22-Sec 02 41 16 - DEMOLITION.pdf
PDF 135 KB Posted
- Attached to
- 2500999 - Canterbury Storm Sewer Replacement State and local contract opportunity
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Mount Aetna CDP, Pennsylvania
About this file
This is a Demolition specification document (Section 02 41 16) for Montgomery Township's Canterbury Storm Sewer Replacement project in Pennsylvania. The work scope includes the removal of all designated structures and associated facilities in accordance with the project's construction sequence, with specific requirements for minimizing interference with adjacent building areas, maintaining protected egress and access, and managing dust control. The project involves the demolition and removal of approximately 1,800 feet of corrugated metal pipe (CMP) ranging from 12 inches to 57 inches by 38 inches, along with other storm sewer infrastructure on Canterbury Lane and Devonshire Drive. The contractor is responsible for locating and protecting existing active utilities, with requirements to contact the Pennsylvania One Call System at least three days prior to excavation work per Pennsylvania Act 172. No pre-bid meeting will be held for this project, and sealed bids must be submitted electronically via the PennBid Program by 10:00 A.M. on September 1, 2026, with public opening at Montgomery Township offices at 1001 Stump Road, Montgomeryville, PA 18936.
All demolished materials must be promptly removed from the site and disposed of in a legal manner at state-approved disposal areas, with the contractor bearing responsibility for debris removal costs. The contractor is required to restore any disturbances to existing facilities and improvements resulting from demolition work at no extra cost to the owner, including restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway. Bid security must be submitted in an amount not less than ten percent (10%) of the bid amount, with a PennBid fee of 0.33% of the bid amount (minimum $150, maximum $6,000) assessed only to awarded bidders. The project is subject to Pennsylvania Act 422 (Prevailing Wage Act) and Act 127 (Public Works Employment Verification), and the contractor must provide Performance and Payment Bonds as required by the Agreement of Surety.
View the file
Other files for this state and local contract opportunity
Show all 50
2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION
02 41 16-1
SECTION 02 41 16
PART 1 - GENERAL
1.01 WORK INCLUDED
A. Remove all items shown on the Drawings in accordance with the Sequence of Construction in Section 01 11 13 including the following:
1. Remove designated structures and associated facilities.
1.02 RELATED WORK
A. Section 01 11 13: Summary of Work B. Section 01 70 00: Contract Closeout: Project record documents.
C. Section 31 23 33: Excavation, Backfill and Compaction
1.03 SUBMITTALS
A. Submit demolition and removal procedures and schedule under provisions of Section 01 33 00 if Contractor proposes to use procedures and schedule which are not in accordance with those procedures and schedule presented in the Work Sequence portion of Section
01 11 13.
1.04 EXISTING CONDITIONS
A. Conduct demolition to minimize interference with adjacent building areas. Maintain protected egress and access at all times.
B. Provide, erect, and maintain temporary barriers and security devices.
B. Satisfactorily prevent of control dust resulting from demolition.
C. Comply with the National Emission Standard for Asbestos, as contained in the Federal
Register, Volume 38, No. 66.
D. Traffic
1. Conduct site preparation, removals and salvaging operations to ensure minimum interference with roads, streets, walks and other adjacent occupied or used facilities. Do not close or obstruct streets, walks or other occupied or used facilities without permission from authorities having jurisdiction.
E. Protection
1. Contractor shall be responsible for the protection of existing facilities and improvements, indicated to remain in place, within the area of the site where his work is being done.
2. Contractor shall be responsible for the protection of existing facilities on adjoining properties.
3. Any disturbances to the work and improvements or any impairments of facilities resulting from work of this Section, shall be promptly restored, repaired or replaced at no extra
02 41 16-2 cost to the owner.
F. Protection of Existing Utilities
1. Pursuant to the requirements of Pennsylvania Act 172, the Contractor shall contact the Pennsylvania One Call System at 1-800-242-1776 at least three days prior to any excavation work.
2. Utility companies owning services that will be affected by alteration and removal of demolition work shall be notified in advance according to the requirements of the utility.
3. The existence and location of underground utilities are not guaranteed and shall be investigated and verified in the field by the Contractor before starting work. Excavation in the vicinity of the existing utilities shall be carried on with extreme caution. Utilities encountered on the Owner's property are to be maintained in existing condition unless otherwise indicated on the drawings. All existing underground utilities, storm piping and associated structures designated for removal shall be completely removed in accordance with the utility company or agency having jurisdiction. Underground utilities designated to be abandoned in place shall be properly plugged and abandoned in accordance with the regulations of the utility company or agency having jurisdiction. Material removed shall be disposed of off-site in a lawful manner.
PART 2 - PRODUCTS
2.01 GENERAL
A. Products and materials utilized in this item of work shall be subject to the approval of the Owner’s representative.
2.02 RESTORATION
A. Products and materials used in restoration and repair of private and public property shall be of a quality equal to or better than the original project or material.
PART 3 - EXECUTION
3.01 PREPARATION
A. Locate existing active utilities and verify whether each utility will remain in service and therefore requires protection of is part of the demolition and removal activity.
B. Protect existing items which are not indicated to be altered.
C. Prior to starting work make arrangements with the proper authorities for turning off and disconnecting utilities in conjunction with demolition activities. Disconnect, remove, and cap designated utility services within demolition areas. Mark location of disconnected utilities.
Identify and indicate capping locations on Project Record Documents.
D. Visit the premises and verify all conditions covering the work of this Section and verify all dimensions. Examine all drawings covering the work of this Section and refer to all other drawings that may affect the work of this Section or require coordination with other trades.
Before starting the work of this Section, make a thorough examination of all portions of the premises in which the work of this Section is to be performed. Check all of the work adjoining, adjacent to, and underlying the locations where the work of this Section is to be performed. Report to the Engineer any and all conditions that may interfere with or otherwise affect or prevent the proper execution and/or completion of the work of this Section. Do not
02 41 16-3 commence work until any and all such conditions have been corrected by the trade or trades responsible.
E. Demolish in an orderly and careful manner. Protect any existing structures to remain from damage.
F. Do not disturb existing paving unless it becomes necessary to do so in order to complete other work.
G. Except where noted otherwise, immediately remove demolished materials from site.
H. Remove materials to be re installed or retained in manner to prevent damage.
I. Remove and promptly dispose of contaminated, vermin infested, or dangerous materials encountered.
J. Remove demolished materials from site as work progresses. Upon completion of work, leave areas of work in clean condition.
K. In the event of discrepancy, immediately notify the Engineer. Do not proceed with work of this Section in areas of discrepancy until all such discrepancies have been fully resolved.
Should any work performed under this Section expose previously unknown major conditions, all work shall be stopped and the matter reported immediately to the Engineer for instructions. However, the Contractor shall use any measures necessary to insure adequate safety conditions.
L. Appropriate erosion and sediment control measures (as shown on the Contract Drawings) should be installed prior to commencement of work of this Section.
3.03 CLEAN-UP
A. Execute work in such a manner as to avoid interference with, use of, or passage to and from adjoining spaces and facilities. Do not burn materials or debris on premises. Remove from the site all rubbish and debris resulting from work of this Section.
B. Do not allow the accumulation of scraps and debris arising from the work of this Section.
Maintain the premises in a neat and orderly condition at all times. Daily clean-up of construction areas is required.
3.04 DISPOSAL OF DEBRIS
A. All items of demolition within the contract limits, including stones, rubbish, utility lines and fixtures, plant material, and similar items shall be, unless otherwise directed, the Contractor's property and shall promptly be removed from the site and disposed of in a legal manner, in a state approved disposal area.
END OF SECTION