49-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf

PDF 129 KB Posted

Attached to
2500999 - Canterbury Storm Sewer Replacement State and local contract opportunity
Solicitation number
Not on record
Issued by
Montgomery County, Mount Aetna CDP, Pennsylvania

About this file

This is a technical specification document for Portland cement concrete paving, related to Montgomery Township's Canterbury Storm Sewer Replacement project in Pennsylvania. The project involves the removal and replacement of approximately 1,800 feet of corrugated metal pipe (CMP) ranging from 12 inches to 57 inches by 38 inches, construction of new circular HDPE pipe and elliptical RCP storm sewer, and replacement of three precast concrete storm sewer structures on Canterbury Lane and Devonshire Drive. Additionally, the project requires restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway. Sealed bids are due by 10:00 A.M. on September 1, 2026, with public opening and reading of bids at the Township offices located at 1001 Stump Road, Montgomeryville, PA 18936. No pre-bid meeting will be held. Bids may be withdrawn within two business days after opening.

Each bid must include bid security in the amount of no less than ten percent (10%) of the bid amount, payable to Montgomery Township, along with an Agreement of Surety certifying that required Performance and Payment Bonds will be provided. A nominal fee of 0.33% of the bid amount, with a minimum of $150 and maximum of $6,000, is assessed by PennBid only to awarded bidders. The project is subject to the Pennsylvania Prevailing Wage Act (Act 422) and Act 127 (Pennsylvania Public Works Employment Verification). All solicitation documents and details are available at no cost through the PennBid online platform at https://pennbid.bonfirehub.com/.

View the file

Other files for this state and local contract opportunity

Other files attached to 2500999 - Canterbury Storm Sewer Replacement, newest first.
File Type Posted
40-Doc 00 72 00 - GENERAL CONDITIONS - 2024.pdf PDF
41-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
55-X3 - Canterbury Details 2026-07-16.pdf PDF
33-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
52-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
11-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
18-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
44-Sec 32 01 16.71 - MILLING OF ASPHALT PAVEMENT SURFACE.pdf PDF
21-Doc 00 61 19 - Maintenance Bond.pdf PDF
32-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
16-Sec 31 22 10 - Topsoiling and Finish Grading.pdf PDF
14-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
36-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
48-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
47-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
50-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
26-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
3-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
9-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
20-Sec 01 56 39 - LANDSCAPE PROTECTION.pdf PDF
30-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
56-X1 - Site Map 2026-07-15.pdf PDF
4-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
24-Sec 31 20 00 - Earthwork.pdf PDF
5-Doc 00 41 00 - BID FORM - EBID.pdf PDF
6-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
15-Sec 01 33 00 - Submittals.pdf PDF
25-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
42-Sec 32 12 00 - ASPHALT CONCRETE PAVING.pdf PDF
17-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
39-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
45-Doc 00 73 00 2 - Appendix A - Cover.pdf PDF
13-Doc 00 73 00 4 - Appendix B - Cover.pdf PDF
43-Sec 01 55 26 - TRAFFIC REGULATION - 2024.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
8-Doc 00 52 00 - AGREEMENT.pdf PDF
54-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
58-Sec 01 22 00-MEASUREMENT AND PAYMENT 2026-07-13.pdf PDF
37-Sec 33 44 14 - STORM INLETS CATCH BASINS ENWALLS AND END SECTIONS.pdf PDF
35-Doc 00 62 76 - Application for Payment.pdf PDF
7-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS - 2024.pdf PDF
1-Doc 00 63 63 - Change Order.pdf PDF
27-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
51-Sec 32 17 23.13 - Painted Traffic Lines and Markings.pdf PDF
29-Sec 31 37 16 - ENIGERY DISSIPATOR.pdf PDF
28-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
57-X2 - 12-14 18-19 of 24 Marked up As-Built Plans 2026-07-15.pdf PDF
2-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
Show all 50

2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PORTLAND CEMENT CONCRETE PAVING

32 13 13-1

SECTION 32 13 13

PORTLAND CEMENT CONCRETE PAVING

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Concrete Sidewalks and Driveway Aprons

2. Concrete Curbs

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere

1. Section 02 41 16: Demolition

2. Section 03 11 00: Concrete Formwork

3. Section 03 20 00: Concrete Reinforcement

4. Section 32 12 23: Restoration of Paved Surfaces

5. Section 32 93 00: Landscaping

1.03 QUALITY ASSURANCE

A. Reference Standards

1. American Concrete Institute – ACI 301, 318

2. American Society for Testing and Materials (ASTM):

A615 Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement

C31 Practices for Making and Curing Concrete Test Specimens in the Field

C39 Test Method for Compressive Strength of Cylindrical Concrete Specimens

C42 Methods of Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

C172 Method of Sampling Freshly Mixed Concrete

C260 Specification for Air-Entraining Admixtures for Concrete

D946 Specification for Penetration - Graded Asphalt Cement for Use in Pavement Construction

3. Pennsylvania Department of Transportation Publication 408 Specifications

B. Testing Laboratory

1. Compressive strength tests shall be performed by an independent testing laboratory engaged by and paid for by Owner.

1.04 SUBMITTALS

A. Certificates:

1. Submit certification from the concrete producer attesting that the concrete conforms to Section 704, Publication 408 Specifications for the class of concrete being used.

