE
STRUCTURAL FLOOR SLAB. SEE DETAIL B3, DRAWING P-501.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PL104
MATCHLINE
PL108
S A
S A
2"
2"
3" 3/4"
2 1/2"
1 1/2" 1 1/2"
V
2 1/2"
1"1 1/4" 2 1/2" 1 1/2"
VC-1
1 1/4"1"
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F
LO
O R
P
LA
N
A R
E A
C
U P
P E
R L
E V
E L
MRK
12822676
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PL106
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FLOOR PLAN - AREA C - UPPER LEVEL
1 2-1/2" COLD WATER PIPE DOWN.
2 1-1/2" HOT WATER PIPE DOWN.
3 1-1/4" COLD WATER PIPE DOWN.
4 1" HOT WATER PIPE DOWN.
5 2" COLD WATER PIPE DOWN.
6 3" VENT PIPE FROM BELOW.
7 3/4" COLD WATER PIPE DOWN.
8 2" VENT PIPE FROM BELOW.
9 2" SHOP AIR PIPE DOWN.
10 PIPING RUN HIGH IN LOW CEILING AREA.
REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PL105
FD-2
FD-1
P-11
P-11COMM.
WASH
RACK
(PROCESS)
WASH
RACK BAY
FIRE
PROTECTION
WATER
TREATMENT
SYSTEM
P-11
P-401 C1
N G
S A
S A
S A
S A
FD-1
ELEC.
FCO
FINISHED FLOOR ELEVATION = 10.00'
REM-2
FD-2
FD-2
T-1
W-2
W-1
F-1
1" 2"
2"
FOR ADDITIONAL WORK
THIS AREA SEE DRAWING
IW101
LOCKER
ROOM
(DIRTY)
WASH
RACK
STORAGE
137 WASH
RACK
(PROCESS)
JAN.
WASH
RACK
EQUIPMENT
FINISHED FLOOR
ELEVATION = 9.50'
WH-1
FD-2
FCO
V
V V
HB-1 HB-1
NG
N G
RWP-1
BT-2
WH-1
GCO
2"
2"
2"
3/4"
VC-1
S A
REM-1
2"
FD-2
WSP-1
RSP-1
RSP-2 BT-1
SF-1
6"
6"
PMB-1
GCO
2 1/2"
3" WCO
VC-1
HB-1
6"
4"
6"
INDUSTRIAL SUMP PIT, REFER TO
STRUCTURAL DRAWINGS FOR SIZE
AND CONSTRUCTION
C3 P-401
P-11
TD-1
TD-1
TD-1
FCO
HR-1
HR-1
HR-1
HR-1
HR-1
HR-1
B
B
B
B
D
D
TD-1
1 1/2"
1" 1 1/4"
1 1/2"
1 1/2"
2"
1"
2"
2"
2"
WASH RACK
(PROCESS)
1 1/4"
3/4"
R L
GCO
2 WAY
2 WAY
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F
LO
O R
P
LA
N
A R
E A
D
LO
W
E R
L E
V E
L
MRK
12822677
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PL107
SCALE: 1/8" = 1'-0"
PLUMBING FLOOR PLAN - AREA D - LOWER LEVEL
31 WASH SYSTEM SUPPLY PIPE UP, FOR REM-2.
32 WASH SYSTEM SUPPLY PIPE UP, FOR REM-1.
33 WASH SYSTEM SUPPLY PIPE DOWN TO REM-2.
34 FOAM SUPPLY PIPE TO REM-2.
35 FOAM SUPPLY PIPE TO REM-1.
36 1-1/2" GAS PIPE UP.
37 6" TANK FILL PIPE FROM RAIN FILTER RF-1.
38 6" TANK OVERFLOW PIPE TO EXTERIOR OF BUILDING.
39 1/2" COMPRESSED AIR DOWN TO REM-2 UNIT.
40 1/2" COMPRESSED AIR DOWN TO REM-1 UNIT.
41 3/4" COLD WATER PIPE UP.
42 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE
REEL AT 14'-0" ABOVE FINISHED FLOOR.
43 TO INDUSTRIAL WASTE SYSTEMS PRODUCT WATER STORAGE TANK.
44 FROM INDUSTRIAL WASTE SYSTEMS PRODUCT WATER STORAGE TANK.
45 6" RAIN LEADER DOWN FROM GUTTER ABOVE.
46 2" SUPPLY FOR F-1, W-1, AND W-2 FROM WSP-1.
16 RINSE WATER SYSTEM PIPING DOWN TO REM-2. SEE DETAIL A4, SHEET
P-503.
17 1 1/4" HOT WATER PIPE DOWN.
18 1 1/4" HOT WATER PIPE UP.
19 2" BREATHING AIR PIPE UP.
20 3/4" COLD WATER PIPE UP.
