This is a Summary of Work document prepared by Montgomery Township, Pennsylvania for the Canterbury Storm Sewer Replacement project (Contract 2025-00999). The project consists of removal and replacement of storm sewer infrastructure on Canterbury Lane and Devonshire Drive, including the removal of approximately 1,800 feet of corrugated metal pipe (CMP) ranging from 12 inches to 57 inches by 38 inches in size, construction of new circular HDPE pipe and elliptical RCP storm sewer, replacement of three precast concrete storm sewer structures, and restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway. Sealed bids will be received online through the PennBid Program until 10:00 A.M. on September 1, 2026, at which time bids will be publicly opened and read aloud at the Township offices located at 1001 Stump Road, Montgomeryville, PA 18936. No pre-bid meeting will be held for this project. The contractor is responsible for all labor, equipment, and materials necessary to complete the work. Bid security of not less than ten percent (10%) of the bid amount must accompany each bid submission, along with an Agreement of Surety certifying that required Performance and Payment Bonds will be provided upon award.

The project is subject to Pennsylvania Act 422 (Prevailing Wage Act) and Act 127 (Public Works Employment Verification). All work must be performed within rights-of-way areas as indicated on plans and directed by the engineer, with the contractor responsible for utility location verification in accordance with Pennsylvania Act 287 (1974), as amended. Construction hours are limited to 7:00 A.M. through dusk, with no work permitted on Sundays without owner approval. The contractor must maintain the roadway free of dirt, dust, debris, and materials during non-working hours, notify property owners and residents at least 24 hours prior to construction, and direct all resident complaints to Montgomery Township. A PennBid fee of 0.33 percent of the bid amount (minimum $150, maximum $6,000) applies only to awarded bidders. Bids may be withdrawn within two business days after bid opening.

View the file

Other files for this state and local contract opportunity

Other files attached to 2500999 - Canterbury Storm Sewer Replacement, newest first.
File Type Posted
3-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
49-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
9-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
20-Sec 01 56 39 - LANDSCAPE PROTECTION.pdf PDF
30-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
56-X1 - Site Map 2026-07-15.pdf PDF
4-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
24-Sec 31 20 00 - Earthwork.pdf PDF
5-Doc 00 41 00 - BID FORM - EBID.pdf PDF
6-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
15-Sec 01 33 00 - Submittals.pdf PDF
25-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
42-Sec 32 12 00 - ASPHALT CONCRETE PAVING.pdf PDF
17-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
39-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
45-Doc 00 73 00 2 - Appendix A - Cover.pdf PDF
13-Doc 00 73 00 4 - Appendix B - Cover.pdf PDF
43-Sec 01 55 26 - TRAFFIC REGULATION - 2024.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
8-Doc 00 52 00 - AGREEMENT.pdf PDF
54-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
58-Sec 01 22 00-MEASUREMENT AND PAYMENT 2026-07-13.pdf PDF
37-Sec 33 44 14 - STORM INLETS CATCH BASINS ENWALLS AND END SECTIONS.pdf PDF
35-Doc 00 62 76 - Application for Payment.pdf PDF
7-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS - 2024.pdf PDF
1-Doc 00 63 63 - Change Order.pdf PDF
40-Doc 00 72 00 - GENERAL CONDITIONS - 2024.pdf PDF
41-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
55-X3 - Canterbury Details 2026-07-16.pdf PDF
33-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
52-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
11-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
18-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
44-Sec 32 01 16.71 - MILLING OF ASPHALT PAVEMENT SURFACE.pdf PDF
21-Doc 00 61 19 - Maintenance Bond.pdf PDF
32-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
16-Sec 31 22 10 - Topsoiling and Finish Grading.pdf PDF
14-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
36-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
48-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
47-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
50-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
26-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
27-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
51-Sec 32 17 23.13 - Painted Traffic Lines and Markings.pdf PDF
29-Sec 31 37 16 - ENIGERY DISSIPATOR.pdf PDF
28-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
57-X2 - 12-14 18-19 of 24 Marked up As-Built Plans 2026-07-15.pdf PDF
Show all 50

2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF WORK

01 11 13-1

SECTION 01 11 13

PART 1 GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Description of Work.

2. Work by Owner.

3. Work by other parties.

4. Owner supplied Products.

5. Contractor use of site and premises.

6. Future work.

7. Work sequence of construction.

8. Owner occupancy.

9. Municipality Specific Requirements

1.02 DESCRIPTION OF WORK

A. The Work to be completed under this contract consists of all labor, equipment, and materials to remove and replace storm sewer on Canterbury Lane and Devonshire Drive as shown on the plans.

The work includes but is not limited to removal of approximately 1,800 feet of corrugated metal pipe (CMP) ranging in sizes from 12 inches through 57 inches x 38 inches, construction of new circular HDPE pipe and elliptical RCP storm sewer, replacement of three precast concrete storm sewer structures, and restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway.

1.03 WORK BY OWNER

A. None.

1.04 WORK BY OTHER PARTIES

A. None

1.05 OWNER SUPPLIED PRODUCTS

A. No Products are to be supplied and paid for by Owner.

1.06 CONTRACTOR USE OF SITE AND PREMISES

A. Contractor shall confine his operations so that all work is performed within the limits of rights-or-way areas, indicated by the plans and/or directed by the Engineers, unless written permission is obtained to occupy additional ground. Upon completion of work, the Contractor shall clean-up and restore the area of his operations to a condition at least equal to original conditions. Damage to property outside of specified construction limits shall be the responsibility of the Contractor and restoration of same shall be made at the Contractor’s expense.

B. Contractor shall take all necessary precautions to protect all existing water, gas, electric, communications, sanitary sewer, storm sewer, or other facilities encountered during the course of his operations, to guard against disruption of service. Before beginning Work, Contractor shall determine the location of each facility which is questionable. The location of utilities shown on the Drawings represents the best information available; however, it is the responsibility of Contractor to establish the exact location in accordance with the requirements of Pennsylvania Act 287 (1974) as last amended by Act 50 (2017). A Utility User's List is noted on the Drawings.

C. Contractor will be responsible for preparing and distributing written notification to all property owners and residents a minimum of twenty-four (24) hours prior to the start of construction on or near their properties.

D. Contractor shall conduct all Work in strict compliance with OSHA Construction Workplace Safety Standards.

01 11 13-2

1.07 FUTURE WORK

A. No future work is proposed as part of this contract.

1.08 WORK SEQUENCE OF CONSTRUCTION

A. The contractor shall submit a complete construction schedule prior to the start of any construction.

1.09 OWNER OCCUPANCY

A. Owner will occupy the site and premises during the entire period of construction for the conduct of normal operations.

B. Cooperate with Owner to minimize conflict, and to facilitate Owner's operations.

C. Schedule the Work to accommodate Owner occupancy.

1.10 MUNICIPALITY SPECIFIC REQUIREMENTS

A. Time of Work

1. Construction may not begin before 7:00 A.M and must be terminated by dusk. This work limitation also includes the moving of equipment. No work may occur on Sunday unless approved by the Owner.

B. It is the Contractor’s responsibility to keep the roadway free of all dirt, dust, debris, material and equipment during non-working hours. If, in the opinion of the Township, the contractor has failed to do so, the Contractor is required to do all clean-up prior to beginning the next day’s work. If, in the opinion of the Township, the contractor has failed to keep the roads clean, the Township will require the use of a self-propelled street broom or the Township will hire a street broom and deduct the cost from the next invoice.

C. Resident Complaints

The Contractor is not permitted to respond to ANY resident complaints. It is the Contractor’s responsibility to direct all resident complaints to Montgomery Township and the resident project representative.

D. ALL WORK in any single development must be completed before starting work in another development.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION