CARVER STREET IMPROVEMENTS - CONSTRUCTION PLANS SUMMARY
This document is a set of construction plans prepared by Roberts Civil Engineering for the City of Mount Vernon, Montgomery County, Georgia. The project involves street improvements to Carver Street, with construction limits spanning from latitude 32.190516, longitude -82.603983 to latitude 32.189810, longitude -82.597375. The scope of work includes roadway reconstruction, grading and drainage installation, erosion and sediment control measures, signing and marking, and guardrail installation. The plans encompass approximately 2,900 linear feet of roadway improvements with a design speed of 25 miles per hour. The project includes removal of unsuitable material, placement of structural fill, installation of recycled asphalt concrete pavement in multiple lifts, construction of storm drainage piping, and implementation of temporary and permanent erosion control measures. Key bid items total 378 items and 35 categories, including traffic control, mobilization, grading, aggregate base course, asphalt concrete in various configurations, guardrail installation, storm drain pipe, and silt fence installation. The plans were originally issued on July 4, 2026, with revisions dated November 12, 2026, and are marked as "NOT RELEASED FOR CONSTRUCTION."
The construction plans specify that all contractors must comply with federal, state, and local laws; obtain necessary permits; and coordinate with utility providers before construction begins. The contractor is responsible for locating all utilities by calling 811 before work commences, verifying existing survey data, and immediately notifying the engineer of any discrepancies or unforeseen complications. The engineer, Roberts Civil Engineering (contact: Bill Weeks, bweeks@robertscivilengineering.com), is not responsible for physical construction but must approve any deviations from the plans in writing. Survey data was provided by M. Jerry Tomberlin, Jr., dated June 30, 2026. Construction specifications include detailed requirements for subgrade preparation, compaction to 100 percent Standard Proctor maximum dry weight density, reinforced concrete pipe installation, joint wrapping with filter fabric, and stabilization of disturbed areas within 14 days. The plans contain 14 sheets of detailed drawings including typical sections, plan-profile views, grading plans, and section views with specific elevation and cross-slope specifications. All construction must adhere to Department of Transportation specifications, and the contractor must provide test results for subgrade and base course compaction to the engineer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Map data © OpenStreetMap contributors, Microsoft, Esri Community Maps contributors, Map layer by Esri Powered by Esri
LIMITS OF CONSTRUCTION
LAT: 32.190516
LONG: -82.603983
LIMITS OF CONSTRUCTION
LAT: 32.189810
LONG: -82.597375
WEST CARVER STREET
N RAILROAD AVE
COVER0
N
TYPICAL SECTION DETAILS
01 GENERAL NOTES
WWW.ROBERTSCIVILENGINEERING.COM
CARVER STREET
IMPROVEMENTS
11/12/26
11/12/26
11/12/26
11/12/26
CARVER STREET
IMPROVEMENTS
Know what's below.
before you dig.Call
R
SITE
CONSTRUCTION
PLANS
CONTENTS
SHEET
VICINITY MAP
REVISIONS
COVER
RCE PROJECT NUMBER: TBD
11/12/26
301 SEA ISLAND ROAD, SUITE 10
ST.SIMONS ISLAND, GA 31522
912-638-9681
2 E. BRYAN STREET, SUITE 1200B
SAVANNAH, GA, 31401
912-298-7006
8442 W BEAVER ST.
JACKSONVILLE, FL 32220
904-741-0099
4000 FABER PLACE DRIVE, SUITE 300
NORTH CHARLESTON, SC 29405
843-323-4224
ORIGINAL ISSUE DATE: 07/04/2026
OWNER
CITY OF MOUNT VERNON
CONTACT
TBD
TBD
ENGINEER
ROBERTS CIVIL ENGINEERING
CONTACT
BILL WEEKS
BWEEKS@ROBERTSCIVILENGINEERING.COM
MONTGOMERY COUNTY
PREPARED FOR:
CITY OF MOUNT VERNON
435 S RAILROAD AVENUE
MOUNT VERNON, GA 30445
912-583-2323
11/12/26
11/12/26
1" = 1000'
GRAPHIC SCALE
2000'0' 1000'
PLAN-PROFILE
05-12 SECTION VIEWS
13-14 STANDARD DETAILS
04 GRADING PLAN
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
R
GENERAL NOTES
1. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE, AND
LOCAL LAWS.
2. ALL PERMITS NECESSARY FOR CONSTRUCTION SHALL BE OBTAINED BY CONTRACTOR.
3. ANY DEVIATIONS FROM THE PLANS ARE PROHIBITED WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.
4. THE CONTRACTOR IS TO IMMEDIATELY CONTACT THE ENGINEER IF ANY UNFORESEEN COMPLICATIONS OR
DISCREPANCIES OCCUR.
5. CONTRACTOR SHALL COORDINATE THE CONSTRUCTION OF ALL UTILITIES ON SITE WITH THE APPROPRIATE PROVIDER (e.g. POWER, PHONE, CABLE, ETC.)
6. THE ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR THE PHYSICAL CONSTRUCTION OF THE SITE.
7. CONTRACTOR SHALL MAINTAIN A SAFE SITE AND MEET ALL APPROPRIATE REGULATIONS CONCERNING
SAFETY.
8. SURVEY DATA PROVIDED BY M. JERRY TOMBERLIN, JR..
A. DATE OF SURVEY JUNE 30th 2026
9. EXISTING SURVEY INFORMATION TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR TO NOTIFY ENGINEER OF ANY DISCREPANCIES IN FIELD OBSERVATIONS VERSUS SURVEY DATA.
10. CONTRACTOR TO LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION BY CALLING THE CALL BEFORE YOU DIG
HOTLINE: 811.
GRADING & DRAINAGE NOTES:
1. STORM PIPES SHALL BE JOINED PER DOT SPECIFICATIONS.
2. ALL PIPE SHALL BE INSTALLED IN NEW CONDITION.
3. A RIGHT OF WAY WORK PERMIT MAY BE REQUIRED BEFORE ANY WORK CAN BE DONE IN THE RIGHT OF WAY.
4. ALL STORM DRAINAGE PIPING SHALL BE CONSTRUCTED PER DOT SPECS.
5. ALL STORM DRAINAGE PIPING JOINTS SHALL BE WRAPPED IN FILTER FABRIC.
6. CONTRACTOR TO REQUEST CONFIRMATION OF LATEST PLAN REVISION DATE FROM ENGINEER IN WRITING
PRIOR TO ORDERING MATERIALS,
7. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO REVIEW AND APPROVE SHOP DRAWINGS PRIOR TO
ORDERING MATERIALS.
8. PRAMITOL TO BE SPRAYED AT ROADWAY JOINT.
9. PAVEMENT TO BE INCLUDED FOR IN OVERALL BID SUBMITTED.
10. ALL REINFORCED CONCRETE PIPE (RCP) WITH LESS THAN 1.0 FOOT OF COVER SHALL BE ASTM C76 CLASS IV.
EARTHWORK AND PAVING
1. CONTRACTOR TO REMOVE ALL UNSUITABLE MATERIAL BENEATH PROPOSED PAVEMENT AND BUILDINGS TO A DEPTH OF 3 FEET AND REPLACE WITH SUITABLE FILL. THIS ONLY APPLIES TO AREAS WHERE UNSUITABLE
MATERIAL IS PRESENT.
2. THE UPPER 12 INCHES OF SUBGRADE BELOW THE PAVEMENT AND BUILDINGS SHALL BE SCARIFIED AND RECOMPACTED TO 100% STANDARD PROCTOR MAX DRY WEIGHT DENSITY WITH A MOISTURE CONTENT WITHIN
2% OF THE OPTIMUM MOISTURE CONTENT.
3. IN AREAS WHERE STRUCTURAL FILL IS REQUIRED, THE FILL SHALL BE PLACED IN LIFTS OF 6 INCHES AND COMPACTED TO 100% STANDARD PROCTOR MAX DRY WEIGHT DENSITY. STRUCTURAL FILL SHALL CONSIST OF
GRANULAR SOIL CONTAINING LESS THAN 10% MATERIAL PASSING THE NO 200 SIEVE.
4. ALL FILLING AND EXCAVATION SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF ANY UTILITIES.
5. CONTRACTOR TO PROVIDE TEST RESULTS OF SUBGRADE AND BASE COURSE COMPACTION TO ENGINEER.
EROSION AND SEDIMENT CONTROL NOTES:
1. THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMPS WITHIN 7 DAYS AFTER
INSTALLATION.
2. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST
ACQUIRING THE NECESSARY VARIANCES AND PERMIT.
3. AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMPS WITH A
HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
4. WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A
SECTION 404 PERMIT.
5. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND
SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.
6. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT
CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
7. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
G
EN
ER
AL
N O
TE
S
SC
AL
E:
N
TS
(F
O R
"X
" P
LO
T)
COUNTY: CITY OF MOUNT VERNON, MONTGOMERY COUNTY PROJECT NUMBER: TBD
ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
ROADWAY ITEMS
150-1000 TRAFFIC CONTROL LS 1
151-1000 MOBILIZATION LS 1
210-0100 GRADING COMPLETE LS 1
310-5080 GR AGGR BASE CRS, 8 INCH, INCL MATL SY 8,990
402-3100 RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H LIME TN 1,552
402-3130 RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM MATL & H LIME TN 776
402-3190 RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H LIME TN 1,035
441-0050 MISC ASPH CONC, 2 IN SY 811
413-0750 TACK COAT GL 1,130
641-1201 GUARDRAIL, TP W - 31 IN LF 850
641-5001 GUARDRAIL ANCHORAGE, TP 12A EA 2
DRAINAGE ITEMS
550-1180 STORM DRAIN PIPE, 18 IN, H 1-10 (CLASS IV RCP) LF 180
550-4218 FLARED END SECTION 18 IN, STORM DRAIN EA 4
EROSION CONTROL ITEMS
163-0232 TEMPORARY GRASSING AC 2.413
163-0301 CONSTRUCT AND REMOVE CONSTRUCTION EXITS EA 1
163-0245 CONSTRUCT AND REMOVE CHECK DAM EA 4
171-0010 TEMPORARY SILT FENCE, TYPE A LF 5,620
171-0030 TEMPORARY SILT FENCE, TYPE C LF 925
603-2181 STN DUMPED RIP RAP, TP 3, 18 IN SY 6
700-6910 PERMANENT GRASSING AC 2.413
SIGNING & MARKING ITEMS
653-1704 THERMOPLASTIC SOLID TRAFFIC STRIPE, 24 IN, WHITE LF 48
653-2501 THERMOPLASTIC SOLID TRAF STRIPE, 5 IN, WHITE LM 1.15
653-2502 THERMOPLASTIC SOLID TRAF STRIPE, 5 IN, YELLOW LM 1.10
636-1030 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 9 SF 5.00
636-1036 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 11 SF 50.00
636-2080 GALV STEEL POSTS, TP 8 LF 120
GRAND TOTAL:
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
TY
PI
C
AL
S
EC
TI
O
N
Know what's below.
before you dig.Call
R
SC
AL
E:
N
TS
(F
O R
"X
" P
LO
T)
TYPICAL SECTION - CARVER STREET
FROM STATION 10+00.00 TO STATION 38+72.00
DESIGN SPEED = 25 MPH
A
B 2" RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR
2, INCL BITUM MATL & H LIME
1.5" RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 1
OR 2, INCL BITUM MATL & H LIME
12.00'
TRAVEL LANE
12.00'
TRAVEL LANE
2.00'
UNPAVED
SHOULDER
6% R
W
60' RW
PROPOSED SHOULDER GRADE
ADJUSTED AS REQUIRED
2% CROSS SLOPE
R W
A 6%
1:4 MAX.
C 3" RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR
2, INCL BITUM MATL & H LIME
D 8" GRADED AGGREGATE BASE, INCL MATL
3:1 MAX FILL SLOPE
4.00'
BERM
2.00'
UNPAVED
SHOULDER
C
D
B
TIE DOWN TO EX. GRADE
(BOTTOM OF REMOVED
RETAINING WALL)
EXISTING RETAINING
WALL TO BE REMOVED
PROPOSED 4' BERM (TO BE
CONSTRUCTED BY OTHERS)
2' FLAT BOTTOM DITCH
1:4 MAX.
NATURAL GROUD
EXTEND BASE 6" PAST EDGE OF
PAVEMENT ON EACH SIDE OF
THE ROAD
1:3
NTS
4.00'
PAVED
SHOULDER
1:2
3.50'
SHOULDER PAVEMENT DETAIL
WITH GUARDRAIL
FROM STATION 22+50.00 TO STATION 31+00.00
2'' MISC. ASPHALT
GUARDRAIL TP W
2% 2%
EDGE OF TRAVEL
LANE
CARVER STREET ALIGNMENT PROFILE
STA. 9+00.00 TO STA. 39+00.00
VERTICAL SCALE: 1" = 10'
HORIZONTAL SCALE: 1" = 100'
9+00 10+00
2.
2.
11+00
2.
4.
12+00
3.
3.
13+00
4.
3.
14+00
4.
4.
15+00
5.
6.
16+00
6.
8.
17+00
6.
7.
18+00
7.
7.
19+00
9.
8.
20+00
2.
1.
21+00
5.
5.
22+00
7.
7.
23+00
0.
7.
24+00
3.
9.
25+00
5.
3.
26+00
8.
6.
27+00
1.
9.
28+00
1.
9.
29+00
1.
6.
30+00
1.
7.
31+00
2.
1.
32+00
2.
4.
33+00
3.
5.
34+00
4.
4.
35+00
4.
4.
36+00
0.
2.
37+00
5.
8.
38+00
0.
3.
39+00
G R
AD
E
BR
EA
K
ST
A
+0
0.
EL
EV
.0
G R
AD
E
BR
EA
K
ST
A
+5
7.
EL
EV
.2
G R
AD
E
BR
EA
K
ST
A
+9
9.
EL
EV
.2
0.67%
2.71%
-0.28% 0.71%
-5.13%
-3.50%
HIGH PT STA: 27+56.65
HIGH PT ELEV: 191.65
PVI STA:27+16.05
PVI ELEV:191.77
K:33.43
LVC:100.00
BV
C
S:
6+
.0
BV
C
E:
.4
EV
C
S:
7+
.0
EV
C
E:
.6
HIGH PT STA: 34+69.09
HIGH PT ELEV: 194.77
PVI STA:35+06.95
PVI ELEV:195.08
K:17.13
LVC:100.00
BV
C
S:
4+
.9
BV
C
E:
.7
EV
C
S:
5+
.9
EV
C
E:
.5
LOW PT STA: 17+73.74
LOW PT ELEV: 167.25
PVI STA:18+23.74
PVI ELEV:167.59
K:49.00
LVC:100.00
BV
C
S:
7+
.7
BV
C
E:
.2
EV
C
S:
8+
.7
EV
C
E:
.9
LOW PT STA: 29+27.11
LOW PT ELEV: 191.22
PVI STA:29+48.72
PVI ELEV:191.12
K:100.99
LVC:100.00
BV
C
S:
8+
.7
BV
C
E:
.2
EV
C
S:
9+
.7
EV
C
E:
.4
PROPOSED
CL PROFILE
EXISTING GRADE
EXISTING GRADE
PROPOSED
CL PROFILE
PROPOSED
CL PROFILE
EXISTING GRADE
0.70%
2.61%
6.25%
0.59%
-5.15%
-3.16%
GRADE BREAK STA = 10+50.00
ELEV = 160.30
GRADE BREAK STA = 35+09.34
ELEV = 194.02
GRADE BREAK STA = 26+48.72
ELEV = 187.97
GRADE BREAK STA = 18+23.74
ELEV = 166.40
GRADE BREAK STA = 37+57.01
ELEV = 181.26
GRADE BREAK STA = 38+94.69
ELEV = 176.91
PROP. LT DITCH
PROFILE
PROP. LT DITCH
PROFILE
PROP. 85' OF 18"
CLASS IV RCP @ 0.14%
PROP. 90' OF 18"
CLASS IV RCP @ 0.18%
SANITARY SEWER MANHOLE
RIM: 198.85' NAVD88
SITE B.M.
12'
60'
R35'
R35'
2'2'
2' 2'
R53'
12'
R228'
R35' R35'
CARVER STREET ALIGNMENT CURVE TABLE
CURVE #
C1
C2
C3
RADIUS
240.00
1600.00
65.00
LENGTH
376.17
387.96
86.91
CHORD DIRECTION
N41° 56' 28.97"E
S86° 12' 37.80"E
S40° 57' 34.85"E
CHORD LENGTH
338.83
387.01
80.58
START STATION
11+42.53
24+23.29
32+76.49
END STATION
15+18.70
28+11.25
33+63.40
N2° 57' 37.35"W 142.532'
N86° 50' 35.29"E 904.591'
S79° 15' 50.90"E 465.246'
S2° 39' 18.81"E 535.858'
4.
166.00
8.0
0.
2.
4.
6.
00 17 8.
00 18 0.
00 18 2.
00 18 4.
6.0
8.0
0.0
+9
+0
+0
+0
+0
14+00
15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
+0
+0
+0
+0
+0
2.
192.00
C2
C3C1
5" SOLID WHITE LINE
(EDGE LINE) (TYP.)
PROP. RW
PROP. RW
5" SOLID WHITE LINE
(EDGE LINE) (TYP.)
PROP. RW
PROP. RW
PROP. RW
PROP. RW
5" SOLID WHITE LINE
(EDGE LINE) (TYP.)5" SOLID WHITE LINE
(EDGE LINE) (TYP.)
EXIST. PROPERTY LINE
EXIST. PROPERTY LINE
EXIST. PROPERTY LINE
24" SOLID WHITE LINE
(STOP BAR) (TYP.)
5" DOUBLE SOLID
YELLOW LINE (TYP.)
5" DOUBLE SOLID
YELLOW LINE (TYP.)
CARVER STREET
ALIGNMENT
STA:10+39.36
OFF:12.00'R
STA:10+72.67
OFF:12.00'L
STA:11+45.52
OFF:12.00'R
STA:11+45.52
OFF:12.00'L
STA:15+16.99
OFF:12.00'R
STA:15+16.99
OFF:12.00'L
STA:24+24.57
OFF:12.00'R
STA:24+24.57
OFF:12.00'L
STA:28+12.53
OFF:12.00'R
STA:28+12.53
OFF:12.00'L
STA:32+52.05
OFF:12.00'L
STA:32+52.05
OFF:12.00'R
STA:33+34.03
OFF:12.00'R
STA:33+34.03
OFF:12.00'L
STA:38+31.03
OFF:12.00'L
STA:38+18.24
OFF:12.00'R
LIMITS OF CONSTRUCTION
LAT: 32.189776
LONG:-82.597373
LIMITS OF CONSTRUCTION
LAT: 32.190531
LONG:-82.603984
SPEED
LIMIT
R2-1 24''x30''
STA:37+50.00
OFF:18.00'L
TYPE 09
R1-1 30''x30''
STA:33+70.56
OFF:18.00'L
TYPE 11
R1-1 30''x30''
STA:38+32.62
OFF:18.00'R
TYPE 11
R1-1 30''x30''
STA:10+79.38
OFF:18.00'L
TYPE 11
STOP
STOP
STOP
STOP
R1-1 30''x30''
STA:32+70.16
OFF:18.20'R
TYPE 11
W2-1 L (36''x36'')
W13-1 (24''x24'')
STA:16+40.94
OFF:22.13'L
MPH
W3-1 36''x36''
STA:12+09.09
OFF:1.16'R
STA:22+50.00, OFF:16.00'R
BEGIN GUARDRAIL, TP W
INSTALL GUARDRAIL
ANCHORAGE, TP 12A
PROP. GUARDRAIL, TP W
4' OFFSET FROM EOP
STA:31+00.00, OFF:16.00'R
END GUARDRAIL, TP W
INSTALL GUARDRAIL
ANCHORAGE, TP 12A
SDSDSDSDSDSD
SD
SD
SD
SD
SD
SD
INV ELEV: 158.88
INV. ELEV: 159.00
PROP. 85' OF 18"
CLASS IV RCP @ 0.14%
PROP. 90' OF 18"
CLASS IV RCP @ 0.18%
INV. ELEV: 173.74
INV ELEV: 173.58
191.00
186.00
181.00
178.00
CONTRACTOR TO FIELD
VERIFY PIPE INVERT
SD
SD
SD
SD
SD
SD
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
GRAPHIC SCALE
1" = 100'
200'0' 100' N
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
PL
AN
-P R
O
FI
LE
EXISTING RIGHT OF WAY
PROPOSED CENTERLINE
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING DRAINAGE PIPESD
PROPOSED ASPHALT PAVEMENT
PROPOSED UNPAVED SHOULDER
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR59
PROPOSED DRAINAGE PIPESD
12'
60'
R35'
R35'
2'2'
2' 2'
R53'
12'
R228'
R35' R35'
N2° 57' 37.35"W 142.532'
N86° 50' 35.29"E 904.591'
S79° 15' 50.90"E 465.246'
S2° 39' 18.81"E 535.858'
4.
166.00
8.0
0 17 0.
00 17 2.
00 17 4.
00 17 6.
00 17 8.
00 18 0.
00 18 2.
00 18 4.
6.0
8.0
0.0
+9
+0
+0
+0
+0
14+00
15+00 16+00
17+00 18+00
19+00 20+00
21+00 22+00
23+00 24+00 25+00 26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
+0
+0
+0
+0
+0
2.
192.00
C2
C3C1 PROP. RW
PROP. RW
PROP. RW
PROP. RW
PROP. RW
PROP. RW
EXIST. PROPERTY LINE
EXIST. PROPERTY LINE
EXIST. PROPERTY LINE
CARVER STREET
ALIGNMENT
LIMITS OF CONSTRUCTION
LAT: 32.189776
LONG:-82.597373
LIMITS OF CONSTRUCTION
LAT: 32.190531
LONG:-82.603984
STA:22+50.00, OFF:16.00'R
BEGIN GUARDRAIL, TP W
INSTALL GUARDRAIL
ANCHORAGE, TP 12A
PROP. GUARDRAIL, TP W
4' OFFSET FROM EOP
STA:31+00.00, OFF:16.00'R
END GUARDRAIL, TP W
INSTALL GUARDRAIL
ANCHORAGE, TP 12A
SDSDSDSDSDSDSDSD
SD
SD
SD
SD
SD
SD
SD
INV ELEV: 158.88
INV. ELEV: 159.00
PROP. 85' OF 18"
CLASS IV RCP @ 0.14%
PROP. 90' OF 18"
CLASS IV RCP @ 0.18%
INV. ELEV: 173.74
INV ELEV: 173.58
178.00
180.00
182.00
184.00
186.00
188.00
190.00
192.00
194.00
194.00
CONTRACTOR TO FIELD
VERIFY PIPE INVERT
SD
SD
SD
SD
SD
SD
SD
SD
CONTRACTOR TO REGRADE THE DITCH
BOTTOM TO ALLOW WATER TO FLOW
TO THE EXIST. PIPE
CONTRACTOR TO REGRADE THE DITCH
BOTTOM TO ALLOW WATER TO FLOW
TO THE EXIST. PIPE
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
GRAPHIC SCALE
1" = 80'
160'0' 80'
N
G R
AD
IN
G P
LA
N
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
EXISTING RIGHT OF WAY
PROPOSED CENTERLINE
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING DRAINAGE PIPESD
PROPOSED ASPHALT PAVEMENT
PROPOSED UNPAVED SHOULDER
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR59
PROPOSED DRAINAGE PIPESD
10+51.98
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 50 60010203040
11+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
11+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
12+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
12+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
13+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
13+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
.1
.3
.6
.9
.2
.5
10+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
PROP. 85' OF 18''
CLASS IV RCP @ 0.14%
PROP. 85' OF 18''
CLASS IV RCP @ 0.14%
PR
O
P.
R
W
PR
O
P.
R
W
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.00% -2.00%
3.
3.
3.
2.
2.00% -2.00%
3.
3.
3.
3.
2.00% -2.00%
3.
3.
3.
3.
2.00% -2.00%
4.
4.
4.
3.
2.00% -2.00%
4.
4.
4.
4.
2.00% -2.00%
1" = 10' Horizontal 1" = 5' Vertical
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
R
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
SE
C
TI
O
N V
IE
W
S
14+00.00
0 10 20 30 40 5001020304050
14+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
15+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
15+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
16+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
16+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
17+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
17+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
.8
.1
.4
.7
.0
.3
.6
.9
4.
4.
4.
4.
2.00% -2.00%
5.
5.
5.
4.
2.00% -2.00%
5.
5.
5.
5.
2.00% -2.00%
5.
6.
5.
5.
2.00% -2.00%
6.
6.
6.
5.
2.00% -2.00%
6.
6.
6.
6.
2.00% -2.00%
6.
7.
6.
6.
2.00% -2.00%
7.
7.
7.
6.
2.00% -2.00%
1" = 10' Horizontal 1" = 5' Vertical
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
R
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
SE
C
TI
O
N V
IE
18+00.00
0 10 20 30 40 5001020304050
18+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
19+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
19+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
20+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
20+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
21+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
21+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
WPR
O
P.
R
W
PR
O
P.
R
WPR
O
P.
R
W
PR
O
P.
R
WPR
O
P.
R
W
PR
O
P.
R
WPR
O
P.
R
W
PR
O
P.
R
WPR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
.2
.0
.3
.7
.0
.3
.6
.9
7.
7.
7.
7.
2.00% -2.00%
8.
8.
8.
8.
2.00% -2.00%
9.
9.
9.
9.
2.00% -2.00%
1.
1.
1.
0.
2.00% -2.00%
2.
2.
2.
2.
2.00% -2.00%
3.
3.
3.
3.
2.00% -2.00%
5.
5.
5.
4.
2.00% -2.00%
6.
6.
6.
6.
2.00% -2.00%
1" = 10' Horizontal 1" = 5' Vertical
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
R
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
SE
C
TI
O
N V
IE
22+00.00
0 10 20 30 40 5001020304050
22+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
23+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
23+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
24+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
24+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
25+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
25+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
.2
.5
.8
.1
.4
.7
.3
.0
7.
8.
7.
7.
2.00% -2.00%
9.
9.
9.
8.
9.
9.
9.
8.
2.00% -2.00% 2.00% -2.00%
0.
0.
0.
0.
26 18 0.
0.
0.
0.
2.00% -2.00%
2.00% 2.00%
1.
2.
1.
1.
61 18 2.
2.
2.
2.
2.00% -2.00%
2.00% 2.00%
3.
3.
3.
2.
97 18 3.
3.
3.
3.
2.00% -2.00%
2.00% 2.00%
4.
4.
4.
4.
32 18 4.
4.
4.
4.
2.00% -2.00%
2.00% 2.00%
5.
6.
5.
5.
68 18 6.
6.
6.
6.
5.
6.
5.
5.
68 18 6.
6.
6.
6.
2.00% -2.00%
2.00% 2.00%2.00% -2.00%
2.00% 2.00%
7.
7.
7.
7.
03 18 7.
7.
7.
7.
2.00% -2.00%
2.00% 2.00%
1" = 10' Horizontal 1" = 5' Vertical
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
R
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
SE
C
TI
O
N V
IE
26+00.00
0 10 20 30 40 5001020304050
26+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
27+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
27+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
28+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
28+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
29+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
29+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
.6
.9
.3
.6
.0
.3
.7
.0
8.
8.
8.
8.
39 18 8.
8.
8.
9.
2.00% -2.00%
2.00% 2.00%
9.
0.
9.
9.
74 19 0.
0.
0.
0.
2.00% -2.00%
2.00% 2.00%
1.
1.
1.
0.
93 19 1.
1.
1.
1.
2.00% -2.00%
2.00% 2.00%
1.
1.
1.
1.
40 19 1.
1.
1.
2.
2.00% -2.00%
2.00% 2.00%
1.
1.
1.
1.
30 19 1.
1.
1.
1.
1.
1.
1.
1.
30 19 1.
1.
1.
1.
2.00% -2.00%
2.00% 2.00%2.00% -2.00%
2.00% 2.00%
1.
1.
1.
1.
16 19 1.
1.
1.
1.
2.00% -2.00%
2.00% 2.00%
1.
1.
1.
1.
02 19 1.
1.
1.
1.
2.00% -2.00%
2.00% 2.00%
1.
1.
1.
1.
01 19 1.
1.
1.
1.
2.00% -2.00%
2.00% 2.00%
1" = 10' Horizontal 1" = 5' Vertical
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
R
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
SE
C
TI
O
N V
IE
30+00.00
0 10 20 30 40 5001020304050
30+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
31+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
31+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
32+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
32+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
33+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
33+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
.4
.7
.1
.4
.8
.2
.5
.9
1.
1.
1.
1.
24 19 1.
1.
1.
1.
2.00% -2.00%
2.00% 2.00%
1.
2.
1.
1.
60 19 2.
2.
2.
2.
2.00% -2.00%
2.00% 2.00%
2.
2.
2.
1.
95 19 2.
2.
2.
2.
2.
2.
2.
1.
95 19 2.
2.
2.
2.
2.00% -2.00%
2.00% 2.00%2.00% -2.00%
2.00% 2.00%
2.
2.
2.
2.
2.00% -2.00%
2.
3.
2.
2.
2.00% -2.00%
3.
3.
3.
3.
2.00% -2.00%
3.
3.
3.
3.
2.00% -2.00%
3.
4.
3.
3.
2.00% -2.00%
1" = 10' Horizontal 1" = 5' Vertical
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
R
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
SE
C
TI
O
N V
IE
34+00.00
0 10 20 30 40 5001020304050
34+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
35+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
35+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
36+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
36+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
37+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
37+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
PR
O
P.
R
W
.2
.6
.9
.9
.4
.7
.2
.6
4.
4.
4.
4.
2.00% -2.00%
4.
4.
4.
4.
2.00% -2.00%
4.
4.
4.
4.
2.00% -2.00%
2.
3.
2.
2.
2.00% -2.00%
0.
0.
0.
0.
2.00% -2.00%
7.
7.
7.
7.
2.00% -2.00%
5.
5.
5.
4.
2.00% -2.00%
2.
2.
2.
2.
2.00% -2.00%
1" = 10' Horizontal 1" = 5' Vertical
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
R
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
SE
C
TI
O
N V
IE
38+93.71
0 10 20 30 40 5001020304050
38+00.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
38+50.00
℄ CONST. CARVER STREET ALIGNMENT
0 10 20 30 40 5001020304050
PROP. 90' OF 18''
CLASS IV RCP @ 0.18%
PR
O
P.
R
W
PR
O
P.
R
W
0.
0.
0.
0.
-0.09% -2.34%
9.
9.
8.
9.
-2.47% -7.43%
7.
8.
6.
7.
.9
.3
1" = 10' Horizontal 1" = 5' Vertical
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
R
SC
AL
E:
A
S N
O
TE
D (F
O R
"X
" P
LO
T)
SE
C
TI
O
N V
IE
ST
AN
D
AR
D D
ET
AI
LS
SC
AL
E:
N
TS
N A R R O W B R I D G E
S P E E D
L I M I T
POST AND SIGNAGE INSTALLATION DETAIL
NTS
4' MIN. 6' MAX.
C ROADWAY
L
2'-0" WIDE THERMOPLASTIC STOP
BAR TO BE LENGTH OF LANE ON
ROADS WITH CONCRETE SWALE
AND FILLETS OR TO EXTEND TO
THE EDGE OF PAVEMENT ON
ROADS WITHOUT
EDGE OF PAVEMENT
FACE OF CURB
BACK OF CURB
STOP BAR DETAIL
NTS
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
ST
AN
D
AR
D D
ET
AI
LS
SC
AL
E:
N
TS
R
EV
IS
IO
N S
D
AT
E:
1/
/2
SHEET:
NOT RELEASED
FOR
CONSTRUCTION
CH
EC
KE
D
BY
: H
R
DR
AW
N B
Y:
S
A
PR
O
JE
CT
N U
M
BE
R:
T
BD
PR
EP
AR
ED
F O
R
C
IT
Y O
F M
O U
N T
VE
R
N O
N , M
O N
TG
O
M
ER
Y C
O U
N
TY
C
AR
VE
R
S
TR
EE
T
IM
PR
O
VE
M
EN
TS
M
O U
N T
VE
R
N O
N C
IT
Y, G A
Know what's below.
before you dig.Call
| Sheets and Views |
| CARVER STREET I-00-COVER-0 |
| CARVER STREET I-01-GENERAL NOTES-01 |
| CARVER STREET I-02-TYPICAL SECTION DETAILS-02 |
| CARVER STREET-03-PLAN&PROFILE-NEWNEW-03 |
| CARVER STREET-04-GRADING PLAN-04 |
| CARVER STREET-13-STANDARD DETAILS-14 |
| CARVER STREET-13-STANDARD DETAILS-13 |
| CARVER STREET_MODEL----copy.pdf |
| Sheets and Views |
| CARVER STREET_SECTION DETAILS-05 |
| CARVER STREET_SECTION DETAILS-06 |
| CARVER STREET_SECTION DETAILS-07 |
| CARVER STREET_SECTION DETAILS-08 |
| CARVER STREET_SECTION DETAILS-09 |
| CARVER STREET_SECTION DETAILS-10 |
| CARVER STREET_SECTION DETAILS-11 |
| CARVER STREET_SECTION DETAILS-12 |
File details come from the government source that posted it. Updated .