48-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf

PDF 129 KB Posted

Attached to
2500999 - Canterbury Storm Sewer Replacement State and local contract opportunity
Solicitation number
Not on record
Issued by
Montgomery County, Mount Aetna CDP, Pennsylvania

About this file

This document is a specification sheet for restoration of paved surfaces related to Montgomery Township's Canterbury Storm Sewer Replacement project (Contract 2025-00999) in Pennsylvania. The project encompasses the removal and replacement of approximately 1,800 feet of corrugated metal pipe (CMP) ranging from 12 inches to 57 inches by 38 inches, installation of new circular HDPE pipe and elliptical RCP storm sewer, replacement of three precast concrete storm sewer structures, and restoration of concrete curb, sidewalk, driveway apron, and asphalt roadway along Canterbury Lane and Devonshire Drive. Montgomery Township will receive sealed bids electronically through the PennBid Program until 10:00 A.M. on September 1, 2026, with public opening and reading of bids at the Township offices located at 1001 Stump Road, Montgomeryville, PA 18936. No pre-bid meeting will be held for this project. Bids may be withdrawn within two business days after the opening of bids.

Each bid must include bid security equal to not less than ten percent of the bid amount payable to Montgomery Township, along with an Agreement of Surety certifying that required Performance and Payment Bonds will be provided. PennBid assesses a nominal fee of 0.33 percent of the bid amount (minimum $150 and maximum $6,000) to awarded bidders only. All bidding documents and solicitation details are available at no cost on PennBid. The project is subject to the prevailing wage requirements under Pennsylvania Act 422 (Pennsylvania Prevailing Wage Act) and Act 127 (Pennsylvania Public Works Employment Verification). Bids must be submitted in accordance with the Instructions to Bidders and comply with all applicable prevailing wage rates issued by the Pennsylvania Department of Labor and Industry.

View the file

Other files for this state and local contract opportunity

Other files attached to 2500999 - Canterbury Storm Sewer Replacement, newest first.
File Type Posted
3-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
49-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
9-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
20-Sec 01 56 39 - LANDSCAPE PROTECTION.pdf PDF
30-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
56-X1 - Site Map 2026-07-15.pdf PDF
4-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
24-Sec 31 20 00 - Earthwork.pdf PDF
5-Doc 00 41 00 - BID FORM - EBID.pdf PDF
6-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
15-Sec 01 33 00 - Submittals.pdf PDF
25-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
42-Sec 32 12 00 - ASPHALT CONCRETE PAVING.pdf PDF
17-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
39-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
45-Doc 00 73 00 2 - Appendix A - Cover.pdf PDF
13-Doc 00 73 00 4 - Appendix B - Cover.pdf PDF
40-Doc 00 72 00 - GENERAL CONDITIONS - 2024.pdf PDF
41-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
55-X3 - Canterbury Details 2026-07-16.pdf PDF
33-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
52-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
11-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
18-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
44-Sec 32 01 16.71 - MILLING OF ASPHALT PAVEMENT SURFACE.pdf PDF
21-Doc 00 61 19 - Maintenance Bond.pdf PDF
32-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
16-Sec 31 22 10 - Topsoiling and Finish Grading.pdf PDF
14-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
36-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
47-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
50-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
26-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
27-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
51-Sec 32 17 23.13 - Painted Traffic Lines and Markings.pdf PDF
29-Sec 31 37 16 - ENIGERY DISSIPATOR.pdf PDF
28-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
57-X2 - 12-14 18-19 of 24 Marked up As-Built Plans 2026-07-15.pdf PDF
2-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
53-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
46-Sec 32 17 23.43 - ADA DETECTABLE WARNING TILES.pdf PDF
34-Sec 33 44 15 - BOXES AND ENDWALLS.pdf PDF
38-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
19-Sec 01 11 13-SUMMARY OF WORK.pdf PDF
22-Sec 02 41 16 - DEMOLITION.pdf PDF
12-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - Canterbury Storm Sewer Replacement.pdf PDF
43-Sec 01 55 26 - TRAFFIC REGULATION - 2024.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
Show all 50

2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESTORATION OF PAVED SURFACES

