34-Sec 33 44 15 - BOXES AND ENDWALLS.pdf

PDF 142 KB Posted

Attached to
2500999 - Canterbury Storm Sewer Replacement State and local contract opportunity
Solicitation number
Not on record
Issued by
Montgomery County, Mount Aetna CDP, Pennsylvania

About this file

This is a specification document for storm sewer construction materials required by Montgomery Township, Pennsylvania for CONTRACT 2025-00999 - Canterbury Storm Sewer Replacement. The project involves the removal and replacement of approximately 1,800 feet of corrugated metal pipe (CMP) ranging from 12 inches to 57 inches x 38 inches in size, with construction of new circular HDPE pipe and elliptical RCP storm sewer on Canterbury Lane and Devonshire Drive. The work also includes replacement of three precast concrete storm sewer structures and restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway. Sealed bids are due online via the PennBid Program by 10:00 A.M. on September 1, 2026, with public opening and reading of bids at the Township offices located at 1001 Stump Road, Montgomeryville, PA 18936. No pre-bid meeting will be held for this project. All solicitation documents and details are available at no cost through PennBid at https://pennbid.bonfirehub.com/.

Each bid submission must include bid security of not less than ten percent (10%) of the bid amount payable to Montgomery Township along with an Agreement of Surety certifying that required Performance and Payment Bonds will be provided. The PennBid program assesses a nominal fee of 0.33% of the bid amount (minimum $150, maximum $6,000) to awarded bidders only. Bids may be withdrawn within two (2) business days after bid opening. The project is subject to Pennsylvania Act 422 (Prevailing Wage Act) as amended, prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry, and Act 127 (Public Works Employment Verification) as amended.

View the file

Other files for this state and local contract opportunity

Other files attached to 2500999 - Canterbury Storm Sewer Replacement, newest first.
File Type Posted
3-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
49-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
9-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
20-Sec 01 56 39 - LANDSCAPE PROTECTION.pdf PDF
30-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
56-X1 - Site Map 2026-07-15.pdf PDF
4-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
24-Sec 31 20 00 - Earthwork.pdf PDF
5-Doc 00 41 00 - BID FORM - EBID.pdf PDF
6-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
15-Sec 01 33 00 - Submittals.pdf PDF
25-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
42-Sec 32 12 00 - ASPHALT CONCRETE PAVING.pdf PDF
17-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
39-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
45-Doc 00 73 00 2 - Appendix A - Cover.pdf PDF
13-Doc 00 73 00 4 - Appendix B - Cover.pdf PDF
43-Sec 01 55 26 - TRAFFIC REGULATION - 2024.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
8-Doc 00 52 00 - AGREEMENT.pdf PDF
54-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
58-Sec 01 22 00-MEASUREMENT AND PAYMENT 2026-07-13.pdf PDF
37-Sec 33 44 14 - STORM INLETS CATCH BASINS ENWALLS AND END SECTIONS.pdf PDF
35-Doc 00 62 76 - Application for Payment.pdf PDF
7-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS - 2024.pdf PDF
1-Doc 00 63 63 - Change Order.pdf PDF
40-Doc 00 72 00 - GENERAL CONDITIONS - 2024.pdf PDF
41-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
55-X3 - Canterbury Details 2026-07-16.pdf PDF
33-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
52-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
11-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
18-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
44-Sec 32 01 16.71 - MILLING OF ASPHALT PAVEMENT SURFACE.pdf PDF
21-Doc 00 61 19 - Maintenance Bond.pdf PDF
32-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
16-Sec 31 22 10 - Topsoiling and Finish Grading.pdf PDF
14-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
36-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
48-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
47-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
50-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
26-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
27-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
51-Sec 32 17 23.13 - Painted Traffic Lines and Markings.pdf PDF
29-Sec 31 37 16 - ENIGERY DISSIPATOR.pdf PDF
28-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
57-X2 - 12-14 18-19 of 24 Marked up As-Built Plans 2026-07-15.pdf PDF
Show all 50

2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOXES AND ENDWALLS

33 44 15-1

SECTION 33 44 15

PART 1 - GENERAL

1.01. SECTION DESCRIPTION

A. The Work of This Section Includes, but is not limited to:

1. Influent box

2. Subdrain system endwall

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 01 57 13: Soil Erosion and Sediment Control

2. Section 03 30 53: Concrete Work for Utilities

3. Section 05 53 00: Aluminum Grating

4. Section 31 20 00: Earthwork

5. Section 31 23 16.26: Rock Removal

6. Section 31 23 33: Excavation, Backfill & Compaction

7. Section 32 93 00: Landscaping

8. Section 33 46 16: Subdrain System

1.03 QUALITY ASSURANCE

A. Reference Standards:

1. Pennsylvania Department of Transportation

Publication 408 Specifications Publication #72 Standards for Roadway Construction

B. Acceptable Manufacturer:

1. Precast structures shall be provided by a firm regularly engaged in the manufacture of such products of the types, materials and sizes required, whose products have been in satisfactory use in similar service for not less than five (5) years.

2. Precast structures shall be provided by one of the following manufacturers or approved equal.

• Monarch Precast Concrete Corporation

• Modern Concrete Septic Tank Company

1.04 SUBMITTALS

A. Shop Drawings:

1. Submit detailed shop drawings of boxes and end walls, including reinforcing steel details.

33 44 15-2

1.05 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Precast Concrete Units:

1. After fabrication and curing, transport the units to the job site. Protect until required for installation.

2. Handle to avoid damage to surfaces, edges and corners and to avoid creation of stresses within the units.

B. Other Requirements:

1. Section 01 60 00 also addresses transportation and handling along with storage and protection of materials and equipment.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Coarse Aggregate Subbase:

1. PADOT Number 2A, Type C, Section 703.2, Publication 408 Specifications.

B. Structural Grade Carbon Steel: ASTM A36

C. Concrete: Section 03 30 53

2.02 FABRICATIONS

A. Precast Cement Concrete Units:

1. Comply with the requirements of Section 713.2(d),Publication 408 Specifications

B. Boxes:

1. Comply with the type, design and dimensions shown on the Drawings and in accordance with Publication #72 (RC-34) for precast units.

C. End Walls:

1. Comply with the type, design and dimensions shown on the Drawings and in accordance with Publication #72 (RC-31) for precast units.

PART 3 - EXECUTION

3.01 EXCAVATION

A. Perform excavation as specified in Section 31 23 33.

B. Locate influent box and subdrain system as indicated on the Drawings.

33 44 15-3

3.02 CONSTRUCTION

A. Construct influent box of either precast sections or of cast-in-place construction in compliance with the type, design and dimensions shown on the Drawings and in accordance with Publication

#72 (RC-34).

1. Provide aluminum frame to accommodate grating as shown on the Drawings and in accordance with Section 05 53 00.

2. Place precast units on a compacted 6" coarse aggregate subbase.

3. Construct cast-in-place units on undisturbed earth.

4. Shape bottom of boxes to channel flow of water to the outlet pipe and to prevent water from standing in box.

B. Construct endwalls of either precast units of cast-in-place construction in compliance with the type, design and dimensions shown on the Drawings and in accordance with Publication #72

(RC-31).

1. Cast-in-place endwalls shall be monolithically cast reinforced concrete units.

C. Do not permit pipes to project more than 2" into influent boxes. Do not expose end of pipe through faces of endwalls.

3.03 BACKFILLING

A. Backfill structures only after examination by the Resident Project Representative.

B. Perform backfilling and compaction as specified in Section 31 23 33.

END OF SECTION