This package includes engineering drawings and specifications for a water treatment system to be installed at a naval facility. The drawings show a flow schematic, system plan, and elevations. Key equipment includes a wastewater storage tank, oil-water separator, electrocoagulation system, defoaming and flocculation tanks, clarifier, dual cell sand filters, sludge thickener, filter press, and various pumps and pipes. The system is designed to treat 50 gpm of wastewater and has capacity for 14 hours of daily usage. Tank sizes, pump capacities and other equipment specifications are provided. The project was approved by the base commander.
The related federal contract opportunity is a solicitation for an indefinite delivery/indefinite quantity multiple award construction contract for facilities in the Hampton Roads area of Virginia. The solicitation is seeking general construction services and was issued by the Naval Facilities Engineering Command of the Department of the Navy. No pricing, response dates or other transactional details are provided in the documents reviewed.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
M M
O N
WEALTH OF VIR
G
IN
IA
P R
O
FESSIONAL ENGIN
E
E R
BURKE B. MURPH III
Lic. No. 061555
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P
A
IN
T F
A C
IL
IT
Y
W A
TE
R
T R
E A
TM
E
N T
FL
O
W S
C H
E M
A
TI
C
MWT
12822695
BBM MWG
SDS / RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
IW001
ROOF GUTTER
SYSTEM
STORM
WATER
FILTER
SF-1
RAIN HARVEST
STORAGE TANK
T-1
TANKER
TRUCK
WASTEWATER
STORAGE TANK
WASTEWATER
PUMP SKID
CAPTURED OIL
RECEPTACLE
OIL - WATER
SEPARATOR
EC INFLUENT
PUMP SKID
ELECTROCOAGULATION
(EC) SYSTEM
DEFOAM
TANK W/
MIXER
FLOC
TANK W/
MIXER
ACID
PUMP SKID
CAUSTIC
PUMP SKID
POLYMER DOSING
SYSTEM SKID
INDUSTRIAL
SUMP PIT
WASH RACK
BAY #144
HIGH
PRESSURE
WATER
CANNON
TREATED
WATER
STORAGE
TANK
TRENCH DRAIN
TD-1
DOMESTIC
WATER SUPPLY
SAND FILTER
HAZARDOUS
WASTE
RECEPTACLE
DEWATERED SUBSTRATE
CLARIFIER
CLARIFIER
SLUDGE PUMP
SKID SLUDGE
THICKENER
SLUDGE
PUMP SKID
FILTER
PRESS
HAZARDOUS
WASTE
RECEPTACLE
NOT TO SCALE
WATER TREATMENT FLOW SCHEMATIC
CaCl DOSING
SYSTEM SKID
RAIN WATER PUMP
RWP-1
LEGEND
# KEY NOTES
GENERAL NOTES
HIGH
PRESSURE
WATER
CANNON
FOAMING
SYSTEM
F-1
WASH SYSTEM
W-2
WASH SYSTEM
W-1
LE
BLADDER
PRESSURE TANK
BT-1
PE
PE
PE
RINSE
SYSTEM
PUMPS
RSP-1,
RSP-2
WASH
SYSTEM
PUMP
WSP-1
PROCESS FLOW
SIDE STREAM
PUMP
THREE-WAY VALVE W/ DDC/ELECTRONIC CONTROLS
TWO-WAY VALVE W/ DDC/ELECTRONIC CONTROLS
TWO-WAY VALVE W/ MANUAL HANDLE
MIXER
FLOWMETER
WASTEWATER TREATMENT SYSTEM CAPACITY IS 50 GPM FOR 14 HOURS
USAGE PER DAY; 2.5 HOURS OF UNINTERRUPTED USAGE.
1.
ALL PIPING 2-1/2" PVC UNLESS NOTED OTHERWISE.2.
SEE PLUMBING DRAWINGS FOR PIPE
SIZES AND EQUIPMENT DETAILS
SEE PLUMBING DRAWINGS FOR PIPE
SIZES AND EQUIPMENT DETAILS
TREATED WATER
PUMP SKID
IWP-1 IWP-1
WASH RACK
EQUIPMENT
ROOM #146
4" 4"
4"
1"
TO REM-1
AND REM-2
LE LEVEL ELEMENT
N.C.
FLOC
PUMP SKID
DEFOAM
PUMP SKID
EC
EFFLUENT
PUMP SKID
SAND FILTER
PUMP SKID
1 WASTEWATER STORAGE TANK - 2,500 GAL.
2 WASTEWATER PUMP SKID
3 OIL - WATER SEPARATOR
4 ELECTROCOAGULATION SYSTEM INFLUENT PUMP SKID
5 ELECTROCOAGULATION SYSTEM
6 DEFOAM TANK W/ MIXER - 2,000 GAL.
7 DEFOAM TANK PUMP SKID
8 FLOCCULATION TANK W/ MIXER - 2,000 GAL.
9 FLOCCULATION TANK PUMP SKID
10 CLARIFIER W/ PLATFORM
11 DUAL CELL SAND FILTER
12 TREATED WATER TANK - 2,500 GAL.
13 CLARIFIER SLUDGE PUMP SKID
14 SLUDGE THICKENER TANK - 500 GAL.
15 SLUDGE PUMP SKID
16 FILTER PRESS
17 HAZARDOUS WASTE RECEPTACLE - 55 GAL.
18 CAPTURED OIL RECEPTACLE - 55 GAL.
19 ACID PUMP SKID
20 ACID TANK W/ LEVEL ELEMENT- 250 GAL.
21 POLYMER AND CALCIUM CHLORIDE PUMP SKID
22 POLYMER TANK W/ LEVEL ELEMENT - 20 GAL.
23 TREATED WATER PUMP SKID
24 CALCIUM CHLORIDE TANK W/ LEVEL ELEMENT - 20 GAL.
25 CAUSTIC PUMP SKID
26 CAUSTIC TANK W/ LEVEL ELEMENT - 50 GAL.
27 TRENCH DRAIN TO WASH BAY SUMP PIT - REFER TO PLUMBING DRAWINGS
28 CRANE PIVOT (NOT SHOWN)
29 REFER TO DRAWING PL107 FOR CONTINUATION (NOT SHOWN)
30 ELECTROCOAGULATION SYSTEM EFFLUENT PUMP SKID
31 SAND FILTER PUMP SKID
2A 2B
4A 4B
12 23A 23B 31A 31B
13A 13B
15A 15B
9A 9B
19A 19B
25A 25B
21C 21D
21A 21B
247A 7B30A 30B
PE PRESSURE ELEMENT
LELELE
LE
LE
REFER TO SECTION 46 53 60 WATER TREATMENT SYSTEM FOR PACKAGE
DETAILS
3.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
M M
O N
WEALTH OF VIR
G
IN
IA
P R
O
FESSIONAL ENGIN
E
E R
BURKE B. MURPH III
Lic. No. 061555
300.12
IW201A1
IW201
IW202
C1
A1
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P
A
IN
T F
A C
IL
IT
Y
W A
TE
R
T R
E A
TM
E
N T
S Y
S
TE
M P
LA
N
MWT
12822696
BBM MWG
SDS / RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
IW101
1/4" = 1' - 0"
0 5' 10' 15'1'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
AREA
A
AREA
B
AREA
D
AREA C
V-147
1/4" = 1'-0"
WATER TREATMENT SYSTEM PLAN
R A
IN
W
A T
E R
D O
M E
S T
IC
W
A T
E R
# KEY NOTES
1 WASTEWATER STORAGE TANK
MINIMUM REQUIREMENTS: 2,500 GAL
2 WASTEWATER PUMP SKID
MINIMUM REQUIREMENTS: 50 GPM @ 20 TDH EACH
3 OIL - WATER SEPARATOR
MINIMUM REQUIREMENTS: 50 GPM
4 ELECTROCOAGULATION SYSTEM INFLUENT PUMP SKID
MINIMUM REQUIREMENTS: 50 GPM @ 20 TDH EACH
