Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
36C77624B0015_1
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Newington, Connecticut 06111, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting construction services for an Electronic Health Record Modernization (EHRM) Infrastructure Upgrade project at the Newington VA Medical Center in Connecticut. The project involves comprehensive IT and communication infrastructure improvements across 12 campus buildings, preparing the facility for a national Cerner electronic health record system upgrade. Contractors must address deficiencies defined in the 2021 VA Physical Security Design and Resiliency Manual, including fiber optic cabling, data drops, electrical outlets, power distribution, and HVAC system upgrades. Technical questions were due by February 10, 2025, with bid submissions required by February 18, 2025, at 11:00 AM EST. Evaluation criteria include compliance with detailed technical specifications, ability to meet infection control measures, and third-party commissioning requirements.

The solicitation is set aside exclusively for Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors, who must be certified in the SBA VetCert database at the time of bid submission and award. The project has a 540-day period of performance from the Notice to Proceed, with work spanning buildings 1C, 2E, 2C, 2W, 3, 12, 32, 33, 34, 42, and 65 in Newington, Connecticut. A 20% bid guarantee is required, not exceeding $3 million, with full performance and payment bonds to be issued upon contract award. The project involves extensive infrastructure upgrades, including installing new Computer Room Air Conditioner units, UPS systems, network cabinets, cable trays, and fire suppression systems. Contractors must maintain hospital operations with limited 8-hour utility interruptions and coordinate closely with VA staff throughout the implementation.

Notice text

2 versions

Update #2 · Latest ·

This project addresses deficiencies within the built environment of the IT and Communication Service
Lines and prepares the campus for the Cerner upgrade that is happening nationally. In addition to ensuring
adequate capacity for planned growth and maintenance, this project addresses deficiencies as defined by
the PSRDM (Physical Security Design and Resiliency Manual) 2021 VA Standard. Like all standards, they
are to be implemented to the greatest extent possible within the framework of available budgets and
without negatively impacting the overall mission of serving the health and welfare of the veteran
population served by the Newington, CT VA Medical Center. The following buildings have been identified
as having deficiencies to address:1C, 2E, 2C, 2W, 3, 12, 32, 33, 34, 42, 65 and the site. If additional buildings
are found to be integral to patient services, they will be included in the survey and design to ensure that
this program is successful and all required connectivity is installed prior to the Go Live date. To date all
buildings have been surveyed.
The Contractor (herein referred to as “GC”) shall provide construction services for a construction project
at the Newington VA Medical Center (VAMC) in accordance with this statement of work.

Update as of 20 Feb 25:

For proposal consideration. “Is seismic bracing required for this project for cable/basket tray?”

**Yes. Please follow Specification 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS to the posed question'

*Please see attachments for soliciation details. 

Update #1 ·

This project addresses deficiencies within the built environment of the IT and Communication Service
Lines and prepares the campus for the Cerner upgrade that is happening nationally. In addition to ensuring
adequate capacity for planned growth and maintenance, this project addresses deficiencies as defined by
the PSRDM (Physical Security Design and Resiliency Manual) 2021 VA Standard. Like all standards, they
are to be implemented to the greatest extent possible within the framework of available budgets and
without negatively impacting the overall mission of serving the health and welfare of the veteran
population served by the Newington, CT VA Medical Center. The following buildings have been identified
as having deficiencies to address:1C, 2E, 2C, 2W, 3, 12, 32, 33, 34, 42, 65 and the site. If additional buildings
are found to be integral to patient services, they will be included in the survey and design to ensure that
this program is successful and all required connectivity is installed prior to the Go Live date. To date all
buildings have been surveyed.
The Contractor (herein referred to as “GC”) shall provide construction services for a construction project
at the Newington VA Medical Center (VAMC) in accordance with this statement of work.

*Please see attachments for soliciation details. 

Files

File Type Posted
Attachment 34 - 689A4-22-700.EHRM.Newington.Add3.20250211.pdf PDF
Technical Questions Tracking Spreadsheet - 2-13-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0007.pdf PDF
Site Visit Sign In Sheet 2.3.25.pdf PDF
Attachment 27 - Wage Rates 01.31.25- Hartford.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0006.pdf PDF
Bid Opening Details - Newington CT - 36C76624B0015.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.27.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0005.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 2 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part1.pdf PDF
Attachment 18 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part3.pdf PDF
Attachment 12 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part3.pdf PDF
Attachment 10 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part1.pdf PDF
Attachment 13 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part4.pdf PDF
Attachment 15 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part6.pdf PDF
Attachment 11 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part2.pdf PDF
Attachment 17 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part2.pdf PDF
Attachment 22 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part1.pdf PDF
Attachment 14 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part5.pdf PDF
Attachment 20 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part1.pdf PDF
Attachment 32 - 689A4-22-700.EHRM.Newington -.20250114 - Addendum 2.pdf PDF
Attachment 16 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part1.pdf PDF
Attachment 21 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part2.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.23.25.pdf PDF
Attachment 19 - 689A4-22-700.Newington.EHRM.IFC.B12.20240703.pdf PDF
Attachment 23 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part2.pdf PDF
Attachment 24 - 689A4-22-700.Newington.EHRM.IFC.SITE.20240703.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0004.pdf PDF
Technical Questions Tracking Spreadsheet - 1-23-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT .pdf PDF
Technical Questions Tracking Spreadsheet - 1-6-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0003.pdf PDF
Attachment 31 - EHRM Newington-Pre Bid Presentation.010725.R02.pdf PDF
2025-01-07 Preproposal conference sign in list.pdf PDF
Attachment 30 - Price Schedule - 36C77624B0015 - 689A4-22-700 EHRM Infrastructure Newington.pdf PDF
Attachment 28 - Site Visit Instructions - Updated 1.6.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0002.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0001.pdf PDF
Attachment 19 - Newington EHRM Drawings - Part 10 of 16 - 12.31.24.pdf PDF
Attachment 29 - 689A4-22-700.EHRM.Newington.Add1.20241213.pdf PDF
36C77624B0015 - Newington EHRM - Solicitation 12.4.24.pdf PDF
Attachment 12 - Newington EHRM Drawings - Part 3 of 16.pdf PDF
Attachment 2 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part1.pdf PDF
Attachment 9 - Underground Utility Locating.pdf PDF
Attachment 20 - Newington EHRM Drawings - Part 11 of 16.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 1 - 689A4-22-700 Construction SOW - EHRM Infrastructure Upgrades - Newington.pdf PDF
Attachment 10 - Newington EHRM Drawings - Part 1 of 16.pdf PDF
Attachment 4 - APPENDIX A - OIT-InfrastrucStdTelecomSpaces.pdf PDF
Attachment 7 - APPENDIX E - Site Telecomm VA Newington report.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377) Award Award Notice
Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377) Latest special notice Special Notice
This notice Solicitation
Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION (VA-24-00028377) Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
613-22-700 | EHRM Infrastructure Upgrades Construction | Martinsburg, WV West Virginia 25405, United States · NAICS 236220 VA Technology Acquisition Center No set-aside
Y1DA--512A5-22-700 | EHRM Infra Upgrades | Perry Point, MD CO: Samantha Mihaila CS: Ric Sochor Perry Point Vamc · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
Y1DA--VISN 2 EHRM Industry Day NAICS 236220 VA Technology Acquisition Center No set-aside
Z2DA--652-24-101 Improve Electrical Distribution Department of Veterans Affairs Richmond, Virginia 23249, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT West Haven, Connecticut, United States · NAICS 236220 ENDIST New England No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors