42-Sec 32 12 00 - ASPHALT CONCRETE PAVING.pdf
PDF 139 KB Posted
- Attached to
- 2500999 - Canterbury Storm Sewer Replacement State and local contract opportunity
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Mount Aetna CDP, Pennsylvania
About this file
This is a specification document for asphalt concrete paving work issued by Montgomery Township, Pennsylvania in conjunction with the Canterbury Storm Sewer Replacement project (Contract 2025-00999). The project scope includes asphalt paving of roadways with restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway following storm sewer replacement on Canterbury Lane and Devonshire Drive. The specification requires warm-mix asphalt (WMA) in multiple courses: a base course at 5.0 inches depth (25mm, PG 64S-22), a binder course at 6.5 inches depth (19mm, PG 64S-22), a scratch/leveling course at 9.5mm (PG 64S-22), and a wearing course at 1.5 inches depth (9.5mm, PG 64S-22). All materials must contain 15 percent recycled material and virgin asphalt cement and comply with Pennsylvania Department of Transportation (PennDOT) Publication 408 Specifications and Bulletin 27. Sealed bids are due online via the PennBid Program by 10:00 A.M. on September 1, 2026, with public bid opening at Montgomery Township offices located at 1001 Stump Road, Montgomeryville, Pennsylvania 18936. No pre-bid meeting will be held for this project.
Bid security in the amount of not less than ten percent of the bid amount is required, payable to Montgomery Township, along with an Agreement of Surety certifying that Performance and Payment Bonds will be provided. A nominal PennBid fee of 0.33 percent of the bid amount (minimum $150, maximum $6,000) applies only to awarded bidders. The project is subject to Pennsylvania Act 422 (Prevailing Wage Act) and Act 127 (Public Works Employment Verification). All materials and construction must conform to applicable Township standards for paving work on public property, with surface preparation, tack coat application, and compaction requirements detailed per PennDOT specifications. Environmental requirements prohibit asphalt placement when base surface temperature is below 40 degrees Fahrenheit or when the surface is wet or frozen. Bids may be withdrawn within two business days following bid opening only by the withdrawing bidder.
View the file
Other files for this state and local contract opportunity
Show all 50
2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASPHALT CONCRETE PAVING
32 12 00-1
SECTION 32 12 00
PART 1 GENERAL
1.01 SECTION DESCRIPTION
A. The Work of this Section Includes:
1. Asphalt paving of roadways.
1.02 SYSTEM DESCRIPTION
A. Paving: Designed for traffic anticipated on the roadways.
1.03 RELATED SECTIONS
A. Section not used
1.04 QUALITY ASSURANCE
A. Reference Standards:
1. Pennsylvania Department of Transportation:
a. Publication 408 Specifications
b. Publication 27 – Specification for Bituminous Mixtures (Bulletin 27)
B. All Materials and Construction shall be in accordance with the latest edition of PennDOT Publication 408.
C. Mixing Plant: Conform to PennDOT Bulletin 27, chapter 1 Standards.
D. Conform to applicable Township standards for paving work on public property.
1.05 SUBMITTALS
A. Certificates:
Submit certification from asphalt and aggregate suppliers attesting that materials conform to the State Specifications in accordance with Section 01 33 00.
1.06 ENVIRONMENTAL REQUIREMENTS
A. Do not place asphalt when base surface temperature is less than 40 degrees F or base surface is wet or frozen.
1.07 JOB CONDITIONS
A. Restore existing paving outside the limits of the Work that is damaged by Contractor’s operations, to its original condition at the expense of Contractor.
PART 2 PRODUCTS
2.01 PAVING MATERIALS
A. WMA Wearing Course: Per Section 413 of PennDOT Publication 408 - 1.5" depth 9.5mm, PG 64S-22, 3.0 – 10 million ESALs, SLR-H, containing ≤ 15% recycled material and virgin asphalt cement. (Wearing Course with more than 15% light colored aggregate will not be accepted.)
B. WMA Scratch/Leveling Course: Per Section 413.2 of PennDOT Publication 408 - 9.5mm, PG 64S- 22, 3.0 – 10 million ESALs, SLR-H, containing ≤ 15% recycled material and virgin asphalt cement
C. Non-Tracking Tack Coat: Per Section 460.2 of PennDOT Publication 408
D. WMA Binder Course: Per Section 413 of PennDOT Publication 408 – 6.5” depth 19mm PG 64S-22,
3.0 – 10 million ESALs, containing ≤ 15% recycled material and virgin asphalt cement
E. WMA Base Course: Per Section 313 of PennDOT Publication 408 – 5.0” depth 25mm PG 64S-22, 32 12 00-2
3.0 – 10 million ESALs, containing ≤ 15% recycled material and virgin asphalt cement
PART 3 EXECUTION
3.01 CONSTRUCTION
A. Surface preparation, tack coat application, base course construction, scratch/leveling course construction, wearing course construction, and asphalt concrete curb construction shall be per PennDOT Publication 408 Sections 313.3, 413.3, 460.3, and 636.3.
B. Verify gradients and elevations of area to be paved.
C. Trim existing paving with minimum one (1) foot cutbacks to remove damaged areas. Cut straight joint lines and right angle offsets.
D. Remove any temporary paving material.
E. Proof-roll subgrade (10 ton roller) and replace any soft or unsuitable material with coarse aggregate.
Verify compacted subgrade is dry and ready to support paving and imposed loads.
F. Keep the milled pavement surface free of all loose materials and dust.
G. Apply tack coat in accordance with PennDOT Publication 408 (latest edition) Section 460.3 requirements and rates of application prior to placing an overlay over existing paving or prior to placing a wearing course over a previously placed binder course.
H. Coat surfaces of any manhole or catch basin frames with oil to prevent bond with asphalt paving.
I. Where proposed asphalt paving adjoins existing asphalt paving, seal the joint with hot asphalt material in accordance with PennDOT Publication 408 (latest edition) requirements.
J. Place leveling course where directed and wearing course in 1-1/2 inch lifts. Apply tack coat on completed leveling course before placing wearing course should there be a delay between completion of leveling course and placement of wearing course.
K. Place wearing course overlay to compacted thickness of 1-1/2 inch and density per Publication 408, Section 413.3.
L. Compact pavement by rolling to achieve even and smooth finish, without roller marks. Hand compact in areas inaccessible to rolling equipment.
M. Where proposed asphalt paving adjoins existing asphalt paving, seal the joint with hot asphalt material in accordance with PennDOT Publication 408 (latest edition) requirements.
N. Repair or replace, to the satisfaction of the Owner, any existing facilities which are damaged by the paving operation including but not limited to mailboxes, sidewalk, curb, utility valve boxes, manholes, etc.
3.02 TOLERANCES
A. Flatness: Maximum variation of 1/4 inch measured with 10-foot straight edge.
B. Compacted Scheduled Thickness: Within 1/4 inch of design thickness.
C. Variation from True Elevation: Within 1/2 inch.
END OF SECTION