12 AF Form 3000.pdf

PDF 2 MB Posted

Attached to
Construct T-1A Static Display Federal contract opportunity
Solicitation number
FA309925R0002
Issued by
Department of the Air Force Air Education and Training Command

About this file

The document appears to be a preliminary PDF loading page with Adobe Reader instructions, not the actual contract document. Therefore, I'll summarize the federal contract opportunity details provided:

The 47th Contracting Squadron at Laughlin Air Force Base, TX is seeking a SBA certified Woman Owned Small Business (WOSB) to design and construct a static display of a T-1A aircraft within the Ribas-Dominicci traffic circle near the West Gate. The firm-fixed-price contract is estimated between $500,000 and $1,000,000, with a total set-aside for WOSBs under NAICS code 236220. A mandatory site visit is scheduled for Friday, 27 June 2025 at 1:30 p.m., requiring advance registration of attendee names by 2:30 p.m. CDT on Tuesday, June 24, 2025. All questions must be submitted via email by 4:30 p.m. CDT on Monday, July 7, 2025. Prospective offerors must be registered in SAM, and the government notes that funds are not currently available and reserves the right to cancel the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Construct T-1A Static Display, newest first.
File Type Posted
15 Financial Institution Reference Sheet.pdf PDF
Solicitation Amendment FA309925R00020003 SF 30.pdf PDF
01 MXDP 24-1015 Construct T-1A Static Display - Draft Statement of Work v2.pdf PDF
Solicitation Amendment FA309925R00020002 SF 30.pdf PDF
Solicitation Amendment_FA309925R00020001 SF 30.pdf PDF
14 Requests for Information.pdf PDF
11 Updated Past Performance Questionnaire.pdf PDF
Solicitation_FA309925R0002.pdf PDF
01 MXDP 24-1015 Construct T-1A Static Display - Draft Statement of Work.pdf PDF
04 C. Environmental Quality Construction Specifications Laughlin AFB May 2024.pdf PDF
05 D. Laughlin Legacy Sustainable Landscape Plan 2011.pdf PDF
10 Notification of Compliance with Contracting Insurance Requirements.pdf PDF
08 G. Progress Schedule Form and Contract Progress Report.xlsx XLSX spreadsheet
11 Past Performance Questionnaire.pdf PDF
13 AF Form 103 Work Clearance Request.pdf PDF
02 A. MXDP 24-1015 Construct T-1A Static Display Conceptual Layout.pdf PDF
03 B. Laughlin AFB Division 01 General Specifications.pdf PDF
06 E. Laughlin Installation Facility Standards.pdf PDF
07 F. Schedule of Material Submittals.xlsx XLSX spreadsheet
09 Wage Determination_TX20250090_03Jan25.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse) Form Approved OMB No 9000-062 Expires May 31, 2005 Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington D.C. 20593. Please DO NOT RETURN your form to either of the addresses Send your completed for to: SAF/AQCP, 1050 Air Force Pentagon, Washington, D.C. 20330

SUBMITTAL

TO BE COMPLETED BY CONTRACTOR

FOR GOVERNMENT USE ONLY

ITEM NO.

SPECIFICATION SECTION/PARA NO./DRAWING NO

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-PROVED

DISAP- PROVED

SEE REVERSE

INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICIFICATIONS OF SUBJECT CONTRACT

FOR GOVERNMENT USE ONLY

RECOMMEND

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.

1.The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2.This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and sample of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to items(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of the form.

4. Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than (1) one contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

INSTRUCTIONS TO CONTRACTORS

AF IMT 3000, 20030901, V1 (REVERSE)

11.0.1.20130826.2.901444.899636

To:
From:
Date_1:
Contract_Number:
New:
Resubmittal:
Previous_Contract_Number:
Cell1:
Cell2:
Cell3:
ApprovedCheckBox: 0
DispprovedCheckBox: 0
SeeReverseCheckBox: 0
Initials:
Cell4: 0
Cell4: 0
Cell4: 0
Cell4: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
:
CheckBox1: 0
Cntractr_Date:
Contractor_Name:
Contractor:
Civil_Engineer:
To_Eval:
Contract_Officer:
To_Cntrt_Office:
Base:
Base_Civil:
APPROVED_CHECK: 0
DISAPPROVED_CHECK: 0
TextField1:
SignatureField1:
For_Eval_Action:
TextField2:

File details come from the government source that posted it. Updated .