This document is an Erosion, Sedimentation, and Pollution Control (ES&PC) Plan prepared by Roberts Civil Engineering for the City of Mount Vernon, Montgomery County, Georgia, detailing street improvements to Carver Street. The project involves clearing, grubbing, grading, and paving an existing unpaved dirt section of Carver Street to provide a continuous paved connection to West Railroad Avenue (US-280/SR-30), complete with roadside drainage ditches, storm drain pipes, and associated outlet protection. The total project site encompasses approximately 4.018 acres of disturbed area across two drainage basins. The plan was originally issued on July 4, 2026, with revisions dated November 12, 2026, and includes three construction phases: initial, intermediate, and final. The construction timeline spans approximately six months from November 1, 2026, to April 30, 2027. The design professional is Jessica Vick, P.E. (Level II Certification #0000062699), with contact information provided for Roberts Civil Engineering in multiple Georgia locations and for the City of Mount Vernon at 435 S Railroad Avenue, Mount Vernon, GA 30445, telephone 912-583-2323.

The project requires implementation of comprehensive best management practices (BMPs) to control erosion and sediment, including silt fencing (both standard and double-row sensitive type adjacent to wetlands), temporary and permanent seeding, dust control, construction exits, check dams, and riprap outlet protection. Two sampling locations have been established with a turbidity standard limit of 75 NTU (Nephelometric Turbidity Units) for warm water fisheries. Delineated wetlands totaling 0.430 acres are located approximately 17 feet from the limits of disturbance and are protected with double-row sensitive silt fence. The plan indicates no state buffer variance is required based on Georgia EPD's October 9, 2026 review letter (File No. SW-103-06-102). Required sediment storage totals 233.34 cubic yards for drainage area one (3.48 acres) and 35.91 cubic yards for drainage area two (0.54 acres). The design professional must inspect and certify initial sediment storage and perimeter control BMPs within seven days after installation. All records, including inspection reports, sampling results, and compliance documentation, must be retained for three years after project completion and notice of termination submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Map data © OpenStreetMap contributors, Microsoft, Esri Community Maps contributors, Map layer by Esri Powered by Esri

LIMITS OF CONSTRUCTION

LAT: 32.190531

LONG: -82.603984

LIMITS OF CONSTRUCTION

LAT: 32.189827

LONG: -82.597438

COVER0

N

WWW.ROBERTSCIVILENGINEERING.COM

CARVER STREET

IMPROVEMENTS

11/12/26

11/12/26

11/12/26

11/12/26

CARVER STREET

IMPROVEMENTS

Know what's below.

before you dig.Call

R

CONTENTS

SHEET

VICINITY MAP

REVISIONS

COVER

RCE PROJECT NUMBER: TBD

11/12/26

301 SEA ISLAND ROAD, SUITE 10

ST.SIMONS ISLAND, GA 31522

912-638-9681

2 E. BRYAN STREET, SUITE 1200B

SAVANNAH, GA, 31401

912-298-7006

8442 W BEAVER ST.

JACKSONVILLE, FL 32220

904-741-0099

4000 FABER PLACE DRIVE, SUITE 300

NORTH CHARLESTON, SC 29405

843-323-4224

ORIGINAL ISSUE DATE: 07/04/2026

OWNER

CITY OF MOUNT VERNON

CONTACT

TBD

EMAIL

TBD

ENGINEER

ROBERTS CIVIL ENGINEERING

CONTACT

BILL WEEKS

EMAIL

BWEEKS@ROBERTSCIVILENGINEERING.COM

MONTGOMERY COUNTY

PREPARED FOR:

CITY OF MOUNT VERNON

435 S RAILROAD AVENUE

MOUNT VERNON, GA 30445

912-583-2323

11/12/26

11/12/26

EROSION, SEDIMENTATION

AND POLLUTION CONTROL

PLANS 1" = 1000'

GRAPHIC SCALE

2000'0' 1000'

DRAINAGE AREA MAP01

INITIAL PHASE02

INTERMEDIATE PHASE03

FINAL PHASE04

NOTES05

DETAILS06-10

No. 046602

PROFESSIONAL

CERTIFIED DESIGN

PROFESSIONAL:

Jessica Vick, P.E.

LEVEL II CERTIFICATION #: 0000062699

11/12/26

LIMITS OF CONSTRUCTION

LAT: 32.190516

LONG:-82.603983

4.

166.00

8.0

0 17 0.

00 17 2.

00 17 4.

00 17 6.

00 17 8.

00 18 0.

00 18 2.

00 18 4.

6.0

8.0

0.0

+0

+0

+0

+0

14+00

15+00 16+00

17+00 18+00

19+00 20+00

21+00 22+00

23+00 24+00 25+00 26+00

27+00

28+00

29+00

30+00

31+00

32+00

33+00

+0

+0

+0

+0

+0

+9

2.

192.00

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

EXIST. PROPERTY LINE

EXIST. PROPERTY LINE

EXIST. PROPERTY LINE

CARVER STREET

ALIGNMENT

LIMITS OF CONSTRUCTION

LAT: 32.189776

LONG:-82.597374

FsB Pl

Pl

FsB

FsB

FsB

FsB

FsB

WxC

FsB

SM

SAMPLING LOCATION

CARVER STREET ALIGNMENT

ST.: 10+05.43

OFF.: 38.72R

ALLOWABLE LIMIT: 75 NTU

SAMPLING LOCATION

CARVER STREET ALIGNMENT

ST.: 38+86.90

OFF.: 53.74R

ALLOWABLE LIMIT: 75 NTU

SM

SDSDSDSDSDSDSDSD

SD

SD

SD

SD

SD

SD

SD

SC

AL

E:

A

S N

O

TE

D (F

O R

"X

" P

LO

T)

GRAPHIC SCALE

1" = 100'

200'0' 100' N

R

EV

IS

IO

N S

D

AT

E:

1/

/2

SHEET:

NOT RELEASED

FOR

CONSTRUCTION

CH

EC

KE

D

BY

: H

R

DR

AW

N B

Y:

S

A

PR

O

JE

CT

N U

M

BE

R:

T

BD

PR

EP

AR

ED

F O

R

C

IT

Y O

F M

O U

N T

VE

R

N O

N , M

O N

TG

O

M

ER

Y C

O U

N

TY

C

AR

VE

R

S

TR

EE

T

IM

PR

O

VE

M

EN

TS

M

O U

N T

VE

R

N O

N C

IT

Y, G A

D R

AI

N

AG

E

AR

EA

M

AP

Montgomery, Toombs, and Wheeler Counties, Georgia (GA647) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI

FsB Fuquay loamy sand, 0 to 5 percent slopes 3.829 95.30%

Pl Pelham loamy sand 0.185 4.60%

WxC Wagram and Duplin soils, 2 to 8 percent slopes 0.004 0.10%

Totals for Area of Interest 4.018 100.00%

OUTLET INFORMATION DISTURBED

AREA(AC)BASIN OUTFALL STATION OFFSET

DRAINAGE

AREA(AC)

CHANNEL

SLOPE(%)

1 1 10+05.43 RT 3.4800 1.50% 3.4800

2 2 38+72.26 RT 0.5400 5.00% 0.5400

DRAINAGE AREA 01

OUTFALL 01

NOTE:

THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT AND CERTIFY THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMPS WITHIN 7 DAYS AFTER INSTALLATION AND PRIOR TO COMMENCING WITH CONSTRUCTION ACTIVITIES AS

REQUIRED BY PART III.D.2. OF THE PERMIT.

NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT

FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS.

AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMPS WITH A

HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.

THE PLAN MUST INCLUDE A DESCRIPTION OF HOW WASTE MATERIALS, INCLUDING WASTE BUILDING MATERIALS, CONSTRUCTION AND DEMOLITION DEBRIS, CONCRETE WASHOUT, EXCAVATED SEDIMENT, ETC., WILL BE PROPERLY DISPOSED OF. ANY DISPOSAL OF SOLID WASTE TO WATERS OF THE STATE IS

PROHIBITED UNLESS AUTHORIZED BY A SECTION 404 PERMIT.

THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND

SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.

EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND

SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT

SOURCE.

ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

DRAINAGE AREA 01

DRAINAGE AREA 02

OUTFALL 02

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEED BOOK 6, PAGE 592

AutoCAD SHX Text

GARY P. & BARBARA P.

AutoCAD SHX Text

BRADDY

AutoCAD SHX Text

DEED BOOK 337, PAGE 419

AutoCAD SHX Text

ENNIS ACRES

AutoCAD SHX Text

INC.

AutoCAD SHX Text

DEED BOOK 244, PAGE 123

AutoCAD SHX Text

MONTGOMERY COUNTY

AutoCAD SHX Text

DEVELOPMENT AUTHORITY

AutoCAD SHX Text

DEED BOOK 216, PAGE 475

AutoCAD SHX Text

CARVER STREET

AutoCAD SHX Text

OLD SEABOARD COASTLINE RAILROAD

AutoCAD SHX Text

NOW GEORGIA DOT

AutoCAD SHX Text ( 200' R/W )

AutoCAD SHX Text R/W

AutoCAD SHX Text R/W

AutoCAD SHX Text

BLAND FARMS

AutoCAD SHX Text

PROPERTY INVESTMENTS, LLC

AutoCAD SHX Text

DEED BOOK 311, PAGE 327

AutoCAD SHX Text

LEZETORA R.

AutoCAD SHX Text

CRAWLEY

AutoCAD SHX Text

DEED BOOK 76, PAGE 415

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEED BOOK 6, PAGE 592

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEMMER

AutoCAD SHX Text

WETLAND A

AutoCAD SHX Text

0.430 ACRES

AutoCAD SHX Text L11

AutoCAD SHX Text L12

AutoCAD SHX Text L13

AutoCAD SHX Text L14

AutoCAD SHX Text L15

AutoCAD SHX Text L16

AutoCAD SHX Text L17

AutoCAD SHX Text L18

AutoCAD SHX Text L19

AutoCAD SHX Text L20

AutoCAD SHX Text L21

AutoCAD SHX Text L22

AutoCAD SHX Text L23

AutoCAD SHX Text L24

AutoCAD SHX Text L25

AutoCAD SHX Text L26

AutoCAD SHX Text L27

LIMITS OF CONSTRUCTION

LAT: 32.190516

LONG:-82.603983

+0

+0

+0

+0

14+00

15+00 16+00

17+00 18+00

19+00 20+00

21+00 22+00

23+00 24+00 25+00 26+00

27+00

28+00

29+00

30+00

31+00

32+00

33+00

+0

+0

+0

+0

+0

+9

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

EXIST. PROPERTY LINE

EXIST. PROPERTY LINE

EXIST. PROPERTY LINE

CARVER STREET

ALIGNMENT

LIMITS OF CONSTRUCTION

LAT: 32.189776

LONG:-82.597373

FsB Pl

Pl

FsB

FsB

FsB

FsB

FsB

WxC

FsB

SAMPLING LOCATION

CARVER STREET ALIGNMENT

ST.: 10+05.43

OFF.: 38.72R

ALLOWABLE LIMIT: 75 NTU

SAMPLING LOCATION

CARVER STREET ALIGNMENT

ST.: 38+86.90

OFF.: 53.74R

ALLOWABLE LIMIT: 75 NTU

Du Ds2

Sd1-Ns

LOD

Sd1-S

DOUBLE ROW

Sd1-S

DOUBLE ROW

LOD

LOD

LOD

Sd1-Ns

Sd1-Ns

Sd1-Ns

LOD

Sd1-Ns

Du Ds2

LOD

Sd1-Ns

SM

SM

CO

SC

AL

E:

A

S N

O

TE

D (F

O R

"X

" P

LO

T)

GRAPHIC SCALE

1" = 100'

200'0' 100' N

R

EV

IS

IO

N S

D

AT

E:

1/

/2

SHEET:

NOT RELEASED

FOR

CONSTRUCTION

CH

EC

KE

D

BY

: H

R

DR

AW

N B

Y:

S

A

PR

O

JE

CT

N U

M

BE

R:

T

BD

PR

EP

AR

ED

F O

R

C

IT

Y O

F M

O U

N T

VE

R

N O

N , M

O N

TG

O

M

ER

Y C

O U

N

TY

C

AR

VE

R

S

TR

EE

T

IM

PR

O

VE

M

EN

TS

M

O U

N T

VE

R

N O

N C

IT

Y, G A

IN

IT

IA

L

PH

AS

E

Montgomery, Toombs, and Wheeler Counties, Georgia (GA647) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI

FsB Fuquay loamy sand, 0 to 5 percent slopes 3.829 95.30%

Pl Pelham loamy sand 0.185 4.60%

WxC Wagram and Duplin soils, 2 to 8 percent slopes 0.004 0.10%

Totals for Area of Interest 4.018 100.00%

DRAINAGE AREA 01

OUTFALL 01

NOTE:

THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT AND CERTIFY THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMPS WITHIN 7 DAYS AFTER INSTALLATION AND PRIOR TO COMMENCING WITH CONSTRUCTION ACTIVITIES AS

REQUIRED BY PART III.D.2. OF THE PERMIT.

NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT

FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS.

AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMPS WITH A

HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.

THE PLAN MUST INCLUDE A DESCRIPTION OF HOW WASTE MATERIALS, INCLUDING WASTE BUILDING MATERIALS, CONSTRUCTION AND DEMOLITION DEBRIS, CONCRETE WASHOUT, EXCAVATED SEDIMENT, ETC., WILL BE PROPERLY DISPOSED OF. ANY DISPOSAL OF SOLID WASTE TO WATERS OF THE STATE IS

PROHIBITED UNLESS AUTHORIZED BY A SECTION 404 PERMIT.

THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND

SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.

EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND

SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT

SOURCE.

ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

DRAINAGE AREA 01

TEMPORARY SEDIMENT STORAGE REQUIREMENTS - (SILT FENCE AT CARVER ST. - LINEAR SITE)

Description Value Notes / Formula

REQUIRED STORAGE

Drainage Area 3.48 AC

Required Volume 233.34 CY 6300.23 CF 67 CY/AC

PROVIDED STORAGE

Max Dist. from Fence 6 FT Dmax

Effective Height (1/2 H) 1.17 FT 1 2 H

Length of Fence 2500 FT L

Provided Vol. 324.07 CY 8750.00 CF V = (1 2 Dmax) x (1

2 H) x L

Net Buffer Storage 90.73 CY 2449.77 CF ADEQUATE

DRAINAGE CALCULATIONS:

RATIONAL METHOD:

Q = CIA

PRE-DEVELOPED DISCHARGE

Total Area: 4.018 AC Forest/Grass Area: 4.018 AC C = 0.30

Intensity: 0.991 in/hr for 5 min Tc -50 YEARS- (NOAA Precipitation Frequency Intensity Table) C = {4.018(0.30)}/4.018 = 0.3

Q = 0.3 * 0.991 * 4.018 = 1.194 CFS

LEGEND - EROSION CONTROL

DUST CONTROL ON DISTURBED AREA (Du)

DISTURBED AREA STABILIZATION

(WITH TEMPORARY SEEDING Ds2)

CONSTRUCTION EXITCO

Sd1-Ns SEDIMENT BARRIER: SILT FENCE -TYPE "A"

NON-SENSITIVE 1 ROW

Du

Ds2

LIMIT OF DISTURBANCELOD

SAMPLING LOCATIONSM

Sd1-S SEDIMENT BARRIER: SILT FENCE -TYPE "C"

SENSITIVE DOUBLE ROW

DRAINAGE CALCULATIONS:

RATIONAL METHOD:

Q = CIA

POST-DEVELOPED DISCHARGE

Total Area: 4.018 AC Forest/Grass Area: 2.413 AC C = 0.30 Pavement Area: 1.605 AC C = 0.95

Intensity: 0.991 in/hr for 5 min Tc -50 YEARS- (NOAA Precipitation Frequency Intensity Table) C = {2.413(0.30) +1.605(0.95)} / 4.018 = 0.559

Q = 0.559 * 0.991 * 4.018 = 2.225 CFS

DRAINAGE AREA 02

TEMPORARY SEDIMENT STORAGE REQUIREMENTS - (SILT FENCE AT CARVER ST. - LINEAR SITE)

Description Value Notes / Formula

REQUIRED STORAGE

Drainage Area 0.54 AC

Required Volume 35.91 CY 969.53 CF 67 CY/AC

PROVIDED STORAGE

Max Dist. from Fence 6 FT Dmax

Effective Height (1/2 H) 1.17 FT 1 2 H

Length of Fence 350 FT L

Provided Vol. 45.37 CY 1225.00 CF V = (1 2 Dmax) x (1

2 H) x L

Net Buffer Storage 9.46 CY 255.47 CF ADEQUATE

DRAINAGE AREA 01

OUTFALL 02

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEED BOOK 6, PAGE 592

AutoCAD SHX Text

GARY P. & BARBARA P.

AutoCAD SHX Text

BRADDY

AutoCAD SHX Text

DEED BOOK 337, PAGE 419

AutoCAD SHX Text

ENNIS ACRES

AutoCAD SHX Text

INC.

AutoCAD SHX Text

DEED BOOK 244, PAGE 123

AutoCAD SHX Text

MONTGOMERY COUNTY

AutoCAD SHX Text

DEVELOPMENT AUTHORITY

AutoCAD SHX Text

DEED BOOK 216, PAGE 475

AutoCAD SHX Text

CARVER STREET

AutoCAD SHX Text

OLD SEABOARD COASTLINE RAILROAD

AutoCAD SHX Text

NOW GEORGIA DOT

AutoCAD SHX Text ( 200' R/W )

AutoCAD SHX Text R/W

AutoCAD SHX Text R/W

AutoCAD SHX Text

BLAND FARMS

AutoCAD SHX Text

PROPERTY INVESTMENTS, LLC

AutoCAD SHX Text

DEED BOOK 311, PAGE 327

AutoCAD SHX Text

LEZETORA R.

AutoCAD SHX Text

CRAWLEY

AutoCAD SHX Text

DEED BOOK 76, PAGE 415

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEED BOOK 6, PAGE 592

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEMMER

AutoCAD SHX Text

WETLAND A

AutoCAD SHX Text

0.430 ACRES

AutoCAD SHX Text L11

AutoCAD SHX Text L12

AutoCAD SHX Text L13

AutoCAD SHX Text L14

AutoCAD SHX Text L15

AutoCAD SHX Text L16

AutoCAD SHX Text L17

AutoCAD SHX Text L18

AutoCAD SHX Text L19

AutoCAD SHX Text L20

AutoCAD SHX Text L21

AutoCAD SHX Text L22

AutoCAD SHX Text L23

AutoCAD SHX Text L24

AutoCAD SHX Text L25

AutoCAD SHX Text L26

LIMITS OF CONSTRUCTION

LAT: 32.190516

LONG:-82.603983

4.

166.00

8.0

0 17 0.

00 17 2.

00 17 4.

00 17 6.

00 17 8.

00 18 0.

00 18 2.

00 18 4.

6.0

8.0

0.0

+0

+0

+0

+0

14+00

15+00 16+00

17+00 18+00

19+00 20+00

21+00 22+00

23+00 24+00 25+00 26+00

27+00

28+00

29+00

30+00

31+00

32+00

33+00

+0

+0

+0

+0

+0

+9

2.

192.00

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

EXIST. PROPERTY LINE

EXIST. PROPERTY LINE

EXIST. PROPERTY LINE

CARVER STREET

ALIGNMENT

LIMITS OF CONSTRUCTION

LAT: 32.189776

LONG:-82.597373

FsB Pl

Pl

FsB

FsB

FsB

FsB

FsB

WxC

FsB

Du Ds2

Sd1-Ns

LOD

Sd1-S

DOUBLE ROW

Sd1-S

DOUBLE ROW

LOD

LOD

LOD

Sd1-Ns

Sd1-Ns

Sd1-Ns

LOD

Sd1-Ns

Du Ds2

LOD

Sd1-Ns

SM

SM

CO

Ds3

Ds3

SAMPLING LOCATION

CARVER STREET ALIGNMENT

ST.: 10+05.43

OFF.: 38.72R

ALLOWABLE LIMIT: 75 NTU

SAMPLING LOCATION

CARVER STREET ALIGNMENT

ST.: 38+86.90

OFF.: 53.74R

ALLOWABLE LIMIT: 75 NTU

SDSDSDSDSDSDSDSD

SD

SD

SD

SD

SD

SD

SD

Cd-Hb St

St

Cd-Hb

St

St

Cd-Hb

Cd-Hb

SC

AL

E:

A

S N

O

TE

D (F

O R

"X

" P

LO

T)

GRAPHIC SCALE

1" = 80'

160'0' 80' N

R

EV

IS

IO

N S

D

AT

E:

1/

/2

SHEET:

NOT RELEASED

FOR

CONSTRUCTION

CH

EC

KE

D

BY

: H

R

DR

AW

N B

Y:

S

A

PR

O

JE

CT

N U

M

BE

R:

T

BD

PR

EP

AR

ED

F O

R

C

IT

Y O

F M

O U

N T

VE

R

N O

N , M

O N

TG

O

M

ER

Y C

O U

N

TY

C

AR

VE

R

S

TR

EE

T

IM

PR

O

VE

M

EN

TS

M

O U

N T

VE

R

N O

N C

IT

Y, G A

IN

TE

R M

ED

IA

TE

P

H

AS

E

Montgomery, Toombs, and Wheeler Counties, Georgia (GA647) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI

FsB Fuquay loamy sand, 0 to 5 percent slopes 3.829 95.30%

Pl Pelham loamy sand 0.185 4.60%

WxC Wagram and Duplin soils, 2 to 8 percent slopes 0.004 0.10%

Totals for Area of Interest 4.018 100.00%

NOTE:

THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT AND CERTIFY THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMPS WITHIN 7 DAYS AFTER INSTALLATION AND PRIOR TO COMMENCING WITH CONSTRUCTION ACTIVITIES AS

REQUIRED BY PART III.D.2. OF THE PERMIT.

NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT

FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS.

AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMPS WITH A

HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.

THE PLAN MUST INCLUDE A DESCRIPTION OF HOW WASTE MATERIALS, INCLUDING WASTE BUILDING MATERIALS, CONSTRUCTION AND DEMOLITION DEBRIS, CONCRETE WASHOUT, EXCAVATED SEDIMENT, ETC., WILL BE PROPERLY DISPOSED OF. ANY DISPOSAL OF SOLID WASTE TO WATERS OF THE STATE IS

PROHIBITED UNLESS AUTHORIZED BY A SECTION 404 PERMIT.

THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND

SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.

EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND

SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT

SOURCE.

ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

LEGEND - EROSION CONTROL

DISTURBED AREA STABILIZATION

(WITH PERMANENT SEEDING)

DUST CONTROL ON DISTURBED AREA (Du)

DISTURBED AREA STABILIZATION

(WITH TEMPORARY SEEDING Ds2)

CONSTRUCTION EXITCO

Du

Ds2

Ds3

LIMIT OF DISTURBANCELOD

SAMPLING LOCATIONSMSd1-S SEDIMENT BARRIER: SILT FENCE -TYPE "C"

SENSITIVE DOUBLE ROW

Sd1-Ns SEDIMENT BARRIER: SILT FENCE -TYPE "A"

NON-SENSITIVE 1 ROW CHECK DAM STRAW BALES

STORM DRAINAGE OUTLET PROTECTIONSt

Cd-Hb

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEED BOOK 6, PAGE 592

AutoCAD SHX Text

GARY P. & BARBARA P.

AutoCAD SHX Text

BRADDY

AutoCAD SHX Text

DEED BOOK 337, PAGE 419

AutoCAD SHX Text

ENNIS ACRES

AutoCAD SHX Text

INC.

AutoCAD SHX Text

DEED BOOK 244, PAGE 123

AutoCAD SHX Text

MONTGOMERY COUNTY

AutoCAD SHX Text

DEVELOPMENT AUTHORITY

AutoCAD SHX Text

DEED BOOK 216, PAGE 475

AutoCAD SHX Text

CARVER STREET

AutoCAD SHX Text

OLD SEABOARD COASTLINE RAILROAD

AutoCAD SHX Text

NOW GEORGIA DOT

AutoCAD SHX Text ( 200' R/W )

AutoCAD SHX Text R/W

AutoCAD SHX Text R/W

AutoCAD SHX Text

BLAND FARMS

AutoCAD SHX Text

PROPERTY INVESTMENTS, LLC

AutoCAD SHX Text

DEED BOOK 311, PAGE 327

AutoCAD SHX Text

LEZETORA R.

AutoCAD SHX Text

CRAWLEY

AutoCAD SHX Text

DEED BOOK 76, PAGE 415

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEED BOOK 6, PAGE 592

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEMMER

AutoCAD SHX Text

WETLAND A

AutoCAD SHX Text

0.430 ACRES

AutoCAD SHX Text L11

AutoCAD SHX Text L12

AutoCAD SHX Text L13

AutoCAD SHX Text L14

AutoCAD SHX Text L15

AutoCAD SHX Text L16

AutoCAD SHX Text L17

AutoCAD SHX Text L18

AutoCAD SHX Text L19

AutoCAD SHX Text L20

AutoCAD SHX Text L21

AutoCAD SHX Text L22

AutoCAD SHX Text L23

AutoCAD SHX Text L24

AutoCAD SHX Text L25

AutoCAD SHX Text L26

LIMITS OF CONSTRUCTION

LAT: 32.190516

LONG:-82.603983

4.

166.00

8.0

0 17 0.

00 17 2.

00 17 4.

00 17 6.

00 17 8.

00 18 0.

00 18 2.

00 18 4.

6.0

8.0

0.0

2.

192.00

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

EXIST. PROPERTY LINE

EXIST. PROPERTY LINE

EXIST. PROPERTY LINE

CARVER STREET

ALIGNMENT

LIMITS OF CONSTRUCTION

LAT: 32.189776

LONG:-82.597373

FsB Pl

Pl

FsB

FsB

FsB

FsB

FsB

WxC

FsB

SAMPLING LOCATION

CARVER STREET ALIGNMENT

ST.: 10+05.43

OFF.: 38.72R

ALLOWABLE LIMIT: 75 NTU

Ds3

Ds3

SM

SM

SAMPLING LOCATION

CARVER STREET ALIGNMENT

ST.: 38+86.90

OFF.: 53.74R

ALLOWABLE LIMIT: 75 NTU

SDSDSDSDSDSDSDSD

SD

SD

SD

SD

SD

SD

SD

St

St

St

St

+0

+0

+0

+0

14+00

15+00 16+00

17+00 18+00

19+00 20+00

21+00 22+00

23+00 24+00 25+00 26+00

27+00

28+00

29+00

30+00

31+00

32+00

33+00

+0

+0

+0

+0

+0

+9

SC

AL

E:

A

S N

O

TE

D (F

O R

"X

" P

LO

T)

GRAPHIC SCALE

1" = 80'

160'0' 80' N

R

EV

IS

IO

N S

D

AT

E:

1/

/2

SHEET:

NOT RELEASED

FOR

CONSTRUCTION

CH

EC

KE

D

BY

: H

R

DR

AW

N B

Y:

S

A

PR

O

JE

CT

N U

M

BE

R:

T

BD

PR

EP

AR

ED

F O

R

C

IT

Y O

F M

O U

N T

VE

R

N O

N , M

O N

TG

O

M

ER

Y C

O U

N

TY

C

AR

VE

R

S

TR

EE

T

IM

PR

O

VE

M

EN

TS

M

O U

N T

VE

R

N O

N C

IT

Y, G A

FI

N

AL

P

H

AS

E

Montgomery, Toombs, and Wheeler Counties, Georgia (GA647) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI

FsB Fuquay loamy sand, 0 to 5 percent slopes 3.829 95.30%

Pl Pelham loamy sand 0.185 4.60%

WxC Wagram and Duplin soils, 2 to 8 percent slopes 0.004 0.10%

Totals for Area of Interest 4.018 100.00%

NOTE:

THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT AND CERTIFY THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMPS WITHIN 7 DAYS AFTER INSTALLATION AND PRIOR TO COMMENCING WITH CONSTRUCTION ACTIVITIES AS

REQUIRED BY PART III.D.2. OF THE PERMIT.

NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT

FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS.

AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMPS WITH A

HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.

THE PLAN MUST INCLUDE A DESCRIPTION OF HOW WASTE MATERIALS, INCLUDING WASTE BUILDING MATERIALS, CONSTRUCTION AND DEMOLITION DEBRIS, CONCRETE WASHOUT, EXCAVATED SEDIMENT, ETC., WILL BE PROPERLY DISPOSED OF. ANY DISPOSAL OF SOLID WASTE TO WATERS OF THE STATE IS

PROHIBITED UNLESS AUTHORIZED BY A SECTION 404 PERMIT.

THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND

SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.

EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND

SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT

SOURCE.

ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

LEGEND - EROSION CONTROL

DISTURBED AREA STABILIZATION

(WITH PERMANENT SEEDING)

CONSTRUCTION EXITCO

Ds3

SAMPLING LOCATIONSM

STORM DRAINAGE OUTLET PROTECTIONSt

EXISTING RIGHT OF WAY

PROPOSED CENTERLINE

LEGEND

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

EXISTING DRAINAGE PIPESD

PROPOSED ASPHALT PAVEMENT

PROPOSED UNPAVED SHOULDER

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR59

PROPOSED DRAINAGE PIPESD

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEED BOOK 6, PAGE 592

AutoCAD SHX Text

GARY P. & BARBARA P.

AutoCAD SHX Text

BRADDY

AutoCAD SHX Text

DEED BOOK 337, PAGE 419

AutoCAD SHX Text

ENNIS ACRES

AutoCAD SHX Text

INC.

AutoCAD SHX Text

DEED BOOK 244, PAGE 123

AutoCAD SHX Text

MONTGOMERY COUNTY

AutoCAD SHX Text

DEVELOPMENT AUTHORITY

AutoCAD SHX Text

DEED BOOK 216, PAGE 475

AutoCAD SHX Text

CARVER STREET

AutoCAD SHX Text

OLD SEABOARD COASTLINE RAILROAD

AutoCAD SHX Text

NOW GEORGIA DOT

AutoCAD SHX Text ( 200' R/W )

AutoCAD SHX Text R/W

AutoCAD SHX Text R/W

AutoCAD SHX Text

BLAND FARMS

AutoCAD SHX Text

PROPERTY INVESTMENTS, LLC

AutoCAD SHX Text

DEED BOOK 311, PAGE 327

AutoCAD SHX Text

LEZETORA R.

AutoCAD SHX Text

CRAWLEY

AutoCAD SHX Text

DEED BOOK 76, PAGE 415

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEED BOOK 6, PAGE 592

AutoCAD SHX Text

CITY OF

AutoCAD SHX Text

MOUNT VERNON

AutoCAD SHX Text

DEMMER

AutoCAD SHX Text

WETLAND A

AutoCAD SHX Text

0.430 ACRES

AutoCAD SHX Text L11

AutoCAD SHX Text L12

AutoCAD SHX Text L13

AutoCAD SHX Text L14

AutoCAD SHX Text L15

AutoCAD SHX Text L16

AutoCAD SHX Text L17

AutoCAD SHX Text L18

AutoCAD SHX Text L19

AutoCAD SHX Text L20

AutoCAD SHX Text L21

AutoCAD SHX Text L22

AutoCAD SHX Text L23

AutoCAD SHX Text L24

AutoCAD SHX Text L25

AutoCAD SHX Text L26

ITEM 1

THE APPLICABLE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN CHECKLIST ESTABLISHED BY THE COMMISSION AS OF JANUARY 1 OF THE YEAR IN WHICH THE

LAND-DISTURBING ACTIVITY WAS PERMITTED. EFFECTIVE JANUARY 1, 2026.

THIS CHECKLIST IS FOR AN INFRASTRUCTURE DEVELOPMENT.

ITEM 2

LEVEL II CERTIFICATION NUMBER ISSUED BY THE COMMISSION, SIGNATURE AND SEAL OF THE CERTIFIED DESIGN PROFESSIONAL.

THE LEVEL II CERTIFIED DESIGN PROFESSIONAL FOR THIS PROJECT IS JESSICA VICK, P.E.: CERTIFICATION NUMBER 0000062699. THE SIGNATURE, SEAL, AND CERTIFICATION

NUMBER IS FOUND ON EACH SHEET OF THE ES&PC PLAN. CURRENT EXPIRES JUNE 27, 2027.

ITEM 3

THE NAME AND PHONE NUMBER OF THE 24-HOUR LOCAL CONTACT RESPONSIBLE FOR EROSION, SEDIMENTATION AND POLLUTION CONTROLS.

CONTACT PERSON: CONTACT PERSON: TBD (CITY OF MOUNT VERNON)

TELEPHONE NO.: 912.583.2323

ITEM 4

PROVIDE THE NAME, ADDRESS, EMAIL ADDRESS AND PHONE NUMBER OF THE PRIMARY PERMITTEE.

NAME: CITY OF MOUNT VERNON CONTACT PERSON: TBD

STREET ADDRESS.: 435 S RAILROAD AVENUE TELEPHONE NO.: 912.583.2323

CITY & STATE: MOUNT VERNON, GA 30445 EMAIL ADDRESS: TBD

ITEM 5

NOTE TOTAL AND DISTURBED ACREAGE OF THE PROJECT OR PHASE UNDER CONSTRUCTION.

TOTAL PROJECT ACREAGE: 4.018 ACRES

DISTURBED ACREAGE: 4.018 ACRES

ITEM 6

PROVIDE THE GPS LOCATION OF THE BEGINNING AND END OF THE INFRASTRUCTURE PROJECT. GIVE THE LATITUDES AND LONGITUDES IN DECIMAL DEGREES.

BEGINNING OF CONSTRUCTION - LATITUDE: 32.190516°, LONGITUDE: -82.603983°

END OF CONSTRUCTION - LATITUDE: 32.189776°, LONGITUDE: -82.597373°

ITEM 7

INITIAL DATE OF THE PLAN AND THE DATES OF ANY REVISIONS MADE TO THE PLAN INCLUDING THE ENTITY WHO REQUESTED THE REVISIONS.

SHOWN ON COVER AND PLAN SHEETS.

ITEM 8

DESCRIPTION OF THE NATURE OF CONSTRUCTION ACTIVITY AND EXISTING SITE CONITIONS.

THE EXISTING SITE CONSISTS PRIMARILY OF AN UNPAVED DIRT SECTION OF AN INTERNAL LOCAL STREET (CARVER STREET) WITHIN THE CITY OF MOUNT VERNON. PROPOSED CONSTRUCTION ACTIVITIES INCLUDE CLEARING AND GRUBBING WITHIN THE RIGHT-OF-WAY TO REMOVE TIMBER, ROOTS, AND STUMPS. THE SCOPE OF WORK INVOLVES GRADING AND PAVING THE EXISTING DIRT ROAD TO PROVIDE A CONTINUOUS PAVED CONNECTION ALONG CARVER STREET TO WEST RAILROAD AVENUE (US-280 / SR-30), COMPLETE WITH ROADSIDE DRAINAGE DITCHES, STORM DRAIN PIPES, AND ASSOCIATED OUTLET PROTECTION. UPON COMPLETION, THE FINAL STABILIZED SITE WILL CONSIST ENTIRELY OF THE NEW

ROADWAY PAVEMENT, DRAINAGE STRUCTURES, AND VEGETATED GREEN AREAS.

ITEM 9 .

PROVIDE VICINITY MAP SHOWING SITE’S RELATION TO SURROUNDING AREAS. INCLUDE DESIGNATION OF SPECIFIC PHASE, IF NECESSARY.

VICINITY MAP SHOWN ON COVER

ITEM 10

IDENTIFY THE PROJECT RECEIVING WATERS AND DESCRIBE ALL SENSITIVE ADJACENT AREAS INCLUDING STREAMS, LAKES, RESIDENTIAL AREAS, WETLANDS, MARSHLANDS, ETC. WHICH

MAY BE AFFECTED.

THE STORMWATER FROM THE PROPOSED ROADWAY TRAVELS IN ROADSIDE DITCHES THAT DISCHARGE INTO AN EXISTING DRAINAGE SYSTEM THAT FLOWS TOWARD AN UNNAMED TRIBUTARY TO LIMESTONE CREEK (OCONEE RIVER BASIN), THE ULTIMATE RECEIVING WATER FOR THIS PROJECT. DELINEATED WETLANDS ARE LOCATED ADJACENT TO THE PROJECT APPROXIMATELY 17 FEET FROM THE LIMITS OF DISTURBANCE (LOD) AND ARE PROTECTED WITH DOUBLE ROW SENSITIVE SILT FENCE (TYPE C). A USGS LOCATION MAP OF THE PROJECT AND RECEIVING WATERS CAN BE FOUND ON SHEET 12 OF THESE NPDES PLANS. THE EXISTING AND PROPOSED DRAINAGE BASIN CONFIGURATIONS ARE DEPICTED

ON PLAN SHEETS.