32 12 23-1

SECTION 32 12 23

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Temporary Paving

2. Permanent Paving

3. Asphalt Overlay

4. Shoulder Restoration

5. Driveways

6. Concrete Curb and Gutter Repairs

7. Stormwater Inlets and Piping

8. Street Signage

1.02 RELATED SECTIONS

A. Related Work specified elsewhere:

1. Section 01 55 26: Traffic Regulation

2. Section 32 12 00: Asphalt Concrete Paving

1.03 QUALITY ASSURANCE

A. Referenced Standards:

1. Pennsylvania Department of Transportation:

a. Publication 408 Specifications

b. Publication 27 - Specification for Bituminous Mixtures (Bulletin 27)

c. Publication 37 - Specification for Bituminous Materials (Bulletin 25)

d. Publication 213 – Temporary Traffic Control Guidelines

1.04 SUBMITTALS

A. Certificates:

1. Submit certification from asphalt and aggregate suppliers attesting that materials conform to the State Specifications in accordance with Section 01 33 00.

2. Submit a PennDOT approved Job Mix Formula for each asphalt concrete mix required.

3. Submit a PennDOT approved Mix Design for each concrete class and use required.

1.05 JOB CONDITIONS

A. Control of Traffic:

1. Take measures to control traffic during repaving operations. Do not allow traffic on repaved areas until authorized by the Resident Project Representative.

2. Employ traffic control measures in accordance with the requirements of Section 01 55 26 including pertinent permits by PennDOT and local municipal agencies having jurisdiction.

B. Restore existing paving outside the limits of the Work, that is damaged by Contractor's operations, to its original condition at the expense of Contractor.

32 12 23-2

PART 2 - PRODUCTS

2.01 ASPHALT PAVING MATERIALS AND AGGREGATES

A. WMA Wearing Course: Per Section 413 of PennDOT Publication 408 - 1.5" depth 9.5mm, PG 64S-22, 3.0 – 10 million ESALs, SLR-H, containing ≤ 15% recycled material and virgin asphalt cement. (Wearing Course with more than 15% light colored aggregate will not be accepted.)

B. WMA Scratch/Leveling Course: Per Section 413.2 of PennDOT Publication 408 - 9.5mm, PG 64S- 22, 3.0 – 10 million ESALs, SLR-H, containing ≤ 15% recycled material and virgin asphalt cement

C. Non-Tracking Tack Coat: Per Section 460.2 of PennDOT Publication 408

D. WMA Binder Course: Per Section 413 of PennDOT Publication 408 – 6.5” depth 19mm PG 64S-22,

3.0 – 10 million ESALs, containing ≤ 15% recycled material and virgin asphalt cement

E. WMA Base Course: Per Section 313 of PennDOT Publication 408 – 5.0” depth 25mm PG 64S-22,

3.0 – 10 million ESALs, containing ≤ 15% recycled material and virgin asphalt cement

PART 3 - EXECUTION

3.01 TEMPORARY PAVING

A. Surface preparation, tack coat application, base course construction, scratch/leveling course construction, wearing course construction, and asphalt concrete curb construction shall be per PennDOT Publication 408 Sections 313.3, 413.3, 460.3, and 636.3.

B. Provide temporary paving immediately upon completion of trench backfilling. Unpaved trenches shall not remain unpaved longer than ten (10) working days after backfilling.

C. Complete trench backfill with coarse aggregate in accordance with the Drawings and Publication 408 requirements.

D. Trim existing paving with minimum one (1) foot cutbacks to remove damaged areas. Cut straight joint lines and right angle offsets.

E. Place temporary paving material consisting of asphalt concrete base course to the required depth shown on the Drawings for the entire width of the trench. Place with a maximum lift thickness of three

(3) inches and compact each lift individually using a trench roller (minimum 5 ton).

F. Continuously maintain temporary paving to the satisfaction of the Resident Project Representative and the State and local municipal road departments having jurisdiction. Temporary paving on State roads must remain in place for a minimum of ninety (90) days.

3.02 PERMANENT PAVING

A. Surface preparation, tack coat application, base course construction, scratch/leveling course construction, wearing course construction, and asphalt concrete curb construction shall be per PennDOT Publication 408 Sections 313.3, 413.3, 460.3, and 636.3.

B. Place asphalt concrete base course on surface of compacted subbase course to compacted thickness (10 ton roller where possible; minimum 5 ton roller in trenches) as shown on Drawings. In-place, compacted density shall be per PennDOT Publication 408, Section 313.3.

C. Apply tack coat, per PennDOT Publication 408, Section 460.3 and Section 32 12 00, on completed binder course before placing wearing course. Place binder and wearing courses to compacted thicknesses (10 ton roller except minimum 5 ton roller for binder course in trenches) as shown on the Drawings. In-place, compacted density shall be per PennDOT Publication 408, Section 413.3.

D. Place wearing course overlay to compacted thickness (10 ton roller) as and where shown on the

E. Compact pavement by rolling to achieve even and smooth finish, without roller marks. Hand compact in areas inaccessible to rolling equipment.

32 12 23-3

F. Where proposed asphalt paving adjoins existing asphalt paving, seal the joint with Asphalt PG 64S- 22 Sealant in accordance with Publication 408 Specifications (latest edition).

G. Replace pavement markings in their former location which were covered or destroyed.

H. Maintain permanent paving to the satisfaction of the Resident Project Representative and the local municipal and State road departments having jurisdiction throughout the Contract maintenance period.

3.03 ASPHALT OVERLAY

A. Surface preparation, tack coat application, base course construction, scratch/leveling course construction, wearing course construction, and asphalt concrete curb construction shall be per PennDOT Publication 408 Sections 313.3, 413.3, 460.3, and 636.3.

B. Where indicated on the Drawings, or directed by the Resident Project Representative, place an asphalt overlay.

C. Construct in accordance with Publication 408 Specifications.

D. Apply tack coat, per PennDOT Publication 408, Section 460.3 and Section 32 12 00, on completed binder course before placing wearing course. Place binder and wearing courses to compacted thicknesses (10 ton roller except minimum 5 ton roller for binder course in trenches) as shown on the

E. Place wearing course overlay to compacted thickness (10 ton roller) as and where shown on the

F. Compact pavement by rolling to achieve even and smooth finish, without roller marks. Hand compact in areas inaccessible to rolling equipment.

G. Where proposed asphalt paving adjoins existing asphalt paving, seal the joint with Asphalt PG 64S- 22 Sealant in accordance with Publication 408 Specifications (latest edition).

H. Replace pavement markings in their former location which were covered or destroyed.

I. Maintain permanent paving to the satisfaction of the Resident Project Representative and the local municipal and State road departments having jurisdiction throughout the Contract maintenance period.

3.04 SHOULDER RESTORATION

A. Restore shoulders in accordance with the Drawings.

3.05 DRIVEWAYS

A. Trim concrete and asphalt driveway surfaces to remove damaged areas. Saw cut straight joint lines parallel to the centerline of the trench. Cut offsets at right angles to the trench centerline.

B. Restore existing portland cement concrete driveways with a 6 inch layer of concrete reinforced with 6 x 6 10/10 wire mesh.

C. Restore existing blacktop driveways in kind or with minimum 1-1/2 inch layer wearing course over 6" layer of 2A aggregate.

D. Restore earth driveways with a 6 inch layer of 2A stone backfill.

E. Restore stone or gravel driveways in kind.

F. Restore brick driveways with like bricks placed on a 4 inch thick wet sand bed. Place bricks in like pattern and spacing.

G. Restore cobblestone driveways with cobblestone placed on a 4 inch thick wet sand bed. Place cobblestones in like pattern and spacing.

32 12 23-4

3.06 CONCRETE CURB AND GUTTER REPAIRS

A. Replace curbs and gutters damaged by construction per OWNER standards and specifications.

B. Reconstruct curbs and gutters to the first expansion joint on either side of the damaged portion. Install expansion joint material.

3.07 STORMWATER INLETS AND PIPING

A. Repair or replace storm water inlets and piping damaged by construction to match existing inlets.

B. The Resident Project Representative will determine whether the frame and grate assembly of each affected storm water inlet is suitable for reuse once it has been removed by Contractor.

C. Construct or repair storm water inlets and piping in accordance with relevant section of Publication 408 Specifications.

3.08 STREET SIGNAGE

A. Reinstall any signage removed to allow for construction activities at the original location.

END OF SECTION