21 2" VENT PIPE FROM BELOW.
22 1-1/2" COLD WATER PIPE UP.
23 3/4" GAS PIPE UP.
24 2" COLD WATER PIPE UP.
25 RINSE WATER SYSTEM PIPING DOWN TO REM-1. SEE DETAIL A4, SHEET
P-503.
26 1" HOT WATER PIPE UP.
27 1" COLD WATER PIPING UP.
28 1-1/2" GAS PIPE DOWN TO BELOW GRADE. PROVIDE TRANSITION FITTING
BETWEEN STEEL PIPE AND PLASTIC PIPE MIN. 18" BELOW FINISHED
GRADE. FITTING TO MEET OR EXCEED THE REQUIREMENTS OF ASTM
D-2513, CATEGORY 1 ANSI B1.20, NFPA-58.
29 WASH SYSTEM SUPPLY PIPE TO REM-1.
30 1 1/2" COLD WATER FOR W-1 AND W-2 MAKE-UP WATER.
1 FLOOR DRAIN/TRENCH WASTE TERMINATES INTO INDUSTRIAL WASTE
SUMP PIT LOCATED IN WASH RACK 144, SHEET PF104.
2 GAS METER SERVICE MAIN FROM BELOW. SEE DETAIL A3, SHEET P-502.
3 SHOP AIR HOSE REEL CONNECTION. REFER TO DETAIL A2/P-501 FOR
REQUIREMENTS.
4 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR
REQUIREMENTS.
5 GAS METER BY LOCAL UTILITY COMPANY.
6 2" VENT PIPE UP.
7 2" SHOP AIR PIPE UP.
8 1 1/4" NATURAL GAS PIPE UP.
9 REFER TO DRAWING IW101 FOR CONTINUATION.
10 3" VENT PIPE UP.
11 WASH WATER SYSTEM PIPING UP FROM WSP-1.
12 RINSE WATER SYSTEM PIPE UP FROM RSP-1.
13 RINSE WATER SYSTEM PIPE UP FROM RSP-2.
14 4" PUMPED INDUSTRIAL SYSTEM SUPPLY FROM SUMP PUMPS LOCATED IN
INDUSTRIAL SUMP PIT.
15 1 1/4" COLD WATER PIPE UP.
1/8" = 1' - 0" 0 5' 10' 15' 30'
GENERAL NOTES GRAPHIC SCALE
KEY PLAN
CONSTRUCTION NOTES#
AREA
A
AREA
B
AREA
D
AREA C
V-147
1. REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL
GENERAL NOTES.
2. FOR CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS THIS
SHEET REFER TO DRAWING PF104.
ALL PIPING BELOW GRADE MUST BE SUPPORTED TO THE
STRUCTURAL FLOOR SLAB. SEE DETAIL B3, DRAWING P-501.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
PL106
SASA
SA
S A
NG
2"
2"
2"
1 1/4"
1 1/4"
1"
1 1/4"
NG
1 1/4"
NG
2 3 4 5
V V
V
VC-1
3"
1 1/2"
1 1/4" 1 1/4"
3/4"
3/4"
3/4"
2"
1 1/2"
1 1/2"
3/4"
2"
SA SA
OFF SET
2"
S A
IW
IW
IW
IW
NG
IW
IW
IW
4 B
B
WHA-C
WHA-C
WHA-C
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
P
LU
M B
IN
G
F
LO
O R
P
LA
N
A R
E A
D
U P
P E
R L
E V
E L
MRK
12822678
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
PL108
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
SCALE: 1/8" = 1'-0"
PLUMBING FLOOR PLAN - AREA D - UPPER LEVEL
1 2" SHOP AIR PIPE DOWN.
2 3" VENT PIPE DOWN.
3 WASH WATER SYSTEM PIPING DOWN TO WSP-1.
4 RINSE WATER PIPING DOWN TO RSP-1.
5 RINSE WATER PIPING DOWN TO RSP-2.
6 RINSE WATER PIPING DOWN TO REM-1 (WATER CANNON). SEE DETAIL A4,
SHEET P-503.
7 RINSE WATER PIPING DOWN TO REM-2 (WATER CANNON). SEE DETAIL A4,
SHEET P-503.
8 1 1/4" HOT WATER PIPE UP.
9 1 1/4" HOT WATER PIPE DOWN.
10 1-1/4" COLD WATER PIPE DOWN.
11 3/4" COLD WATER PIPE DOWN.
12 3/4" NATURAL GAS PIPE DOWN.
13 1 1/2" COLD WATER PIPE DOWN.
14 1" COLD WATER PIPING DOWN.
15 WASH WATER SYSTEM PIPING DOWN.
16 1" HOT WATER PIPE DOWN.
17 2" COLD WATER PIPE DOWN.
18 1-1/4" GAS PIPE DOWN TO A POINT 18" ABOVE FINISHED FLOOR.
19 WASH SYSTEM SUPPLY PIPE DOWN TO REM-2.
20 FOAM SUPPLY PIPE TO REM-2.
21 WASH SYSTEM PIPE DOWN.
22 FOAM SYSTEM SUPPLY PIPE DOWN.
23 1-1/4" GAS PIPE DOWN.
24 1" GAS PIPE DOWN.
REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
FD-1
P-1P-1A
P-7
P-3A
P-5
FD-1
WCO
WHA-C
1 1/4"
FD-1
FD-1FD-1FD-1
P-7AP-7AP-7A
P-7
FCO
WOMEN'S
LOCKER
ROOM
(CLEAN)
MEN'S
LOCKER
ROOM
(CLEAN)
FILTER
STORAGE
1 1/4"
3/4"
3/4"
2"
3/4" 1"
3/4"
2" V UP
1 1/2"
3 3 3
5 5 5
2"
VC-1
VC-1
V V
VC-1
3/4"
A
JAN.
1 1/4"
3/4" 2"
HB-1
FD-1
GWH-1 FD-2
FD-2
BFP-1
FD-2
MEN'S
LOCKER
ROOM
(CLEAN)
TMV-1
WM-1
WCO
WCO
P-3AP-3AP-3A
P-2P-2A
WHA-B
WHA-C
WCO
ET-1
MECH
104A
1"
2"
2"
1/2"
3"
1 1/2" 1 1/2" 1 1/2"
NG
3"
3/4"
2"
BP-1
1/2"
1"
3"
3"
3" 2 1/2"
1 1/2"
2"
3/4"
1"
1 1/2"
1 1/2"
2 1/2" 2 1/2"
2"
3/4"
VC-1
V
V
V
V V
V
V
FCO
A B
P-1A P-1 P-1 P-1
1 1/2"
HB-1
1 1/2"
P-5
P-1A
P-1A
P-3
P-3
P-4B
FD-1
FD-1
NG NG
SA
P-8
N G
WCO
P-7BP-7BP-7B
WHA-B
1 1/2"
1 1/4"
2"
2"
2"
1 1/4"
1 1/2"
1 1/4"
2"
1 1/2"
FD-2
FD-2
V
2" 2"
41 1/2"
1 1/4"
1 1/2"
1 1/4"
3/4"
1 1/2"
2"
1"
1"
N G
N G
VC-1
VC-1 VVV
V
V V
HB-1
1/2"
3 D C 1
LOCKER
ROOM
(DIRTY)
TOILET
WASH
RACK
(PROCESS)
JAN.
2" V UP
WH-1
6"
8"
CONNECT TO DOWN
SPOUT PIPING
6" TO STORM
FILTER SF-1
INTERIOR OF
BUILDING
OVERFLOW
3"6"
3"
RL
RL
1 1/2" RL TYPICAL
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P A
IN
T
F A
C
IL
IT
Y
E N
LA
R
G E
D P
LA
N
S
MRK
12822679
JBW DLR
SDS/RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
P-401 1/4" = 1' - 0"
0 5' 10' 15'1'
GRAPHIC SCALE(S)
# KEY NOTES
GENERAL NOTES
SCALE: 1/4" = 1'-0" (PL101)A3
ENLARGED SHOWER PLAN
SCALE: 1/4" = 1'-0" (PL103)A1
ENLARGED BATHROOM PLAN
1 3" WATER SERVICE PIPE FROM BELOW.
2 4" WASTE PIPE FROM ABOVE.
3 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
4 1-1/2" VENT PIPE FROM BELOW.
5 FLOOR DRAIN/TRENCH WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT
LOCATED IN WASH RACK 144, SHEET PF104.
6 GAS WATER HEATER GWH-1: SEE DETAIL A1, SHEET P-502.
7 DOMESTIC WATER BOOSTER PUMP BP-1: SEE DETAIL A2, SHEET P-503.
SCALE: 1/4" = 1'-0" (PL107)C1
ENLARGED LOCKER ROOM/DECONTAMINATION PLAN
REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
NOTE: CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS CAN FOUND ON DRAWING PF104
NOT TO SCALE (PF104)C3
STORM PIPING SECTION
NOTE:
PIPING SHOWN MUST BE RUN EXTERIOR OF BUILDING AND
SECURED TO EXTERIOR WALL OF BUILDING.
NOT TO SCALE (PF104)C4
HANGAR DOOR DRAINAGE
BT-2
2 A
NOTE: CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS CAN FOUND ON DRAWING PF102
NOTE: CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS CAN FOUND ON DRAWING PF101
NOTE:
COORDINATE 1-1/2" RL PIPE DROPS WITH SPECIFIC HANGAR DOORS
MANFACTURER GUIDE RAIL LOCATIONS.
