Westport Road Improvement Project
Open State & local contract opportunity Posted
- Solicitation number
- P10383
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Jessica McLean jmclean@clatsopcounty.gov (503) 325-8631
- Dean Keranen dkeranen@co.clatsop.or.us (503) 325-8631
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Clatsop County Public Works is soliciting sealed bids for the Westport Road Improvement Project in Oregon, with an optional pre-proposal walk-through on-site on November 18, 2026 at 2:00 p.m. and bids due December 15, 2026 at 2:00 p.m. at 1100 Olney Avenue, Astoria. The project constructs approximately 1,250 feet of new roadway between Highway 30 and Westport Ferry, widens approximately 1,900 feet of Highway 30 to build a westbound left turn lane, and makes minor improvements to the existing Westport Road intersection with Highway 30.
Scope includes traffic control under the Oregon Manual on Uniform Traffic Control Devices, grading, paving, drainage, guardrail, illumination, signing, striping, signals, concrete curb returns, sidewalk connections, ADA ramps, driveway reconstruction, railroad crossing closure, erosion control, and wetland construction. The bid schedule contains 114 line items.
Bidders must post a bid bond equal to 10% of the total bid amount. The successful bidder must execute a Performance Bond and a Payment Bond, each equal to the full contract price, and obtain a $30,000 public works bond filed with the Oregon Construction Contractors Board. Bidders must carry comprehensive general liability and workers' compensation insurance, register with the Construction Contractors Board, and comply with Oregon tax laws. Prevailing wage rates apply under ORS 279C.800 to 279C.870. First-tier subcontractors representing 5% of the project bid or a $15,000 minimum must be disclosed, and a non-collusion affidavit must be executed by the person responsible for pricing decisions.
Liquidated damages accrue at $500 per day for delays beyond the completion date. Five percent retainage is held for up to thirty days after project acceptance. The contract period runs from February 1, 2027 through June 30, 2028.
Pre-proposal questions are due December 8, 2026 at 5:00 p.m., with responses distributed by December 11, 2026. The Board of Commissioners will consider approval on January 13, 2027, with an estimated contract award date of January 22, 2027.
Opportunity text
Clatsop County Public Works intends to contract for a new roadway extension between Hwy 30 and Westport Ferry (approximately 1,250 feet which also includes approximately 1,900 feet of widening Hwy 30 to construct a westbound left turn lane for the new roadway). The Project includes minor improvements to the existing Westport Road intersection with Hwy 30. The work to be completed under this contract consists of: 1.) All traffic control and protection and direction of traffic necessary for safety of motorists as required by the Oregon Manual on Uniform Traffic Control Devices. (2. Provide all equipment, material and labor to pave the roadway as specified in the Special Provisions. 3. Westport Bypass Road Construction. 4. Highway 30 Widening. 5. Highway 30 at Existing Westport Road. Construct concrete curb return, sidewalk connection and pedestrian ADA ramp, reconstruct driveways, and railroad crossing closure.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice-Westport Road Improvement Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity