About this file

This solicitation is for an indefinite-delivery, indefinite-quantity, multiple award construction contract to provide large general construction projects primarily in the Hampton Roads Area of Responsibility in Virginia. The Navy seeks to award up to five contracts for a five-year base period and a five-year option. The total contract value is not to exceed $500 million per awardee. Work will include new construction, repair, alteration, and renovation of facilities. Response date is August 6, 2021. The Department of the Navy Naval Facilities Engineering Command is the issuing agency.

View the file

Other files

File Type Posted
21R2507 0016.pdf PDF
21R2507 0015.pdf PDF
21R2507 0018.pdf PDF
21R2507 0019.pdf PDF
21R2507 0017.pdf PDF
SKM-1.pdf PDF
21R2507 0014.pdf PDF
21R2507 0013.pdf PDF
21R2507 0012.pdf PDF
21R2507 0011.pdf PDF
21R2507 0010.pdf PDF
21R2507 0009.pdf PDF
21R2507 0008.pdf PDF
P1035 Site Visit.pdf PDF
ATT G SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
21R2507 0007.pdf PDF
21R2507 0006.pdf PDF
21R2507 0005.pdf PDF
One Day Pass Request.xls XLS spreadsheet
ATTACHMENT E Historical SB Utilization.docx DOCX document
21R2507 0004.pdf PDF
21R2507 0003.pdf PDF
1614720dwg03of16_CivilR.pdf PDF
1614720 P1035 DesRev01 17Nov2020.pdf PDF
1614720dwg02of16_BoringsR.pdf PDF
1614720dwg09of16_GeneralR.pdf PDF
21R2507 0002.pdf PDF
1614720dwg07of16_ArchitecturalR.pdf PDF
1614720dwg15of16_CathodicR.pdf PDF
Attachment A Con Des.docx DOCX document
21R2507 0001.pdf PDF
Attachment C SB Commitment.docx DOCX document
Attachment D PPI Log.xlsx XLSX spreadsheet
Attachment B PPQ.docx DOCX document
1614720_P1035 SID BINDER.pdf PDF
1614720dwg12of16_WaterTreatment.pdf PDF
1614720dwg14of16_Electrical.pdf PDF
1614720dwg09of16_General.pdf PDF
Price Proposal Form 11-13-20.pdf PDF
1614720spc02of03.pdf PDF
N4008521R2507 RFP.pdf PDF
1614720_P1035 CxPlan w FPT and PFC.pdf PDF
1614720dwg16of16_Telecom.pdf PDF
1614720dwg08of16_Interiors.pdf PDF
1614720_P1035 Bldg V-57 Laundry - 1943 dwgs.pdf PDF
1614720dwg04of16_Landscape.pdf PDF
1614720dwg15of16_Cathodic.pdf PDF
1614720_P1035 OPR.pdf PDF
1614720dwg02of16_Borings.pdf PDF
1614720spc03of03.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENT THROUGH ROOF - DIAGRAMMATIC

WATER HAMMER ARRESTOR

'A'

DOMESTIC COLD WATER

DOMESTIC HOT WATER (120°F)

DOMESTIC HOT WATER RECIRCULATING

HIGH VOLUME WATER PIPING

UNION

WALL HYDRANT (WH)

HOSE BIBB (HB)

OVERFLOW RAINLEADER PIPINGORL

RAINLEADER PIPINGRL

VENT PIPING

PIPE TURNING DOWN

PIPE TURNING UP

PITCH DOWN IN DIRECTION OF ARROW

NATURAL GAS PIPINGNG

A COMPRESSED AIR RISER DESIGNATION - BREATHING

WALL CLEANOUTWCO

CLEANOUT PLUGCOP

WASTE RISER DESIGNATION - INDUSTRIAL

WATER RISER DESIGNATION - DOMESTIC

VALVES AND ACCESSORIES

BACKFLOW PREVENTER (BFD)

BALL VALVE

CAPPED PIPE

CHECK VALVE

DIRECTION OF FLOW

FLEXIBLE CONNECTION

MANUAL AIR VENT

HOT WATER BALANCING STATION

PLUG VALVE

PIPE GUIDE

PRESSURE REDUCING VALVE

TEMPERATURE AND PRESSURE RELIEF VALVE (T&P)

PRESSURE GAUGE WITH GAUGE COCK

STRAINER

THERMOMETER

VACUUM BREAKER

GENERAL

LEGEND

FLOOR DRAIN/SINK WITH DEEP SEAL P-TRAPFD

CLEANOUT, GRADE TYPE

GCO

CLEANOUT, FLOOR TYPE

FCO

BRANCH SIDE CONNECTION

BRANCH TOP CONNECTION

BRANCH BOTTOM CONNECTION

STORM DRAINAGE PIPINGST

HVW

A

A

V

PUMPED DISCHARGE PIPINGPD

GAS RISER DESIGNATION#

# CONSTRUCTION NOTE IDENTIFICATION

INDUSTRIAL WASTE PIPINGIW

SOLUTION MIX PIPINGSMS

FS

BREATHING AIR PIPINGBA

SHOP AIR PIPINGSA

SUMP PUMP/PIT DISCHARGE PIPINGSPD

# COMPRESSED AIR RISER DESIGNATION - SHOP

WASTE RISER DESIGNATION - SANITARY#

WATER RISER DESIGNATION - INDUSTRIALA

STORM WATER RISER DESIGNATION#

HIGH PRESSURE PIPINGHP

ROOM NUMBER007

SOLUTION MIX PIPINGSM

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

L E

G E

N D

MRK

12822666

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

P-001

ABA ARCHITECTURAL BARRIERS ACT

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AP ACCESS PANEL

ATM ATMOSPHERE

BA BREATHING AIR

DIA DIAMETER

DN DOWN

DWG DRAWING

FF FINISHED FLOOR

FS FLOOR SINK

GA GAUGE

GFCI GOVERNMENT FURNISHED/CONTRACTOR INSTALLED

GPM GALLONS PER MINUTE

HB HOSE BIBB

IW INDUSTRIAL WASTE

M3 CUBIC METERS

MG MILLIGRAM

OD OVERFLOW DRAIN

PPM PARTS PER MILLION

RBJ RUN THRU JOISTS

RD ROOF DRAIN

RL RAINLEADER

RP RECIRCULATION PUMP

S.S. STAINLESS STEEL

SA SHOP AIR

SPD SUMP PUMP DISCHARGE

TA TOOL AIR

TMV THERMOSTATIC MIXING VALVE

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

WHA-'A' WATER HAMMER ARRESTOR AND SIZE

WSV WATER STACK VENT

WVB WATER VALVE BOX

1. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH PLUMBING DRAWING OF THIS SET. NOTES SPECIFIC TO

INDIVIDUAL PLUMBING DRAWINGS WILL BE SHOWN ON THE RESPECTIVE PLUMBING DRAWINGS.

2. PROVIDE LABOR, MATERIAL, AND EQUIPMENT REQUIRED FOR THE COMPLETION AND OPERATION OF SYSTEMS IN THIS SECTION OF WORK IN ACCORDANCE WITH CONTRACT PLANS, SPECIFICATIONS AND APPLICABLE STATE AND LOCAL CODES.

3. PROVIDE A COMPLETE SYSTEM OF HOT AND COLD WATER, AND WASTE AND VENT PIPING TO FIXTURES WITHIN THE BUILDING.

4. WATER, SOIL, WASTE, VENT, NATURAL GAS, AND COMPRESSED AIR PIPING LINES MUST BE CONCEALED IN THE BUILDING CONSTRUCTION, EXCEPT WHERE INDICATED OTHERWISE. IN SPACES WITH NO CEILINGS, MECHANICAL SPACES, INDUSTRIAL AREAS, AND PIPING RUN AT PRE-FABRICATED WALLS LOCATIONS, ROUTE PIPING TO HOLD TIGHT TO CEILING, WALL OR FLOOR.

5. CONTRACTOR MUST PREPARE AND MAINTAIN ACCURATE RECORD DRAWINGS AT THE PROJECT SITE.

6. MAKE PROPER PIPING CONNECTIONS TO FIXTURES AND EQUIPMENT EVEN THOUGH ALL BRANCH MAINS, ELBOWS AND

CONNECTIONS ARE NOT SHOWN.

7. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES.

8. ROUTING OF PIPING MUST BE COORDINATED WITH OTHER TRADES.

9. DESIGN SHOWS ALL PLUMBING VENTS TERMINATING THROUGH THE WALL, WHEN A PLUMBING VENT PIPE MUST EXIT THROUGH THE ROOF AND THE PLUMBING VENT PIPE EXITS THROUGH THE ROOF WITHIN A 15'-0" RADIUS OF A ROOF TOP UNIT OR FRESH AIR

INTAKE THE VENT PIPE MUST BE OFFSET TO CLEAR OUTSIDE THE RADIUS.

10. PROTECT COPPER PIPING AGAINST CONTACT WITH MASONRY OR DISSIMILAR METALS. HANGERS, SUPPORTS, ANCHORS AND

CLIPS MUST BE COPPER OR COPPER PLATED.

11. PROVIDE SHUT-OFF VALVES AND BACKFLOW PREVENTION DEVICES AT CONNECTIONS TO NON-POTABLE WATER SYSTEMS AND

EQUIPMENT.

12. INSTALL CLEANOUTS AT THE BASE OF DRAINAGE STACKS.

13. PROVIDE UL LISTED THROUGH WALL FIRE STOPPING ASSEMBLIES FOR EACH PENETRATION OF FIRE-RATED WALLS AND

ASSEMBLIES.

14. PROVIDE DISCONNECT SWITCHES, VFD'S, STARTERS AND OTHER COMPONENTS REQUIRED FOR OPERATION OF THE PLUMBING EQUIPMENT AS DESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS. THE ELECTRICAL CONTRACTOR MUST PROVIDE CONDUIT AND WIRING FROM THE POWER SOURCE TO THE DISCONNECT SWITCH, FROM THE DISCONNECT SWITCH TO THE STARTER OR VFD, AND FROM THE STARTER OR VFD TO THE FINAL PLUMBING EQUIPMENT CONNECTION.

15. COORDINATE PIPING WITH ELECTRICAL PANELS AND EQUIPMENT. RUN PLUMBING PIPING SUCH THAT IT DOES NOT RUN ABOVE

ELECTRICAL PANELS, SWITCH GEAR, AND SIMILAR ELECTRICAL EQUIPMENT.

16. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE LISTING REQUIREMENTS.

17. COORDINATE FLOOR DRAIN(S) WITH EQUIPMENTS HOUSE KEEPING PAD.

18. LOCATE AND SIZE CONCRETE HOUSEKEEPING PADS IN ACCORDANCE WITH ACTUAL EQUIPMENT PURCHASED. EXTEND PAD

BEYOND EQUIPMENT FOR 6" IN ALL DIRECTIONS.

19. EQUIPMENT OF HIGHER CHARACTERSTICS MAY BE FURNISHED PROVIDED SUCH PROPOSED EQUIPMENT IS APPROVED IN WRITING AND CONNECTING ELECTRICAL SERVICE, CIRCUIT BREAKERS AND CONDUIT SIZES ARE APPROPRIATELY MODIFIED AT

NO COST TO THE OWNER.

20. WHEN CONSTRUCTION IS COMPLETE, THOROUGLY CLEAN EQUIPMENT, FIXTURES AND MATERIALS PRIOR TO TURN-OVER TO THE

OWNER.

21. ALL PIPING AND EQUIPMENT MUST BE LABELED AND ALL VALVES MUST BE TAGGED.

22. COORDINATE FLOOR DRAINS LOCATED UNDER TOILET PARTITION WITH TOILET PATITION FLOOR MOUNTING HARDWARE.

23. REFER TO STRUCTURAL DRAWINGS FOR CHAMFER REQUIREMENTS FOR HOUSE CLEANING PADS.

24. LOCATE WATER HAMMER ARRESTORS IN ACCESSIBLE LOCATIONS, OR PROVIDE ACCESS AS REQUIRED. SEE DETAIL B2 SHEET P-503.

25. PROVIDE ACCESS PANELS FOR VALVES AND EQUIPMENT LOCATED WITHIN WALLS AND ABOVE HARD CEILINGS.

26. HOSE REELS MUST BE MOUNTED AT 14'-0"ABOVE FINISHED FLOOR TO CENTER LINE OF HOSE REEL.

27. CONTRACTOR MUST PROVIDE THE REQUIRED EQUIPMENT, VALVES, FITTINGS, ETC. AS NEEDED FOR FINAL CONNECTION TO ALL EQUIPMENT REQUIRING A PLUMBING CONNECTION. REFER TO DRAWINGS, PLUMBING SCHEDULES AND INTERIOR DRAWINGS FOR

EQUIPMENT REQUIRING PLUMBNING CONNECTIONS.

28. EXPOSED PIPING WILL BE RUN PARALLEL AND STACKED IN A NEAT AND ORDERLY MANNER IN THE BAYS: FOR CLARITY, DRAWINGS

SHOW PIPING AWAY FROM THE WALL FOR INFORMATION ONLY.

29. EVERY EFFORT HAS BEEN MADE DURING DESIGN TO IDENTIFY MAJOR BLOCK-OUTS AND HOLES OVER 2" ROUND THROUGH THE PRE-CAST CONCRETE WALL PANELS ABOVE AND BELOW THE SLAB-ON GRADE FLOOR. IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE THE VARIOUS CONSTRUCTION TRADES UNDER HIS CONTRACT TO REVIEW AND CONFIRM THOSE , AS WELL AS LOCATE, COORDINATE AND MARK-UP THOSE NOT SHOWN THAT ARE GREATER THEN THE ALLOWED 2" ROUND FIELD CORE DRILL ON THE PRE-CAST CONCRETE SHOP DRAWINGS, PRIOR TO SUBMISSION TO THE ARCHITECT/ENGINEER.

30 REFER TO DRAWING IW001 FOR COORDINATION OF WORK BETWEEN THE INDUSTRIAL WASTE SYSTEM AND THE PLUMBING

SYSTEM.

31 WIRELESS CONNECTIONS MUST BE PROVIDED ON EQUIPMENT NOTED FOR SUCH A CONNECTION IN THE CYBERSECURITY DOCUMENTS. NO OTHER DEVICE OR EQUIPMENT SHALL BE PROVIDED WITH A WIRELESS CONNECTION.

32 PROVIDE PRESSURE REGULATOR FOR EQUIPMENT REQUIRING A DIFFERENT PRESSURE THAN SYSTEMS SUPPLIED PRESSURE.

GENERAL NOTESABBREVIATIONS

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

MATCHLINE

PF102

IW

IW

SANSAN SAN

SAN

S A

N

S A

N

IW

IW

IW

IW

S A

N

3" IW

3"

4"

2" IW

2" IW2" IW 2" IW 2" IW

FINISHED FLOOR ELEVATION = 10.00'

4"

4"

3"

3"

4"

3" IW

2" IW

3"

4"

3"

4"

4"

4"

4"

4"4"

1 1/2" IW

4" 4"

S A

N

S A

N

S A

N

S A

N

2"

S A

N

S A

N

3" IW

N G

2" IW

A

2"

4"

S A

N

3"

2"

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F O

U N

D A

TI

O

N P

LA

N

A

R E

A A

MRK

12822667

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PF101

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FOUNDATION PLAN - AREA A

1 REFER TO CIVIL DRAWING CU101 FOR CONTINUATION.

2 4" SANITARY SEWER INVERT ELEVATION AT 5'-0" BEYOND EXTERIOR WALL =

6.00' (48" BELOW FINISHED FLOOR).

3 4" WASTE PIPE FROM GRADE CLEANOUT ABOVE.

4 2" VENT PIPE UP.

5 4" WASTE PIPE FROM FLOOR DRAIN ABOVE.

6 4" WASTE PIPE FROM ABOVE.

7 1-1/2" VENT PIPE UP.

8 3" WASTE PIPE FROM FLOOR DRAIN ABOVE SEE DETAIL A1, SHEET P-503

(TYPICAL).

9 2" WASTE PIPE FROM FLOOR DRAIN ABOVE.

10 4" WASTE PIPE FROM FLOOR CLEANOUT ABOVE.

11 2" GAS PIPE FROM ABOVE.

12 REFER TO CIVIL DRAWING CU101 FOR CONTINUATION OF GAS PIPING TO

EMERGENCY GENERATOR.

13 REFER TO FLEXIBLE PIPE CONNECTION BELOW SLAB DETAIL C2/P-504.

SOIL CONDITIONS ARE UNSTABLE, UNDERFLOOR PIPING MUST BE

SUPPORTED TO THE STRUCTURAL SUPPORTED FLOOR SLAB

ABOVE. SEE DETAIL B3 ON DRAWING P-501.

REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL

GENERAL NOTES.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PF103

MATCHLINE

PF101

IW

IW

IW

IW

IWS

A

N

IW

IW

FINISHED FLOOR ELEVATION = 10.00'

4"

4"

3"

4"

4"

4"

4"

3"

2" V

4"

4" 2

2" IW

1 1/2" IW

4"

3"

2"

IW

IW

IW

IW

4"

A

B

C C

C

4"

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F O

U N

D A

TI

O

N P

LA

N

A

R E

A B

MRK

12822668

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PF102

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FOUNDATION PLAN - AREA B

1 3" WATER SERVICE UP, PROVIDE SHUT-OFF VALVE 12" ABOVE FINISHED FLOOR

IN VERTICAL.

2 4" WASTE PIPE FROM FLOOR CLEANOUT ABOVE.

3 3" WASTE PIPE FROM FLOOR DRAIN ABOVE SEE DETAIL A1, SHEET P-503

(TYPICAL).

4 1-1/2" VENT PIPE UP.

5 2" VENT PIPE UP.

6 REFER TO CIVIL DRAWING CU101 FOR CONTINUATION.

7 4" WASTE PIPE FROM FLOOR DRAIN ABOVE.

8 4" WASTE PIPE FROM WALL CLEANOUT ABOVE.

9 REFER TO FLEXIBLE PIPE CONNECTION BELOW SLAB DETAIL C2/P-504.

SOIL CONDITIONS ARE UNSTABLE, UNDERFLOOR PIPING MUST BE

SUPPORTED TO THE STRUCTURAL SUPPORTED FLOOR SLAB

ABOVE. SEE DETAIL B3 ON DRAWING P-501.

REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL

GENERAL NOTES.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PF102

MATCHLINE

PF104

IW

IW

IW

IW

IW

IW

IW

IW

FINISHED FLOOR ELEVATION = 10.00'

4"

4"

4"

4"

4"

4"

4"

2" IW

2"

4"

4"

IW

IW

4"

3"

3"

6"

4"

3" 3"

IW

IW

IW

IW

4"

C

C

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F O

U N

D A

TI

O

N P

LA

N

A

R E

A C

MRK

12822669

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PF103

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

SCALE: 1/8" = 1'-0"

PLUMBING FOUNDATION PLAN - AREA C

AREA

A

AREA

B

AREA

D

AREA C

V-147

1 4" WASTE PIPE FROM FLOOR DRAIN ABOVE.

2 3" WASTE PIPE FROM FLOOR DRAIN ABOVE SEE DETAIL A1, SHEET P-503

(TYPICAL).

3 1-1/2" VENT PIPE UP.

4 4" WASTE PIPE FROM WALL CLEANOUT ABOVE.

5 2" VENT PIPE UP.

6 4" WASTE PIPE FROM FLOOR CLEANOUT ABOVE.

7 COORDINATE VENT PIPE ROUTING WITH MECHANICAL EQUIPMENT/DUCTWORK

ABOVE.

SOIL CONDITIONS ARE UNSTABLE, UNDERFLOOR PIPING MUST BE

SUPPORTED TO THE STRUCTURAL SUPPORTED FLOOR SLAB

ABOVE. SEE DETAIL B3 ON DRAWING P-501.

REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PF103

IW

IW

IW

IW

SPD

FINISHED FLOOR ELEVATION = 10.00'

6"

4"

4"

6"3"

4"

4"

3"

3" IW

2" IW

4" SPD

4"

4"

6"

6"

6" 6"

R L

3"

3"

2"

4" 4"

4"4"

4"

6"

8"

3"

6"6"

3"

6" 6"

6"

6"

4"

IWP-1 IWP-1

BWV-1

C3 P-401

C4 P-401

IW

R L

RLRL

R L

R L

R L

RL RL

RL

SPD

3 D

D

1 1/4"

32 32

3"

TYP

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F O

U N

D A

TI

O

N P

LA

N

A

R E

A D

MRK

12822670

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PF104

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FOUNDATION PLAN - AREA D

1 REFER TO CIVIL DRAWING CU101 FOR CONTINUATION.

2 4" WASTE PIPE FROM GRADE CLEANOUT ABOVE.

3 4" WASTE PIPE FROM FLOOR DRAIN ABOVE.

4 4" WASTE PIPE FROM TRENCH DRAIN ABOVE.

5 2" VENT PIPE UP.

6 1-1/2" VENT PIPE UP.

7 3" WASTE PIPE FROM FLOOR DRAIN ABOVE SEE DETAIL A1, SHEET P-503

(TYPICAL).

8 4" WASTE PIPE FROM FLOOR CLEANOUT ABOVE.

9 NATURAL GAS PIPE UP TO SERVICE METER ABOVE.

10 4" WASTE PIPE DOWN, 2" VENT PIPE UP.

11 EQUIPMENT FLOOR PIT. REFER TO STRUCTURAL DRAWINGS FOR SIZE.

12 4" WASTE PIPE FROM TRENCH DRAIN ABOVE. PROVIDE TRENCH DRAIN

ASSEMBLY WITH SUMP BASIN AT OUTLET LOCATION, SUMP BASIN TO HAVE

REMOVABLE SEDIMENT BUCKET.

13 4" SANITARY SEWER INVERT ELEVATION AT 5'-0" BEYOND EXTERIOR WALL =

7.50' (30" BELOW FINISHED FLOOR).

14 8" STORM PIPE FROM ABOVE.

15 8" STORM PIPE INVERT ELEVATION AT 5'-0" BEYOND EXTERIOR WALL = 7.00'(36"

BELOW FINISHED FLOOR)

16 4" SUMP PUMP DISCHARGE PIPE UP.

17 3" VENT PIPE UP.

18 1-1/2" STORM PIPE FROM HANGAR DOOR TRACK DRAINAGE ABOVE TYPICAL.

19 6" STORM PIPE INVERT ELEVATION = 8.00' (24" BELOW FINISHED FLOOR).

20 6" STORM PIPE INVERT ELEVATION AT 5'-0" BEYOND EXTERIOR WALL = 7.00' (36"

BELOW FINISHED FLOOR).

21 3" INDUSTRIAL WASTE PIPE FROM WALL CLEANOUT ABOVE.

22 1 1/4" GAS PIPE FROM ABOVE.

23 1 1/4" GAS PIPE TO MECHANICAL EQUIPMENT HV-1.

24 CONNECT GAS PIPING, SIZE AS NOTED TO MECHANICAL EQUIPMENT, REFER TO

GAS CONNECTION DETAIL C3/P-502.

25 4" SUMP PUMP DISCHARGE PIPE UP FROM IWP DUPLEX PUMP SYSTEM BELOW.

26 PIPING SLOPED AT 1/2" PER FOOT.

27 PIPE INVERT IS -72" (6'-0) BELOW FINISHED FLOOR ELEVATION 10.00'

28 BACKWATER VALVE ACCESS.

29 SPD PIPE TO BE RUN 8" BELOW BOTTOM ELEVATION OF WASH BAY SLAB

FLOOR.

30 REFER TO FLEXIBLE PIPE CONNECTION BELOW SLAB DETAIL C2/P-504.

31 6" STORM PIPE FROM GRADE CLEANOUT ABOVE.

32 END OF 6" PIPE SHALL NOT PROTRUDE INTO LIFT TABLE PIT NO MORE THAN 3"

AND INVERT ELEVATION MUST BE LEVEL WITH PIT FLOOR ELEVATION.

COORDINATE EXACT PIPE LOCATION AND DEPTH OF PROTRUSION WITH

ACTUAL LIFT TABLE BEING INSTALLED.

SOIL CONDITIONS ARE UNSTABLE, UNDERFLOOR PIPING MUST BE

SUPPORTED TO THE STRUCTURAL SUPPORTED FLOOR SLAB

ABOVE. SEE DETAIL B3 ON DRAWING P-501.

REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PL103

FD-2

FD-2

FD-2

P-4B

P-4B

P-11A

CORR.

AIR DRY

PMB BAY

SUPPLY

AIR

PLENUM

114C

FILTER

STORAGE

MEN'S

LOCKER

ROOM

(CLEAN)

BLAST

MEDIA

STORAGE

BLAST

MEDIA

RECOVERY

ELEC.

P-401 A3

FD-2

P-11A

GCO

WH-1

FD-2 FD-2

FCO

FCO

WH-1

SA

BA

SA

BA

BA

SA

BA

SA

PMB BAY

EXHAUST

AIR

PLENUM

PMB

STORAGE

LOCKER

ROOM

(DIRTY)

WH-1

FD-1

FINISHED FLOOR ELEVATION = 10.00'

COMM.

HB-1

1 1/2" V

SAC-1

BAC-1

BAC-2

SAC-2

BAD-2 BAD-1SAD-2 SAD-1

3/4" 1 1/2"

1 1/2"

3/4"

1 1/2"

1 1/2"

2"

2"

1 1/2"

3/4"

2"

2" 4"

3/4"

1/2"

1/2"

3/4"

1"

FD-2

FD-2

BFP-2

OWS-1 OWS-1

BA

SA

VC-1

2"

3"

5"15

FCO

VC-1

2" 2" 2"

4"2"

AHU-1

UH-4

NG

N G

N G

NGNG

HR-1 HR-1 HR-1

HR-1 HR-1

HR-1 HR-1HR-1 HR-1

4"

HR-1

25 4"2 25

3/4"

3/4"

CCC-1

N G

2"

N G

B

N G

A

AA

A

A

2A

1 A 1

A

COMPRESSOR

ROOM

2"FD-2

34 34 34 34 34

37 37

1 1/2"

1/2"

3/4"

1"

1"

1"

1 1/2" 1 1/2" 1"

1"3/4"

1" 1"

DC-1

DC-2

DC-3 DC-4

41 41

UH-3

DUST

COLLECTOR

YARD

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F

LO

O R

P

LA

N

A R

E A

A

LO

W

E R

L E

V E

L

MRK

12822671

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PL101

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - AREA A - LOWER LEVEL

1 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

2 BREATHING AIR HOSE REEL CONNECTION, REFER TO DETAIL A4/P-501 FOR

REQUIREMENTS.

3 2" VENT PIPE FROM BELOW.

4 BREATHING AIR RECEIVER TANK.

5 SHOP AIR RECEIVER TANK.

6 5" SHOP AIR PIPE UP.

7 3" BREATHING AIR PIPE UP.

8 3/4" COLD WATER MAKE-UP, REFER TO MECHANICAL DRAWINGS FOR

CONTINUATION. SEE BACKFLOW PREVENTOR DETAIL D4, SHEET P-503.

9 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

10 1-1/2" VENT PIPE FROM BELOW.

11 2" VENT PIPE UP.

12 REFER TO A1 DRAWING P-801 FOR SHOP AIR PIPING DIAGRAM.

13 REFER TO B1 DRAWING P-801 FOR BREATHING AIR PIPING DIAGRAM.

14 4" SHOP AIR PIPE UP.

15 1/2" COLD WATER DOWN TO HOSE BIBB BELOW.

16 3/4" COLD WATER PIPE UP.

17 1/2" COLD WATER PIPE UP.

18 2" BREATHING AIR PIPE UP.

19 1/2" SHOP AIR PIPE FOR EQUIPMENT #429 AIR WASTE COMPACTOR, REFER TO

INTERIORS DRAWING FOR EQUIPMENT REQUIREMENTS.

20 HOT WATER RETURN BALANCING STATION, SET FLOW TO 1.25 GPM. SEE DETAIL

C1, SHEET P-502.

21 HOT WATER RETURN BALANCING STATION, SET FLOW TO 0.5 GPM. SEE DETAIL

C1, SHEET P-502.

22 COORDINATE ALL PIPE ROUTING AND LOCATION WITH EQUIPMENT PLATFORM

ABOVE.

23 3" SHOP AIR PIPE UP.

24 CONNECT GAS PIPING, SIZE AS NOTED TO MECHANICAL EQUIPMENT, REFER TO

GAS CONNECTION DETAIL C3/P-502.

25 SHOP AIR HOSE REEL CONNECTION. REFER TO DETAIL A2/P-501 FOR

REQUIREMENTS.

26 RUN PIPING EXPOSED ABOVE FINISHED GRADE AT HVAC PIPING ELEVATION.

27 ISOLATION VALVE IN VERTICAL RISE OF PIPE AT MIMNIMUM 6'-0" ABOVE

FINISHED FLOOR.

28 HEAT TAPE AND INSULATE ALL EXPOSED WATER PIPING. HEAT TAPE MUST BE

SELF-REGULATING, 8 WATT OUTPUT PER LINEAR FOOT, 277V, RATED FOR

EXTERIOR INSTALLATION, PROVIDE COMPLETE OPERATIONAL SYSTEM.

INSULATE WITH 2" EXTERIOR RATED INSULATION.

29 2" GAS PIPE DOWN ON WALL.

30 GAS PIPE THROUGH WALL AT 18" ABOVE FINISHED FLOOR.

31 2" GAS PIPE DOWN TO BELOW GRADE. PROVIDE TRANSITION FITTING BETWEEN

STEEL PIPE AND PLASTIC PIPE MIN. 18" BELOW FINISHED GRADE. FITTING TO

MEET OR EXCEED THE REQUIREMENTS OF ASTM D-2513, CATEGORY 1 ANSI

B1.20, NFPA-58.

32 OFFSET VENT PIPE AROUND WALL LOUVER.

33 FLOOR DRAIN FD-2 FOR DRAINAGE OF HOSE REEL AUTOMATIC DRIP VALVES

FROM ADJACENT BAY 114.

34 ROUTE 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING TO FD-2 IN SOUTHWEST

CORNER OF ADJACENT COMPRESSOR ROOM 113.

35 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR

REQUIREMENTS.

36 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING CAN BE TIED TOGETHER WITH UP TO

8 DRAIN VALVES ON A 1/2" PIPE MAIN.

37 ROUTE 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING TO FD-2 IN ADJACENT PAINT

BAY 120 SERVING PLUMBING FIXTURE P-11 ON NORTH WALL.

38 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE REEL

AT 14'-0" ABOVE FINISHED FLOOR.

39 1/2" SHOP AIR PIPE UP.

40 1" SHOP AIR PIPE RISER.

41 3/4" SHOP AIR PIPE RISER.

42 1-1/2" SHOP AIR PIPE RISER.

1. REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL

GENERAL NOTES.

2. FOR CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS THIS

SHEET REFER TO DRAWING PF101.

ALL PIPING BELOW GRADE MUST BE SUPPORTED TO THE

STRUCTURAL FLOOR SLAB. SEE DETAIL B3, DRAWING P-501.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PL104

S A

B A

B A

S A

B A

S A

B A

S A

S A

B A

S A

B A

3/4"

5"3"

3"

4"

2"

4"

2"

4"

3/4"

5 6 7

7 7

V

SA

VC-1

2"

1/2"

1/2"

VC-1

A

A 2

A

2 A

1414 15 15

1" 1 1/2"

1 1/2"

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F

LO

O R

P

LA

N

A R

E A

A

U P

P E

R L

E V

E L

MRK

12822672

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PL102

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - AREA A - UPPER LEVEL

1 2" VENT PIPE UP.

2 3/4" COLD WATER PIPE DOWN.

3 1/2" COLD WATER DOWN TO HOSE BIBB BELOW.

4 1/2" COLD WATER PIPE DOWN.

5 1/2" SHOP AIR PIPE DOWN.

6 2" BREATHING AIR PIPE DOWN.

7 4" SHOP AIR PIPE DOWN.

8 3" SHOP AIR PIPE DOWN.

9 3" BREATHING AIR PIPE DOWN.

10 5" SHOP AIR PIPE DOWN TO 2,000 GALLON SHOP AIR STORAGE TANK.

11 3" BREATHING AIR PIPE DOWN TO 1,500 GALLON BREATHING AIR STORAGE

TANK.

12 2" VENT PIPE FROM BELOW.

13 1-1/2" SHOP AIR PIPE DOWN.

14 1" SHOP AIR PIPE DOWN.

15 3/4" SHOP AIR PIPE DOWN.

1 2" VENT PIPE UP.

2 3/4" COLD WATER PIPE DOWN.

3 1/2" COLD WATER DOWN TO HOSE BIBB BELOW.

4 1/2" COLD WATER PIPE DOWN.

5 1/2" SHOP AIR PIPE DOWN.

6 2" BREATHING AIR PIPE DOWN.

7 4" SHOP AIR PIPE DOWN.

8 3" SHOP AIR PIPE DOWN.

9 3" BREATHING AIR PIPE DOWN.

10 5" SHOP AIR PIPE DOWN TO 2,000 GALLON SHOP AIR STORAGE TANK.

11 3" BREATHING AIR PIPE DOWN TO 1,500 GALLON BREATHING AIR STORAGE

TANK.

12 2" VENT PIPE FROM BELOW.

13 1-1/2" SHOP AIR PIPE DOWN.

14 1" SHOP AIR PIPE DOWN.

15 3/4" SHOP AIR PIPE DOWN.

REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PL101

MATCHLINE

PL105

P-4A

PAINT BAY

EXHAUST

AIR

PLENUM

PAINT BAY

SUPPLY

AIR

PLENUM

120C

BREAK

ISSUE

P-11

FD-2

FD-2

P-11

MEN'S

LOCKER

ROOM

(CLEAN)

105P-401 A1

2 P-4B

P-8

FCO

BA

SA

BA

SA

N G

N G

MECH

104A

FINISHED FLOOR ELEVATION = 10.00'

BA

2 1/2"

3/4" 3/4" SA

2"

2 1/2"

3"

3/4"

3/4" 1 1/2"

1 1/2"

2 1/2"

1 1/2" SA BA SA SA BA

3 3

3"

2 1/2"

3"

2 1/2"2

4 4

3/4"

SA

WH-1

WSB-1WSB-1

1"1 1/2"

HR-1

HR-1HR-1HR-1HR-1HR-1HR-1

HR-1

HR-1

HR-1

HR-1 HR-1

HR-1

HR-1

2 1/2"

3"

1" 1 1/4"

3/4"

2"

1 1/2"

2 1/2"

1"

1/2"

1 1/2"

1"

N G

N G

V

3/4"

1 1/2" 1 1/2"

A

A 2

A

SA

A

3 A 3 A

C

B

A

C

B

12 12 12

12 12

13 13

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F

LO

O R

P

LA

N

A R

E A

B

LO

W

E R

L E

V E

L

MRK

12822673

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PL103

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - AREA B LOWER LEVEL

1 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

2 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

3 BREATHING AIR HOSE REEL CONNECTION, REFER TO DETAIL A4/P-501 FOR

REQUIREMENTS.

4 PAINTING AIR HOSE REEL CONNECTION, REFER TO DETAIL B4/P-501.

5 HOT WATER BALANCING STATION SET FLOW TO 0.75 GPM. SEE DETAIL C1,

SHEET P-502.

6 3/4" SHOP AIR PIPE PIPE FOR EQUIPMENT #412 BLAST FILTER CLEANER, REFER

TO INTERIORS DRAWINGS FOR EQUIPMENT REQUIREMENTS.

7 3" SHOP AIR PIPE UP.

8 2-1/2" BREATHING AIR PIPE UP.

9 HOT WATER BALANCING STATION SET FLOW TO 2.0 GPM. SEE DETAIL C1, SHEET

P-502.

10 3/4" SHOP AIR PIPE UP.

11 FLOOR DRAIN TO RECEIVE DISCHARGE FROM AUTOMATIC DRIP VALVE DRAIN

PIPING FROM HOSE REELS AUTOMATIC DRIP VALVE PIPING LOCATED ON THE

NORTH WALL OF PAINT BAY 120 (THIS ROOM) AND FROM HOSE REELS

AUTOMATIC DRIP VALVE IN ADJACENT PMB BAY 114 SOUTH WALL.

12 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING

FIXTURE P-11 BELOW ON SOUTH WALL.

13 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING

FIXTURE P-11 BELOW ON NORTH WALL.

14 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR

REQUIREMENTS.

15 FLOOR DRAIN FD-2 TO RECEIVE DRAINAGE FROM AUTOMATIC DRIP VALE

DRAINS ABOVE ON SOUTH WALL OF PAINT BAY 120.

16 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE REEL

AT 14'-0" ABOVE FINISHED FLOOR, REFER TO DRAWINGS AE302 AND AE303.

17 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING CAN BE TIED TOGETHER WITH UP TO

8 DRAIN VALVES ON A 1/2" PIPE MAIN.

18 2" VENT PIPE UP.

1 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

2 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

3 BREATHING AIR HOSE REEL CONNECTION, REFER TO DETAIL A4/P-501 FOR

REQUIREMENTS.

4 PAINTING AIR HOSE REEL CONNECTION, REFER TO DETAIL B4/P-501.

5 HOT WATER BALANCING STATION SET FLOW TO 0.75 GPM. SEE DETAIL C1,

SHEET P-502.

6 3/4" SHOP AIR PIPE PIPE FOR EQUIPMENT #412 BLAST FILTER CLEANER, REFER

TO INTERIORS DRAWINGS FOR EQUIPMENT REQUIREMENTS.

7 3" SHOP AIR PIPE UP.

8 2-1/2" BREATHING AIR PIPE UP.

9 HOT WATER BALANCING STATION SET FLOW TO 2.0 GPM. SEE DETAIL C1, SHEET

P-502.

10 3/4" SHOP AIR PIPE UP.

11 FLOOR DRAIN TO RECEIVE DISCHARGE FROM AUTOMATIC DRIP VALVE DRAIN

PIPING FROM HOSE REELS AUTOMATIC DRIP VALVE PIPING LOCATED ON THE

NORTH WALL OF PAINT BAY 120 (THIS ROOM) AND FROM HOSE REELS

AUTOMATIC DRIP VALVE IN ADJACENT PMB BAY 114 SOUTH WALL.

12 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING

FIXTURE P-11 BELOW ON SOUTH WALL.

13 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING

FIXTURE P-11 BELOW ON NORTH WALL.

14 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR

REQUIREMENTS.

15 FLOOR DRAIN FD-2 TO RECEIVE DRAINAGE FROM AUTOMATIC DRIP VALE

DRAINS ABOVE ON SOUTH WALL OF PAINT BAY 120.

16 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE REEL

AT 14'-0" ABOVE FINISHED FLOOR, REFER TO DRAWINGS AE302 AND AE303.

17 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING CAN BE TIED TOGETHER WITH UP TO

8 DRAIN VALVES ON A 1/2" PIPE MAIN.

18 2" VENT PIPE UP.

1 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

2 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

3 BREATHING AIR HOSE REEL CONNECTION, REFER TO DETAIL A4/P-501 FOR

REQUIREMENTS.

4 PAINTING AIR HOSE REEL CONNECTION, REFER TO DETAIL B4/P-501.

5 HOT WATER BALANCING STATION SET FLOW TO 0.75 GPM. SEE DETAIL C1,

SHEET P-502.

6 3/4" SHOP AIR PIPE PIPE FOR EQUIPMENT #412 BLAST FILTER CLEANER, REFER

TO INTERIORS DRAWINGS FOR EQUIPMENT REQUIREMENTS.

7 3" SHOP AIR PIPE UP.

8 2-1/2" BREATHING AIR PIPE UP.

9 HOT WATER BALANCING STATION SET FLOW TO 2.0 GPM. SEE DETAIL C1, SHEET

P-502.

10 3/4" SHOP AIR PIPE UP.

11 FLOOR DRAIN TO RECEIVE DISCHARGE FROM AUTOMATIC DRIP VALVE DRAIN

PIPING FROM HOSE REELS AUTOMATIC DRIP VALVE PIPING LOCATED ON THE

NORTH WALL OF PAINT BAY 120 (THIS ROOM) AND FROM HOSE REELS

AUTOMATIC DRIP VALVE IN ADJACENT PMB BAY 114 SOUTH WALL.

12 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING

FIXTURE P-11 BELOW ON SOUTH WALL.

13 ROUTE 1/2" AUTOMATIC DRIP VALVE PIPING TO FD-2 SERVING PLUMBING

FIXTURE P-11 BELOW ON NORTH WALL.

14 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR

REQUIREMENTS.

15 FLOOR DRAIN FD-2 TO RECEIVE DRAINAGE FROM AUTOMATIC DRIP VALE

DRAINS ABOVE ON SOUTH WALL OF PAINT BAY 120.

16 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE REEL

AT 14'-0" ABOVE FINISHED FLOOR, REFER TO DRAWINGS AE302 AND AE303.

17 1/2" AUTOMATIC DRIP VALVE DRAIN PIPING CAN BE TIED TOGETHER WITH UP TO

8 DRAIN VALVES ON A 1/2" PIPE MAIN.

18 2" VENT PIPE UP.

1. REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL

GENERAL NOTES.

2. FOR CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS THIS

SHEET REFER TO DRAWING PF102.

ALL PIPING BELOW GRADE MUST BE SUPPORTED TO THE

STRUCTURAL FLOOR SLAB. SEE DETAIL B3, DRAWING P-501.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PL102

S A

B A

S A

B A

B A

S A

S A

SA

B A

S A

S A

MATCHLINE

PL106

3"

2 1/2"

4" SA

3" BA

3/4"

2"

3"

2 1/2"

3"

2 1/2" 2 1/2"

3" 2"

SA

3A

3A2A

3A

3/4"

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F

LO

O R

P

LA

N

A R

E A

B

U P

P E

R L

E V

E L

MRK

12822674

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PL104

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - AREA B - UPPER LEVEL

1 3" SHOP AIR PIPE DOWN.

2 2 1/2" BREATHING AIR PIPE DOWN.

3 3/4" SHOP AIR PIPE RISER.

REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PL107

P-11

WH-1

FD-1

FD-2

FD-2

PAINT

STORAGE

PAINT

MIXING

MATERIAL

STORAGE

TOOL CRIB

STENCIL

ROOM

EQUIPMENT

CLEANING

CORR.

MOTHER'S

ROOM

ADMIN

MECHANICAL

ROOM

ADMIN

CLOSET

101A

CORR.

P-4

MATCHLINE

PL103

N G

N G

NG NG

S A

NG

WCO

WH-1

FINISHED FLOOR

ELEVATION = 10.00'

2"

1/2"

2"

3/4"

3/4" 1 1/4" 2"

1 1/2"

2 1/2"

1/2"

3/4" 1 1/2"

3/4"

V

FD-2

V

VV

SA SA

2"

1 1/2" 2 1/2"

3/4"3/4"

2"

3/4"1 1/2" 2 1/2"

VC-1

VC-1

FD-2

FD-2

FD-2

FCO

BFP-2

8 9

VC-1

2"

1/2"

HB-1

NG

N G

S A

C

C

C

HB-1

AHU-3

2"

2"2"

4" WCO

P-3P-2P-1

3/4"

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F

LO

O R

P

LA

N

A R

E A

C

LO

W

E R

L E

V E

L

MRK

12822675

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PL105

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - AREA C - LOWER LEVEL

1 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

2 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

3 1/2" SHOP AIR OUTLET FOR PAINT SHAKERS #403. COORDINATE PIPE

CONNECTION, PROVIDE PRESSURE REGULATOR AS REQUIRED FOR ADJUSTING

PRESSURE TO EQUIPMENTS REQUIREMENT. REFER TO INTERIORS DRAWINGS

FOR EQUIPMENTS SPECIFIC REQUIREMENTS.

4 2" VENT PIPE FROM BELOW.

5 1-1/2" VENT PIPE FROM BELOW.

6 CONNECT GAS PIPING, SIZE AS NOTED TO MECHANICAL EQUIPMENT, REFER TO

GAS CONNECTION DETAIL C3/P-502.

7 3" VENT PIPE UP.

8 3" VENT PIPE FROM BELOW.

9 3/4" COLD WATER PIPE FROM ABOVE.

10 2" SHOP AIR PIPE UP.

11 2" COLD WATER PIPE UP.

12 1 1/2" HOT WATER PIPE UP.

13 2 1/2" COLD WATER PIPE UP.

14 1" HOT WATER PIPE UP.

15 1 1/4" COLD WATER PIPE UP.

16 2" COLD WATER MAKE-UP FOR HVAC EQUIPMENT, REFER TO MECHANICAL

DRAWINGS FOR CONTINUATION. SEE BACKFLOW PREVENTOR DETAIL D4,

SHEET P-503

17 1/2" COLD WATER PIPE DOWN.

1 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

2 FLOOR DRAIN WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

3 1/2" SHOP AIR OUTLET FOR PAINT SHAKERS #403. COORDINATE PIPE

CONNECTION, PROVIDE PRESSURE REGULATOR AS REQUIRED FOR ADJUSTING

PRESSURE TO EQUIPMENTS REQUIREMENT. REFER TO INTERIORS DRAWINGS

FOR EQUIPMENTS SPECIFIC REQUIREMENTS.

4 2" VENT PIPE FROM BELOW.

5 1-1/2" VENT PIPE FROM BELOW.

6 CONNECT GAS PIPING, SIZE AS NOTED TO MECHANICAL EQUIPMENT, REFER TO

GAS CONNECTION DETAIL C3/P-502.

7 3" VENT PIPE UP.

8 3" VENT PIPE FROM BELOW.

9 3/4" COLD WATER PIPE FROM ABOVE.

10 2" SHOP AIR PIPE UP.

11 2" COLD WATER PIPE UP.

12 1 1/2" HOT WATER PIPE UP.

13 2 1/2" COLD WATER PIPE UP.

14 1" HOT WATER PIPE UP.

15 1 1/4" COLD WATER PIPE UP.

16 2" COLD WATER MAKE-UP FOR HVAC EQUIPMENT, REFER TO MECHANICAL

DRAWINGS FOR CONTINUATION. SEE BACKFLOW PREVENTOR DETAIL D4,

SHEET P-503

17 1/2" COLD WATER PIPE DOWN.

1. REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL

GENERAL NOTES.

2. FOR CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS THIS

SHEET REFER TO DRAWING PF103.

ALL PIPING BELOW GRADE MUST BE SUPPORTED TO THE

STRUCTURAL FLOOR SLAB. SEE DETAIL B3, DRAWING P-501.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PL104

MATCHLINE

PL108

S A

S A

2"

2"

3" 3/4"

2 1/2"

1 1/2" 1 1/2"

V

2 1/2"

1"1 1/4" 2 1/2" 1 1/2"

VC-1

1 1/4"1"

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F

LO

O R

P

LA

N

A R

E A

C

U P

P E

R L

E V

E L

MRK

12822676

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PL106

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - AREA C - UPPER LEVEL

1 2-1/2" COLD WATER PIPE DOWN.

2 1-1/2" HOT WATER PIPE DOWN.

3 1-1/4" COLD WATER PIPE DOWN.

4 1" HOT WATER PIPE DOWN.

5 2" COLD WATER PIPE DOWN.

6 3" VENT PIPE FROM BELOW.

7 3/4" COLD WATER PIPE DOWN.

8 2" VENT PIPE FROM BELOW.

9 2" SHOP AIR PIPE DOWN.

10 PIPING RUN HIGH IN LOW CEILING AREA.

REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PL105

FD-2

FD-1

P-11

P-11COMM.

WASH

RACK

(PROCESS)

WASH

RACK BAY

FIRE

PROTECTION

WATER

TREATMENT

SYSTEM

P-11

P-401 C1

N G

S A

S A

S A

S A

FD-1

ELEC.

FCO

FINISHED FLOOR ELEVATION = 10.00'

REM-2

FD-2

FD-2

T-1

W-2

W-1

F-1

1" 2"

2"

FOR ADDITIONAL WORK

THIS AREA SEE DRAWING

IW101

LOCKER

ROOM

(DIRTY)

WASH

RACK

STORAGE

137 WASH

RACK

(PROCESS)

JAN.

WASH

RACK

EQUIPMENT

FINISHED FLOOR

ELEVATION = 9.50'

WH-1

FD-2

FCO

V

V V

HB-1 HB-1

NG

N G

RWP-1

BT-2

WH-1

GCO

2"

2"

2"

3/4"

VC-1

S A

REM-1

2"

FD-2

WSP-1

RSP-1

RSP-2 BT-1

SF-1

6"

6"

PMB-1

GCO

2 1/2"

3" WCO

VC-1

HB-1

6"

4"

6"

INDUSTRIAL SUMP PIT, REFER TO

STRUCTURAL DRAWINGS FOR SIZE

AND CONSTRUCTION

C3 P-401

P-11

TD-1

TD-1

TD-1

FCO

HR-1

HR-1

HR-1

HR-1

HR-1

HR-1

B

B

B

B

D

D

TD-1

1 1/2"

1" 1 1/4"

1 1/2"

1 1/2"

2"

1"

2"

2"

2"

WASH RACK

(PROCESS)

1 1/4"

3/4"

R L

GCO

2 WAY

2 WAY

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F

LO

O R

P

LA

N

A R

E A

D

LO

W

E R

L E

V E

L

MRK

12822677

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PL107

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - AREA D - LOWER LEVEL

31 WASH SYSTEM SUPPLY PIPE UP, FOR REM-2.

32 WASH SYSTEM SUPPLY PIPE UP, FOR REM-1.

33 WASH SYSTEM SUPPLY PIPE DOWN TO REM-2.

34 FOAM SUPPLY PIPE TO REM-2.

35 FOAM SUPPLY PIPE TO REM-1.

36 1-1/2" GAS PIPE UP.

37 6" TANK FILL PIPE FROM RAIN FILTER RF-1.

38 6" TANK OVERFLOW PIPE TO EXTERIOR OF BUILDING.

39 1/2" COMPRESSED AIR DOWN TO REM-2 UNIT.

40 1/2" COMPRESSED AIR DOWN TO REM-1 UNIT.

41 3/4" COLD WATER PIPE UP.

42 ALL HOSE REELS THIS BAY TO BE MOUNTED WITH CENTERLINE OF HOSE

REEL AT 14'-0" ABOVE FINISHED FLOOR.

43 TO INDUSTRIAL WASTE SYSTEMS PRODUCT WATER STORAGE TANK.

44 FROM INDUSTRIAL WASTE SYSTEMS PRODUCT WATER STORAGE TANK.

45 6" RAIN LEADER DOWN FROM GUTTER ABOVE.

46 2" SUPPLY FOR F-1, W-1, AND W-2 FROM WSP-1.

16 RINSE WATER SYSTEM PIPING DOWN TO REM-2. SEE DETAIL A4, SHEET

P-503.

17 1 1/4" HOT WATER PIPE DOWN.

18 1 1/4" HOT WATER PIPE UP.

19 2" BREATHING AIR PIPE UP.

20 3/4" COLD WATER PIPE UP.

21 2" VENT PIPE FROM BELOW.

22 1-1/2" COLD WATER PIPE UP.

23 3/4" GAS PIPE UP.

24 2" COLD WATER PIPE UP.

25 RINSE WATER SYSTEM PIPING DOWN TO REM-1. SEE DETAIL A4, SHEET

P-503.

26 1" HOT WATER PIPE UP.

27 1" COLD WATER PIPING UP.

28 1-1/2" GAS PIPE DOWN TO BELOW GRADE. PROVIDE TRANSITION FITTING

BETWEEN STEEL PIPE AND PLASTIC PIPE MIN. 18" BELOW FINISHED

GRADE. FITTING TO MEET OR EXCEED THE REQUIREMENTS OF ASTM

D-2513, CATEGORY 1 ANSI B1.20, NFPA-58.

29 WASH SYSTEM SUPPLY PIPE TO REM-1.

30 1 1/2" COLD WATER FOR W-1 AND W-2 MAKE-UP WATER.

1 FLOOR DRAIN/TRENCH WASTE TERMINATES INTO INDUSTRIAL WASTE

SUMP PIT LOCATED IN WASH RACK 144, SHEET PF104.

2 GAS METER SERVICE MAIN FROM BELOW. SEE DETAIL A3, SHEET P-502.

3 SHOP AIR HOSE REEL CONNECTION. REFER TO DETAIL A2/P-501 FOR

REQUIREMENTS.

4 TOOL AIR HOSE REEL CONNECTION. REFER TO DETAIL A1/P-501 FOR

REQUIREMENTS.

5 GAS METER BY LOCAL UTILITY COMPANY.

6 2" VENT PIPE UP.

7 2" SHOP AIR PIPE UP.

8 1 1/4" NATURAL GAS PIPE UP.

9 REFER TO DRAWING IW101 FOR CONTINUATION.

10 3" VENT PIPE UP.

11 WASH WATER SYSTEM PIPING UP FROM WSP-1.

12 RINSE WATER SYSTEM PIPE UP FROM RSP-1.

13 RINSE WATER SYSTEM PIPE UP FROM RSP-2.

14 4" PUMPED INDUSTRIAL SYSTEM SUPPLY FROM SUMP PUMPS LOCATED IN

INDUSTRIAL SUMP PIT.

15 1 1/4" COLD WATER PIPE UP.

1/8" = 1' - 0" 0 5' 10' 15' 30'

GENERAL NOTES GRAPHIC SCALE

KEY PLAN

CONSTRUCTION NOTES#

AREA

A

AREA

B

AREA

D

AREA C

V-147

1. REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND ADDITIONAL

GENERAL NOTES.

2. FOR CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS THIS

SHEET REFER TO DRAWING PF104.

ALL PIPING BELOW GRADE MUST BE SUPPORTED TO THE

STRUCTURAL FLOOR SLAB. SEE DETAIL B3, DRAWING P-501.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

PL106

SASA

SA

S A

NG

2"

2"

2"

1 1/4"

1 1/4"

1"

1 1/4"

NG

1 1/4"

NG

2 3 4 5

V V

V

VC-1

3"

1 1/2"

1 1/4" 1 1/4"

3/4"

3/4"

3/4"

2"

1 1/2"

1 1/2"

3/4"

2"

SA SA

OFF SET

2"

S A

IW

IW

IW

IW

NG

IW

IW

IW

4 B

B

WHA-C

WHA-C

WHA-C

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

P

LU

M B

IN

G

F

LO

O R

P

LA

N

A R

E A

D

U P

P E

R L

E V

E L

MRK

12822678

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

PL108

1/8" = 1' - 0"

0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

AREA

A

AREA

B

AREA

D

AREA C

V-147

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - AREA D - UPPER LEVEL

1 2" SHOP AIR PIPE DOWN.

2 3" VENT PIPE DOWN.

3 WASH WATER SYSTEM PIPING DOWN TO WSP-1.

4 RINSE WATER PIPING DOWN TO RSP-1.

5 RINSE WATER PIPING DOWN TO RSP-2.

6 RINSE WATER PIPING DOWN TO REM-1 (WATER CANNON). SEE DETAIL A4,

SHEET P-503.

7 RINSE WATER PIPING DOWN TO REM-2 (WATER CANNON). SEE DETAIL A4,

SHEET P-503.

8 1 1/4" HOT WATER PIPE UP.

9 1 1/4" HOT WATER PIPE DOWN.

10 1-1/4" COLD WATER PIPE DOWN.

11 3/4" COLD WATER PIPE DOWN.

12 3/4" NATURAL GAS PIPE DOWN.

13 1 1/2" COLD WATER PIPE DOWN.

14 1" COLD WATER PIPING DOWN.

15 WASH WATER SYSTEM PIPING DOWN.

16 1" HOT WATER PIPE DOWN.

17 2" COLD WATER PIPE DOWN.

18 1-1/4" GAS PIPE DOWN TO A POINT 18" ABOVE FINISHED FLOOR.

19 WASH SYSTEM SUPPLY PIPE DOWN TO REM-2.

20 FOAM SUPPLY PIPE TO REM-2.

21 WASH SYSTEM PIPE DOWN.

22 FOAM SYSTEM SUPPLY PIPE DOWN.

23 1-1/4" GAS PIPE DOWN.

24 1" GAS PIPE DOWN.

REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

FD-1

P-1P-1A

P-7

P-3A

P-5

FD-1

WCO

WHA-C

1 1/4"

FD-1

FD-1FD-1FD-1

P-7AP-7AP-7A

P-7

FCO

WOMEN'S

LOCKER

ROOM

(CLEAN)

MEN'S

LOCKER

ROOM

(CLEAN)

FILTER

STORAGE

1 1/4"

3/4"

3/4"

2"

3/4" 1"

3/4"

2" V UP

1 1/2"

3 3 3

5 5 5

2"

VC-1

VC-1

V V

VC-1

3/4"

A

JAN.

1 1/4"

3/4" 2"

HB-1

FD-1

GWH-1 FD-2

FD-2

BFP-1

FD-2

MEN'S

LOCKER

ROOM

(CLEAN)

TMV-1

WM-1

WCO

WCO

P-3AP-3AP-3A

P-2P-2A

WHA-B

WHA-C

WCO

ET-1

MECH

104A

1"

2"

2"

1/2"

3"

1 1/2" 1 1/2" 1 1/2"

NG

3"

3/4"

2"

BP-1

1/2"

1"

3"

3"

3" 2 1/2"

1 1/2"

2"

3/4"

1"

1 1/2"

1 1/2"

2 1/2" 2 1/2"

2"

3/4"

VC-1

V

V

V

V V

V

V

FCO

A B

P-1A P-1 P-1 P-1

1 1/2"

HB-1

1 1/2"

P-5

P-1A

P-1A

P-3

P-3

P-4B

FD-1

FD-1

NG NG

SA

P-8

N G

WCO

P-7BP-7BP-7B

WHA-B

1 1/2"

1 1/4"

2"

2"

2"

1 1/4"

1 1/2"

1 1/4"

2"

1 1/2"

FD-2

FD-2

V

2" 2"

41 1/2"

1 1/4"

1 1/2"

1 1/4"

3/4"

1 1/2"

2"

1"

1"

N G

N G

VC-1

VC-1 VVV

V

V V

HB-1

1/2"

3 D C 1

LOCKER

ROOM

(DIRTY)

TOILET

WASH

RACK

(PROCESS)

JAN.

2" V UP

WH-1

6"

8"

CONNECT TO DOWN

SPOUT PIPING

6" TO STORM

FILTER SF-1

INTERIOR OF

BUILDING

OVERFLOW

3"6"

3"

RL

RL

1 1/2" RL TYPICAL

VIRGINIA BEACH, VA 23462

SUITE 1400

757·455·5800 FAX 757·455·5638

WWW.CLARKNEXSEN.COM

4525 MAIN STREET

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

N

A V

A L

S T

A T

IO

N

N

O R

F O

L K

V

A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

N40085-19-D-9041

1614720

1 2 3 4 5

Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center

Mid-Atlantic, via Email.

14 Sept 2020

P -1

C

O R

R O

S

IO

N C

O N

T R

O L

P A

IN

T

F A

C

IL

IT

Y

E N

LA

R

G E

D P

LA

N

S

MRK

12822679

JBW DLR

SDS/RSF

N O

R F

O

LK

, V

IR

G

IN

IA

N

A V

A L

S T

A T

IO

N

N O

R F

O

LK

EJA

ALG

DSN

P-401 1/4" = 1' - 0"

0 5' 10' 15'1'

GRAPHIC SCALE(S)

# KEY NOTES

GENERAL NOTES

SCALE: 1/4" = 1'-0" (PL101)A3

ENLARGED SHOWER PLAN

SCALE: 1/4" = 1'-0" (PL103)A1

ENLARGED BATHROOM PLAN

1 3" WATER SERVICE PIPE FROM BELOW.

2 4" WASTE PIPE FROM ABOVE.

3 PLUMBING FIXTURE WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

4 1-1/2" VENT PIPE FROM BELOW.

5 FLOOR DRAIN/TRENCH WASTE TERMINATES INTO INDUSTRIAL WASTE SUMP PIT

LOCATED IN WASH RACK 144, SHEET PF104.

6 GAS WATER HEATER GWH-1: SEE DETAIL A1, SHEET P-502.

7 DOMESTIC WATER BOOSTER PUMP BP-1: SEE DETAIL A2, SHEET P-503.

SCALE: 1/4" = 1'-0" (PL107)C1

ENLARGED LOCKER ROOM/DECONTAMINATION PLAN

REFER TO DRAWING P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

NOTE: CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS CAN FOUND ON DRAWING PF104

NOT TO SCALE (PF104)C3

STORM PIPING SECTION

NOTE:

PIPING SHOWN MUST BE RUN EXTERIOR OF BUILDING AND

SECURED TO EXTERIOR WALL OF BUILDING.

NOT TO SCALE (PF104)C4

HANGAR DOOR DRAINAGE

BT-2

2 A

NOTE: CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS CAN FOUND ON DRAWING PF102

NOTE: CONTINUATION OF SANITARY AND INDUSTRIAL WASTE PIPE DROPS CAN FOUND ON DRAWING PF101

NOTE:

COORDINATE 1-1/2" RL PIPE DROPS WITH SPECIFIC HANGAR DOORS

MANFACTURER GUIDE RAIL LOCATIONS.

MICHAEL R. KARCHERC

O

M M

O

NWEA L T H OF V

I RG

I N

I A

P R

O F

E S S I ONA L E NG

I N E

E RLic. No. 013270

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

BA

BALL VALVE W/ AIR BLEED OFF

FILTER+REGULATOR COMBO, 5 MICRON FILTER, 1/2" NPTF, 1/4" GAUGE

CONNECTION, 150 PSI MAX. PRESSURE, 0-30 PRESSURE CONTROL RANGE,

90 SCFM FLOW RATE, POLYCARBONATE BOWL, AUTOMATIC DRIP VALVE

DRAIN

1/2" PIPE DROP

BREATHING

AIR MAIN

1/2" DRAIN VALVE

STAND-OFF PIPE SUPPORTS @ 4'-0" O.C.

B A

HR-1

AIR HOSE MUST BE HEAVY DUTY,

CERTIFIED CLASS "C", BLUE, RATED FOR

BREATHING AIR - 3/8" ID X 100'

3/8" BRASS

QUICK CONNECT

1/2"

SA

BALL VALVE W/ AIR BLEED OFF

FILTER+REGULATOR+LUBRICATOR COMBO, 40 MICRON FILTER, 3/4" NPTF

CONNECTION, 1/4" GAUGE CONNECTION, 150 PSI MAX. PRESSURE, 0-125

PRESSURE CONTROL RANGE, 270 SCFM FLOW RATE, POLYCARBONATE

BOWL, AUTOMATIC DRIP VALVE DRAIN, 16 OZ AUTOMATIC LUBRICATOR

1" PIPE DROP

SHOP AIR

MAIN

1/2" DRAIN VALVE

STAND-OFF PIPE SUPPORTS @ 4'-0" O.C.

S A

HR-1

AIR HOSE MUST BE HEAVY DUTY,

CERTIFIED CLASS "B", BLACK - 3/4" ID X

100'

3/4" TWIST-CLAW

HOSE COUPLING

1"

SA

BALL VALVE W/ AIR BLEED OFF

3/4"

3/4" PIPE DROP

SHOP AIR

MAIN

1/2" DRAIN VALVE

STAND-OFF PIPE SUPPORTS @ 4'-0" O.C.

S A

HR-1

AIR HOSE MUST BE HEAVY DUTY,

CERTIFIED CLASS "B" , RED - 1/2" ID X 100'

1/2" BRASS QUICK

CONNECT

FILTER+REGULATOR+LUBRICATOR COMBO, 40 MICRON FILTER, 3/4" NPTF

CONNECTION, 1/4" GAUGE CONNECTION, 150 PSI MAX. PRESSURE, 0-125

PRESSURE CONTROL RANGE, 270 SCFM FLOW RATE, POLYCARBONATE

BOWL, AUTOMATIC DRIP VALVE DRAIN, 16 OZ AUTOMATIC LUBRICATOR

TRUE UNION BALL VALVES -

THESE WILL SERVE AS A

DISCONNECT UNION FOR PUMP

REMOVAL.

5 5

PUMPS OFF

PUMP #1 ON

PUMPS #1 & #2 ON

HIGH WATER ALARM

4"

3"3"

TO WATER

TREATMENT SYSTEM

S P

D

S P

D

S P

D

S P

D

SPD

SPD

SPD

IWP-1 IWP-1

SA

BALL VALVE W/ AIR BLEED OFF

FILTER+REGULATOR COMBO, 5 MICRON FILTER, 3/4" NPTF

CONNECTION, 1/4" GAUGE CONNECTION, 150 PSI MAX.

PRESSURE, 0-125 PRESSURE CONTROL RANGE, 90 SCFM FLOW

RATE, POLYCARBONATE BOWL, AUTOMATIC DRIP VALVE DRAIN

3/4" PIPE DROP

SHOP AIR

MAIN

1/2" DRAIN VALVE

STAND-OFF PIPE SUPPORTS @ 4'-0" O.C.

S A

HR-1

AIR HOSE MUST BE HEAVY DUTY,

CERTIFIED CLASS "B", YELLOW, 5/16"

ID X 100'

1/2" BRASS

QUICK CONNECT

3/4"

SOLENOID VALVE FOR CONTROL OF

SUPPLY AIR, REFER TO DDC CONTROL

SYSTEM ON DRAWING M-802

COLD WATER

SUPPLY

HOT WATER

SUPPLY

LAVATORY

TMV-2: ASSE

1070 MIXING

VALVE

P-3

4 X 4 X 1/4

PLATE WASHER

STEEL REINFORCING

BAR (TYP)

REINFORCED CONCRETE

FLOOR SLAB

3/4" DIA GALVANIZED

STEEL ROD

CLEVIS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .