37-Sec 33 44 14 - STORM INLETS CATCH BASINS ENWALLS AND END SECTIONS.pdf

PDF 127 KB Posted

Attached to
2500999 - Canterbury Storm Sewer Replacement State and local contract opportunity
Solicitation number
Not on record
Issued by
Montgomery County, Mount Aetna CDP, Pennsylvania

About this file

This is a technical specification document for storm inlet catch basins, end walls, and end sections related to Montgomery Township's Canterbury Storm Sewer Replacement project in Pennsylvania. The specification establishes construction standards and material requirements for precast concrete storm sewer structures that will replace existing infrastructure on Canterbury Lane and Devonshire Drive. The project involves removal of approximately 1,800 feet of corrugated metal pipe ranging from 12 inches to 57 inches by 38 inches in diameter, replacement with new circular HDPE pipe and elliptical reinforced concrete pipe (RCP) storm sewer, and replacement of three precast concrete storm sewer structures. Sealed bids are due by 10:00 A.M. on September 1, 2026, with public opening and reading at Montgomery Township offices located at 1001 Stump Road, Montgomeryville, PA 18936. No pre-bid meeting is scheduled for this project. Bidding shall occur through the PennBid online platform, and all work must comply with prevailing wage requirements under Pennsylvania Act 422 and public works employment verification under Act 127.

Bid security of not less than ten percent of the bid amount, with a minimum of $150 and maximum of $6,000 PennBid assessment fee, is required along with an Agreement of Surety certifying that Performance and Payment Bonds will be provided upon award. Bids may be withdrawn within two business days after opening. The specification document details technical requirements for catch basin construction, including materials, dimensions, reinforcement specifications, and quality standards for precast concrete structures used in the storm sewer system. All project documents and solicitation details are available at no cost through the PennBid platform.

View the file

Other files for this state and local contract opportunity

Other files attached to 2500999 - Canterbury Storm Sewer Replacement, newest first.
File Type Posted
3-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
49-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
9-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
20-Sec 01 56 39 - LANDSCAPE PROTECTION.pdf PDF
30-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
56-X1 - Site Map 2026-07-15.pdf PDF
4-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
24-Sec 31 20 00 - Earthwork.pdf PDF
5-Doc 00 41 00 - BID FORM - EBID.pdf PDF
6-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
15-Sec 01 33 00 - Submittals.pdf PDF
25-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
42-Sec 32 12 00 - ASPHALT CONCRETE PAVING.pdf PDF
17-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
39-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
45-Doc 00 73 00 2 - Appendix A - Cover.pdf PDF
13-Doc 00 73 00 4 - Appendix B - Cover.pdf PDF
43-Sec 01 55 26 - TRAFFIC REGULATION - 2024.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
8-Doc 00 52 00 - AGREEMENT.pdf PDF
54-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
58-Sec 01 22 00-MEASUREMENT AND PAYMENT 2026-07-13.pdf PDF
35-Doc 00 62 76 - Application for Payment.pdf PDF
7-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS - 2024.pdf PDF
1-Doc 00 63 63 - Change Order.pdf PDF
27-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
51-Sec 32 17 23.13 - Painted Traffic Lines and Markings.pdf PDF
29-Sec 31 37 16 - ENIGERY DISSIPATOR.pdf PDF
28-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
57-X2 - 12-14 18-19 of 24 Marked up As-Built Plans 2026-07-15.pdf PDF
2-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
53-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
46-Sec 32 17 23.43 - ADA DETECTABLE WARNING TILES.pdf PDF
34-Sec 33 44 15 - BOXES AND ENDWALLS.pdf PDF
38-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
19-Sec 01 11 13-SUMMARY OF WORK.pdf PDF
22-Sec 02 41 16 - DEMOLITION.pdf PDF
12-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - Canterbury Storm Sewer Replacement.pdf PDF
40-Doc 00 72 00 - GENERAL CONDITIONS - 2024.pdf PDF
41-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
55-X3 - Canterbury Details 2026-07-16.pdf PDF
33-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
52-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
11-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
18-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
44-Sec 32 01 16.71 - MILLING OF ASPHALT PAVEMENT SURFACE.pdf PDF
21-Doc 00 61 19 - Maintenance Bond.pdf PDF
32-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
Show all 50

2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORM INLETS, CATCH BASINS AND TRENCH DRAINS