MICHAEL R. KARCHERC
O
M M
O
NWEA L T H OF V
I RG
I N
I A
P R
O F
E S S I ONA L E NG
I N E
E RLic. No. 013270
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P
BA
BALL VALVE W/ AIR BLEED OFF
FILTER+REGULATOR COMBO, 5 MICRON FILTER, 1/2" NPTF, 1/4" GAUGE
CONNECTION, 150 PSI MAX. PRESSURE, 0-30 PRESSURE CONTROL RANGE,
90 SCFM FLOW RATE, POLYCARBONATE BOWL, AUTOMATIC DRIP VALVE
DRAIN
1/2" PIPE DROP
BREATHING
AIR MAIN
1/2" DRAIN VALVE
STAND-OFF PIPE SUPPORTS @ 4'-0" O.C.
B A
HR-1
AIR HOSE MUST BE HEAVY DUTY,
CERTIFIED CLASS "C", BLUE, RATED FOR
BREATHING AIR - 3/8" ID X 100'
3/8" BRASS
QUICK CONNECT
1/2"
SA
BALL VALVE W/ AIR BLEED OFF
FILTER+REGULATOR+LUBRICATOR COMBO, 40 MICRON FILTER, 3/4" NPTF
CONNECTION, 1/4" GAUGE CONNECTION, 150 PSI MAX. PRESSURE, 0-125
PRESSURE CONTROL RANGE, 270 SCFM FLOW RATE, POLYCARBONATE
BOWL, AUTOMATIC DRIP VALVE DRAIN, 16 OZ AUTOMATIC LUBRICATOR
1" PIPE DROP
SHOP AIR
MAIN
1/2" DRAIN VALVE
STAND-OFF PIPE SUPPORTS @ 4'-0" O.C.
S A
HR-1
AIR HOSE MUST BE HEAVY DUTY,
CERTIFIED CLASS "B", BLACK - 3/4" ID X
100'
3/4" TWIST-CLAW
HOSE COUPLING
1"
SA
BALL VALVE W/ AIR BLEED OFF
3/4"
3/4" PIPE DROP
SHOP AIR
MAIN
1/2" DRAIN VALVE
STAND-OFF PIPE SUPPORTS @ 4'-0" O.C.
S A
HR-1
AIR HOSE MUST BE HEAVY DUTY,
CERTIFIED CLASS "B" , RED - 1/2" ID X 100'
1/2" BRASS QUICK
CONNECT
FILTER+REGULATOR+LUBRICATOR COMBO, 40 MICRON FILTER, 3/4" NPTF
CONNECTION, 1/4" GAUGE CONNECTION, 150 PSI MAX. PRESSURE, 0-125
PRESSURE CONTROL RANGE, 270 SCFM FLOW RATE, POLYCARBONATE
BOWL, AUTOMATIC DRIP VALVE DRAIN, 16 OZ AUTOMATIC LUBRICATOR
TRUE UNION BALL VALVES -
THESE WILL SERVE AS A
DISCONNECT UNION FOR PUMP
REMOVAL.
5 5
PUMPS OFF
PUMP #1 ON
PUMPS #1 & #2 ON
HIGH WATER ALARM
4"
3"3"
TO WATER
TREATMENT SYSTEM
S P
D
S P
D
S P
D
S P
D
SPD
SPD
SPD
IWP-1 IWP-1
SA
BALL VALVE W/ AIR BLEED OFF
FILTER+REGULATOR COMBO, 5 MICRON FILTER, 3/4" NPTF
CONNECTION, 1/4" GAUGE CONNECTION, 150 PSI MAX.
PRESSURE, 0-125 PRESSURE CONTROL RANGE, 90 SCFM FLOW
RATE, POLYCARBONATE BOWL, AUTOMATIC DRIP VALVE DRAIN
3/4" PIPE DROP
SHOP AIR
MAIN
1/2" DRAIN VALVE
STAND-OFF PIPE SUPPORTS @ 4'-0" O.C.
S A
HR-1
AIR HOSE MUST BE HEAVY DUTY,
CERTIFIED CLASS "B", YELLOW, 5/16"
ID X 100'
1/2" BRASS
QUICK CONNECT
3/4"
SOLENOID VALVE FOR CONTROL OF
SUPPLY AIR, REFER TO DDC CONTROL
SYSTEM ON DRAWING M-802
COLD WATER
SUPPLY
HOT WATER
SUPPLY
LAVATORY
TMV-2: ASSE
1070 MIXING
VALVE
P-3
4 X 4 X 1/4
PLATE WASHER
STEEL REINFORCING
BAR (TYP)
REINFORCED CONCRETE
FLOOR SLAB
3/4" DIA GALVANIZED
STEEL ROD
CLEVIS…
This is the start of the file's text. The full file is on GovTribe.