Mt. Vernon GTIB- Carver St. Extension

Open State & local contract opportunity Posted

Solicitation number
PE-66425-NONST-2027-000000004
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 36
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Mount Vernon, Georgia is soliciting sealed bids under IFB 2513 for grading, drainage, base, and paving of the Carver Street Extension, with bids due December 10, 2026 at 11:00 a.m. at City Hall. A non-mandatory pre-bid conference is set for December 1, 2026 at 11:00 a.m. Bidders must be prequalified with the Georgia Department of Transportation (GDOT) to bid.

The project covers approximately 0.54 miles of new roadway that provides a continuous paved connection from Carver Street to West Railroad Avenue (US-280/SR-30). Required work includes roadway reconstruction, storm drain piping, guardrail, signing and marking, and removal of unsuitable material, with recycled asphalt concrete pavement placed in multiple lifts. Compaction must reach 100 percent Standard Proctor maximum dry density, and the contractor must provide subgrade and base course test results to the engineer. Erosion and sediment controls are mandatory, including silt fence (double-row sensitive type adjacent to delineated wetlands), a 75 NTU turbidity limit, and stabilization of disturbed areas within 14 days. The bid schedule contains 378 items across 35 categories. Roberts Civil Engineering serves as engineer, and Jessica Najar Roberts is the technical contact at jnajar@robertscivilengineering.com.

Work must finish within 120 consecutive calendar days from Notice to Proceed, with liquidated damages of $500 per calendar day for late completion. Bids require a bid bond of at least 5 percent of the bid amount, and the successful bidder must furnish performance and payment bonds equal to 100 percent of the contract amount from a surety authorized in Georgia with an A.M. Best rating of B+ or better. Required insurance includes general liability of $1 million combined single limit per occurrence and $2 million aggregate, plus automobile and workers' compensation coverage. The contractor must also comply with the Georgia Security and Immigration Compliance Act, maintain a drug-free workplace, and pay prevailing wages set by the U.S. Department of Labor. The City will award to the lowest responsive, responsible bidder at its discretion and pays monthly within 30 days of approved invoices.

Opportunity text

Project consists of Grade, Drain, Base, and Pave on Carver Street Extension. Please see Site Construction Plans and Erosion, Sedimentation, and Pollution Control Plans for full scope.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors