This is a Summary of Work document prepared by Montgomery Township, Pennsylvania for the Canterbury Storm Sewer Replacement project (Contract 2025-00999). The project consists of removal and replacement of storm sewer infrastructure on Canterbury Lane and Devonshire Drive, including the removal of approximately 1,800 feet of corrugated metal pipe (CMP) ranging from 12 inches to 57 inches by 38 inches in size, construction of new circular HDPE pipe and elliptical RCP storm sewer, replacement of three precast concrete storm sewer structures, and restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway. Sealed bids will be received online through the PennBid Program until 10:00 A.M. on September 1, 2026, at which time bids will be publicly opened and read aloud at the Township offices located at 1001 Stump Road, Montgomeryville, PA 18936. No pre-bid meeting will be held for this project. The contractor is responsible for all labor, equipment, and materials necessary to complete the work. Bid security of not less than ten percent (10%) of the bid amount must accompany each bid submission, along with an Agreement of Surety certifying that required Performance and Payment Bonds will be provided upon award.
The project is subject to Pennsylvania Act 422 (Prevailing Wage Act) and Act 127 (Public Works Employment Verification). All work must be performed within rights-of-way areas as indicated on plans and directed by the engineer, with the contractor responsible for utility location verification in accordance with Pennsylvania Act 287 (1974), as amended. Construction hours are limited to 7:00 A.M. through dusk, with no work permitted on Sundays without owner approval. The contractor must maintain the roadway free of dirt, dust, debris, and materials during non-working hours, notify property owners and residents at least 24 hours prior to construction, and direct all resident complaints to Montgomery Township. A PennBid fee of 0.33 percent of the bid amount (minimum $150, maximum $6,000) applies only to awarded bidders. Bids may be withdrawn within two business days after bid opening.
View the file
Other files for this state and local contract opportunity
Show all 50
2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF WORK
01 11 13-1
SECTION 01 11 13
PART 1 GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Description of Work.
2. Work by Owner.
3. Work by other parties.
4. Owner supplied Products.
5. Contractor use of site and premises.
6. Future work.
7. Work sequence of construction.
8. Owner occupancy.
9. Municipality Specific Requirements
1.02 DESCRIPTION OF WORK
A. The Work to be completed under this contract consists of all labor, equipment, and materials to remove and replace storm sewer on Canterbury Lane and Devonshire Drive as shown on the plans.
The work includes but is not limited to removal of approximately 1,800 feet of corrugated metal pipe (CMP) ranging in sizes from 12 inches through 57 inches x 38 inches, construction of new circular HDPE pipe and elliptical RCP storm sewer, replacement of three precast concrete storm sewer structures, and restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway.
1.03 WORK BY OWNER
A. None.
1.04 WORK BY OTHER PARTIES
A. None
1.05 OWNER SUPPLIED PRODUCTS
A. No Products are to be supplied and paid for by Owner.
1.06 CONTRACTOR USE OF SITE AND PREMISES
A. Contractor shall confine his operations so that all work is performed within the limits of rights-or-way areas, indicated by the plans and/or directed by the Engineers, unless written permission is obtained to occupy additional ground. Upon completion of work, the Contractor shall clean-up and restore the area of his operations to a condition at least equal to original conditions. Damage to property outside of specified construction limits shall be the responsibility of the Contractor and restoration of same shall be made at the Contractor’s expense.
B. Contractor shall take all necessary precautions to protect all existing water, gas, electric, communications, sanitary sewer, storm sewer, or other facilities encountered during the course of his operations, to guard against disruption of service. Before beginning Work, Contractor shall determine the location of each facility which is questionable. The location of utilities shown on the Drawings represents the best information available; however, it is the responsibility of Contractor to establish the exact location in accordance with the requirements of Pennsylvania Act 287 (1974) as last amended by Act 50 (2017). A Utility User's List is noted on the Drawings.
C. Contractor will be responsible for preparing and distributing written notification to all property owners and residents a minimum of twenty-four (24) hours prior to the start of construction on or near their properties.
D. Contractor shall conduct all Work in strict compliance with OSHA Construction Workplace Safety Standards.
01 11 13-2
1.07 FUTURE WORK
A. No future work is proposed as part of this contract.
1.08 WORK SEQUENCE OF CONSTRUCTION
A. The contractor shall submit a complete construction schedule prior to the start of any construction.
1.09 OWNER OCCUPANCY
A. Owner will occupy the site and premises during the entire period of construction for the conduct of normal operations.
B. Cooperate with Owner to minimize conflict, and to facilitate Owner's operations.
C. Schedule the Work to accommodate Owner occupancy.
1.10 MUNICIPALITY SPECIFIC REQUIREMENTS
A. Time of Work
1. Construction may not begin before 7:00 A.M and must be terminated by dusk. This work limitation also includes the moving of equipment. No work may occur on Sunday unless approved by the Owner.
B. It is the Contractor’s responsibility to keep the roadway free of all dirt, dust, debris, material and equipment during non-working hours. If, in the opinion of the Township, the contractor has failed to do so, the Contractor is required to do all clean-up prior to beginning the next day’s work. If, in the opinion of the Township, the contractor has failed to keep the roads clean, the Township will require the use of a self-propelled street broom or the Township will hire a street broom and deduct the cost from the next invoice.
C. Resident Complaints
The Contractor is not permitted to respond to ANY resident complaints. It is the Contractor’s responsibility to direct all resident complaints to Montgomery Township and the resident project representative.
D. ALL WORK in any single development must be completed before starting work in another development.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION