1-Doc 00 63 63 - Change Order.pdf

PDF 96 KB Posted

Attached to
2500999 - Canterbury Storm Sewer Replacement
Solicitation number
Not on record
Issued by
Montgomery County, Mount Aetna CDP, Pennsylvania

About this file

This is a Change Order document issued by Montgomery Township in Pennsylvania for Contract 2025-00999, Canterbury Storm Sewer Replacement. The change order, prepared by engineer Gilmore & Associates, Inc., authorizes modifications to the original contract scope. The underlying project involves the removal and replacement of approximately 1,800 feet of corrugated metal pipe (CMP) ranging from 12 inches to 57 inches by 38 inches, construction of new circular HDPE pipe and elliptical RCP storm sewer on Canterbury Lane and Devonshire Drive, replacement of three precast concrete storm sewer structures, and restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway. The contract requires sealed bids submitted electronically via PennBid with a bid opening deadline of 10:00 A.M. on September 1, 2026, and is subject to Pennsylvania's prevailing wage requirements under Act 422 and public works employment verification under Act 127.

The change order form contains blank fields for documenting the original contract price and time, net changes from previous change orders, and the cumulative impact on contract price and substantial completion timeline. Bid security of not less than ten percent of the bid amount is required, with a PennBid processing fee of 0.33 percent of the bid amount (minimum $150, maximum $6,000) applicable only to awarded bidders. Performance and Payment Bonds must be provided by the contractor. The document requires authorized signatures from the engineer, owner, and contractor to approve changes to contract price and time terms.

View the file

Other files

File Type Posted
15-Sec 01 33 00 - Submittals.pdf PDF
42-Sec 32 12 00 - ASPHALT CONCRETE PAVING.pdf PDF
36-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
49-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
3-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
44-Sec 32 01 16.71 - MILLING OF ASPHALT PAVEMENT SURFACE.pdf PDF
5-Doc 00 41 00 - BID FORM - EBID.pdf PDF
16-Sec 31 22 10 - Topsoiling and Finish Grading.pdf PDF
33-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
19-Sec 01 11 13-SUMMARY OF WORK.pdf PDF
13-Doc 00 73 00 4 - Appendix B - Cover.pdf PDF
20-Sec 01 56 39 - LANDSCAPE PROTECTION.pdf PDF
56-X1 - Site Map 2026-07-15.pdf PDF
9-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
2-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
53-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
32-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
24-Sec 31 20 00 - Earthwork.pdf PDF
25-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
50-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
40-Doc 00 72 00 - GENERAL CONDITIONS - 2024.pdf PDF
55-X3 - Canterbury Details 2026-07-16.pdf PDF
11-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
31-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
46-Sec 32 17 23.43 - ADA DETECTABLE WARNING TILES.pdf PDF
38-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
12-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - Canterbury Storm Sewer Replacement.pdf PDF
17-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
6-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
34-Sec 33 44 15 - BOXES AND ENDWALLS.pdf PDF
4-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
45-Doc 00 73 00 2 - Appendix A - Cover.pdf PDF
30-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
39-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
52-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
18-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
41-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
48-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
22-Sec 02 41 16 - DEMOLITION.pdf PDF
27-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
28-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
57-X2 - 12-14 18-19 of 24 Marked up As-Built Plans 2026-07-15.pdf PDF
26-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
29-Sec 31 37 16 - ENIGERY DISSIPATOR.pdf PDF
51-Sec 32 17 23.13 - Painted Traffic Lines and Markings.pdf PDF
21-Doc 00 61 19 - Maintenance Bond.pdf PDF
47-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
14-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
37-Sec 33 44 14 - STORM INLETS CATCH BASINS ENWALLS AND END SECTIONS.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT 00 63 63

No.

PROJECT:

DATE OF ISSUANCE EFFECTIVE DATE

OWNER:

OWNER'S Contract No.

CONTRACTOR: ENGINEER:

You are directed to make the following changes in the Contract Documents.

Description:

Reason for Change Order:

Attachments:

Original Contract Price Original Contract Times

Substantial Completion:

$ Ready for final payment:

Net changes from previous Change Orders No. to No. Net changes from previous Change Orders No. to No.

$ days

Contract Price prior to this Change Order Contract Times prior to this Change Order

Substantial Completion:

$ Ready for final payment:

Net increase (decrease) of this Change Order Net increase (decrease) of this Change Order

$ days

Contract Price with all approved Change Orders Contract Times with all approved Change Orders

Substantial Completion:

$ Ready for final payment:

RECOMMENDED: APPROVED: ACCEPTED:

By: By: By:

Date: Date: Date:

Engineer (authorized signature)

CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:

Owner (authorized signature) Contractor (authorized signature)

CHANGE ORDER

Montgomery Township

2025-00999 - Canterbury Storm Sewer Replacement

Gilmore & Associates, Inc.

EJCDC Form C-941

CHANGE ORDER

00 63 63-1

File details come from the government source that posted it. Updated .