2500999 - Canterbury Storm Sewer Replacement State and local contract opportunity
Solicitation number
Not on record
Issued by
Montgomery County, Mount Aetna CDP, Pennsylvania

About this file

This is a Bidder's Acknowledgement Form for Montgomery Township, Pennsylvania, related to Contract 2025-00999 for the Canterbury Storm Sewer Replacement project. The work consists of removing and replacing storm sewer infrastructure on Canterbury Lane and Devonshire Drive, including removal of approximately 1,800 feet of corrugated metal pipe (CMP) ranging from 12 inches to 57 inches by 38 inches, construction of new circular HDPE pipe and elliptical reinforced concrete pipe (RCP) storm sewer, replacement of three precast concrete storm sewer structures, and restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway. Sealed bids must be submitted electronically via the PennBid Program by 10:00 A.M. on September 1, 2026, with public opening and reading of bids at Montgomery Township offices located at 1001 Stump Road, Montgomeryville, Pennsylvania 18936. No pre-bid meeting will be held for this project. Bidders acknowledge that they have examined the bidding documents, visited the site, reviewed all subsurface conditions and environmental reports, and understand all applicable federal, state, and local laws and regulations affecting the work.

All bids must include bid security in an amount not less than ten percent (10%) of the bid amount, payable to Montgomery Township, along with an Agreement of Surety certifying that required Performance and Payment Bonds will be provided. Bids may be withdrawn within two business days after the opening of bids. The contract is subject to the Pennsylvania Prevailing Wage Act and Act 127 regarding Public Works Employment Verification. All bidding documents are available at no cost through PennBid, with a nominal fee of 0.33% of the bid amount (minimum $150 and maximum $6,000) assessed only to awarded bidders. The bid must remain subject to acceptance for sixty days after bid opening, or longer if agreed to in writing by the bidder. Bidders must submit supporting documentation including a bid bond form, bidder qualification statement, non-collusion affidavit, certificate of insurance, public works employment verification form, and a list of proposed subcontractors and suppliers.

View the file

Other files for this state and local contract opportunity

Other files attached to 2500999 - Canterbury Storm Sewer Replacement, newest first.
File Type Posted
27-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
51-Sec 32 17 23.13 - Painted Traffic Lines and Markings.pdf PDF
29-Sec 31 37 16 - ENIGERY DISSIPATOR.pdf PDF
28-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
57-X2 - 12-14 18-19 of 24 Marked up As-Built Plans 2026-07-15.pdf PDF
2-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
53-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
46-Sec 32 17 23.43 - ADA DETECTABLE WARNING TILES.pdf PDF
34-Sec 33 44 15 - BOXES AND ENDWALLS.pdf PDF
19-Sec 01 11 13-SUMMARY OF WORK.pdf PDF
22-Sec 02 41 16 - DEMOLITION.pdf PDF
12-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - Canterbury Storm Sewer Replacement.pdf PDF
3-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
49-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
9-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
20-Sec 01 56 39 - LANDSCAPE PROTECTION.pdf PDF
30-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
56-X1 - Site Map 2026-07-15.pdf PDF
4-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
24-Sec 31 20 00 - Earthwork.pdf PDF
5-Doc 00 41 00 - BID FORM - EBID.pdf PDF
6-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
15-Sec 01 33 00 - Submittals.pdf PDF
25-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
42-Sec 32 12 00 - ASPHALT CONCRETE PAVING.pdf PDF
17-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
39-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
45-Doc 00 73 00 2 - Appendix A - Cover.pdf PDF
13-Doc 00 73 00 4 - Appendix B - Cover.pdf PDF
43-Sec 01 55 26 - TRAFFIC REGULATION - 2024.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
8-Doc 00 52 00 - AGREEMENT.pdf PDF
54-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
58-Sec 01 22 00-MEASUREMENT AND PAYMENT 2026-07-13.pdf PDF
37-Sec 33 44 14 - STORM INLETS CATCH BASINS ENWALLS AND END SECTIONS.pdf PDF
35-Doc 00 62 76 - Application for Payment.pdf PDF
7-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS - 2024.pdf PDF
1-Doc 00 63 63 - Change Order.pdf PDF
40-Doc 00 72 00 - GENERAL CONDITIONS - 2024.pdf PDF
41-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
55-X3 - Canterbury Details 2026-07-16.pdf PDF
33-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
52-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
11-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
18-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
44-Sec 32 01 16.71 - MILLING OF ASPHALT PAVEMENT SURFACE.pdf PDF
21-Doc 00 61 19 - Maintenance Bond.pdf PDF
32-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
Show all 50

2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDER’S ACKNOWLEDGEMENT FORM

00 45 10-1

DOCUMENT 00 45 10

PROJECT IDENTIFICATION: Montgomery Township – Canterbury Storm Sewer Replacement

CONTRACT NUMBER: 25-00999

ARTICLE 1 – BID RECIPIENT

1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 - BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. The Bid will remain subject to acceptance for sixty (60) days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.

ARTICLE 3 - BIDDER’S REPRESENTATIONS

3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that:

A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all of which is hereby acknowledged.

Addendum No. Addendum Date

B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and (2) reports and drawings of a Hazardous Environmental Condition, if any, which has been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.

E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.

00 45 10-2

F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.

I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.

J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance of the Work for which this Bid is submitted.

K. Bidder is aware measurement and payment criteria of each bid item is indicated in the Bidding Documents.

ARTICLE 4 - BIDDER’S CERTIFICATION

4.01 Bidder certifies that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

C. Bidder has not solicited or induced any individual or entity to refrain from bidding;

D. Bidder has not sought by collusion to obtain for itself any advantage over any other bidder or over

OWNER; and

E. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01 D.:

1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;

2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

4. “coercive practice” means harming or threatening to harm directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

ARTICLE 5 - BASIS OF BID

5.01 Bidder will complete the Work in accordance with the Contract Documents at the prices indicated for each line item specified in the bid form.

00 45 10-3

5.02 Unit Prices have been computed in accordance with paragraph 11.03.A of the General Conditions.

5.03 Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents.

5.04 Bidder acknowledges understanding of Article 19 of the Instructions to Bidder (00 21 13) regarding the evaluation of the Bids.

ARTICLE 6 - TIME OF COMPLETION

6.01 Bidder agrees that the Work will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within the number of calendar days indicated in the Agreement.

6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified above, which shall be stated in the Agreement.

ARTICLE 7 - ATTACHMENTS TO THIS BID

7.01 The following documents are submitted along with this document and made a condition of this Bid:

A. PennBid Bid Form

B. Bid Bond Form (Document 00 43 13) or other Bid Security

C. Bidder Acknowledgement Form (Document 00 45 10)

D. Bidder Qualification Statement Form (Document 00 45 13)

E. Non-Collusion Affidavit Form (Document 00 45 19)

F. Agreement of Surety Form (Document 00 45 53)

G. Certificate of Insurance (Document 00 62 16. See Document 00 73 00, Section 1.10 for Coverage and Limit Requirements)

H. Public Works Employment Verification Form (Document 00 73 00 Appendix B)

I. List of Proposed Subcontractors, Proposed Suppliers, and other individuals and entities required to be identified in this Bid.

ARTICLE 8 - COMMUNICATIONS

8.01 Communications concerning this Bid shall be addressed to the following individual:

If the address, telephone number, and fax number of the above individual is different than noted at the end of the Bid Form, note the address, telephone number, and fax number of the above individual:

Business Address:

Telephone No.: ( )

Fax No.: ( )

Email:

00 45 10-4

ARTICLE 9 - DEFINED TERMS

9.01 The terms used in this Bid with initial capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 10 - BID SUBMITTAL

10.01 This Bid is submitted on , 20 . by:

If Bidder is:

An Individual

Name (typed or printed):

By:

(Individual’s signature)

Doing business as:

A Partnership

Partnership Name:

(Signature of general partner – attach evidence of authority to sign)

Title:

A Corporation

Corporation Name: (SEAL)

State of Incorporation:

Type:

(General Business, Professional, Service, Limited Liability)

(Signature – attach evidence of authority to sign)

Attest

Date of Qualification to do business in Pennsylvania is / / .

00 45 10-5

A Joint Venture

Name of Joint Venture:

First Joint Venturer Name: (SEAL)

(Signature of first joint venture partner – attach evidence of authority to sign)

Second Joint Venturer Name: (SEAL)

(Signature of second joint venture partner – attach evidence of authority to sign)

Name (typed or printed):

Title:

(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)

END OF DOCUMENT

File details come from the government source that posted it. Updated .