ITEM 11

DESIGN PROFESSIONAL'S CERTIFICATION STATEMENT AND SIGNATURE THAT THE SITE WAS VISITED PRIOR TO DEVELOPMENT OF THE ES&PC PLAN AS STATED ON PART IV PAGE 21 OF

THE PERMIT.

"I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE VISIT TO THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR MY AUTHORIZED AGENT, UNDER

MY SUPERVISION."

CERTIFIED BY JESSICA VICK CERTIFICATION # 0000062699

ITEM 12

DESIGN PROFESSIONAL'S CERTIFICATION STATEMENT AND SIGNATURE THAT THE PERMITTEE’S ES&PC PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BMPs AND SAMPLING TO MEET PERMIT REQUIREMENTS AS STATED ON PART IV PAGE 20 OF THE PERMIT.*

"I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY CONTROL ACT AND THE DOCUMENT "MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA" (MANUAL) PUBLISHED BY THE GEORGIA SOIL AND WATER CONSERVATION COMMISSION AS OF JANUARY 1 OF THE YEAR IN WHICH LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE SAMPLING OF THE RECEIVING WATER(S) OR THE SAMPLING OF THE STORM WATER OUTFALLS AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENT PRACTICE AND SAMPLING METHODS IS EXPECTED TO MEET THE REQUIREMENTS CONTAINED IN THE GENERAL NPDES PERMIT NO. GAR 100002."

CERTIFIED BY JESSICA VICK CERTIFICATION # 0000062699

ITEM 13

DESIGN PROFESSIONAL CERTIFICATION STATEMENT AND SIGNATURE THAT THE PERMITTEE'S ES&PC PLAN PROVIDES FOR REPRESENTATIVE SAMPLING AS STATED ON PART IV.D.6.C.(3)

PAGE 37 OF THE PERMIT AS APPLICABLE.*

"I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN PROVIDES FOR THE MONITORING OF: (A) ALL PERENNIAL AND INTERMITTENT STREAMS AND OTHER WATER BODIES SHOWN ON TEH USGS TOPOGRAPHIC MAP AND ALL OTHER FIELD VERIFIED PERENNIAL AND INTERMITTENT STREAMS AND OTHER WATER BODIES, OR (B) WHERE ANY SUCH SPECIFIC IDENTIFIED PERENNIAL OR INTERMITTENT STREAM AND OTHER WATER BODY IS NOT PROPOSED TO BE SAMPLED, I HAVE DETERMINED IN MY PROFESSIONAL JUDGEMENT, UTILIZING THE FACTORS REQUIRED IN THE GENERAL NPDES PERMIT NO. GAR 100002, THAT THE INCREASE IN THE TURBIDITY OF EACH SPECIFIC IDENTIFIED SAMPLED RECEIVING WATER WILL BE REPRESENTATIVE OF THE INCREASE IN THE TURBIDITY OF A SPECIFIC IDENTIFIED UN-SAMPLED RECEIVING WATER."

CERTIFIED BY JESSICA VICK CERTIFICATION # 0000062699

ITEM 14

CLEARLY NOTE THE STATEMENT THAT "THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT AND CERTIFY THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMPs WITHIN 7 DAYS AFTER INSTALLATION."

THE PRIMARY PERMITTEE MUST RETAIN THE DESIGN PROFESSIONAL WHO PREPARED THE PLAN, OR ALTERNATIVE DESIGN PROFESSIONAL APPROVED BY GAEPD IN WRITING TO INSPECT AND CERTIFY (A) THE INSTALLATION OF SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMPs FOR THE "INITIAL SEGMENT" OF THE LINEAR INFRASTRUCTURE PROJECT AND (B) ALL SEDIMENT BASINS WITHIN THE ENTIRE LINEAR INFRASTRUCTURE PROJECT WITHIN (7) DAYS AFTER THE INSTALLATION. FOR THE PURPOSES OF THE SPECIFIC REQUIREMENTS IN PART IV.A.5., THE DISTURBED ACREAGE OF THE "INITIAL SEGMENT" OF A LINEAR INFRASTRUCTURE PROJECT MUST BE EQUAL TO OR GREATER THAN 10% OF THE TOTAL ESTIMATED DISTURBED ACREAGE FOR THE LINEAR INFRASTRUCTURE PROJECT BUT NOT LESS THAN ONE (1) ACRE. THE DESIGN PROFESSIONAL SHALL DETERMINE IF THESE BMPs HAVE BEEN INSTALLED AND ARE BEING MAINTAINED AS DESIGNED. THE DESIGN PROFESSIONAL SHALL REPORT THE RESULTS OF THE INSPECTION TO THE PRIMARY PERMITTEE WITHIN (7) DAYS AND THE PERMITTEE MUST CORRECT ALL DEFICIENCIES WITHIN (2) BUSINESS DAYS OF RECEIPT OF THE INSPECTION REPORT FROM THE DESIGN PROFESSIONAL UNLESS WEATHER RELATED SITE CONDITIONS ARE SUCH THAT ADDITIONAL TIME IS REQUIRED. PERMIT IV.A.5. PG 26.

ITEM 15

CLEARLY NOTE THE STATEMENT...

NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES

AND PERMITS.

ITEM 16

PROVIDE A DESCRIPTION OF ANY BUFFER ENCROACHMENTS AND INDICATE WHETHER A BUFFER VARIANCE IS REQUIRED.

THE PROPOSED WORK CONSISTS OF ROADWAY AND ASSOCIATED DRAINAGE IMPROVEMENTS ALONG CARVER STREET. DELINEATED WETLANDS ARE LOCATED APPROXIMATELY 17 FEET FROM THE LIMITS OF DISTURBANCE (LOD) AND ARE SHOWN ON THE PLAN SHEETS WITH DOUBLE ROW SENSITIVE SILT FENCE PROTECTION. BASED ON THE PROJECT INFORMATION REVIEWED, A STATE BUFFER VARIANCE IS NOT REQUIRED FOR THE PROPOSED PROJECT AS NO IMPACTS TO STATE WATER BUFFERS ARE PROPOSED. ANY CHANGE TO THE PROPOSED WORK THAT AFFECTS STATE WATERS OR APPLICABLE BUFFERS SHALL BE EVALUATED BEFORE IMPLEMENTATION TO DETERMINE WHETHER ADDITIONAL

AUTHORIZATION IS REQUIRED.

ITEM 17

CLEARLY NOTE THE STATEMENT THAT...

AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMPs WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.

ITEM 18

CLEARLY NOTE THE STATEMENT THAT...

THE CONTRACTOR SHALL COLLECT CONSTRUCTION AND DEMOLITION DEBRIS AND OTHER SOLID WASTE IN SUITABLE COVERED CONTAINERS AND REMOVE THE MATERIAL REGULARLY TO A FACILITY AUTHORIZED TO ACCEPT SUCH WASTE. WASTE STORAGE AREAS SHALL BE LOCATED AWAY FROM DRAINAGE DITCHES, STORM DRAIN INLETS, WETLANDS, AND OTHER STATE WATERS.

SEDIMENT REMOVED FROM EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PLACED IN A DESIGNATED, PROTECTED AREA WITHIN THE LIMITS OF DISTURBANCE, CONTAINED TO PREVENT RUNOFF, AND STABILIZED PROMPTLY. MATERIAL NOT SUITABLE FOR AUTHORIZED ON-SITE REUSE SHALL BE TRANSPORTED TO AN AUTHORIZED RECEIVING FACILITY.

ON-SITE CONCRETE WASHOUT AND WASHDOWN OF TOOLS, MIXER CHUTES, HOPPERS, AND VEHICLES ARE PROHIBITED. SUCH WASHING SHALL BE PERFORMED AT AN OFF-SITE FACILITY EQUIPPED AND AUTHORIZED TO CONTAIN AND MANAGE CONCRETE WASH WATER AND RESIDUE.

WASTE MATERIALS SHALL NOT BE BURIED ON SITE OR DISCHARGED INTO DRAINAGE SYSTEMS. WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT

AS AUTHORIZED BY A SECTION 404 PERMIT.

ITEM 19

CLEARLY NOTE STATEMENT THAT...

THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND

DISTURBING ACTIVITIES.

ITEM 20

CLEARLY NOTE STATEMENT THAT...

EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.

ITEM 21

CLEARLY NOTE THE STATEMENT...

ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING.

ITEM 22

ANY CONSTRUCTION ACTIVITY WHICH DISCHARGES STORM WATER INTO AN IMPAIRED STREAM SEGMENT, OR WITHIN 1 LINEAR MILE UPSTREAM OF AND WITHIN THE SAME WATERSHED AS, ANY PORTION OF AN BIOTA IMPAIRED STREAM SEGMENT MUST COMPLY WITH PART III. C. OF THE PERMIT. INCLUDE THE COMPLETED APPENDIX 1 LISTING ALL THE BMPs THAT WILL BE

USED FOR THOSE AREAS OF THE SITE WHICH DISCHARGE TO THE IMPAIRED STREAM SEGMENT.

THE PROJECT DISCHARGES INTO AN EXISTING DRAINAGE SYSTEM THAT FLOWS TOWARD AN UNNAMED TRIBUTARY OF LIMESTONE CREEK, WHICH ULTIMATELY FLOWS INTO THE OCONEE RIVER. THERE ARE NO BIOTA IMPAIRED OR SEDIMENT IMPAIRED STREAM SEGMENTS WITHIN 1 LINEAR MILE DOWNSTREAM OF THE PROJECT OUTFALLS. THEREFORE, THE SPECIFIC BMP REQUIREMENTS OF PART III.C AND APPENDIX 1 DO NOT APPLY TO THIS PROJECT.

ITEM 23

IF A TMDL IMPLEMENTATION PLAN FOR SEDIMENT HAS BEEN FINALIZED FOR THE BIOTA IMPAIRED STREAM SEGMENT (IDENTIFIED IN ITEM 22 ABOVE) AT LEAST SIX MONTHS PRIOR TO SUBMITTAL OF NOI, THE ES&PC PLAN MUST ADDRESS ANY SITE-SPECIFIC CONDITIONS OR REQUIREMENTS INCLUDED IN THE TMDL IMPLEMENTATION PLAN.

PROJECT RUNOFF IS CONVEYED THROUGH THE EXISTING DRAINAGE SYSTEM TOWARD LIMESTONE CREEK IN THE OCONEE RIVER BASIN. ALL REQUIRED EROSION AND

SEDIMENTATION CONTROL BMPs, INCLUDING DOUBLE ROW SENSITIVE SILT FENCE ADJACENT TO WETLANDS AND PERIMETER CONTROLS, ARE INCORPORATED INTO THIS ES&PC

PLAN TO PREVENT SEDIMENT DISCHARGE TO RECEIVING WATERS.

ITEM 24

BMPs FOR CONCRETE WASHDOWN OF TOOLS, CONCRETE MIXER CHUTES, HOPPERS AND THE REAR OF THE VEHICLES. INCLUDE STATEMENT THAT WASHOUT OF THE DRUM AT THE

CONSTRUCTION SITE IS PROHIBITED.

WASHOUT OF THE DRUM AND WASHDOWN OF TOOLS, CONCRETE MIXER CHUTES, HOPPERS, AND THE REAR OF VEHICLES AT THE CONSTRUCTION SITE IS PROHIBITED.

g. THE RESULTS OF SUCH ANALYSES, INCLUDING THE BENCH SHEETS, INSTRUMENT READOUTS, COMPUTER DISKS OR TAPES, ETC., USED TO DETERMINE THESE

RESULTS;

h. RESULTS WHICH EXCEED 1000 NTU SHALL BE REPORTED AS "EXCEEDS 1000 NTU;" AND

i. CERTIFICATION STATEMENT THAT SAMPLING WAS CONDUCTED AS PER THE PLAN.

ITEM 32

PROVIDE COMPLETE DETAILS FOR RETENTION OF RECORDS AS PER PART IV.F. OF THE PERMIT.

F. RETENTION OF RECORDS

1.THE PRIMARY PERMITTEE SHALL RETAIN THE FOLLOWING RECORDS AT THE CONSTRUCTION SITE OR THE RECORDS SHALL BE READILY AVAILABLE AT A DESIGNATED ALTERNATE LOCATION FROM COMMENCEMENT OF CONSTRUCTION UNTIL SUCH TIME AS A NOT IS SUBMITTED IN ACCORDANCE WITH PART VI:

a. A COPY OF ALL NOTICES OF INTENT SUBMITTED TO EPD;

b. A COPY OF THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN REQUIRED BY THIS PERMIT;

c. THE DESIGN PROFESSIONAL'S REPORT OF THE RESULTS OF THE INSPECTION CONDUCTED IN ACCORDANCE WITH PART IV.A.5 OF THIS PERMIT;

d. A COPY OF ALL SAMPLING INFORMATION, RESULTS, AND REPORTS REQUIRED BY THIS PERMIT;

e. A COPY OF ALL INSPECTION REPORTS GENERATED IN ACCORDANCE WITH PART IV.D.4.A. OF THIS PERMIT;

f. A COPY OF ALL VIOLATION SUMMARIES AND VIOLATION SUMMARY REPORTS GENERATED IN ACCORDANCE WITH PART III.D.2. OF THIS PERMIT; AND

g. DAILY RAINFALL INFORMATION COLLECTED IN ACCORDANCE WITH PART IV.D.4.A.(2). OF THIS PERMIT.

2. COPIES OF ALL NOTICES OF INTENT, NOTICES OF TERMINATION, INSPECTION REPORTS, SAMPLING REPORTS (INCLUDING ALL CALIBRATION AND MAINTENANCE RECORDS AND ALL ORIGINAL STRIP CHART RECORDINGS FOR CONTINUOUS MONITORING INSTRUMENTATION) OR OTHER REPORTS REQUESTED BY EPD, EROSION, SEDIMENTATION AND POLLUTION CONTROL PLANS, RECORDS OF ALL DATA USED TO COMPLETE THE NOTICE OF INTENT BE COVERED BY THIS PERMIT AND ALL OTHER RECORDS REQUIRED BY THIS PERMIT SHALL BE RETAINED BY THE PERMITTEE WHO EITHER PRODUCED OR USED IT FOR A PERIOD OF AT LEAST THREE YEARS FROM THE DATE THAT THE NOT IS SUBMITTED IN ACCORDANCE WITH PART VI OF THIS PERMIT. THESE RECORDS MUST BE MAINTAINED AT THE PERMITTEE'S PRIMARY PLACE OF BUSINESS OR AT A DESIGNATED ALTERNATIVE LOCATION ONCE THE CONSTRUCTION ACTIVITY HAS CEASED AT THE PERMITTED SITE. THIS PERIOD MAY BE EXTENDED BY REQUEST OF THE EPD AT ANY TIME UPON WRITTEN NOTIFICATION TO

THE PERMITTEE.

ITEM 33

DESCRIPTION OF ANALYTICAL METHODS TO BE USED TO COLLECT AND ANALYZE THE SAMPLES FROM EACH LOCATION.

STORM WATER SAMPLES ARE TO BE ANALYZED IN ACCORDANCE WITH METHODOLOGY AND TEST PROCEDURES ESTABLISHED BY 40 CFR PART 136 AND THE GUIDANCE DOCUMENT TITLED "NPDES STORM WATER SAMPLING GUIDANCE DOCUMENT. EPA 833-B-92-001." STORMWATER IS TO BE SAMPLED FOR NEPHELOMETRIC TURBIDITY UNITS (NTU) AT THE OUTFALL LOCATION. A DISCHARGE OF STORM WATER RUNOFF FROM DISTURBED AREAS WHERE BEST MANAGEMENT PRACTICES HAVE NOT BEEN PROPERLY DESIGNED, INSTALLED, AND MAINTAINED SHALL CONSTITUTE A SEPARATE VIOLATION FOR EACH DAY ON WHICH SUCH CONDITION RESULTS IN THE TURBIDITY OF THE DISCHARGE EXCEEDING 75, THE VALUE THAT WAS SELECTED FROM APPENDIX B IN PERMIT NO 100002. THE NTU IS BASED UPON THE DISTURBED ACREAGE FOR THE PROJECT SITE, THE SURFACE WATER

DRAINAGE AREA, AND RECEIVING WATER WHICH SUPPORTS WARM WATER FISHERIES.

ITEM 34

APPENDIX B RATIONALE FOR NTU VALUES AT ALL OUTFALL SAMPLING POINTS WHERE APPLICABLE.

BASED ON APPENDIX B IN PERMIT NO 100002 THE DISTURBED ACREAGE FOR THE PROJECT SITE IS WITHIN THE RANGE OF 1.00-10 ACRES. THE SURFACE WATER DRAINAGE AREA IS WITHIN THE RANGE OF 0-4.99 SQUARE MILES. THE RECEIVING WATER SUPPORTS WARM WATER FISHERIES. THEREFORE, NTU VALUE IS 75.

ITEM 35

DELINEATE ALL SAMPLING LOCATIONS ON ALL PHASES OF THE PLAN, AND PERENNIAL AND INTERMITTENT STREAMS AND OTHER WATER BODIES INTO WHICH STORM WATER IS

DISCHARGED.

USGS TOPO MAP SHOWN ON SHEET 10.

ITEM 36

A DESCRIPTION OF APPROPRIATE CONTROLS AND MEASURES THAT WILL BE IMPLEMENTED AT THE CONSTRUCTION SITE INCLUDING: (1) INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMPS, (2) INTERMEDIATE GRADING AND DRAINAGE BMPS, AND (3) FINAL BMPS. FOR CONSTRUCTION SITES WHERE THERE WILL BE NO MASS GRADING AND THE INITIAL PERIMETER CONTROL BMPS, INTERMEDIATE GRADING AND DRAINAGE BMPS, AND FINAL BMPS ARE THE SAME, THE PLAN MAY COMBINE ALL OF THE BMPS INTO A SINGLE PHASE.

THE INITIAL BMPs SHALL BE THE CONSTRUCTION EXIT, SILT FENCE (INCLUDING DOUBLE ROW SENSITIVE SILT FENCE ADJACENT TO WETLANDS), DUST CONTROL, AND TEMPORARY SEEDING. THE INTERMEDIATE BMPs SHALL BE THE CONSTRUCTION EXIT, SILT FENCE (INCLUDING DOUBLE ROW SENSITIVE SILT FENCE), DUST CONTROL, TEMPORARY SEEDING, PERMANENT SEEDING, CHECK DAMS, AND STORM DRAINAGE OUTLET PROTECTION INCLUDING RIPRAP (St). THE FINAL BMPs SHALL BE STORM DRAINAGE OUTLET PROTECTION

(RIPRAP) AND PERMANENT SEEDING.

ITEM 37

GRAPHIC SCALE AND NORTH ARROW.

SHOWN ON ALL PLAN SHEET

ITEM 38

EXISTING AND PROPOSED CONTOUR LINES WITH CONTOUR LINES DRAWN AT AN INTERVAL IN ACCORDANCE WITH THE FOLLOWING:

EXISTING CONTOURS - USGS 1":2000' TOPOGRAPHICAL SHEETS

PROPOSED CONTOURS - 1":400' CENTERLINE PROFILE

SHOWN ON PLAN SHEET.

ITEM 39

USE OF ALTERNATIVE BMPs WHOSE PERFORMANCE HAS BEEN DOCUMENTED TO BE EQUIVALENT TO OR SUPERIOR TO CONVENTIONAL BMPs AS CERTIFIED BY A DESIGN PROFESSIONAL (UNLESS DISAPPROVED BY EPD OR THE GEORGIA SOIL AND WATER CONSERVATION COMMISSION). REFER TO THE ALTERNATIVE BMP GUIDANCE DOCUMENT FOUND AT

WWW.GASWCC.GEORGIA.GOV.

NO ALTERNATIVE BMPS ARE PROPOSED

ITEM 40

USE OF ALTERNATIVE BMP FOR APPLICATION TO THE EQUIVALENT BMP LIST. PLEASE REFER TO APPENDIX A-2 OF THE MANUAL FOR EROSION & SEDIMENT CONTROL IN GEORGIA 2016

EDITION.

NO ALTERNATIVE BMPS ARE PROPOSED.

ITEM 41

DELINEATION OF THE APPLICABLE 25-FOOT OR 50-FOOT UNDISTURBED BUFFERS ADJACENT TO STATE WATERS AND ANY ADDITIONAL BUFFERS REQUIRED BY THE LOCAL ISSUING

AUTHORITY. CLEARLY NOTE AND DELINEATE ALL AREAS OF IMPACT.

DELINEATED WETLANDS AND OTHER WATER FEATURES ARE SHOWN ON SHEETS 01 THROUGH 04. GEORGIA EPD'S OCTOBER 9, 2026 REVIEW LETTER, FILE NO. SW-103-06-102, DETERMINED THAT THE PROPOSED PROJECT DOES NOT REQUIRE A STATE BUFFER VARIANCE. REFER TO ITEM 16 FOR THE EPD DETERMINATION.

ITEM 42

DELINEATION OF ON-SITE WETLANDS AND ALL STATE WATERS LOCATED ON AND WITHIN 200 FEET OF THE PROJECT SITE.

STATE WATERS AND WETLANDS IDENTIFIED ON OR WITHIN 200 FEET OF THE PROJECT SITE ARE DELINEATED ON SHEET 01 AND ON THE INITIAL, INTERMEDIATE, AND FINAL PHASE PLANS, SHEETS 02, 03, AND 04, RESPECTIVELY. REFER TO SHEET 10 FOR THE RECEIVING-WATER LOCATION MAP.

ITEM 43

DELINEATION AND ACREAGE OF CONTRIBUTING DRAINAGE BASINS ON THE PROJECT SITE

SHOWN ON SHEET 1

ITEM 44

DELINEATE ON-SITE DRAINAGE AND OFF-SITE WATERSHEDS USING USGS 1" :2000' TOPOGRAPHICAL SHEETS.

SHOWN ON SHEET 10

ITEM 45

ESTIMATE OF THE RUNOFF COEFFICIENT OR PEAK DISCHARGE FLOW OF THE SITE PRIOR TO AND AFTER CONSTRUCTION ACTIVITIES ARE COMPLETED.

PRE-CONSTRUCTION C = 0.3, POST-CONSTRUCTION C = 0.559

ITEM 46

STORM-DRAIN PIPE AND WEIR VELOCITIES WITH APPROPRIATE OUTLET PROTECTION TO ACCOMMODATE DISCHARGES WITHOUT EROSION. IDENTIFY/DELINEATE ALL STORM WATER

DISCHARGE POINTS.

STORM DRAIN PIPE VELOCITIES, DISCHARGE POINTS, AND APPROPRIATE RIPRAP OUTLET PROTECTION (St) TO ACCOMMODATE DISCHARGES WITHOUT EROSION ARE SHOWN ON

THE PLAN AND DETAIL SHEETS (SEE SHEET 04A).

ITEM 47

SOIL SERIES FOR THE PROJECT SITE AND THEIR DELINEATION.

THE SITE CONSISTS OF: Fuquay loamy sand, 0 to 5 percent slopes - Pelham loamy sand - Wagram and Duplin soils, 2 to 8 percent slopes

DELINEATION SHOWN ON PLAN SHEETS.

ITEM 48

THE LIMITS OF DISTURBANCE FOR EACH PHASE OF CONSTRUCTION.

LIMITS OF DISTURBANCE FOR ALL PHASES SHOWN ON EACH SHEET.

ITEM 49

PROVIDE A MINIMUM OF 67 CUBIC YARDS OF SEDIMENT STORAGE PER ACRE DRAINED USING A TEMPORARY SEDIMENT BASIN, RETROFITTED DETENTION POND, AND/OR EXCAVATED INLET SEDIMENT TRAPS FOR EACH COMMON DRAINAGE LOCATION. SEDIMENT STORAGE VOLUME MUST BE IN PLACE PRIOR TO AND DURING ALL LAND DISTURBANCE ACTIVITIES UNTIL FINAL STABILIZATION OF THE SITE HAS BEEN ACHIEVED. A WRITTEN JUSTIFICATION EXPLAINING THE DECISION TO USE EQUIVALENT CONTROLS WHEN A SEDIMENT BASIN IS NOT ATTAINABLE MUST BE INCLUDED IN THE PLAN FOR EACH COMMON DRAINAGE LOCATION IN WHICH A SEDIMENT BASIN IS NOT PROVIDED. A WRITTEN JUSTIFICATION AS TO WHY 67 CUBIC YARDS OF STORAGE IS NOT ATTAINABLE MUST ALSO BE GIVEN. WORKSHEETS FROM THE MANUAL MUST BE INCLUDED FOR STRUCTURAL BMPS AND ALL CALCULATIONS USED BY THE DESIGN PROFESSIONAL TO OBTAIN THE REQUIRED SEDIMENT STORAGE WHEN USING EQUIVALENT CONTROLS. WHEN DISCHARGING FROM SEDIMENT BASINS AND IMPOUNDMENTS, PERMITTEES ARE REQUIRED TO UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE, UNLESS INFEASIBLE. IF OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE ARE NOT FEASIBLE, A WRITTEN JUSTIFICATION EXPLAINING THIS DECISION MUST BE INCLUDED IN THE PLAN.

SEDIMENT STORAGE SHALL BE PROVIDED AT EACH COMMON DRAINAGE LOCATION AT A MINIMUM RATE OF 67 CUBIC YARDS PER ACRE DRAINED. STORAGE CREDIT FOR TYPE S SILT FENCE SHALL BE BASED ON A MAXIMUM SEDIMENT STORAGE HEIGHT OF 14 INCHES AND THE ACTUAL AVAILABLE STORAGE GEOMETRY. OVERLAPPING STORAGE VOLUMES SHALL NOT BE COUNTED MORE THAN ONCE. REQUIRED AND PROVIDED STORAGE VOLUMES SHALL BE DOCUMENTED ON SHEET 02, AND THE REQUIRED STORAGE SHALL BE

INSTALLED BEFORE LAND DISTURBANCE AND MAINTAINED UNTIL FINAL STABILIZATION.

SHOWN ON PLAN SHEET 02

ITEM 50

LOCATION OF BEST MANAGEMENT PRACTICES THAT ARE CONSISTENT WITH AND NO LESS STRINGENT THAN THE MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA. USE

UNIFORM CODING SYMBOLS FROM THE MANUAL, CHAPTER 6, WITH LEGEND.

SHOWN ON PLAN SHEETS

ITEM 51

PROVIDE DETAILED DRAWINGS FOR ALL STRUCTURAL PRACTICES. SPECIFICATIONS MUST, AT A MINIMUM, MEET THE GUIDELINES SET FORTH IN THE MANUAL FOR EROSION AND

SEDIMENT CONTROL IN GEORGIA.

SEE DETAIL SHEET

ITEM 52

PROVIDE VEGETATIVE PLAN, NOTING ALL TEMPORARY AND PERMANENT VEGETATIVE PRACTICES. INCLUDE SPECIES, PLANTING DATES AND SEEDING, FERTILIZER, LIME AND MULCHING RATES. VEGETATIVE PLAN SHALL BE SITE SPECIFIC FOR APPROPRIATE TIME OF YEAR THAT SEEDING WILL TAKE PLACE AND FOR THE APPROPRIATE GEOGRAPHIC REGION OF GEORGIA.

SEE STRUCTURAL BMP DETAILS ON SHEETS 07 ,08 AND 09

ITEM 25

PROVIDE BMPs FOR THE REMEDIATION OF ALL PETROLEUM SPILLS AND LEAKS.

· LOCAL, STATE, AND MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE CLEARLY POSTED AND PROCEDURES WILL BE MADE AVAILABLE TO PERSONNEL.

· MATERIALS AND EQUIPMENT FOR SPILL CLEANUP SHALL BE KEPT IN THE MATERIAL STORAGE AREA (I.E. BROOMS, MOPS, RAGS, GOGGLES, GLOVES, CAT LITTER, ETC.).

· SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE REVIEWED AFTER A SPILL AND ADJUSTED AS NECESSARY TO PREVENT FUTURE SPILLS.

· ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY UPON DISCOVERY. ALL SPILLS WILL BE REPORTED AS REQUIRED BY LOCAL, STATE, AND FEDERAL REGULATIONS.

· SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE WATER) REQUIRE THE NRC (NATIONAL RESPONSE CENTER) TO BE CONTACTED WITHIN 24 HRS AT

800-424-8802.

· SPILLS GREATER THAN 25 GALLONS WITH NO SURFACE WATER IMPACTS REQUIRE THE GEORGIA EPD TO BE CONTACTED WITHIN 24 HRS AT 800-241-4113.

· SPILLS LESS THAN 25 GALLONS WITH NO SURFACE WATER IMPACTS REQUIRE LOCAL AUTHORITIES (MONTGOMERY COUNTY EMERGENCY MANAGEMENT AGENCY AT

912-583-2363 OR 911) TO BE CONTACTED AS REQUIRED.

· FOR SPILLS OF UNKNOWN AMOUNT, THE NATIONAL RESPONSE CENTER (NRC) WILL BE CONTACTED WITHIN 24 HOURS AT 800-424-8802.

· THE CONTRACTOR SHALL NOTIFY THE LICENSED PROFESSIONAL WHO PREPARED THIS PLAN IF MORE THAN 1320 GALLONS OF PETROLEUM IS STORED ONSITE (THIS INCLUDES

CAPACITIES OF EQUIPMENT) OR IF ANY PIECE OF EQUIPMENT HAS A CAPACITY GREATER THAN 660 GALLONS. THE CONTRACTOR WILL NEED A SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) PLAN PREPARED BY A LICENSED PROFESSIONAL.

ITEM 26

DESCRIPTION OF THE MEASURES THAT WILL BE INSTALLED DURING THE CONSTRUCTION PROCESS TO CONTROL POLLUTANTS IN STORM WATER THAT WILL OCCUR AFTER

CONSTRUCTION OPERATIONS HAVE BEEN COMPLETED.

RIPRAP OUTLET PROTECTION, VEGETATED ROADSIDE DITCHES, AND PERMANENT GRASSING WILL CONTINUE TO REDUCE STORM WATER POLLUTANTS AFTER THE COMPLETION OF

CONSTRUCTION.

ITEM 27

DESCRIPTION OF PRACTICES TO PROVIDE COVER FOR BUILDING MATERIALS AND BUILDING PRODUCTS ON SITE.

PLASTIC SHEETING OR TEMPORARY ROOFS WILL BE USED TO COVER BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION WASTE, TRASH, LANDSCAPE MATERIALS, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE, AND OTHER MATERIALS ON SITE IN ORDER TO MINIMIZE EXPOSURE TO PRECIPITATION AND TO

STORMWATER. AND BUILDING PRODUCTS ON SITE.

ITEM 28

DESCRIPTION OF THE PRACTICES THAT WILL BE USED TO REDUCE THE POLLUTANTS IN STORM WATER DISCHARGES.*

PRODUCT SPECIFIC PRACTICES:

· PETROLEUM BASED PRODUCTS - CONTAINERS FOR PRODUCTS SUCH AS FUELS, LUBRICANTS AND TARS WILL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS INCLUDES

ON-SITE VEHICLE AND MACHINERY DAILY INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH EQUIPMENT. EQUIPMENT MAINTENANCE AREAS WILL BE LOCATED AWAY FROM STATE WATER, NATURAL DRAINS AND STORM WATER DRAINAGE INLETS. IN ADDITION, TEMPORARY FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER TO PREVENT/MINIMIZE SITE CONTAMINATION. DISCHARGE OF OILS, FUELS AND LUBRICANTS IS PROHIBITED. PROPER DISPOSAL METHODS WILL INCLUDE COLLECTION IN A SUITABLE CONTAINER AND DISPOSAL AS REQUIRED BY LOCAL AND STATE REGULATIONS.

· PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS WILL BE STORED IN TIGHTLY SEALED ORIGINAL CONTAINERS WHEN NOT IN USE. EXCESS PRODUCT WILL NOT BE DISCHARGED TO THE STORM WATER COLLECTION SYSTEM. EXCESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS AND PRODUCT CONTAINERS WILL BE DISPOSED OF ACCORDING TO

MANUFACTURERS SPECIFICATIONS AND RECOMMENDATIONS.

· CONCRETE TRUCK WASHING - NO CONCRETE TRUCKS WILL BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS CONCRETE OF DRUM WASH WATER ONSITE.

· FERTILIZER/ HERBICIDES - THESE PRODUCTS WILL BE APPLIED AT RATES THAT DO NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS OR ABOVE THE GUIDELINES SET

FORTH IN THE CROP ESTABLISHMENT OR IN THE GSWCC MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA. ANY STORAGE OF THESE MATERIALS WILL BE UNDER

ROOF IN SEALED CONTAINERS.

· BUILDING MATERIALS - NO BUILDING OR CONSTRUCTION MATERIALS WILL BE BURIED OR DISPOSED OF ONSITE. ALL SUCH MATERIAL WILL BE DISPOSED OF IN PROPER WASTE DISPOSAL PROCEDURES. EQUIPMENT MAINTENANCE AREAS WILL BE LOCATED AWAY FROM STATE WATER, NATURAL DRAINS AND STORM WATER DRAINAGE INLETS. IN ADDITION, TEMPORARY FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER TO PREVENT/MINIMIZE SITE CONTAMINATION.

ITEM 29

DESCRIPTION AND CHART OR TIMELINE OF THE INTENDED SEQUENCE OF MAJOR ACTIVITIES WHICH DISTURB SOILS FOR THE MAJOR PORTIONS OF THE SITE (I.E., INITIAL PERIMETER AND SEDIMENT STORAGE BMPs, CLEARING AND GRUBBING ACTIVITIES, EXCAVATION ACTIVITIES, UTILITY ACTIVITIES, GRADING, INFRASTRUCTURE, TEMPORARY AND FINAL STABILIZATION).

SHOWN ON DETAIL SHEET

ITEM 30

PROVIDE REQUIREMENTS OF INSPECTIONS AND RECORD KEEPING BY THE PRIMARY PERMITTEE.

PRIMARY PERMITTEE.

(1). EACH DAY WHEN ANY TYPE OF CONSTRUCTION ACTIVITY HAS TAKEN PLACE AT A PRIMARY PERMITTEE’S SITE, CERTIFIED PERSONNEL PROVIDED BY THE PRIMARY PERMITTEE SHALL INSPECT: (A) ALL AREAS AT THE PRIMARY PERMITTEE’S SITE WHERE PETROLEUM PRODUCTS ARE STORED, USED, OR HANDLED FOR SPILLS AND LEAKS FROM VEHICLES AND EQUIPMENT AND (B) ALL LOCATIONS AT THE PRIMARY PERMITTEE’S SITE WHERE VEHICLES ENTER OR EXIT THE SITE FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING. THESE

INSPECTIONS MUST BE CONDUCTED UNTIL A NOTICE OF TERMINATION IS SUBMITTED.

(2). MEASURE AND RECORD RAINFALL WITHIN DISTURBED AREAS OF THE SITE THAT HAVE NOT MET FINAL STABILIZATION ONCE EVERY 24 HOURS EXCEPT ANY NON-WORKING SATURDAY, NON-WORKING SUNDAY AND NON-WORKING FEDERAL HOLIDAY. THE DATA COLLECTED FOR THE PURPOSE OF COMPLIANCE WITH THIS PERMIT SHALL BE REPRESENTATIVE OF THE MONITORED ACTIVITY. MEASUREMENT OF RAINFALL MAY BE SUSPENDED IF ALL AREAS OF THE SITE HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP OF ANNUAL VEGETATION AND A SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION.

(3). CERTIFIED PERSONNEL (PROVIDED BY THE PRIMARY PERMITTEE) SHALL INSPECT THE FOLLOWING AT LEAST ONCE EVERY FOURTEEN (14) CALENDAR DAYS: (A) DISTURBED AREAS OF THE PRIMARY PERMITTEE’S CONSTRUCTION SITE; (B) AREAS USED BY THE PRIMARY PERMITTEE FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION;

AND (C) STRUCTURAL CONTROL MEASURES. EROSION AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN APPLICABLE TO THE PRIMARY PERMITTEE’S SITE SHALL BE OBSERVED TO ENSURE THAT THEY ARE OPERATING CORRECTLY. CERTIFIED PERSONNEL SHALL ALSO CONDUCT INSPECTIONS WITHIN 24 HOURS OF THE END OF A STORM THAT IS

0.5 INCHES RAINFALL OR GREATER (UNLESS SUCH STORM ENDS AFTER 5:00 PM ON ANY FRIDAY OR ON ANY NON-WORKING SATURDAY, NON-WORKING SUNDAY OR ANY NON-WORKING FEDERAL HOLIDAY IN WHICH CASE THE INSPECTION SHALL BE COMPLETED BY THE END OF THE NEXT BUSINESS DAY AND/OR WORKING DAY, WHICHEVER OCCURS FIRST). POST-RAIN INSPECTIONS WILL RESET THE 14-DAY INSPECTION FREQUENCY REQUIREMENT.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .