Asphalt and Concrete Services

Closed State & local contract opportunity

Solicitation number
PR9220
State
Florida
Responses due

Opportunity facts

Jurisdictions
NIGP codes
Show all 27
Point of contact

Updated .

About this opportunity

The Orlando Utilities Commission (OUC) is requesting proposals for comprehensive asphalt and concrete services across OUC facilities, service territory, and customer areas in Orange County and Orlando, Florida, with proposals due September 15, 2026 at 2:00 p.m. EST.

Bidders must demonstrate a minimum of five years of experience with asphalt paving and urban projects including maintenance of traffic and work within tight rights-of-way. All personnel must hold current occupational licenses for applicable Florida jurisdictions and comply with FDOT Standard Specifications and MUTCD requirements. Insurance requirements include general liability of $2 million, auto liability of $1 million with MCS-90 endorsement, statutory workers' compensation, and pollution liability of $2 million, with policies allowing additional insured status and waiver of subrogation. Bidders must submit three verifiable references for similar work performed in Florida, complete subcontractor information with licenses and project history, health and safety program documentation including OSHA metrics, and disclosure of any planned subcontractor use. Drug-free workplace policies and employee screening procedures including criminal background checks are required.

The scope encompasses asphalt milling and repaving, concrete pavement and driveway construction, sidewalk and curb creation and restoration, sealcoating, striping, lime rock base installation, Portland cement applications, debris removal, sod replacement and irrigation repair, and general roadway and parking surface maintenance. Work assignments are determined by the OUC Project Manager on an as-needed basis. The pricing schedule contains 88 line items for standard services plus equipment and personnel rates, with two sample projects included for evaluation. Bidders must complete all workbook sheets and both sample projects.

The contract term is three years with one optional two-year renewal at OUC's election. Pricing must remain firm throughout the initial three-year period. Line items on the Florida Department of Transportation Asphaltic Index adjust by the Bituminous Index rate when variations exceed 5% from the index at bid receipt. Payment discount options range from 1 to 3% based on timing. Bid bonds and payment/performance bonds are not required. Evaluation criteria include qualifications and experience, responsiveness to requirements, safety and quality programs, financial soundness, and price. Questions are due August 24, 2026, with addenda due August 28, 2026. No pre-response conference is scheduled.

Opportunity text

OUC is requesting proposals from qualified suppliers to provide comprehensive asphalt and concrete services. This includes furnishing all qualified labor, supervision, technical expertise, materials, tools, equipment, trade accessories, fuel, transportation, etc. required to complete the work. The scope of services may cover a wide range of tasks, such as lime rock base installation, asphalt concrete surface work, Portland cement applications, concrete pavement and driveway construction, sidewalk creation, and concrete curb restoration. Additionally, suppliers may be asked to handle debris removal, the removal of brick base or underlayment, sod replacement and irrigation repair as part of street restoration efforts. Beyond these services, OUC will also need general roadway and parking surface maintenance, customer driveway repairs, milling, sealcoating, and support for location-specific projects across various OUC facilities, OUC service territory, and customer areas. The exact requirements will be determined and communicated by the OUC Project Manager as needed. The contractor shall possess, prior to commencement of any Work Order, all licenses, permits, certifications, and approvals required by federal, state, and local laws to perform the assigned work. Refer to Section 2.1, Detailed Scope & Requirements for more information.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity