Technical Questions Tracking Spreadsheet - 1-6-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf

PDF 125 KB Posted

Attached to
Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
Solicitation number
36C77624B0015_1
Issued by

About this file

This is a Questions and Answers tracking sheet for solicitation 36C77624B0015 regarding EHRM Infrastructure Upgrades construction at the VA Medical Center in Newington, CT. The document contains four technical questions received between December 17-31, 2024 and answered between December 31, 2024 and January 7, 2025.

Key questions addressed include specifications for a Site Safety and Health Officer (SSHO), potential interference between a retaining wall footing and existing gas line clearances, availability of pricing/CLIN sheets, and clarifications about fire protection systems. Notably, the VA confirmed that combination heat/smoke detectors are required at specified locations, and speaker/visual devices must match and extend the existing Johnson Controls Fire Protection-Simplex 4100ES Network Voice System. The VA Contract Specialist indicated that Amendment 0001 provided updated Attachment 19 and Amendment 0002 provided Attachment 30 for pricing/CLIN information.

View the file

Other files

File Type Posted
Technical Questions Tracking Spreadsheet - 2-13-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0007.pdf PDF
Attachment 34 - 689A4-22-700.EHRM.Newington.Add3.20250211.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0006.pdf PDF
Attachment 27 - Wage Rates 01.31.25- Hartford.pdf PDF
Bid Opening Details - Newington CT - 36C76624B0015.pdf PDF
Site Visit Sign In Sheet 2.3.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0005.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.27.25.pdf PDF
Attachment 2 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part1.pdf PDF
Attachment 21 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part2.pdf PDF
Attachment 13 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part4.pdf PDF
Attachment 17 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part2.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0004.pdf PDF
Attachment 22 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part1.pdf PDF
Attachment 32 - 689A4-22-700.EHRM.Newington -.20250114 - Addendum 2.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 12 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part3.pdf PDF
Attachment 15 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part6.pdf PDF
Attachment 20 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part1.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.23.25.pdf PDF
Attachment 18 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part3.pdf PDF
Attachment 23 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part2.pdf PDF
Attachment 19 - 689A4-22-700.Newington.EHRM.IFC.B12.20240703.pdf PDF
Attachment 14 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part5.pdf PDF
Attachment 10 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part1.pdf PDF
Technical Questions Tracking Spreadsheet - 1-23-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT .pdf PDF
Attachment 16 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part1.pdf PDF
Attachment 24 - 689A4-22-700.Newington.EHRM.IFC.SITE.20240703.pdf PDF
Attachment 11 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part2.pdf PDF
Attachment 31 - EHRM Newington-Pre Bid Presentation.010725.R02.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0003.pdf PDF
2025-01-07 Preproposal conference sign in list.pdf PDF
Attachment 30 - Price Schedule - 36C77624B0015 - 689A4-22-700 EHRM Infrastructure Newington.pdf PDF
Attachment 28 - Site Visit Instructions - Updated 1.6.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0002.pdf PDF
Attachment 19 - Newington EHRM Drawings - Part 10 of 16 - 12.31.24.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0001.pdf PDF
Attachment 29 - 689A4-22-700.EHRM.Newington.Add1.20241213.pdf PDF
Attachment 28 - Site Visit Instructions.pdf PDF
Attachment 24 - Newington EHRM Drawings - Part 15 of 16.pdf PDF
Attachment 11 - Newington EHRM Drawings - Part 2 of 16.pdf PDF
Attachment 26 - Newington VAHC campus map.pdf PDF
Attachment 22 - Newington EHRM Drawings - Part 13 of 16.pdf PDF
Attachment 23 - Newington EHRM Drawings - Part 14 of 16.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 14 - Newington EHRM Drawings - Part 5 of 16.pdf PDF
Attachment 10 - Newington EHRM Drawings - Part 1 of 16.pdf PDF
Attachment 27 - Wage Rates 8.9.24- Hartford.pdf PDF
Attachment 9 - Underground Utility Locating.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION 36C77624B0015 – NEWINGTON, CT -36C77624B0015 - CONSTRUCT EHRM INFRASTRUCTURE UPGRADES- TECHNICAL

QUESTIONS AND VA RESPONSE TRACKING SHEET

ITEM

NO.

DATE

QUESTION

RECEIVED

DATE

QUESTION

ANSWERED

QUESTION GOVERNMENT RESPONSE

1. 12-23-24 1-6-25 We are interested in bidding as a safety services subcontractor for the GCs bidding this project. We do not see any specifications requiring a Site Safety and Health Officer (SSHO). Can you provide a link to them?

Specification Section 01 00 00 -3 1.2, H. 1. B &c 1.2, Z Section 1.7, 1.8, 1.8

1-6-25 – VA COR

2. 12-31-24 12-31-24 Will the retaining wall footing interfere with required Dominion clearances for the existing gas line?

Amendment 0001 provides an updated Attachment 19 published on sam.gov on 12-31- 24 – VA Contract Specialist.

3. 1-2-25 1-6-25 We are interested in bidding this project and attending the site visit next week but we don’t see any price references or CLIN’s to bid as referenced in the solicitation. Do you have one available?

Amendment 0002 provides Attachment 30 – as price/CLIN sheet. – VA Contract Specialist 1-6-

4. 12-17-24 1-7-25 All of the Fire Protection drawings shows the request for Horn Strobes for Ceiling and Wall Mounted notification devices, the existing fire alarm network system is a Johnson Controls Fire Protection -Simplex 4100ES Network Voice System. The devices to be added or replaced are Speaker Visuals.

Keynotes Note 6 requires a NEW HEAT/SMOKE DETECTOR AND FIRE

ALARM STROBE/HORN, MOUNT AND SUPPORT FROM DECK ABOVE.

COORDINATE LOCATION WITH ALL OTHER TRADES, EXISTING

CONDITIONS, AND COR. SEE ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

Please confirm that the fire alarm device that is being required is a Combo Heat/Smoke for these locations shown on all Fire Protection drawings.

Confirmed, contractor shall provide a combination heat/smoke detector at each location. – AE – Triple C – Mat Perkins

ITEM

NO.

DATE

QUESTION

RECEIVED

DATE

QUESTION

ANSWERED

QUESTION GOVERNMENT RESPONSE

Please confirm the system is requiring Speaker Visuals per Note 6 of the Keynotes on all Fire Protection devices.

Confirmed, speaker/visual devices shall be specified to match and extend the existing Fire Alarm system. – AE – Triple C – Mat Perkins