Invitation to Bid - Westport Road Improvement Project
Open State & local contract opportunity Posted
- Solicitation number
- S-C00040-00018390
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
Show all 26
- 95121647 Elevated roadway or highway
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141001 Highway and road new construction service
- 72141106 Gravel or dirt road construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72141127 Seal coating of roads, highways and parking lots
- Point of contact
-
- Jessica McLean jmclean@clatsopcounty.gov (503) 325-8631
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
Clatsop County Public Works is soliciting sealed bids under Invitation to Bid for the Westport Road Improvement Project, with an optional on-site pre-proposal walk-through on November 18, 2026 at 2:00 p.m. and bids due December 15, 2026 at 2:00 p.m. at 1100 Olney Avenue, Astoria, Oregon 97103. The contract is subject to Oregon prevailing wage requirements under ORS 279C.800 to 279C.870.
The scope is a new roadway of approximately 1,250 feet between Highway 30 and Westport Ferry, approximately 1,900 feet of Highway 30 widening for a westbound left turn lane, and minor improvements to the existing Westport Road intersection with Highway 30. Work includes grading, paving, drainage, guard rail, illumination, signing, striping, signals, and roadside development with constructed wetlands. The project adds a new rail crossing with signals and reroutes pedestrian and bicycle traffic. The 114-line-item Bid Schedule is priced by unit against specified quantities. Awardees must coordinate with the ODOT access permit for Highway 30 work and with Clatskanie Public Utility District, which will install underground cable in 3-inch schedule 4 PVC at a minimum 3-foot cover.
Environmental permits carry binding conditions. The Oregon Department of State Lands removal-fill permit (No. 65405-RF) expires April 9, 2027. Fill or removal below ordinary high water on Columbia River tributaries is restricted to July 15 through September 15 unless coordinated with the Oregon Department of Fish and Wildlife. The Oregon Department of Environmental Quality must approve the NPDES permit before construction begins. Unavoidable wetland loss of 0.26 acres requires 0.26 credits from the Claremont Road Mitigation Bank, plus a 0.24-acre on-site depressional wetland complex, with annual monitoring for at least five growing seasons.
Bidders must submit a Bid Proposal Form, a Non-Collusion Affidavit, and a bid bond equal to 10 percent of the total bid. The First-Tier Subcontractor Disclosure is due within two hours of the bid deadline for contracts over $100,000. Upon award, the contractor must furnish a performance bond and a payment bond, each equal to the full contract price, a $30,000 Public Works Bond filed with the Oregon Construction Contractors Board, workers' compensation with employer's liability of at least $100,000, and general liability of at least $1,000,000 per occurrence.
Pre-proposal questions are due December 8, 2026 at 5:00 p.m., with responses distributed by December 11, 2026. The Board of Commissioners will approve the award January 13, 2027, with a Notice of Intent to Award on January 15, 2027 and the challenge period expiring January 22, 2027. The contract runs from February 1, 2027 through June 30, 2028, with liquidated damages of $500 per day for incomplete work. The County reserves the right to waive minor informalities and reject any or all bids. Bid documents are available at www.clatsopcounty.gov under Jobs & Bids/RFPs.
Opportunity text
Invitation to Bid - Westport Road Improvement Project Clatsop County Public Works intends to contract for a new roadway extension between Hwy 30 and Westport Ferry (approximately 1,250 feet which also includes approximately 1,900 feet of widening Hwy 30 to construct a westbound left turn lane for the new roadway). The project includes minor improvements to the existing Westport Road intersection with Hwy 30. ITB Documents: www.clatsopcounty.gov, see Jobs & Bids/RFPs
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity