Attachment 7 - APPENDIX E - Site Telecomm VA Newington report.pdf

PDF 452 KB Posted

Attached to
Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
Solicitation number
36C77624B0015_1
Issued by

About this file

This is an appendix (Appendix E) containing photographs from a Limited Asbestos Inspection and Lead Paint Screening Report for the EHRM Project at multiple buildings at the Newington VAMC in Connecticut, dated October 23, 2023 (Terracon Project No. J2237039).

The appendix contains six labeled photographs documenting asbestos-containing materials (ACM) found in various building locations, including: tan residual glue on ceramic wall tile in Building 3-105, light blue vinyl floor tile with black mastic in Building 1-424, tan vinyl floor tile with black mastic in Building 1C-142, white vinyl floor tile with tan mastic in Building 2C-3141, tan sheet flooring with tan glue and black mastic in Building 1-325, and white vinyl floor tile with black mastic in Building 3-106. All photographed materials are identified as ACM and were documented on September 21, 2023.

View the file

Other files

File Type Posted
Technical Questions Tracking Spreadsheet - 2-13-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0007.pdf PDF
Attachment 34 - 689A4-22-700.EHRM.Newington.Add3.20250211.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0006.pdf PDF
Attachment 27 - Wage Rates 01.31.25- Hartford.pdf PDF
Bid Opening Details - Newington CT - 36C76624B0015.pdf PDF
Site Visit Sign In Sheet 2.3.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0005.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.27.25.pdf PDF
Attachment 2 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part1.pdf PDF
Attachment 21 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part2.pdf PDF
Attachment 13 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part4.pdf PDF
Attachment 17 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part2.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0004.pdf PDF
Attachment 22 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part1.pdf PDF
Attachment 32 - 689A4-22-700.EHRM.Newington -.20250114 - Addendum 2.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 12 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part3.pdf PDF
Attachment 15 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part6.pdf PDF
Attachment 20 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part1.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.23.25.pdf PDF
Attachment 18 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part3.pdf PDF
Attachment 23 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part2.pdf PDF
Attachment 19 - 689A4-22-700.Newington.EHRM.IFC.B12.20240703.pdf PDF
Attachment 14 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part5.pdf PDF
Attachment 10 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part1.pdf PDF
Technical Questions Tracking Spreadsheet - 1-23-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT .pdf PDF
Attachment 16 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part1.pdf PDF
Attachment 24 - 689A4-22-700.Newington.EHRM.IFC.SITE.20240703.pdf PDF
Attachment 11 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part2.pdf PDF
Attachment 31 - EHRM Newington-Pre Bid Presentation.010725.R02.pdf PDF
Technical Questions Tracking Spreadsheet - 1-6-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0003.pdf PDF
2025-01-07 Preproposal conference sign in list.pdf PDF
Attachment 30 - Price Schedule - 36C77624B0015 - 689A4-22-700 EHRM Infrastructure Newington.pdf PDF
Attachment 28 - Site Visit Instructions - Updated 1.6.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0002.pdf PDF
Attachment 19 - Newington EHRM Drawings - Part 10 of 16 - 12.31.24.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0001.pdf PDF
Attachment 29 - 689A4-22-700.EHRM.Newington.Add1.20241213.pdf PDF
Attachment 28 - Site Visit Instructions.pdf PDF
Attachment 24 - Newington EHRM Drawings - Part 15 of 16.pdf PDF
Attachment 11 - Newington EHRM Drawings - Part 2 of 16.pdf PDF
Attachment 26 - Newington VAHC campus map.pdf PDF
Attachment 22 - Newington EHRM Drawings - Part 13 of 16.pdf PDF
Attachment 23 - Newington EHRM Drawings - Part 14 of 16.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 14 - Newington EHRM Drawings - Part 5 of 16.pdf PDF
Attachment 10 - Newington EHRM Drawings - Part 1 of 16.pdf PDF
Attachment 27 - Wage Rates 8.9.24- Hartford.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Limited Asbestos Inspection and Lead Paint Screening Report EHRM Project - Multiple Buildings | Newington VAMC - Newington, CT October 23, 2023 | Terracon Project No. J2237039

APPENDIX E

PHOTOGRAPHS

VAMC Newington ■ 555 Willard Avenue Newington, CT 06111-2631 Date Pictures Taken: September 21, 2023 ■ Terracon Project No. J2237039

Responsive ■ Resourceful ■ Reliable

Photo 1 Building 3-105 Tan Residual Glue on Ceramic Wall Tile (ACM)

Photo 2 Building 1-424 12” x 12” Light Blue Vinyl Floor Tile with Streaks (ACM) and Black Mastic

Photo 3 Building 1C-142 12” x 12” Tan Vinyl Floor Tile and Black Mastic (ACM)

Photo 4 Building 2C-3141 12” x 12” White Vinyl Floor Tile and Tan Mastic (ACM)

Photo 5 Building 1 325 -Tan Sheet Flooring with Tan Glue and Black Mastic (ACM)

Photo 6 Building 3-106 12” x 12” White Vinyl Floor Tile (ACM) and Black Mastic (ACM)

File details come from the government source that posted it. Updated .