21R2507 0009.pdf
PDF 134 KB Posted
- Solicitation number
- N4008521R2507
About this file
This document contains an amendment to a solicitation for an indefinite delivery/indefinite quantity multiple award construction contract for facilities primarily in the Hampton Roads Area of Responsibility in Virginia. The amendment revises submission requirements and due dates for non-price factors and price proposals. Offerors must now submit non-price factors electronically by December 22, 2020 and in hard copy by December 30, 2020. Price proposals and Factor 5 are due electronically on January 8, 2020 and in hard copy by January 15, 2020. The amendment provides responses to pre-proposal inquiries to clarify requirements for construction and design experience submissions, hazardous material reports, electrical specifications, and other factors.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Revisions and PPIs
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Dec-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R2507
X 9B. DATED (SEE ITEM 11)
06-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Dec-2020
CODE
NAVFACSYSCOM MID-ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521R2507
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0009
This amendment hereby:
1. Adds Proposal Submission Guidance Electronic Submission of Non-Price Factors 1-4 December 22, 2020 by 1400 EST Hard Copy Submission of Non-Price Factors 1-4 December 30, 2020 by 1400 EST Electronic Submission of Price and Factor 5 January 8, 2020 by 1400 EST Hard Copy Submission of Price and Factor 5 January 15, 2020 by 1400 EST
2. Removes Attachment G Small Business Subcontracting Plan.
Attachments C and E shall be submitted for the Small Business Factor 5.
3. Revises both Factor 1, Construction AND Design Experience, to read:
The attached Construction Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).
4. Revises Factor 1, Design Experience Both design-build and design-bid-build projects may be contemplated under this MACC. Therefore, the Offeror is required to identify the design firm(s) (Architect/Engineering firm) to be utilized as Designer(s) of Record (DORs) on anticipated future projects. Provide the full name of the firm, address, DUNS number, and CAGE code. The designated firm(s) will be required to be utilized as the DOR on future design-build task orders under the resulting MACC, unless a substitution is approved by the Contracting Officer for the proposed task order. The Offeror must provide supporting documentation (such as a signed joint venture agreement, partnership agreement, teaming agreement, or letter of commitment on the proposed DOR’s letterhead) demonstrating agreement by the proposed design firm to perform as DOR for the duration of this MACC.
Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating. Offerors are still limited to a total of five (5) projects for Design Experience.
5. Adds language to RFP Section 5.2.1 Price Proposal and Non-Cost/Price Factors Proposal, Offerors shall request a DOD Safe Drop Link for both Non-Cost/Price Factors Proposal and Price/Small Business Proposal no later than 5 days prior to the respective submission due date. If an Offeror requires separate DoD SAFE drop off instructions for the purpose of submitting financial information in accordance with the Price submission instructions, a maximum of two additional email addresses may be provided per Offeror.
To submit the proposal, the offeror will utilize the link provided in the automated email to take you to DoD SAFE at https://safe.apps.mil. The system will allow for inclusion of a short note to the Recipient and then the offeror will click to add files or drag and drop them. Click “Drop-Off Files” to send the files to the recipient. You should receive a notification on the site “Drop-Off Completed” “Your files have been sent successfully.” Please keep this for your records. The file(s) are uploaded and an email will be sent to the recipient notifying them of the “drop-off”.
[Additional details can be viewed in the DoD SAFE User Guide available at https://safe.apps.mil].
Note that the submission of any proposal must be completed no later than the due date and time, unless the date and time are changed via Solicitation Amendment, using the link sent by the contract specialist.
The DoD SAFE system will record the date and time of package submittal. The date and time of package submittal recorded in DoD SAFE shall govern the timeliness of any proposal submission.
Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.
6. Answers PPIs as listed below.
# References Question Government Response
35 01 57 15.01 26 1.2.1.4 Has there been a Site Environmental
Assessment Report generated for the existance of Haz Mat and Universal Waste Materials? If so, will this be made available to the Bidders?
No such report exists.
48 Sheet F/AF601 1. General Note F./AF601 states, “Provide RWS1 at all exterior windows, excluding corridors and toilet rooms.”
a. Is RWS1 only required at windows [S1] in Rooms 101 + 103?
See response to PPI #30
51 45,46 22 00 00 Table II The Table for Plumbing Pipe & fittings materials applications allows Service A- Cold Water AG & Service B- Hot & Cold Water Distribution to be item 2 galvanized steel pipe, item 11 carbon steel fittings,item 13 mallable fittings.
Please confirm if this is acceptable for domestic water or utility serive only.
See revised table II provided in addendum documentation.
52 DWG M601
Dwg M602
Division 23
HVAC
Confirm ESP of 6” is accurate for
AHU-2A/2B
AHU-2A/2B Have 4" in w.g External Static pressure
53 DWG M601
Dwg M602
Division 23
HVAC
Confirm different motor sizes for supply fans for AHU-2A/2B, as they are specified as (2) 75hp & (2) 60hp and why not all the same size?
The units contain 2 separate air tunnels, one cooling/heating air tunnel and one by-pass tunnel: The coil air tunnel has (2)75 HP fans and by-pass air tunnel has (2) 60 HP fans
54 DWG M601
Dwg M602
Division 23
HVAC
Hazardous environment spec (class/div/group) please verify extent of what all falls under
Hazardous environment specifications are listed on the electrical power drawings. All HVAC equipment required to be explosion-proof or spark resistant are identified on the equipment schedules.
55 DWG M601
Dwg M602
Division 23
HVAC
Please clarify construction materials for AHUs/HVs, aluminum, stainless inner & outer walls or 3000 hour salt spray paint galvanized?
Bid per RFP.
56 DWG M601
Dwg M602
Division 23
HVAC
ꞏ On drawing M-403, the side view of AHU-2B shows a lower air tunnel and upper tunnel. It doesn’t appear that the upper tunnel has a fan (I don’t see one on the schedule). Confirm if that air is being pulled/pushed from an external fan or if there should be a fan in that
The upper tunnel (by-pass air tunnel) has (2) 60 HP fans deck. Or if the airstream wraps around and that upper tunnel air is driven by the lower supply fan array
58 There are 3 Corian specs listed; Silver Gray, Glacier White, and Lava Rock.
Please confirm which solid suface spec to use at the following locations: 1.
Men's Locker vanity 2. Women's Locker Vanity, 3. Mother's Room countertop, Breakroom countertop.
Please see General Notes C, D and E on Sheet AF601.
59 EP702 Refer to EP702, the note 1 on designation 3000s on the feeder schedule is incorrect. 4 conductors of 750KCMIL (35kV, 133% EPR/PVC) will not fit into a 4" conduit. They will not even fit in a 6" conduit. Please advise.
Note 1 indicating medium voltage, type 133% EPR PVC conductors is a drafting error. These conductors are not medium voltage type rated.
60 The basis of design manufacturer for the lockers is called out to be Scranton.
There is a 50 locker minimum count requirement to make them 84", otherewise if there are not 50 lockers, they will only make them 72". Since there are less than 50 lockers, will 72" tall lockers be acceptable?
72" lockers are not acceptable.
Scranton is only the basis of design and 84" lockers are available from other manufacturers.
61 MS 101, MS
33 61 14 Refer to spec section 33 61 14 - UG Heat Distribution System. The specifications section 2.3 indicates a 8" cross section, while the drawings MS 101 and MS102 indicate 6". Please confirm the size of the pipe.
Steam service was based on using a 6" 150 PSIG steam carrier pipe for the conduit system.
62 AF601 General Note F/AF601 states "Provide RWS1 at all exterior windows, excluding corridors and toilet rooms." Is RWS1 only required at windows [S1] in rooms 101 and 103?
See response to PPI #30
63 23 25 00 2.6.2 Please refer to 23 25 00 Pgae 5 section
2.6.2. The spec calls for a 30%
propylene glycol solution to be used.
Please provide the volume of the condenser water and chilled water loop systems including equipment, coils, tanks, etc, that will receive the 30% glycol solution.
The approximate volume used for sizing the expansion tank on the chilled water system is 1,200 gallons. The approximate volume used for sizing the expansion tank on the condenser water system was 500 gallons.
64 EL101 &
EL102
Please provide the specifications for lighting inverters INV-1 and INV-2.
See INV symbol on sheet E-001 and spec section 265100, 2.6.5 for specifications. Note that the size is noted on E-001, disregard the size noted in the specs.
67 12 of 73 Factor 1 - Corporate Experience
(2) Design Experience
Is the Offeror permitted to provide more than one Designer of Record firm under Factor 1, Design Experience?
Yes.
69 Is there a spec section or design for the painting equipment that will eventually be utilized by the end user to paint
FF&E package includes paint equipment and other equipment.
Please see IF sheets.
aircrafts in the paint bay? Is this by the general contractor or furnished/installed by the Owner?
72 11 24 29 Some information on the architectural drawings and within the spec section describe the overhead fall arrest system as a rigid rail system. However, the details on SF504 show the system as an I-Beam Trolley. Please clarify which system is needed.
Provide as detailed on SF504.
73 F-001 & P-504 Are Factory Mutual standards required to be followed for all Fire Sprinkler design and install and Plumbing piping below grade per notes? The 'Factory Mutual' name is sprinkled throughout other specifications as well. Factory Mutual insurance requirements usually increase construction costs quite a bit (at least for fire protection) so we want to nail this down. Please clarify.
See Response to PPI #73
76 ES101, ES401,
EP501, EP701
Please confirm whether the Contractor or the Owner will be providing the Utility Equipment, such as; T-1, T-1 (Pad Mounted Transformers 34.5kv- 480/277v) and the 34.5kv Pad Mounted 4way Switch.
The contractor is to provide equipment in question.
77 AE313 Are the PMB Bay Plenum doors supposed to have filters?
No
78 AF601 The porcelain tile is shown in certain rooms on the finish schedule. Where on the walls is it located? Is it on all walls in the rooms?
See sheet AF602 detail A1. Yes.
All walls.
79 26 32 13.00 20 2.1.2, 2.2.4 & 2.2.5.1
One section references a diesel engine and the other refers to a natural gas fuel system. Please confirm which type of generator, fuel system and engine starting batteries you want.
See Response to PPI #79
80 Please clarify what the finish is on the precast panels (Interior face and exterior face)
Refer to Section 03 45 00
81 8 11 90 40 2.2.1 The Rotating Media Screw Metering System description search leads to a proprietary product. This metering system is not a common necessity for these types of blasting systems since augers will crush plastic media. Would another means of metering media be allowed, or can this be omitted?
Other means of metering may be allowed, but would need to be approved by the owner.
82 5 11 90 50 2.3 Dust Collectors. Will a dust collector design utilizing recirculation of filtered air and 20% fresh air return that does not involve any equipment outdoors, or conveying of any dust material be allowed? Or should all contractors bid exactly what is shown on plans and
Bid Per RFP.
specs and offer alternate design/product ideas post-award?
83 10 14 00.20 For signage, would embedded lettering be acceptable in place of photopolymer?
No.
84 Sheet SF109 Where is the roof joist load diagram for the 78BG16N8.5K Bar joists?
78BG is a joist girder. The designation includes the load information, per SJI standard notation.
85 Details A1/SF301
& A1/SF302 &
A3/A503
It does not make sense to construct a steel frame supported Concrete on Metal Deck for the "Equipment Platform" over a finished roof system.
Or, if the concrete on metal deck work is constructed first, it would be next to impossible to perform the roofing work and warranty it. Please advise.
Bid per RFP. Roofing will need to be completed prior to platform's metal deck being installed.
86 Following Amendments 006 and 007, which changed the price proposal due date to 1/6, please confirm that PPIs will be accepted until 14 days prior to 1/6 to ensure that questions arising from the site visit on 12/8 can be asked and considered.
PPIs are due 14 days prior to their respective due dates.
Technical PPI due date remains unchanged. Technical PPIs are due 14 days prior to the proposal due date, which was December 8, 2020.
Price/Small Business PPIs are due 14 days prior to the proposal due date, which is December 25, 2020.
However, since this is Christmas, PPIs will be due by December 24, 2020.
PPI due dates will correlate with any changes in proposal due date.
87 Amend 7 incorporated Attachment G Small Business Subcontracting Plan, does this supersede Attachment C?
See Amendment 0009.
89 EP401 and
EP104
What is the classification of the Waste Water Treatment room 143? EP104 shows it as part of a Class II Div 1 Group G area, and EP401 shows NEMA 4 disconnects. Which is correct?
Waste Water Treatment room 143 is part of the Class II, Div 1 Group G area. Provide hazardous location listed disconnects as stated on equipment schedule(s).
90 We request that the bid date be moved from 1/6/2020 to 1/8/2020. With the bid date right after the holidays, it will be very difficult to get coverage on critical scopes of work considering most companies will be coming back from holiday break on 1/4/2020. These extra 2 days allow the subcontracting community to reengage their pricing activities and offer much better coverage that could help the government procure the work at a lower cost.
Bid per RFP.
92 Amend 7 Amend 7 incorporated Attachment G Small Business Subcontracting Plan, does this supersede Attachment C Small
See Amendment 0009.
Business Subcontracting Plan from the orginial RFP?
93 12 RFP Factor 3 The RFP directs offeror's to provide quaifications for a Designer of Record and provide 3-5 projects from the design firm. In order to provide the government with the highest quality service and the ability to provide the best design services for all types of the projects anticipated under this MACC, it is our intention to propose a two-design firm approach. Please confirm that projects can be provided from each of two design firms if all of the relevancy criteria can be demonstrated from each firm with a maximum of 5 projects total. (For example, 3 projects from Firm A and 2 projects from Firm B.)
Confirmed.
94 22 of 73 (Solicitation, Offer And Award)
00 21 13 5.3 During the Site Visit, Tuesday, December 8, 2020, it was understood instructions were given the Pre-Proposal Inquires (PPI’s) deadline was December 8, 2020. The first Paragraph 5.3 (there are actually two 5.3 paragraphs) of Section 00 21 13 – Instructions to Bidders appears to indicate PPI’s must be received fourteen calendar days prior to the solicitation closing date. Based on the due date for pricing change indicated in Amendment Number 7, to January 6, 2021, it would appear the cut-off for PPI’s would be December 23, 2020. Please review and advise accordingly.
PPIs are due 14 days prior to their respective due dates.
Technical PPI due date remains unchanged. Technical PPIs are due 14 days prior to the proposal due date, which was December 8, 2020.
Price/Small Business PPIs are due 14 days prior to the proposal due date, which is December 25, 2020.
However, since this is Christmas, PPIs will be due by December 24, 2020.
PPI due dates will correlate with any changes in proposal due date.
95 EP601 and
EP103
Reference EP601 and EP103. CH-1 and CH-2 shown to require both 400A and 600A disconnects. Which is correct?
Provide 600A disconnects as indicated on sheet EP103 and on sheet EP604, panel schedule "H3"
96 EP101 and
EP604
Reference EP101 and EP604. EF-3 is shown to require #8 and #10 branch circuits protected by 80A fuses and a 40A breaker. Which is correct
EF-3 will require 3-#6AWG and 1-#8gnd conductors in minimum 3/4" conduit. Provide 3 pole, 70amp rated circuit breaker.
97 EP101 and
EP604
Reference EP101 and EP604. DC-3 is shown to require #8 and #3 branch circuits. Which is correct?
DC-3 will require 3-#6AWG and 1-#8gnd conductors in minimum 3/4" conduit. Provide 3 pole, 70amp rated circuit breaker.
98 09 96 00 3.1.3 Specification 09 96 00, High Performance Coatings, sections 3.1.3.1 and 3.1.3.3 reference SSPC 7/NACE No.4 for blast cleaning/abrasive cleaning. Please confirm that blast cleaning/abrasive cleaning are only required if indicated by the coating manufacturer.
Confirmed.
99 09 96 00 3.1.3 Specification 09 96 00, High HPC1 is called out on the interior
Performance Coatings, section 3.1.3 is titled Concrete Surfaces however it references shop - applied prime coats.
Since only precast concrete could receive shop applied coatings, and the Precast Architectural Concrete specification, 03 45 00, does not indicate any shop applied coatings, please confirm that the referenced section does not apply to this project. If the section is applicable, please indicate what products it applies to.
finish schedule as the precast finish color in the 3 bays. No shop applied coatings are required.
100 08 34 16.10 2.4.1 Paragraph 2.4.1 in specification section 08 34 16.10 Steel Sliding Hangar Door requires to "clean, prepare, and coat all exposed and non-exposed ferrous metal surfaces" per 09 96 00. Does this requirement apply to the hangar door bottom rails that are embedded in the concrete on Sheet AE313 detail A4?
No.
101 08 34 16.10 2.4.1 Paragraph 2.4.1 in specification section 08 34 16.10 Steel Sliding Hangar Door requires to "clean, prepare, and coat all exposed and non-exposed ferrous metal surfaces" per 09 96 00. Does this requirement apply to the hangar door top guides on Sheet AE313 detail A4?
Yes.
102 08 34 16.10 2.4.1 Paragraph 2.4.1 in specification section 08 34 16.10 Steel Sliding Hangar Door requires to "clean, prepare, and coat all exposed and non-exposed ferrous metal surfaces" per 09 96 00. Does this requirement apply to the bracing required for the exterior and interior covering as instructed in Hangar Door Specs (SECTION 08 34 16.10) paragraph 2.2.1.2?
Provide to all exposed and non-exposed surfaces as indicated.
103 AE-105 11 01 00 Drawing AE-105 Overall Roof Plan does not indicate a Horizontal Cable Lifeline system. Does the roof require a Horizontal Cable Lifeline system per 11 01 00? If so, is it up to the fall protection provider to determine the layout?
It is not required. Only guardrails as shown.
104 AE-111 11 24 29 Fall protection isn't shown at the PMB Bay. Please confirm it is not required.
It is not required in the PMB Bay.
105 Page 22 of 73 5. PROPOSAL
REQUIREMENTS
and Amendment 7
5.3 Pre-
proposal inquiries (PPIs) and
PPI 23
Government response
Please confirm that all inquiries must be submitted in writing and received by the contracting specialist 14 days prior to the electronic price proposal due date (Dec. 30th). A PPI deadline of Dec.
16th will allow offerors the opportunity to submit questions after the site visit and still provide adequate time for the government to reply prior to the bid
PPIs are due 14 days prior to their respective due dates.
Technical PPI due date remains unchanged. Technical PPIs are due 14 days prior to the proposal due date, which was December 8, 2020.
Price/Small Business PPIs are due 14 days prior to the proposal due date. date, which is December 25, 2020.
However, since this is Christmas, PPIs will be due by December 24, 2020.
PPI due dates will correlate with any changes in proposal due date.
107 General Please provide the P-1035, Corrosion Control and Paint Facility electronic files (i.e. revit, dwg, etc.).
Electronic files will be forwarded to awardee.
108 Please advise if there is a template for the letter of commitment needed as part of the SWaM goals.
There is no template.
109 Amendment 4 Attachment E - Historical Small Business Utilization form released with Amendment 4 states to provide the information for "for each project submitted under Factor 1, Corporate Experience." Is this form required for the Design projects submitted under Factor 1, or only for the Prime Contractor?
See Amendment 0005 for revisions to the language.
110 123 2.6.2/ Div 5. Is Zinc-Rich Primer required on structural steel as called out in the specs?
Previously Confirmed
111 AF601 Note F "Provide RWS1 at all exterior windows, excluding corridors and toilet rooms." Is RWS1 only required at windows (S1) in rooms 101 & 103?
See response to PPI #30
112 Amendment 7 Amendment 7 extends the due dates as follows but does not provide a time by which submissions must be received on those dates. Please confirm the due time on each of the following dates:
Electronic Submission of Non-Price Factors 1-4 December 22, 2020 Hard Copy Submission of Non-Price Factors 1-4 December 30, 2020 Electronic Submission of Price and Factor 5 January 6, 2020 Hard Copy Submission of Price and Factor 5 January 11, 2020
See Amendment 0009.
113 2 of 5 On page 2 of AM007, item 2 revises Factor 1, (2) Design Experience page limits from two (2) double-sided pages or four (4) singled-sided pages to one
(1) double-sided page or two (2) singled sided pages. However, on page 13 of 73 of the original RFP, the first paragraph reads "...total length for each project data sheet shall not exceed one (1) double-sided page or two (2) single-sided pages." This is the same language as the amendment. Please clarify and confirm the total number of pages for Design Experience projects.
114 Amendment 07 2 Item 2 in Amendment 7 revises the page length submission requirements for Factor 1, (2) Design Experience to “one
(1) double-sided page (or two (2) single-sided pages).” Please confirm the page length submission requirement for Factor 1, (1) Construction Experience remains two (2) double-sided pages (or four (4) single-sided pages). Less than four pages (inclusive of boxes 1-8 of the Exhibit A which takes up nearly one page) is insufficient to present details of the projects that substantiate its relevance to this solicitation. Considering this procurement is being conducted in one step – rather than the two-step process often utilized by NAVFAC for MACC contracts – it is essential offerors are permitted to most effectively showcase their Construction Experience, and allowing a maximum four pages for each project supports this aim.
See Amendment 0009.
115 RFP 7 1(a)(1) Evaluation Factors for Award notes a submission requirement for a CD-ROM.
However, section 5.2 Proposal Submission Instructions indicates to submit via DOD Safe Site to holly.snow@navy.mil. Please clarify if CD-ROM is required for submission. If required, please confirm if USB drive is acceptable in lieu of CD-ROM.
A CD-ROM shall be submitted in the hard copy proposal.
Electronic Proposal Submissions shall be submitted through DOD Safe.
117 Specifiation 05 12 00-2.6.2 notes shop primer per SSPC Paint 20 or 29 which are zinc coatings. Specification 05 21 00-2.5 notes standard SSPC Paint 15 which is standard manf shop primer, except joists and girders that require finish paint per 09 90 00. It appears all interior exposed steel per 09 90 00 will require to be painted in the field per 09 90 00-3.13.2 (Primer MPI 79, Intermediate MPI 138 and top coat MPI 138). SSPC QP 1 certification is required for coatings. Please verify the interior exposed steel, joists, and misc.
metals are to receive these coatings at areas such as in Area D. Also, please verify the structural steel and steel joists at areas that get a suspended metal panel ceiling (PMB and Paint Bays) do not require the shop applied Zinc Rich Primer called out in 05 12 00 -2.6.2 and 09 90 00.
Refer to 09 90 00 1.12.2 for steel (and joists) excluded from paint.
Refer to 05 12 00 for steel and 05 21 00 for joists to be primed only.
For steel and joists to be painted, refer to 09 90 00 for both primer and paint.
118 12 00 21 13 Factor 1 Basis of Evaluation (ii) identifies Bid per RFP.
additional characterists and notes, "Projects demonstrating experience with Electrocoagulation Systems, Plastic Media Systems, and/or Plenum doors.
This expereince seems to be very centric to the SEED project. Would the government consider allowing 1 project in addition to the 5 projects allowed in Factor 1 to demonstrate this experience?
119 SB504 Please provide the bottom of pit elevation for the "typical concrete pit for aircraft lift system" on SB504. Note 1 is referenced, but that is for the width and length of the pits only.
Base bid bottom of pit elevation is [-3'-0"]. Coordinate with lift table requirements.
120 21 00 21 13 5.2a Paragraph 5.2a states only 2 email addresses may be provided per Offeror.
Since confidenital finanical statements must be uploaded, please allow a third email address to provide the finanical statement as they are typically provided directly by the CFO. This will allow 2 links for the remainder of the proposal (1 for the primiary and a second as a back-up.)
See Amendment 0009.
121 S-001 Design note 1 on S-001 references UFC 3-301-01. Please indicate if the Precast Panels will need to follow 2" min concrete coverage over reinforcing incidated in UFC 3-301-01. If so, the current panel thickness could potentially increase. If 1.5" requirement set forth in ACI 362.1 is acceptable, please verify.
Comply with UFC 3-301-01 for cover requirements.
122 S-001 Design note 3 "ATFP Criteria" references to design in accordance with UFC 4-010-01. Since this projet is installed more than 50' inside a controlled perimeter, please confirm blast rated systems are not required for the precast, glazing and door systems.
Comply with UFC 4-010-01 requirements for a project located more than 50 ft inside controlled perimeter.
144 General Requirements
PPI Cutoff Date Amendment
Amendment 0007 separated the proposal due dates for the Non-Price Factors and the Price and Factor 5. The due date for PPIs, however, remains fourteen calendar days prior to the solicitation closing date which is currently January 6th setting the PPI cutoff date as 12/23, one day after the due date for the Technical Non-Price Factors on 12/22. How does the government plan to address PPIs that arrive after 12/22?
PPIs are due 14 days prior to their respective due dates.
Technical PPI due date remains unchanged. Technical PPIs are due 14 days prior to the proposal due date, which was December 8, 2020.
Price/Small Business PPIs are due 14 days prior to the proposal due date, which is December 25, 2020.
However, since this is Christmas, PPIs will be due by December 24, 2020.
PPI due dates will correlate with any changes in proposal due date.
145 Amendement Amendment 0004 states that all See Amendment 0009.
0004 pg. 2-4 submissions should include Attachment G – Small Business Subcontracting Plan, and all corresponding Factor 5 Attachments C & E. Please confirm that each offeror should include Attachment C, E, and G with their submission.
190 Amendment #004 revised the Factor 5 Small Business Utilization deliverables.
Per this Amendment, the Contractor is to include the Attachment E Historical Small Business Utilization forms, and the Attachment C Small Business Participation Commitment Document.
However, is it correct that outside of Factor 5, but still within the Price Binder, we are to include the Attachment G Small Business Subcontracting Plan (which is extremely similar to Attachment C)?
(End of Summary of Changes)