About this file

This is an amendment to a solicitation for an indefinite-delivery, indefinite-quantity multiple award construction contract for facilities primarily in the Hampton Roads Area of Responsibility in Virginia. The Navy seeks to award more than six contracts for construction and design-build projects valued at a minimum of $5,000 each. Eligible projects include large general construction across multiple Navy locations. The amendment provides responses to offeror questions, allowing the use of multiple lead architecture and engineering firms and confirming that relevant experience includes managing simultaneous projects under different contracts. It also modifies submission requirements for responsibility determination information.

View the file

Other files

File Type Posted
21R2507 0016.pdf PDF
21R2507 0015.pdf PDF
21R2507 0018.pdf PDF
21R2507 0019.pdf PDF
21R2507 0017.pdf PDF
SKM-1.pdf PDF
21R2507 0014.pdf PDF
21R2507 0013.pdf PDF
21R2507 0012.pdf PDF
21R2507 0011.pdf PDF
21R2507 0009.pdf PDF
21R2507 0008.pdf PDF
P1035 Site Visit.pdf PDF
ATT G SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
21R2507 0007.pdf PDF
21R2507 0006.pdf PDF
21R2507 0005.pdf PDF
One Day Pass Request.xls XLS spreadsheet
ATTACHMENT E Historical SB Utilization.docx DOCX document
21R2507 0004.pdf PDF
21R2507 0003.pdf PDF
1614720dwg03of16_CivilR.pdf PDF
1614720 P1035 DesRev01 17Nov2020.pdf PDF
1614720dwg02of16_BoringsR.pdf PDF
1614720dwg09of16_GeneralR.pdf PDF
21R2507 0002.pdf PDF
1614720dwg07of16_ArchitecturalR.pdf PDF
1614720dwg15of16_CathodicR.pdf PDF
Attachment A Con Des.docx DOCX document
21R2507 0001.pdf PDF
Attachment C SB Commitment.docx DOCX document
Attachment D PPI Log.xlsx XLSX spreadsheet
Attachment B PPQ.docx DOCX document
1614720_P1035 SID BINDER.pdf PDF
1614720dwg12of16_WaterTreatment.pdf PDF
1614720dwg14of16_Electrical.pdf PDF
1614720dwg09of16_General.pdf PDF
Price Proposal Form 11-13-20.pdf PDF
1614720spc02of03.pdf PDF
N4008521R2507 RFP.pdf PDF
1614720_P1035 CxPlan w FPT and PFC.pdf PDF
1614720dwg16of16_Telecom.pdf PDF
1614720dwg08of16_Interiors.pdf PDF
1614720_P1035 Bldg V-57 Laundry - 1943 dwgs.pdf PDF
1614720dwg04of16_Landscape.pdf PDF
1614720dwg15of16_Cathodic.pdf PDF
1614720_P1035 OPR.pdf PDF
1614720dwg02of16_Borings.pdf PDF
1614720spc03of03.pdf PDF
1614720dwg07of16_Architectural.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Revisions and PPIs

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R2507

X 9B. DATED (SEE ITEM 11)

06-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Dec-2020

CODE

NAVFACSYSCOM MID-ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R2507

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]

(End of provision)

1. Adds/Revises Language to the following:

Section 00 21 13 – Instructions to Bidders, Paragraph 1.3.1: Add the following at the end of the paragraph: “The Government reserves the right to award more than six (6) contracts, if deemed necessary by the Contracting Officer.”

Section 00 21 13 – Instructions to Bidders, Paragraph 1.3.2: Add the following at the end of the paragraph: “Work at other NAVFAC locations may be ordered under this MACC.”

Section 00 21 13 – Instructions to Bidders, Paragraph 1.3.3: Replace “The Government’s minimum guarantee for each FFP IDIQ contract is $5,000.00 to be paid during the base year of the contract.” with “The Government’s minimum guarantee for each FFP IDIQ contract is $5,000 over the life of the contract.”

2. Revises Submission Method under Price, Additional Responsibility Determination Information, # 1-4.

Additional Responsibility Determination Information, # 1-4 shall be submitted both Electronically and Hard Copy, but need not be submitted on the CD-ROM.

3. Provides PPI responses as below.

# Reference Question Government Response

91 Factor 3 In order to provide design-builders and NAVFAC access to AE firms with a wider range of expertise, a greater ability to design concurrent projects simultaneously, and the surge staffing to expedite task orders; please confirm it is acceptable to utilize multiple lead AE firms in response to this solicitation, as has been successfully utilized on past NAVFAC MACC contracts. In this manner, an AE firm’s selection as designer of record for a given task order will be based upon each task order’s required expertise and scope of work

Confirmed.

116 RFP 12 Factor 1 i. (2) The basis of evaluation for Factor 1 notes 5 characteristics for which a relevant project may receive a higher rating. The fourth characteristic is “projects demonstrating Offeror’s ability to perform multiple projects simultaneously.” Please confirm a single contract involving simultaneous construction of two or more buildings meets the intent of this characteristic.

No. The RFP states, "A project is defined as a construction project performed under a single task order or stand alone contract." The intent is to demonstrate multiple projects (multiple contracts) simultaneously.

8 of

4. Evaluation Factors for Award (a) Price (1)

Solicitation Submittal

Requirements

Responsibility Determination Information

Under RESPONSIBILITY

DETERMINATION INFORMATION,

it states that the offeror shall provide the latest three complete fiscal year financial statements and a signed bank reference. Under paragraph (1) Solicitation Submittal Requirements, it states that offerors shall submit (1) hard copy Original, and (1) hard copy.

For security reasons, please consider having offerors only submit electronic versions by uploading the information to the secure DoD Safe Website and removing the requirement for hard copy submissions.

Bid per RFP.

of

5.2 Proposal

Submission Instructions

5.2.1 Electronic

Submisison of Proposals

Paragraph 5.2.1 states that "only two email addresses may be provided per Offeror." Please allow offerors three email requests to allow the confidential Responsibility Determination Information to be submitted by a separate individual that has access to this company information, as well as a back up for the electronic submission.

See Amendment 0009.

7 of

4. Evaluation Factors for Award (a)

Price

(1) Solicitation Submittal

Requirements

Under paragraph (1) Solicitation Submittal Requirements, it states that offerors shall submit (1) hard copy Original, and (1) hard copy Copy and two CD-ROMs. Each offeror will be submitting an electronic copy of their

BID PER RFP.

proposals to DoD Safe. Please confirm that CD-ROMs are not required.

7 of

4. Evaluation Factors for Award (a)

Price

(1) Solicitation Submittal

Requirements

Under paragraph (1) Solicitation Submittal Requirements, it states that offerors shall submit (1) hard copy Original, and (1) hard copy Copy and two CD-ROMs. If CD-ROMs are required, please confirm that the Responsibility Determination Information shall not be included on the CD-ROMs.

Confirmed. The Additional Responsibility Determination information shall be submitted Electronically through DOD Safe as well as hard copy and need not submitted on the CD-ROM.

52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $100,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor -

(1) Any order for a single item in excess of $100,000,000;

(2) Any order for a combination of items in excess of $100,000,000; or

(3) A series of orders from the same ordering office within 5 days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

52.216-22 INDEFINITE QUANTITY. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the time specified in the order.”

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 15% percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of Summary of Changes)