About this file

This document contains questions and responses related to a solicitation for a Design-Build/Design-Bid-Build, Indefinite Delivery/Indefinite Quantity Multiple Award Construction Contract for facilities in the Hampton Roads area of Virginia. The solicitation seeks proposals for large general construction projects to be awarded to multiple vendors, and involves the Naval Facilities Engineering Command. Key details include the scope of work involving design and construction of facilities for painting, maintenance, and washing of aircraft. Responses provide clarification on specifications, drawings, and requirements regarding wall assemblies, HVAC equipment, fire alarm systems, and other aspects of projects involving hazardous material handling.

View the file

Other files

File Type Posted
21R2507 0016.pdf PDF
21R2507 0015.pdf PDF
21R2507 0018.pdf PDF
21R2507 0019.pdf PDF
21R2507 0017.pdf PDF
SKM-1.pdf PDF
21R2507 0014.pdf PDF
21R2507 0012.pdf PDF
21R2507 0011.pdf PDF
21R2507 0010.pdf PDF
21R2507 0009.pdf PDF
21R2507 0008.pdf PDF
P1035 Site Visit.pdf PDF
ATT G SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
21R2507 0007.pdf PDF
21R2507 0006.pdf PDF
21R2507 0005.pdf PDF
One Day Pass Request.xls XLS spreadsheet
ATTACHMENT E Historical SB Utilization.docx DOCX document
21R2507 0004.pdf PDF
21R2507 0003.pdf PDF
1614720dwg03of16_CivilR.pdf PDF
1614720 P1035 DesRev01 17Nov2020.pdf PDF
1614720dwg02of16_BoringsR.pdf PDF
1614720dwg09of16_GeneralR.pdf PDF
21R2507 0002.pdf PDF
1614720dwg07of16_ArchitecturalR.pdf PDF
1614720dwg15of16_CathodicR.pdf PDF
Attachment A Con Des.docx DOCX document
21R2507 0001.pdf PDF
Attachment C SB Commitment.docx DOCX document
Attachment D PPI Log.xlsx XLSX spreadsheet
Attachment B PPQ.docx DOCX document
1614720_P1035 SID BINDER.pdf PDF
1614720dwg12of16_WaterTreatment.pdf PDF
1614720dwg14of16_Electrical.pdf PDF
1614720dwg09of16_General.pdf PDF
Price Proposal Form 11-13-20.pdf PDF
1614720spc02of03.pdf PDF
N4008521R2507 RFP.pdf PDF
1614720_P1035 CxPlan w FPT and PFC.pdf PDF
1614720dwg16of16_Telecom.pdf PDF
1614720dwg08of16_Interiors.pdf PDF
1614720_P1035 Bldg V-57 Laundry - 1943 dwgs.pdf PDF
1614720dwg04of16_Landscape.pdf PDF
1614720dwg15of16_Cathodic.pdf PDF
1614720_P1035 OPR.pdf PDF
1614720dwg02of16_Borings.pdf PDF
1614720spc03of03.pdf PDF
1614720dwg07of16_Architectural.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment incorporates PPI responses.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jan-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R2507

X 9B. DATED (SEE ITEM 11)

06-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jan-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R2507

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

This Amendment hereby Incorporates:

1. PPI Responses

References Questions Responses

6 Seed Project - AE101 What are the heights of the interior masonry walls surrounding Rooms 111, 112, and 113?

The demising walls for these rooms go to deck. Refer to General Partition

Note 7 on sheet AE501

7 Seed Project - AF601

Reflected Ceiling Plans seem to indicate an acoustical tile ceiling in Room 120E - Air Lock but Room finish does not have a ceiling material identified. Please clarify.

This room is to have acoustic ceiling tile (ACT1) as shown on sheet

AE112. Finish schedule on AF601 to be revised.

Mech, Plum, & Water

Treatment Plans

PMB and Wash (Div 11), Mech, Plum, &

Integrated Automation

Specs

There appears to be very little mention of equipment and controls being Class 1 & 2, Div 1 rated or 'explosion proof' within the drawings and specs referenced, while there are many points of mention in the specs (especially plenum doors and lifts) that 'relate' to the hazardous locations noted on the electrical plans. We see the explosion proof motors noted in some mechanical schedules but only one sheet of controls plans for the paint booth indicating that everything in the AHU's will be explosion proof.

The plenum door spec indicates much more detail with switches and controls, etc. all being explosion proof methods and materials. Please clarify the extent of PMB, Wash, Mechanical, Plumbing, & Integrated Automation requirements within the hazardous locations as noted on the electrical plans.

The PMB Bay is Class II, Division 1, Group G for the explosive dust:

Motors and equipment required to be explosion-proof are noted on the drawings and equipment schedules.

Provide low voltage wiring and control devices in this space with explosion-proof, non-sparking devices. The Paint Bay and the Paint Mixing/Paint Storage/Cleaning spaces are Class I, Division 1, Group C with the same requirements as noted above for the PMB Bay. Electrical drawing EP-104 shows the Wash Rack Bay as being Class I, Division 1, Group C:

This classification applies only to the electrical services in this space, and not to the HVAC, plumbing or wastewater treatment systems.

53 12 24 13

Section 1.5.1.1 calls for motor-controlled roller shades. Then Section 2.1.1.e calls for manual operated chain drive hardware. Please clarify whether motor or manual shades are required.

Not required.

Roller Window Shades Spec Section

12 24 13 – remove from section 1.5.1.1 wording

"motor - controlled".

57 SF700 and AE102 Drawing SF700 appears to be missing a CP10R2 or CP10 wall type panel

Provide CP10 panels as shown on AE102, to 11'-6 above finished floor.

when compared to Drawing AE102 at Paint Bay Storage 120C. Please provide a wall panel type to be used on SF700.

Panels are not load-bearing.

64 Sheet IW101 41.22.23.19

The RFP included spec. section

41.22.23.19 Jib Crane Hoist. Can you

provide more details for the jib crane?

Is it floor mounted? Sheet IW101 Note 28 states “Refer to Mechanical Drawings”. Mechanical drawings so no minimum requirements.

Floor mounted per section 2.3.3 of the specification

14' reach

65 C502

Sheet C-502 Detail A1 shows 10” min of stone under equipment pad. The same detail shows 6” thick #57 Stone under equipment pad. Please clarify correct thickness of stone under equipment pad.

10" Min. dimension refers to concrete turn down; stone thickness (min.) is as noted.

66 CG101

Sheet CG101 Note 2 States “Manufactured Filtering Device”.

Can more detail be provided for this?

Refer to Specification 33 40 00 for detailed requirements.

No Federal Signal UVRI-BU is shown on the legend, the riser, the matrix, or the floor plans. Historically it has been a Navy requirement for MNS. Is one required on this project?

The system must interface with the basewide MNS system. Refer to specification section 28 31 76 paragraph 2.16.3.

No remote annunciator is shown on the legend, the riser, the matrix, or the floor plans. Historically it has been a Navy requirement for MNS. Is one required on this project?

No, Bid per RFP

No Local Operator Console is shown on the legend, the riser, the matrix, or the floor plans. Historically it has been a Navy requirement for MNS. Is one required on this project?

No, Bid per RFP

Several contractors have indicated that certain areas are Class 1 Div 1/2 EXP PRF based on the electrical drawings. No indication of Explosion Proof devices are shown on the legend, the riser, the specifications, or the floor plans. Are Explosion Proof Fire/MNS devices required on this project?

Fire alarm/MNS devices and the associated installation are to be suitable for the environment in which they are installed. If the electrical drawings indicate an area is electrically classified, appropriate devices and installation methods are required.

If EXP PRF devices are required are the also required to synchronize?

Synchronization is required per NFPA 72 where multiple strobes are in the same field of view.

If EXP PRF devices are required they are most likely not available in the candela indicated on the IFC drawings. What is the intent?

Drawings indicate the minimum candela rating required to meet NFPA

72 public mode notification requirements. Devices of higher rates are acceptable.

The specifications are indicating Scrolling LED Text Displays are

Bid per RFP.

required. Historically the Navy has preferred the Eaton Wheelock LEMD-M. Is this an acceptable product for the MNS LED text displays?

Multiple paths of egress do not have LED Text Displays or Pull stations.

Please confirm they are not required?

Provide text signs where indicated.

Provide pull stations where indicated, except also provide a pull station at the double door adjacent to ELEC

110.

75 Sheet F-002

Sheet F-002 indicates

“COORDINATE WITH

SPRINKLER CONTRACTOR FOR

QUANTITY OF FLOW AND

TAMPER SWITCH MONITORING

POINTS AND THEIR EXACT

LOCATION.” This would imply the fire alarm drawings have not been coordinated with the sprinkler drawings. Is it the intent the FA contractor is required to make an assumption with regard to the quantities?

The drawings are intended to indicate a coordinated design, but the detailed sprinkler system layout is via shop drawings. Coordination between subcontractors is required.

Spec Section

2.7.2

Spec Section 2.7.2 indicates both remote LED and test switches are required. None are shown on the legend, the riser, the matrix, or the floor plans even though there is an NFPA 72 symbol for them. Are they a requirement for this project?

Bid per RFP.

2.11.2

Spec Section 2.11.2 indicates “xenon flash tubes”. The majority of the industry has transitioned to LED strobes. Are LED strobes acceptable for this project?

Yes.

2.11.1

Spec Section 2.11.1 provides parameters for speaker tap and frequency range. If EXP PRF devices are required no products are available to meet the spec requirements. What is the intent?

The intent is to provide a combined fire alarm/mass notification system that produces intelligible voice messages. If devices meeting specific requirements are not available, submit a deviation request as part of the shop drawing submittal.

If EXP PRF speakers and strobes are required they are not available in white or ALERT lettering. What is the intent?

Red devices are acceptable if white isn't available. Strobes may not be marked FIRE.

81 Specifications

Please provide specifications for the structural pre-cast wall assemblies.

The only specification section given was for architectural pre-cast wall assemblies.

Precast panels are covered by Section 03 45 00

Are Fire Alarm drawings going to be issued or are we to use Sprinkler Drawings for takeoff? If we are to use Sprinkler Drawings, do we price class

Fire alarm devices are shown on the fire protection drawings..

1 div 2 areas?

83 General

Is the contractor responsible for the installation the gas line? If not, are there any fee’s the contractor is responsible for?

Gas lines from service main to meter, and Gas Meter are by gas utility company. Gas line from meter into building by installation contractor.

86 EL104, EG101, EP104

On dwgs EL104, EG101, Area D is classified as a Class 1, Div 1 Hazardous Area, however dwg EP104 is classifying Area D as a Class 2, Div 1 Hazardous Area. Which Hazardous Classification should it be listed as?

Sheet EP04 classification rating shall be like sheets EL104 and EG101 Area D - rated as Class I, Div I.

87 11 01 00 Provide clarifications/details for fall protection anchor attachment to steel.

Please refer to the fall protection trolley as shown on A1/AE511 and fall arrest anchor details on SF504.

88 07 42 13 2.1

Provide clarification of the manufacturer for the specific metal wall panel system that will used for the building façade. Contractors are having difficulties locating a manufacturer that meets all specs.

Provide a 24" wide panel with 8" spaced pencil ribs. The Government needs more details regarding contractor difficulties.

89 07 42 10 2.1

Provide clarification of the manufacturer for the specific Composite Framing Support system that will used for the metal wall panel substrate on the building façade.

Contractors are having difficulties locating a manufacturer that meets all specs.

Please provide additional information about specific difficulties.

90 SF107, SF202, SF203

Joists 104LH01 thru 104LH07, are not standard joist designation for this series. The LH Joist series only span up to 96' with a maximum depth of 48". However, the DLH Series which has a standard joist size of 104DLH18 thru 104DLH23 can span up to 240' and can also accomodate the 104" depth. Please confirm that joists 104LH01 thru 104LH07 are supposed to be 104DLH18.

Bid per RFP.

26 20 00

2.13.1 a, 26 20 00 2.14 a and b and 26 24 13 2.2.2.1 a and e

Panelboards' and indoor transformers' enclosures are required to be NEMA 1 standard code gauge steel. The switchboards' enclosures, located in the same room, are required to be NEMA 1 304 or 304L Stainless Steel.

Because the Switchboards will be located indoors, we recommend their enclosures to be NEMA 1 standard code gauge steel. Is this acceptable?

Switchboard enclosure rating shall be NEMA 1 Type rating.

EP101, EP102, EP103,

EP104, FP101, FP102

AND FP103

We cannot locate a requirement for explosion-proof fire alarm devices, despite the fact the PMB Bay is Class II, Div I, the Paint Bay is Class I, Div I, and the Wash Rack is Class II, Div I. The Wash Rack shows

Fire alarm/MNS devices are to be suitable for the environment in which they are installed. If the electrical drawings indicate an area is electrically classified, appropriate devices and installation methods are weatherproof devices, and the other two locations call for indoor rated devices. Please clarify.

required.

109 ES101 & EP502

The size of Telecom Handholes HH1, HH2, HH3 and HH4 are not listed.

Shall they be UG-4 or UG-6? Sizes 1, 2, 5, 6, 7, 8 or 9?

Handholes HH1-HH-4 sizes are indicated on sheet E-001, under the legend line item for "SITE".

Handholes are "UG-4", type 1. Bid per RFP.

110 AE105

Guardrail shown on drawing AE105 indicates it's freestanding. Is it acceptable to provide this with standing seam clamps instead?

The intent for this rooftop guardrail system is to be a manufacturer supplied railing that is clamped to the standing seam metal roof as required to achieve OSHA compliance.

FP-101, FP-102, FP-

103, FP-104, EL101,

EL102, EL103,

EL104, EP101,

EP102, EP103, EP104

Is the Fire Alarm Notification System install to be Classified as a Hazardous Location in the PMB Bay, Paint Bay and Wash Bay?

Drawings FP-101, 102, 103, 104 are NOT boxed out as Hazardous Locations like on drawings EL101, 102, 103, 104 or EP101, 102, 103, Electrical classifications as indicated on the electrical drawings are applicable to all systems.

114 SF700 Note 2

Sheet SF700, note 2 indicates that the precast wall panels are delegated design and to refer to the specifications for design and performance criteria. Please provide Specification Section 034500 Precast Architectural Concrete as it is not currently in the bid documents.

Precast panels are covered by Section 03 45 00. Section 03 45 00 is located in the Bid Documents.

116 Not Found

We have been unable to find a Specification Section for the Paint Bay Equipment. Is a specification available?

Plumbing work in the Paint Bay is covered in 22 00 00 and in the air compressor specifications:

Mechanical HVAC equipment serving the Paint Bay is specified in Section 23 35 19.00 20. All instrumentation and control devices in the Paint Bay need to be explosion-proof, non-sparking.

118 General Please provide boom length of jib crane and how many are needed for this project.

The length is 14'. There is only 1 jib crane required.

119 M105

Sheet M-105 shows (2) Hydronic Lines exiting the proposed building. Plans do not show where these lines are run outside the building. Can you please provide clarity on the hydronic lines once they leave the building?

Routing of the underground chilled water conduit piping was shown on sketch SKM-1 issued December 2020.

121 LP101

Please provide depth of root barrier as shown on sheet LP101.

Root barrier to be 18" deep.

122 17 31 62 13 .20 3.3.8

The structural drawings call for up to 90-ft piles to be installed and specification 31 62 13 .20 Precast/Prestressed Concrete Piles

Pile splices are not permitted.

section 3.3.8 does not allow for splicing of piles. Typically, any moment concerns on the piles are alleviated the deeper the splice is located. The pile lengths on this project would require a splice 30- to 40-ft below cut-off elevation to allow for more options of equipment and material selection, if a splice were allowed. This could lead to a more cost effective piling price. Would the government please consider the use of splices for this project?

034500

AE202

Specification section 03 45 00 Precast Architectural Concrete calls for “Fine sandblast Finish” for exposed to view surfaces. Drawing AE202 indicates exterior finish of Precast to be (Body 2) Federal Standard 37769. Is the design intent that the EXTERIOR precast exposed surface be painted or applied High Performance Coating to match the Federal Standard color? Or is integrally colored concrete with the light blast finish intended to be the finish product?

Exterior precast is intended to have an integral aggregate, pigment, and cement mix that closely reflects the Federal Standard 37769 color. The exterior precast panels do not receive paint. The High Performance Coating only applies to the interior surfaces of

Precast Architectural Concrete.

Drawing E-001 includes a note referencing Bid Options and states “Apron Snow Melting Systems for PMB, Paint Bay and Wash Rack Hangar Doors (Not Shown On Plans).

See specification section 22 13.00 20”. It would appear that the appropriate reference is Document 00 22 13.00 20 Supplementary Instructions to Bidders, 1.4.i CLIN Specific Bid Notes, CLIN 0010 and this is the extent of information provided for this system. Questions concerning this system;

a. Does the entire new concrete apron require the snow melting cable system installed on the required 8” centers?

b. Can additional information be provided to show the required number of and locations for slab mounted sensors

c. For pricing purposes can you provide an interior location for the control panel and activation device.

a. The snow melting system described in CLIN 0010 is based on snow melting cable running on either side of the door rails and 10' out into the concrete apron at 8" on center for the Wash Bay and the path of the swinging doors for PMB and Paint

Bays.

b. b. Based on the written description in CLIN 0010, provide one sensor for each of the (3) door systems

c. . c. Written description describes the controller for each door system mounted in a NEMA 4X enclosure (outside).

125 22 00 00 3.1.5

Spec 22 00 00 – Para 3.1.5 states that buried ductile iron, cast iron, and steel must have a protective coating. Does buried Cast Iron DWV piping need to

Yes.

have a coating system on it?

126 22 00 00 3.12

Spec 22 00 00 – Para 3.12 Table 1 states that Seamless Copper Pipe is the only acceptable piping for all the Corrosive Waste and Vent. However, both the copper DWV fittings and Solder joint fittings are unchecked.

Also, is this copper to be type M, L, or K. Please provide additional information as to what system needs to be installed for the Service F:

Corrosive Waste and Vent Above and Below Ground.

Both DWV fittings and Solder joint fitting will be added to Table I. Type

L or K copper pipe must be used.

Service" F" to be revised to Industrial

Waste System and all acceptable piping for building soil, waste and vent piping will be permitted.

127 AE411 Detail B4

Detail B4 on AE411 call out for a

2.5” DEEP COMPOSITE FRAMING

SUPPORT SYSTEM and 2.5”

THICK, CLOSED CELL SPRAY

FOAM INSULATION AND AIR

BARRIER to be installed at the exterior walls, however spray foam is a messy process that often results in overspray of the framing support system making it difficult to apply the 1.5” HAT CHANNEL for the METAL WALL PANELS to be installed. This construction usually includes rigid board insulation at the sub girts with spray applied air barrier on the backup CMU. Please confirm the drawn framing and spray foam/air barrier is correct, as well as the intent for the spray foam to act as the building’s air barrier in lieu of a fluid applied air barrier.

Confirmed. The spray foam is to comply with spec section 07 27 36 to complete the air barrier system as detailed.

Regarding Aircraft Washing Equipment Section 11 90 30.00 22

2.3 wash system equipment. For the natural gas fired hot water wash machines, are there any efficiency or emissions requirements? Or will a standard NG draft burner hot water pressure washer be acceptable?

Efficiency and emissions must be set by equipment manufacturer, Unit is noted to be installed per UL 1776 requirements. No, a standard NG draft burner hot water pressure washer is not acceptable.

DDC

Drawngs M-

DDC M-802 list an input for LEL (Lower Explosive Limits) a combustile gas detection system.

There is no information on the specs or drawings if this is required. There is no information about the controls for this system either. Please confirm if this is an existing devise. If not, are we to provide and if so what gas or gases are we trying to detect?

Provide a new combustible gas detection system to determine the

LEL for the control system. Gases are based on the painting materials being used and are common for most LEL monitors for this application.

Spec Section

22 00 00 Para.

3.1.5

States that buried ductile iron, cast iron, and steel must have a protective coating. Does buried Cast Iron DWV

Yes.

piping need to have a coating system on it?

Spec Section

22 00 00

Para 3.12

Table 1

States that Seamless Copper Pipe is the only acceptable piping for all the Corrosive Waste and Vent. However, both the copper DWV fittings and Solder joint fittings are unchecked. Also, is this copper to be type M, L, or K. Please provide additional information as to what system needs to be installed for the Service F: Corrosive Waste and Vent Above and Below Ground.

Both DWV fittings and Solder joint fitting will be added to Table I. Type

L or K copper pipe must be used.

Service" F" to be revised to Industrial

Waste System and all acceptable piping for building soil, waste and vent piping will be permitted.

132 Div 41

The specifications for division 41 state a one-ton Jib crane “radius per drawing.” The drawings do not identify a jib crane radius.

14' Reach

134 C-004

Sheet C-004 states "As part of the LUCS, the cost of a passive ventilation system for the building subgrade has been included in the project scope." Is the cost to be included in our proposal? Please verify.

Note is part of a narrative and does not define scope.

Price

Proposal sheet

CLIN 0012 of the price propsal form has an AV equipment value of $2,267. Can you confirm that this is the AV equipment total that we should carry?

Bid per the RFP

136 AF601

The description for SC1 Sealed Concrete on Sheet AF601 is "clear finish" with no other information in the specifications. Please provide recommended manufacturers or more information for SC1 Sealed Concrete.

See Spec Section 03 30 00 Cast in Place Concrete, 2.4.3, Floor Finish

Materials .

137 AE101/AE404/AF601

Key Note 13 on Sheet AE101 calls out a metal platform in Room 113 Compressor Room. Sheet AF601 denotes the room to have an exposed ceiling with a PT1 paint finish.

Please confirm that the exposed structure above the platform will be painted with the 3 part system as well as the rest on the ceiling where no platform is present.

This room is open to the decking, including the area at the platform, and the exposed decking and structure will need to be painted as shown on the Finish Schedule on sheet AF601. The finish in this room does not need to include the 3-part paint system HPC1.

138 AE111/AF601

The Room Finish Schedule on Sheet AF601 calls for exposed ceilings in 114C PMB Bay Supply Plenum.

Sheet AE111 of the reflected ceiling plans shows gypsum wall board ceilings. Please confirm whether its exposed or GWB.

Room 114C PMB Supply Air Plenum on sheet AF601 should be 5/8" gypsum board as detailed in architecture drawings. Refer to

A1/AE313 and D3/AE506. This finish will need to be HPC1.

139 AF601

Rooms 120C, 120E, and 121 of the Room Finish Schedule do not have a ceiling designation. Please provide a

120C (Paint Bay Storage): Metal Panel Ceiling to match Paint Bay.

120C (Paint Bay Supply Plenum):

ceiling material and finish. Refer to arch detail A1/AE313 and D3/AE506. 120E: Acoustical Ceiling Tile (ACT1). 121: Exposed painted

(PT1)

140 AF601/AE114

The Room Finish Schedule calls for a moisture resistant GWB ceiling as well as a fiberglass reinforced plastic ceiling. Please advise whether both are to be used and their location within the room

Rooms shown on AF601 indicating both ceiling finishes for room 136, and the entire room should be detailed as shown on Arch detail C3/AE512

141 AF601/AE101/AE102

For Rooms 120C and 121, the exhaust and supply plenums are to have an EP1 finish with an EP1 base. For Rooms 114C and 116, the exhaust and supply plenums are to have an SC2 finish while 114C has no base and EP1 base for 116. Please confirm whether bases are needed in Rooms 114C and 116.

114C and 116 do not require base.

142 AF601/AE101/AE102

Rooms 120C, 121, 114C, and 116 call for a PT2 or HPC1 wall finish.

Rooms 116 anf 121 have filter walls and Rooms 114C and 120C have swinging doors. Please confirm whether the filter walls/doors need to be painted along with the other surrounding walls in these rooms.

For the exhaust plenum, the filters (definitely not painted) and the frames (factory anodized aluminum) sit in the block wall, and they are not painted:

The wall itself needs to be painted

(HPC1).

For the plenum door, paragraph 2.3.1 in Section 08 34 16 notes that all ferrous metal (not factory coated) needs to be painted in accordance with 09 90 00 (so there is some field painting): This is reinforced in paragraph 3.2.6.1 concerning “touch-up” painting on un-finished ferrous surfaces in accordance with 09 90 00.

The majority of the door is factory painted. The specification for (HPC1) High Performance Coating spec 09 96

00.

143 AE111/AE511

In Room 105 on Sheet AE111, soffits are located above the Men's Locker Room lockers. Sheet AE111 refers to Detail B1 on Sheet AE511 which calls for GWB from the top of lockers to ceiling. Will the area above the lockers need porcelain tile on cementitous backer board similar to the rest of the room or should we follow Detail B1 on Sheet AE511?

Follow Arch detail B1/AE511.

Porcelain tile does not continue above the lockers.

144 AE101/AF601

Rooms 114A and 114B are located within Room 114 and share the same walls. The only difference is the metal grate flooring for Rooms 114A and 114B. Rooms 114A and 114B are to receive a PT2 wall finish while 114 receives a HPC1 wall finish.

114A and 114B are to receive the same finish as the rest of the PMB

Bay - HPC1

Please confirm that all three rooms should receive the same wall finish

146 AF101-AF104

Sheets AF101-AF104 call out PT4 in various locations of the corridors.

Please clarify what is to be painted

PT4.

Wood trim should match wood door finish. The CMU wall should be painted PT4 with the door trim being painted PT3 . Finish note K (Paint wood trim PT3) is wrong on the Finish Schedule. Please reference Sheet AE505y, detail D3 and Sheet

AE403, detail C3.

147 AE312/AE502

Section A1/AE312 refers to Detail B1/AE502. On A1/AE312, the top of wall clearly shows 12" CMU block but Detail B1/AE502 shows metal stud framing. Please provide the correct Rake Detail for A1/AE312.

The correct rake detail will be SIM to detail A4/AE502 except 12" CMU is required at this location.

148 AF104/AF601

On Sheet AE601, the floor finish for Room 137 includes FS1 and FS4 striping. FS4 striping is not listed on the Finish Legend. Please confirm that the striping should be FS1 and

FS2.

Confirmed.

150 AE506

Detail D3/AE506 shows 6" metal studs running vertically. There is also metal studs running horizontally above the plenum door with no designation. Please clarify the size of these studs

The horizontal framing is to be 3 5/8" studs.

151 5 09 29 00 2.1.1

Regular and Type X gypsum board in mentioned in the 09 29 00 spec.

Please confirm that Type X should be used throughout the building.

Type X gypsum board should be used throughout the building.

125 7 of 8

00 22 13.00.20

Price Proposal

Form

1.3.i

Please provide the size (square footage) of the snow melt system in the concrete apron for each hangar door.

See Previous PPI 124 response in this document.

128 8 11-90-40 2.2.1

The Rotating Media Screw Metering System description search leads to a proprietary product. This metering system is not a common necessity for these types of blasting systems since augers will crush plastic media.

Would another means of metering media be allowed?

Alternate means of metering will be reviewed, but will need to be approved by the Government.

129 5 11-90-50 2.3

Will a dust collector design be allowed which utilizes recirculation of filtered air and 20% fresh air return that does not involve any equipment outdoors or conveying of any dust material?

Bid Per RFP.

The drawings and specification for the P1035 Project Paint Bay indicate misc. plenums and ducts along with incorporating a building into a paint

Bid Per RFP area. Our experience is it would be a much better design to utilize a booth insert within the allotted space, the advantages are:

1. Better Controlled Air-Flow

2. Control Air Cure Cycles

3. Reduces Stratification

4. Better Lighting

5. Smooth walls for ease of maintenance

6. Better filter loading for reduced operation cost

7. 80/20 or 90/10 Recirculation- Recirculation provides for much smaller Air Make Up Systems and provided extreme reduction in utilities including electric, gas and chilled water (lower operating cost)

8. Booth Design meets NFPA, OSHA, IBC and IFC Codes

9. Mitigates the need for tile ceiling

10. Plenum doors can be designed to mount on booth or building structure

We have included a concept drawing of a similar application as a reference

Please advise if the Government will accept this design in lieu of the specification as written

143 General

What the objective of the window film is for? Is it privacy? Is it to get rid of heat and glare? Or is it decorative?”

Privacy.

146 Specifications

No specifications nor details have been provided for the Swinging Plenum Doors located on Rm 114 PMB Bay and Rm 120 Paint Bay.

Please provide details on how these are to be constructed and details on what is supposed to be included in the scope of work.

See specification 08 34 16

182 EP401 and EP104

What is the classification of the Waste Water Treatment room 143? EP104 shows it as part of a Class II Div 1 Group G area, and EP401 shows NEMA 4 disconnects. Which is correct?

Sheet EP401 disconnect ratings of NEMA 4 are correct. These disconnects are not required to be Class II,Div I rated.

184 EP101

Key Note 13 - This note calls fro 500W type rated cable. We think this maybe a typo. Please Clarify.

Key Note 13 should read, "3#12, 1#12GND - PROVIDE 480VAC

POWER FROM MOTOR

OPERATOR TO DOOR CONTROL

ENCLOSURE PER EQUIPMENT

MANUFACTURERS

RECOMMENDED CABLING."

185 Geotech report 4.8

The Geotechnical Report from GET Solutions discusses a number of deep foundation types and provides detailed information regarding driven steel piles, driven precast concrete piles and auger cast in place piles.

The Report reads as if any of these three deep foundation systems are acceptable for the proposed work at the site. However, the drawings provided include only details for precast driven piles. In lieu of precast driven piles, would other drilled deep foundations be acceptable for this project due to desirable schedule and cost impacts?

Bid Per RFP.

187 pages 7 -8 00 22 13.00 20 Section

1.4

Clin- Specific

Bid Notes, Para I -

CLIN

Please provide the basis of design, i.e.

manufacturer, model number and sales point of contact for the Snow Melting System.

See Chris Waltz at Waltz Equipment Sales, (757)873-5544

Details A1 &

B1/AE503

Please provide a more detailed design for the conduit and light fixture within the canopy as this is an irregular design.

The D4 basis of design fixture is less than 1.3” deep, and is not drawn to scale in the detail. The fixture and conduit should be able to recess into the cavity of the canopy. The basis of design is, but not limited to, the Lithonia WF6 (Wafer LED Recessed Downlight).”

Spec 41 22

23.19

Confirm the hook lift height is 20ft?

What kind of jib? What span? What height of crane? Is jib manual or powered rotation?

Bid per specifications, span is 14'.

Is there a particular color requirement for the concrete mix in precast concrete wall panels?

Refer to Exterior Materials Legend on sheet AE202. See also PPI round 2 response to item 123.

Project specifications, section 034500, Note 2.7.1 indicate an R-value of 15.2 or greater and also indicate a U-factor of 0.048. The drawings indicate that the insulated panels are shown as being 14" thick (5 1/2" exterior side, 3" insulation, and 5 1/2" interior side). This panel configuration may not be able to obtain the indicated U-factor rating given the number of openings in the panels, setback of insulation around edges of wall panels, solid areas of concrete in the wall panels, etc. Can we make adjustment to the panel configuration in order to meet the U-

Bid per RFP.

factor rating?

Do the special coatings on the precast panels extend full height, or just up to the drop down ceiling?

High Performance Coatings are to extend to 6" above the ceiling, and extend to deck where there is no ceiling.

197 SB504 / AE505

Please clarify the depth lift system pits as neither the architectural nor structural drawings provide dimensions. Note #1 on SB504 states "Reference Arch. Plans for pit dimensions", and detail A1/AE505 does not denote the depth of the pits.

Base bid bottom of pit elevation is [- 3'-0"]. Coordinate with lift table requirements.

200 12 24 13

Section 2.2 specifies openness factor of shade fabric must be 37 percent.

The Finish Schedule & Legend on AF601 indicates 3% open for roller window shade. Please clarify.

There is a typo in the specification section. The spec section 2.2 should read 3 percent, not 37 percent.

202 12 24 13

Section 1.5.1.1 calls for motor-controlled roller shades. Then Section 2.1.1.e calls for manual operated chain drive hardware. Please clarify whether motor or manual shades are required.

There is a typo in the specification section. In spec section 1.5.1.1 the words "motor-controlled" should be deleted.

(End of Summary of Changes)