This specification document outlines the technical requirements for a rock energy dissipator component being incorporated into the Canterbury Storm Sewer Replacement project managed by Montgomery Township in Pennsylvania. The work involves the construction of a rock energy dissipator consisting of R-4 grade rock material placed over Class 1 geotextile fabric, sized and configured according to project drawings. The energy dissipator is one element within a larger storm sewer replacement initiative on Canterbury Lane and Devonshire Drive that includes removal of approximately 1,800 feet of corroded metal pipe ranging from 12 to 57 inches, installation of new HDPE and RCP storm sewer lines, replacement of three precast concrete structures, and restoration of concrete and asphalt surfaces. Sealed bids for the overall project are due by 10:00 A.M. on September 1, 2026, with bids to be submitted electronically through the PennBid Program and publicly opened at Montgomery Township offices located at 1001 Stump Road, Montgomeryville, PA 18936.
The specification references Pennsylvania Department of Transportation Publication 408 Specifications and Publication 72 Standards for Roadway Construction as governing standards. Rock material must be of acceptable quality, sound, and free from structural defects or foreign substances, conforming to Type A coarse aggregate requirements. Installation procedures require removal of unsuitable subsurface material and replacement with acceptable fill, careful placement of geotextile fabric prior to rock placement, and uniform rock distribution without tearing the fabric or allowing segregation. The project is subject to Pennsylvania's prevailing wage requirements under Act 422 and public works employment verification under Act 127. Bid security equal to ten percent of the bid amount is required, with performance and payment bonds mandated. The PennBid program assesses a nominal fee of 0.33 percent of the bid amount (minimum $150, maximum $6,000) only to awarded bidders. No pre-bid meeting will be held for this project.
View the file
Other files for this state and local contract opportunity
Show all 50
2500999 - Canterbury Storm Sewer Replacement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENERGY DISSIPATOR
31 37 16-1
SECTION 31 37 16
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Rock Energy Dissipator
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere:
1. Section 31 11 00: Clearing and Grubbing
2. Section 31 20 00: Earthwork
3. Section 31 23 33: Excavation, Backfill & Compaction
4. Section 32 93 00: Landscaping
5. Section 33 44 14: Storm Inlets, Catch Basin, Endwalls, End Sections
1.03 QUALITY ASSURANCE
A. Reference Standards:
1. Pennsylvania Department of Transportation
Publication 408 Specifications Publication 72 Standards for Roadway Construction
1.04 SUBMITTALS
A. Manufacturer's Literature:
1. Submit manufacturer's descriptive literature for the following items in accordance with Section 01 33 00:
• Geotextile Fabric
1.05 PRODUCT DELIVERY, STORAGE & HANDLING
A. During loading, transporting and unloading, exercise care to prevent damage to materials.
B. Other Requirements
1. Section 01 60 00 also addresses transportation of handling along with storage and protection of materials and equipment.
31 37 16-2
PART 2 - PRODUCTS
2.01 BASIC MATERIALS
A. Rock:
1. Acceptable quality; sound; free from structural objects and foreign substances.
2. Rock must come from material providing a Type A coarse aggregate per Section 703.2, Publication 408 Specifications.
3. Rock size and gradation shall conform to R-4 as set forth in Section 850, Publication
408 Specifications.
2.02 FABRICATED PRODUCTS
A. Geotextile Fabric:
1. Conform with Section 735, Publication 408 Specifications for Class 1 geotextile.
PART 3 - EXECUTION
3.01 PREPARATION
A. Perform clearing, grubbing, and excavation in accordance with Sections 31 11 00, 31 23 00 and 31 23 33 as required at location(s) shown on Drawings.
B. Remove unsuitable material below the energy dissipator and replace with acceptable material.
3.02 INSTALLATION
A. Energy dissipator shall be constructed of such size and configuration as shown on the Drawings.
B. Geotextile fabric shall be placed under the proposed rock energy dissipator in accordance with Section 212.3(c), Publication 408 Specifications and the Drawings.
C. Rock shall be carefully placed on the geotextile fabric to produce an even distribution with minimum of voids and without tearing the geotextile fabric.
D. Rock shall be placed in full thickness in one operation in a manner to prevent segregation and rearranged, as necessary to insure uniform distribution.
3.03 RESTORATION
A. Area around energy dissipator shall be restored in accordance with the Drawings and Section 32 93 00.
END OF SECTION