52-Sec 31 11 00 - CLEARING AND GRUBBING.pdf

PDF 98 KB Posted

Attached to
2500999 - Canterbury Storm Sewer Replacement State and local contract opportunity
Solicitation number
Not on record
Issued by
Montgomery County, Mount Aetna CDP, Pennsylvania

About this file

This is a Scope of Work specification document for Section 31 11 00 – Clearing and Grubbing, prepared for the Canterbury Storm Sewer Replacement project in Montgomery Township, Pennsylvania. The work encompasses removal of trees, brush, vegetation, and obstructions; grubbing to remove stumps, roots, and organic materials to a minimum depth of 8 inches; stripping and stockpiling topsoil; and disposal of all resulting debris. The contractor must coordinate tree removal with the Resident Project Representative, protect designated trees and landscape features with temporary fencing, and confine all clearing operations to public rights-of-way, easements, and Owner's property. Grubbing and topsoil stripping must be staged to limit erosion exposure, with utility construction stages limited to trench lengths that can be installed and backfilled in one day. The contractor is required to notify the Engineer at least 48 hours prior to beginning clearing work and must provide written agreements for debris disposal at off-site locations. All debris, including trees, logs, branches, stumps, and brush, becomes contractor property and must be disposed of legally; open burning is prohibited.

Temporary fencing materials specified include 4-foot-high picket snow fence or orange mesh plastic construction fencing with 6-foot studded "T" type soil-set fence posts. Tree wound dressing must be antiseptic, waterproof, and asphalt-based. All injuries to remaining plants must be repaired using approved arboricultural practices, and any trees, shrubs, or plants designated for preservation that are permanently injured or die during construction must be replaced with like species acceptable to the property owner. The contractor must comply with Pennsylvania Act 287 (1974) as amended by PA Act 121 (2008) regarding utility relocations and must provide property owners with at least five days' advance notice before clearing operations begin. Upon project completion, all protective fencing and enclosures must be removed and guard posts, rails, signs, and other structures restored to their pre-construction condition.

View the file

Other files for this state and local contract opportunity

Other files attached to 2500999 - Canterbury Storm Sewer Replacement, newest first.
File Type Posted
40-Doc 00 72 00 - GENERAL CONDITIONS - 2024.pdf PDF
41-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
55-X3 - Canterbury Details 2026-07-16.pdf PDF
33-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
11-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
18-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
44-Sec 32 01 16.71 - MILLING OF ASPHALT PAVEMENT SURFACE.pdf PDF
21-Doc 00 61 19 - Maintenance Bond.pdf PDF
32-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
16-Sec 31 22 10 - Topsoiling and Finish Grading.pdf PDF
14-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
36-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
48-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
47-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
50-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
26-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
3-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
49-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
9-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
20-Sec 01 56 39 - LANDSCAPE PROTECTION.pdf PDF
30-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
56-X1 - Site Map 2026-07-15.pdf PDF
4-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
24-Sec 31 20 00 - Earthwork.pdf PDF
5-Doc 00 41 00 - BID FORM - EBID.pdf PDF
6-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
15-Sec 01 33 00 - Submittals.pdf PDF
25-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
42-Sec 32 12 00 - ASPHALT CONCRETE PAVING.pdf PDF
17-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
39-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
45-Doc 00 73 00 2 - Appendix A - Cover.pdf PDF
13-Doc 00 73 00 4 - Appendix B - Cover.pdf PDF
43-Sec 01 55 26 - TRAFFIC REGULATION - 2024.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
8-Doc 00 52 00 - AGREEMENT.pdf PDF
54-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
58-Sec 01 22 00-MEASUREMENT AND PAYMENT 2026-07-13.pdf PDF
37-Sec 33 44 14 - STORM INLETS CATCH BASINS ENWALLS AND END SECTIONS.pdf PDF
35-Doc 00 62 76 - Application for Payment.pdf PDF
7-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS - 2024.pdf PDF
1-Doc 00 63 63 - Change Order.pdf PDF
27-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
51-Sec 32 17 23.13 - Painted Traffic Lines and Markings.pdf PDF
29-Sec 31 37 16 - ENIGERY DISSIPATOR.pdf PDF
28-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
57-X2 - 12-14 18-19 of 24 Marked up As-Built Plans 2026-07-15.pdf PDF
2-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
Show all 50

2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLEARING AND GRUBBING

31 11 00-1

SECTION 31 11 00

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Clearing

2. Grubbing

3. Stripping and stockpiling topsoil

4. Debris disposal

B. Definitions:

1. Clearing is defined as the removal of trees, brush, down timber, rotten wood, rubbish, any other vegetation, and objectionable material at or above original ground elevation not designated to be saved. Clearing also includes removal of fences, walls, guard posts, guard rail, signs, and other obstructions interfering with the proposed work.

2. Grubbing is defined as the removal from below the surface of the natural ground of stumps, roots and stubs, brush, organic materials and debris.

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 01 57 13: Soil Erosion and Sediment Control

2. Section 31 23 33: Excavation, Backfill and Compaction

3. Section 32 92 00: Finish Grading, Seeding, and Sodding

A. Contractor may clear all obstructions within the permanent and temporary construction easements and within the limit of disturbance of Owner's property as absolutely necessary to perform the construction work. Contractor shall leave as many trees as possible within the temporary construction easements and shall not disturb portions of Owner's property beyond the limit of disturbance. Removal of trees shall be coordinated with the Resident Project Representative.

1.03 SUBMITTALS

A. Agreements for Disposal of Debris:

1. Arrange for disposal of debris resulting from clearing and grubbing to locations outside Owner's property, easements and public right-of-ways and obtain a written agreement with the owners of each property where the debris will be deposited.

2. Submit two (2) copies of the agreement with each property owner releasing Owner from responsibility in connection with the disposal of the debris.

31 11 00-2

PART 2 - PRODUCTS

2.01 MATERIALS

A. Temporary Fencing:

1. Undamaged picket snow fence, 4' high, formed of wooden slats, tightly woven with wire cable or orange, open mesh plastic construction fencing, 4' high, or other acceptable, highly visible, weather resistant, easily maintained fencing that provides a substantial barrier.

2. Soil-set fence posts, studded "T" type, 6' high.

B. Tree Wound Dressing:

1. Antiseptic and waterproof, asphalt base.

PART 3 - EXECUTION

3.01 PREPARATION

A. Notify Engineer at least 48 hours prior to beginning any clearing work.

B. Protect benchmarks, utilities, existing trees, shrubs and other landscape features designated for preservation with temporary fencing or barricades satisfactory to the Resident Project Representative. No material shall be stored or construction operation carried on within four

(4) feet of any tree to be saved or within the tree protection fence.

C. When a private enclosure fence encroaches on the work area, notify the property owner at least five (5) days in advance of the clearing/grubbing operations to permit the property owner to remove it, construct a supplemental fence, or make such other arrangements as may be necessary for security purposes. Upon failure of the property owner to reasonably proceed with the work required to secure his property, carefully remove the fence, in whole or in part, and neatly pile the materials onto the property owner's property.

3.02 UTILITY RELOCATIONS

A. Inform all companies, individuals and others owning or controlling facilities or structures within the limits of the work which have to be relocated, adjusted or reconstructed in sufficient time for the utility to organize and perform such work in conjunction with or in advance of Contractor's operations.

B. Comply with the provisions of PA Act 287 (1974) as last amended by PA Act 121 (2008).

3.03 CLEARING

A. Confine clearing as required to within the limits of the public Right-of-Ways, easements and Owner's property. Attention is called to Paragraph 1.03 of this Section.

B. Fell trees in a manner that will avoid damage to trees, shrubs, and other installations which are to be retained.

C. Where stumps are not required to be grubbed, flushcut with ground elevation.

31 11 00-3

3.04 GRUBBING

A. Turf clearing and grubbing shall be staged to limit exposure and potential erosion. [For utility construction, stages shall be limited to that length of trench which may be installed and backfilled in one (1) day.]

B. Grub areas within the construction limits to remove roots and other objectionable material to a minimum depth of 8".

C. Remove all stumps within the cleared areas unless otherwise authorized by the Resident

Project Representative.

3.05 STRIPPING AND STOCKPILING TOPSOIL

A. Stripping of topsoil shall be staged to limit exposure and potential erosion. [For utility construction, stages shall be limited to that length of trench which may be installed and backfilled in one (1) day.]

B. Strip topsoil to whatever depth it may occur from areas to be excavated, filled, or graded and stockpile at a location approved by the Resident Project Representative for use in finish grading.

C. Topsoil shall not be used as backfill or removed from the site.

3.06 DEBRIS DISPOSAL

A. Trees, logs, branches, brush, stumps, and other debris resulting from clearing and grubbing operations associated with the Work on the Project site and/or within off-site easements/public right-of-ways shall become the property of Contractor and shall be disposed of legally.

B. Debris resulting from the clearing and grubbing work shall not be deposited or buried on the

Project site, easements or public Right-of-Ways.

C. Open burning of debris is prohibited.

3.07 RESTORATION

A. Repair all injuries to bark, trunk, limbs, and roots of remaining plants by properly dressing, cutting, tracing and painting, using approved arboricultural practices and materials.

B. Replace trees, shrubs and plants designated to be saved which are permanently injured or die during the Contract or the maintenance period as a result of construction operations with like species acceptable to the property owner.

C. Remove protective fences, enclosures and guards upon the completion of the project.

D. Restore guard posts, guard rail, signs and other interferences to the condition equal to that existing before construction operations.

END OF SECTION