2. Submit certified results of compressive strength tests performed by an independent testing laboratory.

32 13 13-2

PART 2 - PRODUCTS

2.01 MATERIALS

A. Forms:

1. Forms shall be straight, free from warp and of sufficient strength to resist the pressure of concrete without springing. Forms and template which are worn, bent, warped or broken shall not be used.

2. For curb ramps, sidewalks and driveway aprons, use forms of wood or steel profiled to suit conditions.

3. For curbs, use forms of steel except for sharp curves and short tangent sections where wood forms may be used when approved by the Resident Project Representative. Metal forms shall be of approved sections and shall have a flat surface on top and wood forms shall be of a depth equal to the depth of the curb, designed to permit secure fastening of the face and back forms at the tops. These fastenings shall be constructed in a manner that will not obstruct satisfactory finishing and edging of the top of the curb but will permit removal of the inside or face forms. The outside or back forms shall be straight from top to bottom. The inside of the face forms shall have a batter from the top of the curb to the finished surface line of the pavement, as indicated on the drawings, and shall be straight from this line to the bottom.

B. Expansion Joint Filler: 1/2" thickness conforming to Section 705.1, Publication 408 Specifications.

C. Joint Sealing Material: Liquid Asphalt Cement, ASTM D-946.

D. Concrete Curing Material/Compound: Section 711.1 and 711.2(a), Publication 408 Specifications.

E. Coarse Aggregate: Type C or better, No. 2B per Section 703.2, Publication 408 Specifications.

F. Reinforcement Bars: ASTM A615; Grade 60, deformed billet steel bars, finish conforming to Section 709.1, Publication 408 Specifications.

G. Welded Steel Wire Fabric: Plain type; unfinished, coiled rolls, conforming to gage and mesh size as noted on the Drawings and Sections 709.3 and 709.4, Publication 408 Specifications.

2.02 CONCRETE MIX

A. Plant-mixed, conforming to Section 704, Publication 408 Specifications.

1. Requirements for State approved batch plants, design computations and plant inspection shall not apply. The acceptability of concrete will be based on conformance with the Cement Concrete Criteria specified below and the results of the specified tests.

B. Cement Concrete Criteria:

1. All Concrete shall be PennDOT Class S:

a. Compressive strength @ 7 days: 3000 psi

b. Compressive strength @ 28 days: 4000 psi

c. Slump: maximum of five inches (5”) except for slip forming of curbs which shall be a maximum of 1-1/2 inches

d. The air content of air-entrained concrete shall be 6% + 1% by volume. Air- Entraining Agents shall conform to ASTM C260

e. Cement Content: 564 pounds (lb) minimum

2. Cement Factor and Maximum Water-Cement Ratio conforming to Table A, Section 704.1, Publication 408 Specifications.

3. Concrete design mix shall be submitted to Engineer for approval prior to work commencement. No concrete shall be placed until Engineer has approved the design mix.

32 13 13-3

PART 3 - EXECUTION

3.01 EXAMINATION AND PREPARATION

A. Subgrade Preparation

1. Verify gradients and elevations of subgrade.

2. Soft, spongy, organic or other unsuitable material shall be removed from the subgrade and replaced with dry, firm material.

3. Compact subbase and/or subgrade to a firm unyielding surface at the required depth below the finished line and grade of the required construction work as specified.

B. Aggregate Placement

1. Spread aggregate on prepared subgrade to form a bed of the required depth as specified.

2. Compact aggregate thoroughly using mechanical tamping device.

3.02 FORMING

A. Curb Ramps

1. Curb ramp replacements shall be formed and poured separately from curb replacements; monolithic pours are not permitted.

2. Place and secure forms to correct location, dimension and grade in a manner to prevent settlement or displacement. Provide sufficient horizontal and vertical support.

3. Radial forms shall be used for all sidewalks with a radius of less than 250 feet.

4. Clean and treat all forms and templates with an approved material as required to prevent the concrete from adhering thereto. Oil, bituminous paper or other material which will adhere to or discolor the concrete shall not be used.

5. Form sidewalks to provide for separate slabs twenty (20) feet in length.

6. Place premolded expansion joint filler in joints between slabs, adjacent to existing structures, between the sidewalk and driveway apron, and between the driveway apron and concrete curb. Place premolded expansion joint material vertical in position, in straight lines for the full depth of the concrete.

B. Curbs

1. Curb replacements shall be formed and poured separately from curb ramps;

monolithic pours are not permitted.

2. Full depth forms shall be used for the face and back of all curb replacements; face forming is not permitted.

3. Place and secure forms to correct location, dimension and grade in a manner to prevent settlement or displacement. Provide sufficient horizontal and vertical support.

4. Clean and treat all forms and templates with an approved material as required to prevent the concrete from adhering thereto. Oil, bituminous paper or other material which will adhere to or discolor the concrete shall not be used.

5. Provide construction joints in uniform lengths not exceeding 15.5 feet except where shorter sections are necessary for closures or curves. No section shall be less than four (4) feet.

Saw cut joints may be provided in lieu of hand-formed construction joints.

6. Place premolded expansion joint material, cut to conform to the cross sectional area at all structures and at the end of the day's work.

32 13 13-4

3.03 REINFORCEMENT

A. Curbs

1. Place steel reinforcement at driveway depressions as noted on the Drawings.

2. Interrupt reinforcement at expansion joints.

3.04 PLACING AND FINISHING CONCRETE

A. General

1. Moisten subbase/subgrade to minimize absorption of water from fresh concrete.

2. For use, proportioning, mixing and placing, and quality of concrete, follow applicable sections of ACI 318.

3. Place concrete in accordance with ACI 301.

4. Do not disturb formwork components or reinforcement during placement of concrete.

5. Place concrete continuously between predetermined joints.

6. Cure and protect exposed concrete construction as specified in Section 501.3(k), Publication 408 Specifications and Part 2 of this Section. Contractor shall apply Aquron 2000 Cure and Seal, as manufactured by Aquron Corporation or Protocap S

Concrete Sealer and Protector, as manufactured by CPG Northeast, Inc.

B. Field Tests of Concrete During Construction by Contractor.

1. Conduct three successful series of concrete testing for the first concrete pour and conduct one successful series of concrete testing for each neighborhood thereafter. Retain an independent testing laboratory to test cylinders at the expense of the Contractor. The field representative has the authority to increase or decrease the frequency of required concrete testing based on test results and field observation.

a. Sample concrete in accordance with ASTM C172. One test for slump, air entrainment and air and concrete temperature will be taken for each set of test cylinders taken.

b. Prepare and cure one set of four (4) test cylinders in accordance with ASTM C31.

c. Test cylinders in accordance with ASTM C39 at the following schedule: 1 @ 7 days, 2 @ 28 days and 1 held in reserve.

d. One additional set of test cylinders will be taken during cold weather concreting, cured on job site under same conditions as concrete it represents.

2. If test cylinders fail to meet strength requirements, the Resident Project Representative may require core tests in accordance with ASTM C42 at the expense of Contractor.

C. Curb Ramps

1. Provide a slope on landing areas towards the street as indicated and finish surface to a semi-smooth condition.

D. Curbs

1. Place concrete in the forms in horizontal layers not exceeding five (5) inches and spade sufficiently to eliminate all voids. A vibrator may be used when approved by the Resident Project Representative.

2. Provide drainage openings through curb at the elevation and of the size required as indicated or as directed by the Resident Project Representative.

3. Provide depressed curb as directed by the Resident Project Representative.

4. Finish top surface of the curb true to line and grade in a smooth, neat and even manner.

5. Round the edges of the face and back of the top surface of the curb to a radius of not more

32 13 13-5 than 3/4 inch and 1/4 inch respectively while the concrete is still plastic.

6. Saw cut joints where construction joints have not been hand-formed. Sawing of joints shall be done as soon as practicable after the concrete has set sufficiently to preclude raveling during the sawing operation and before any shrinkage cracking occurs. The saw cut depth may be decreased at the edge adjacent to the pavement to obtain a maximum depth that will avoid damage to the pavement. Provide tooled edges on construction joints.

3.05 RESTORATION

A. Backfilling

1. Perform backfilling as required adjacent to the construction following removal of forms in such a way as to not disturb the concrete construction.

B. Final Grading and Seeding or Sodding

1. Perform final grading and provide seeding or sodding as required.

C. Concrete Joints

1. Sealing material shall be applied only to the vertical face of concrete curb below the final road elevation.

END OF SECTION