33 44 14-1

SECTION 33 44 14

STORM INLETS, CATCH BASINS, TRENCH DRAINS AND END SECTIONS

PART 1 - GENERAL

1.01. SECTION DESCRIPTION

A. The Work of This Section Includes, but is not limited to:

1. Storm drainage curb inlets

2. Storm drainage catch basins

3. Trench drains

4. Storm drainage pipe end walls and end sections

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 01 57 13: Soil Erosion and Sediment Control

2. Section 31 23 33: Excavation, Backfill & Compaction

3. Section 32 93 00: Landscaping

4. Section 33 41 00: Storm Drain Pipe

1.03 QUALITY ASSURANCE

A. Reference Standards:

1. American Society for Testing and Materials (ASTM):

A36 Specification for Structural Steel A47 Specification for Malleable Iron Castings A536 Specification for Ductile Iron Castings C32 Specification for Sewer and Manhole Brick C270 Specification for Mortar for Unit Masonry

2. Pennsylvania Department of Transportation

Publication 408 Specifications Publication #72 Standards for Roadway Construction

B. Acceptable Manufacturer:

1. Precast structures, and frames and covers shall be provided by a firm regularly engaged in the manufacture of such products of the types, materials and sizes required, whose products have been in satisfactory use in similar service for not less than five (5) years.

2. Precast structures shall be provided by one of the following manufacturers or approved equal.

• Monarch Precast Concrete Corporation

• Continental Concrete Products, Inc.

• Modern Concrete Septic Tank Company

33 44 14-2

3. Frames and grates shall be provided by one of the following manufacturers or

• Neenah Foundry Company

• East Jordan Iron Works, Inc.

• Syracuse Castings Sales Corporation

4. Catch basins and grates shall be provided by one of the following manufacturers or

• NDS

• Nyloplast

5. Trench drains shall be provided by one of the following manufacturers or approved equal.

• ACO Drain

• Nyloplast

1.04 SUBMITTALS

A. Shop Drawings:

1. Submit detailed shop drawings of inlet units, end walls, and end sections including reinforcing steel details.

1.05 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Precast Concrete Units:

1. After fabrication and curing, transport the units to the job site. Protect until required for installation.

2. Handle to avoid damage to surfaces, edges and corners and to avoid creation of stresses within the units.

B. Other Requirements:

1. Section 01 60 00 also addresses transportation and handling along with storage and protection of materials and equipment.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Coarse Aggregate Subbase:

1. PADOT Number 2A, Type C, Section 703.2, Publication 408 Specifications.

B. Brick: ASTM C32, grade SS, solid

C. Masonry Mortar: ASTM C270, Type S

D. Malleable Iron Castings: ASTM A47, Grade 35018. Domestic

33 44 14-3

E. Ductile Iron Castings: ASTM A536, Grade 60-40-18. Domestic

F. Structural Grade Carbon Steel: ASTM A36

2.02 FABRICATIONS

A. Precast Cement Concrete Units:

1. Comply with the requirements of Section 713.2(d), Publication 408 Specifications

B. Inlets and Catch Basins:

1. Comply with the type, design and dimensions shown on the Drawings and in accordance with Publication #72 (RC-34) for precast units.

C. End Walls and End Sections:

1. Comply with the type, design and dimensions shown on the Drawings and in accordance with Publication #72 for precast units.

PART 3 - EXECUTION

3.01 EXCAVATION

A. Perform excavation in conjunction with storm pipe installation, Section 33 41 00 and as specified in Section 31 23 33.

B. Locate inlets, catch basins and trench drains indicated on the Drawings.

3.02 CONSTRUCTION

A. Construct inlets and catch basins of either precast sections or of cast-in-place construction in compliance with the type, design and dimensions shown on the Drawings and in accordance with Publication #72 (RC-34).

l. Place precast units on a 12" coarse aggregate subbase placed in 4" layers compacted to 95% of dry weight density.

2. Construct cast-in-place units on undisturbed earth.

3. Shape bottom of inlet boxes to channel flow of water to the outlet pipe and to prevent water from standing in box.

4. Unless units are cast-in-place, use precast concrete sections or brick to adjust to grade. Mortar in place.

B. Do not permit pipes to project more than 2" into inlets. Do not expose end of pipe through faces of endwalls.

C. Where indicated on the Drawings, provide pipe culvert end sections in compliance with the design and dimensions shown on the Drawings and in accordance with Publication #72

(RC-33).

33 44 14-4

3.03 BACKFILLING

A. Backfill structures only after examination by the Resident Project Representative.

B. Perform backfilling and compaction as specified in Section 31 23 33.

END OF SECTION