5 ELECTROCOAGULATION SYSTEM
MINIMUM REQUIREMENTS: 50 GPM
6 DEFOAM TANK W/ MIXER
MINIMUM REQUIREMENTS: 2,000 GAL @ 3/4 HP
7 DEFOAM TANK PUMP SKID
MINIMUM REQUIREMENTS: 50 GPM @ 20 TDH EACH
8 FLOCCULATION TANK W/ MIXER
MINIMUM REQUIREMENTS: 2,000 GAL @ 3/4 HP
9 FLOCCULATION TANK PUMP SKID
MINIMUM REQUIREMENTS: 50 GPM @ 20 TDH EACH
10 CLARIFIER W/ PLATFORM
MINIMUM REQUIREMENTS: 50 GPM
11 DUAL CELL SAND FILTER
MINIMUM REQUIREMENTS: 50 GPM EACH
12 TREATED WATER TANK
MINIMUM REQUIREMENTS: 2,500 GAL
13 CLARIFIER SLUDGE PUMP SKID
MINIMUM REQUIREMENTS: 10 GPM @ 20 TDH EACH
14 SLUDGE THICKENER TANK
MINIMUM REQUIREMENTS: 500 GAL
15 SLUDGE PUMP SKID
MINIMUM REQUIREMENTS: 10 GPM @ 20 TDH EACH
16 FILTER PRESS
MINIMUM REQUIREMENTS: 10 GPM
17 HAZARDOUS WASTE RECEPTACLE
MINIMUM REQUIREMENTS: 55 GAL
18 CAPTURED OIL RECEPTACLE
MINIMUM REQUIREMENTS: 55 GAL
19 ACID PUMP SKID
MINIMUM REQUIREMENTS: 5 GPM @ 10 TDH EACH
20 ACID TANK W/ LEVEL ELEMENT
MINIMUM REQUIREMENTS: 250 GAL
21 POLYMER AND CALCIUM CHLORIDE PUMP SKID
MINIMUM REQUIREMENTS: 0.1 GPH @ 10 TDH EACH
22 POLYMER TANK W/ LEVEL ELEMENT
MINIMUM REQUIREMENTS: 20 GAL
23 TREATED WATER PUMP SKID
MINIMUM REQUIREMENTS: 50 GPM @ 20 TDH EACH
24 CALCIUM CHLORIDE TANK W/ LEVEL ELEMENT
MINIMUM REQUIREMENTS: 20 GAL
25 CAUSTIC PUMP SKID
MINIMUM REQUIREMENTS: 0.1 GPH @ 20 TDH EACH
26 CAUSTIC TANK W/ LEVEL ELEMENT
MINIMUM REQUIREMENTS: 50 GAL
27 TRENCH DRAIN TO WASH BAY SUMP PIT
MINIMUM REQUIREMENTS: REFER TO PLUMBING DRAWINGS
28 CRANE PIVOT
MINIMUM REQUIREMENTS: REFER TO MECHANICAL DRAWINGS
29 REFER TO DRAWING PL107 FOR CONTINUATION
MINIMUM REQUIREMENTS: REFER TO PLUMBING DRAWINGS
30 ELECTROCOAGULATION SYSTEM EFFLUENT PUMP SKID
MINIMUM REQUIREMENTS: 50 GPM @ 20 TDH EACH
31 SAND FILTER PUMP SKID
MINIMUM REQUIREMENTS: 50 GPM @ 20 TDH EACH
W A
S H
P U
M P
S Y
S T
E M
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
M M
O N
WEALTH OF VIR
G
IN
IA
P R
O
FESSIONAL ENGIN
E
E R
BURKE B. MURPH III
Lic. No. 061555
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P
A
IN
T F
A C
IL
IT
Y
E
LE
V A
TI
O
N S
W
A
TE
R T
R E
A
TM
E N
T S
Y S
TE
M
MWT
12822697
BBM MWG
SDS / RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
IW201
1/4" = 1' - 0"
0 5' 10' 15'1'
GRAPHIC SCALE(S)
# KEY NOTES
FINISHED FLOOR
9.50'
FINISHED FLOOR
9.50'
25 19
SCALE: 1/4" = 1'-0" (AE104)A1
ELEVATION - WATER TREATMENT SYSTEM (EAST)
SCALE: 1/4" = 1'-0" (AE104)C1
ELEVATION - WATER TREATMENT SYSTEM (SOUTH)
1 WASTEWATER STORAGE TANK - 2,500 GAL.
2 WASTEWATER PUMP SKID
3 OIL - WATER SEPARATOR
4 ELECTROCOAGULATION SYSTEM INFLUENT PUMP SKID (NOT SHOWN)
5 ELECTROCOAGULATION SYSTEM
6 DEFOAM TANK W/ MIXER - 2,000 GAL.
7 DEFOAM TANK PUMP SKID (NOT SHOWN)
8 FLOCCULATION TANK W/ MIXER - 2,000 GAL.
9 FLOCCULATION TANK PUMP SKID (NOT SHOWN)
10 CLARIFIER W/ PLATFORM
11 DUAL CELL SAND FILTER (NOT SHOWN)
12 TREATED WATER TANK - 2,500 GAL. (NOT SHOWN)
13 CLARIFIER SLUDGE PUMP SKID (NOT SHOWN)
14 SLUDGE THICKENER TANK - 500 GAL. (NOT SHOWN)
15 SLUDGE PUMP SKID (NOT SHOWN)
16 FILTER PRESS (NOT SHOWN)
17 HAZARDOUS WASTE RECEPTACLE - 55 GAL. (NOT SHOWN)
18 CAPTURED OIL RECEPTACLE - 55 GAL. (NOT SHOWN)
19 ACID PUMP SKID
20 ACID TANK W/ LEVEL ELEMENT - 250 GAL. (NOT SHOWN)
21 POLYMER AND CALCIUM CHLORIDE PUMP SKID
22 POLYMER TANK W/ LEVEL ELEMENT - 20 GAL. (NOT SHOWN)
23 TREATED WATER PUMP SKID (NOT SHOWN)
24 CALCIUM CHLORIDE TANK W/ LEVEL ELEMENT - 20 GAL. (NOT SHOWN)
25 CAUSTIC PUMP SKID
26 CAUSTIC TANK W/ LEVEL ELEMENT - 50 GAL.
27 TRENCH DRAIN TO WASH BAY SUMP PIT - REFER TO PLUMBING DRAWINGS
(NOT SHOWN)
28 CRANE PIVOT
29 REFER TO DRAWING PL107 FOR CONTINUATION (NOT SHOWN)
30 ELECTROCOAGULATION SYSTEM EFFLUENT PUMP SKID
31 SAND FILTER PUMP SKID (NOT SHOWN)
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
M M
O N
WEALTH OF VIR
G
IN
IA
P R
O
FESSIONAL ENGIN
E
E R
BURKE B. MURPH III
Lic. No. 061555
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
N40085-19-D-9041
1614720
1 2 3 4 5
Approved by Brett D. Ingle, Captain, USN, Commander, with Fleet Readiness Center
Mid-Atlantic, via Email.
14 Sept 2020
P -1
C
O R
R O
S
IO
N C
O N
T R
O L
P
A
IN
T F
A C
IL
IT
Y
E
LE
V A
TI
O
N S
W
A
TE
R T
R E
A
TM
E N
T S
Y S
TE
M
MWT
12822698
BBM MWG
SDS / RSF
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
N O
R F
O
LK
EJA
ALG
DSN
IW202
1/4" = 1' - 0"
0 5' 10' 15'1'
GRAPHIC SCALE(S)
# KEY NOTES
FINISHED FLOOR
9.50'
SCALE: 1/4" = 1'-0" (AE104)A1
ELEVATION - WASTEWATER TREATMENT SYSTEM (WEST)
1 WASTEWATER STORAGE TANK - 2,500 GAL. (NOT SHOWN)
2 WASTEWATER PUMP SKID (NOT SHOWN)
3 OIL - WATER SEPARATOR (NOT SHOWN)
4 ELECTROCOAGULATION SYSTEM INFLUENT PUMP SKID (NOT SHOWN)
5 ELECTROCOAGULATION SYSTEM (NOT SHOWN)
6 DEFOAM TANK W/ MIXER - 2,000 GAL. (NOT SHOWN)
7 DEFOAM TANK PUMP SKID (NOT SHOWN)
8 FLOCCULATION TANK W/ MIXER - 2,000 GAL. (NOT SHOWN)
9 FLOCCULATION TANK PUMP SKID (NOT SHOWN)
10 CLARIFIER W/ PLATFORM
11 DUAL CELL SAND FILTER
12 TREATED WATER TANK - 2,500 GAL. (NOT SHOWN)
13 CLARIFIER SLUDGE PUMP SKID (NOT SHOWN)
14 SLUDGE THICKENER TANK - 500 GAL.
15 SLUDGE PUMP SKID
16 FILTER PRESS
17 HAZARDOUS WASTE RECEPTACLE - 55 GAL.
18 CAPTURED OIL RECEPTACLE - 55 GAL. (NOT SHOWN)
19 ACID PUMP SKID (NOT SHOWN)
20 ACID TANK W/ LEVEL ELEMENT - 250 GAL. (NOT SHOWN)
21 POLYMER AND CALCIUM CHLORIDE PUMP SKID (NOT SHOWN)
22 POLYMER TANK W/ LEVEL ELEMENT - 20 GAL. (NOT SHOWN)
23 TREATED WATER PUMP SKID
24 CALCIUM CHLORIDE TANK W/ LEVEL ELEMENT - 20 GAL. (NOT SHOWN)
25 CAUSTIC PUMP SKID (NOT SHOWN)
26 CAUSTIC TANK W/ LEVEL ELEMENT - 50 GAL. (NOT SHOWN)
27 TRENCH DRAIN TO WASH BAY SUMP PIT - REFER TO PLUMBING DRAWINGS
(NOT SHOWN)
28 CRANE PIVOT (NOT SHOWN)
29 REFER TO DRAWING PL107 FOR CONTINUATION (NOT SHOWN)
30 ELECTROCOAGULATION SYSTEM EFFLUENT PUMP SKID (NOT SHOWN)
31 SAND FILTER PUMP SKID
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
| IW001 - WATER TREATMENT FLOW SCHEMATIC |
| IW101 - WATER TREATMENT SYSTEM PLAN |
| IW201 - ELEVATIONS -WATER TREATMENT SYSTEM |
| IW202 - ELEVATIONS -WATER TREATMENT SYSTEM |
| 2020-09-14T13:57:02-0400 | |
| Macon | |
| I, [Name], am signing to approve this document. |
| 2020-09-14T13:58:11-0400 | |
| Macon | |
| I, [Name], am signing to approve this document. |
| 2020-09-14T13:58:11-0400 | |
| Macon | |
| I, [Name], am signing to approve this document. |
| 2020-09-14T13:58:12-0400 | |
| Macon | |
| I, [Name], am signing to approve this document. |
| 2020-09-25T07:12:02-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-09-25T07:12:52-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-09-25T07:13:00-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-09-25T07:13:04-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-09-25T07:13:21-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-09-25T07:14:31-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-09-25T07:14:32-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-09-25T07:14:34-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |