Attachment 10 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part1.pdf
PDF 20 MB Posted
- Attached to
- Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
- Solicitation number
- 36C77624B0015_1
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/03/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
NEWINGTON VA MEDICAL CENTER
STAMP
01_02
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.G en er al
.S he et s.
rv t
-1
0-
6:
:2
01G-000
COVER SHEET 689A4-22-700
07/03/2024 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
ISSUED FOR CONSTRUCTION
07/03/2024
689A4-22-700 - ELECTRONIC HEALTH RECORDS MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES --
LOCATION MAP
VICINITY MAP
PROJECT SCOPE OF WORK:
COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND WRITTEN
REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL CONTRACTOR).
CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION CONSULTANTS
TO PERFORM ALL INSPECTIONS REQUIRED BY THIS CONTRACT. THE VA
HAS NO INSPECTION CAPABILITY. ANY REFERENCE TO VA INSPECTIONS
SHALL BE BY A THIRD-PARTY INSPECTOR QUALIFIED TO PERFORM THE
WORK. CREDENTIALS SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY
THIS CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND
PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE VA
WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS. VA
INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND
DO NOT REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.
THIRD-PARTY INSPECTIONS:
CAMPUS MAP
GENERAL NOTES:
1.
2.
3.
ALL EXISTING PORTS ARE BEING REPLACED ON THIS PROJECT. DEMO
SHEETS HAVE NOT BEEN PROVIDED UNLESS WALL REVISIONS ARE
REQUIRED. EXISTING WORK AREA OUTLETS WITH (3) OR (4) EXISTING
DATA PORTS SHALL BE REDUCED AND PROVIDED WITH (2) NEW
PORTS/(2) NEW CAT 6a CABLES. COORDINATED WITH OWNER PRIOR TO
REDUCTION AT EACH LOCATION.
WHILE ALL POSSIBLE DUE DILIGENCE WAS PERFORMED THE BIDDERS
ARE REQUIRED TO PROVIDE A 20% ALLOWANCE FOR NEW DATA PORTS.
ALL DEVIATIONS FROM THE DESIGN DOCUMENTS FOR LOCATIONS AND
QUANTITIES OF DATA PORTS ARE REQUIRED TO BE VERIFIED BY THE VA
COR AND A/E. AS AN EXAMPLE, IF 100 DATA DROPS WERE IDENTIFIED AND
DOCUMENTED IN A BUILDING, THE CONTRACTOR SHALL BID 120 DATA
DROPS AND CABLE, CONNECTION, TESTING, AND LABELING FOR THAT
BUILDING. DURING THE COURSE OF THE INSTALLATION THE
CONTRACTOR SHALL IDENTIFY ANY ADDITIONAL DATA PORTS AND ANY
DATA DROPS NOT FOUND TO ENSURE THE AGGREGATE SUM IS
CAPTURED IN THE RECORD DRAWINGS AND THE OWNER HAS AN
ACCURATE COUNT AT THE END OF THE PROJECT.
NO IN-WALL CONDUIT DEMOLITION SHALL OCCUR, ONLY OUTLETS AND
CABLE TO BE REPLACED. CONTRACTOR TO UTILIZE EXISTING CONDUIT IN
ALL LOCATIONS WHERE CABLES ARE BEING REPLACED. WHERE NO
EXISTING CONDUIT EXISTS, CONTRACTOR TO UTILIZE SURFACE
MOUNTED WIREWAY SIZED TO MEET THE CAT6A TO MEET THE ISTS.
a.
b.
c.
d.
e.
f.
g.
h.
i.
This project provides complete recabling within multiple buildings at the Newington VA Medical Center.
Multiple buildings on campus including Buildings 1C, 2E, 2C, 2W, 3, 12, 32, 65 and also site infrastructure upgrades. See main project cover sheet for building priority.
This project shall include general construction, alterations, and necessary removal of existing structures and construction and certain other items. Contract documents, drawings, and specifications, indicate the scope of work. The purpose of this project is to address deficiencies and upgrade communications cabling and infrastructure. Scope includes newTelecommunications Rooms (TR) located within multiple buildings on campus and new, redundant site infrastructure. Project scope also includes a new Main Computer Room building with temporary and new fiber. This project provides the new construction, renovation and infrastructure required to provide new telecommunications infrastructure, include (but not limited to): new Fiber optic cable and new CAT 6a telecommunications cable to all locations, work area outlets (WAO), racks, UPS, power supplies and associated electrical distribution equipment, new HVAC, new CCTV, new fire protection and fire alarm, new advanced utility monitoring system and new PACS and doors for all buildings in this project.
Construction addresses deficiencies including new electrical service, new dedicated mechanical units, new UPS, new grounding and bonding conditions within each TR, new racks and cable management equipment within the TRs and new cable tray for each building as shown on the plans.
Provide new equipment rack(s) furnished with both horizontal and vertical cable managers, vertical bonding bars, UPS, patch panel and an optical fiber termination shelf. All telecommunications equipment and cabling shall be tested, approved, and accepted by the VA prior to connecting to active, ongoing operations. Any modifications required to existing systems (HVAC, smoke detectors, fire alarm, fire sprinklers, lights, other devices, etc..) are the responsibility of the Contractor. The VA will not assist with any modification.
Includes all labor, material, equipment, and supervision to perform the required electrical and telecommunications construction work on this project including materials and construction equipment to provide new telecommunications Cat 6A and Fiber cable throughout, new outlets, and new racks, patch panels, UPS, fiber panels and associated equipment for all buildings.
Provide new electrical panels, transformers, circuit breakers and distribution to serve the new spaces/equipment.
For communications functions, provide cable trays, equipment racks with vertical/horizontal wire management. Replace all fiber optic lines serving the TRs. Provide network drops in each new TR. Provide a new digital, wall mounted CCTV (Closed Circuit Television) camera at each TR, camera shall comply with Campus standards (IP addressable network camera, POE+, PTZ, motion sensor, auto-tracking, dome with wall mount. Integrate camera into existing VMS. provide controllability through existing IT network).
Temporary fiber shall be provided between existing entrance room and newMain Computer Room and from the existing Data Center to the new MCR.
Provide Physical Security Access Control (PACS) for all the TR doors (including controllers and power supplies), coordinate with the door hardware specification for additional requirements.
The existing fire alarm system will be modified by relocating and/or adding compatible devices to the existing building fire alarm system for all TRs and providing a new fire alarm system for the new MCR building.
Contractor shall provide a 30-day load test on all existing source panels serving new work at each Building. This test is required by NEC 220.87 for In addition to replacing all of the communications cabling and additional 20% capacity shall be provided as shown on the drawings and specifications. verification that no loads have been added since the design level survey. Contractor shall provide load monitoring data to the COR/AE. New electrical panels and electrical service branch circuits are specified by the scope of work and shall be furnished by the contractor. Load monitoring shall also be performed on all panels upstream of the new branch circuit panels.
Work includes all labor, material, equipment, and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including new dedicated cooling, condensate pumps and drains, and reconfiguring and certifying existing wet pipe fire protection system.
Contractor shall submit coordination drawings for approval showing all trades including:
equipment locations, proposed routing, supports and penetrations prior to beginning any work.
Also indicate new and existing systems and all provisions for coordinating existing utilities.
For fire suppression, contractor shall reconfigure and/or provide additional sprinkler heads to the existing building automatic sprinkler system as shown on the drawings. Provide new wet-pipe and clean agent fire suppression system for the new MCR.
Site work includes all labor, material, equipment and supervision to perform the required hardscape and landscape construction work on this project including materials and construction equipment to provide new concrete walkways, planting beds, artificial turf, fencing, trees and additional landscape materials to the new building and renovations detailed by the construction drawings and specifications. Protection for existing plantings, trees and hardscape to remain shall be installed, maintained and enforced by contractor.
New site fiber conduit shall be encased in concrete. Base bid shall include trenching, concrete ductbank and hand digging at existing utility crossings. Directional boring with annular concrete encasement requires Government approval.
For all telecommunications rooms (TR), the contractor is responsible for providing a new fire extinguisher cabinet with a Type 2A:10B:C clean agent fire extinguisher located no greater than 75 feet away from the new TR. Contractor to coordinate the new location with the COR.
Contractor shall bid a new FEC for each TR in the Scope of Work. See specification 10 44 13.
All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for each building per Specification 01 91 00.
No wireless access points shall be replaced and shall be protected-in-place, cabling, face plate and jack will be replaced. All cabling for wireless access points shall be labeled in accordance with the specifications.
This project will require working on multiple buildings simultaneously with multiple crews to achieve the overall construction period duration for the entire project. Based on the approved schedule by the VA COR (and based on approved Project Schedule and Phasing plan submittals), multiple buildings shall be renovated simultaneously to meet Construction Schedule requirements. However, any required shutdowns shall be limited to one at a time to minimize the impact on Facility Operations.
The expected construction period includes all pre-construction activity, construction, and post-construction testing, third-party inspections, Owner inspections, and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES
(SMALL PROJECTS DESIGN/BID/BUILD).
Contractor shall submit and obtain approval for all project submittals including coordination drawings prior to beginning physical construction.
Contractor shall perform Commissioning per 01 91 00 of all new systems and existing systems impacted by the project according to requirements in sections:
01 91 00 – GENERAL COMMISSIONING REQUIREMENTS.
07 08 00 – FACILITY EXTERIOR CLOSURE COMMISSIONING.
21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.
22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS.
23 08 00 – COMMISSIONING OF HVAC SYSTEMS.
26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS.
27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS.
28 08 00 – COMMISSIONING OF SECURITY SYSTEMS.
33 08 00 – COMMISSIONING OF SITE UTILITIES.
Inspections: Comprehensive Third-Party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.
Contractor shall appoint an individual, company, or firm to act as the Commissioning Manager.
The Commissioning Manager is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process. A detailed commissioning plan is required to ensure that all systems are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.
THIS PROJECT MUST BE "STAND ALONE". THAT IS, THE PROJECT CANNOT DEPEND ON ANOTHER
PROJECT OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE AND USABLE.
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
SIGNATURE DATE: 07/03/2024
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
PROJECT LOCATION
CO:
Anthony Wilson anthony.wilson3@va.gov
COR:
Peter Sandor Healthcare Engineer 203.627.6698 peter.sandor@va.gov
USER:
HEFPSEPEHRMIntegration Engineering Team HEFPSEPEHRMIntegrationEngineeringTeam@va.gov
OIT IO Data Center and Infrastructure Engineering VAITESEDatacenterEngineering2@va.gov
Kevin Grzelka kevin.grzelka@va.gov
Gonzalo Garcia GGarcia@bdrsolutionsllc.com
SERVICE PROVIDERS:
T-Mobile Berlin Turnpike
(860) 665-7481 3111 Berlin Turnpike Newington, CT 06111
VAMC INTERIOR DESIGN CONTACT:
Kristina Smith Interior Designer VISN 1 VA New England Healthcare System 950 Campbell Avenue Building 14A/Room 114 West Haven, CT 06516 kristina.smith2@va.gov
BUILDING 01 & 02
TEL
MEMORIAL DRIVE
R
CO
NC
RE
TE
W
AL
K
2E
MEMORIAL DRIVE
2C2W
ADP
VETERANS CIRCLE
VETERANS CIRCLE
VETERANS CIRCLE
T2
VETERANS DRIVE
CS:
Ally Razzano alexandra.razzano@va.gov
Revisions: Date:
Lokesh Text Box
Lokesh Text Box
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_0 2_
R
.rv t
-1
0-
6:
:1
01G-001
DRAWING INDEX 689A4-22-700
01_02
07/03/2024 M. Perkins K. Mcdermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD INCLUDED IN 100% CD ISSUED FOR CONSTRUCTION
02E-106E ELECTRICAL PLAN - SIXTH LEVEL - B2E No Yes Yes Yes Yes 02E-101W ELECTRICAL PLAN - FIRST LEVEL - B2W No Yes Yes Yes Yes 01E-400 ELECTRICAL ENLARGED PLANS - B1 No Yes Yes Yes Yes 01E-401 ELECTRICAL ENLARGED PLANS - B1 No Yes Yes Yes Yes 01E-402 ELECTRICAL ENLARGED PLANS - B1 No Yes Yes Yes Yes 01E-403 ELECTRICAL ENLARGED PLANS - B1 No Yes Yes Yes Yes 01E-404 ELECTRICAL ENLARGED PLANS - B1 No Yes Yes Yes Yes 01E-405 ELECTRICAL ENLARGED PLANS - B1 No Yes Yes Yes Yes 02E-401 ELECTRICAL ENLARGED PLANS - B2E No Yes Yes Yes Yes 02E-402 ELECTRICAL ENLARGED PLANS - B2E No Yes Yes Yes Yes 02E-403 ELECTRICAL ENLARGED PLANS - B2E No Yes Yes Yes Yes 02E-404 ELECTRICAL ENLARGED PLANS - B2E No Yes Yes Yes Yes 02E-405 ELECTRICAL ENLARGED PLANS - B2C No Yes Yes Yes Yes 02E-406 ELECTRICAL ENLARGED PLANS - B2W No Yes Yes Yes Yes 01E-501 ELECTRICAL DETAILS Yes Yes Yes Yes Yes 01E-502 ELECTRICAL DETAILS Yes Yes Yes Yes Yes 01E-503 ELECTRICAL DETAILS Yes Yes Yes Yes Yes 01E-504 ELECTRICAL DETAILS Yes Yes Yes Yes Yes 01E-505 ELECTRICAL DETAILS Yes Yes Yes Yes Yes 01E-506 ELECTRICAL UPS DETAILS No Yes Yes Yes Yes 01E-601 ELECTRICAL ONE-LINE DIAGRAMS EMERGENCY LOADS No Yes Yes Yes Yes 01E-602 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes Yes 01E-603 ELECTRICAL ONE-LINE DIAGRAMS - B1 No Yes Yes Yes Yes 01E-604 ELECTRICAL ONE-LINE DIAGRAMS MCR AND UPS No Yes Yes Yes Yes 02E-601 ELECTRICAL ONE-LINE DIAGRAMS - B2C No Yes Yes Yes Yes 02E-602 ELECTRICAL ONE-LINE DIAGRAMS - B2E No Yes Yes Yes Yes 02E-603 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes Yes 02E-604 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes Yes 02E-605 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes Yes 01E-701 ELECTRICAL SCHEDULES B01 No Yes Yes Yes Yes 01E-702 ELECTRICAL SCHEDULES B01 Yes Yes Yes Yes Yes 01E-703 ELECTRICAL SCHEDULES B01 Yes Yes Yes Yes Yes 01E-704 ELECTRICAL SCHEDULES B01 Yes Yes Yes Yes Yes 01E-705 ELECTRICAL SCHEDULES B01 Yes Yes Yes Yes Yes 02E-706 ELECTRICAL SCHEDULES B2E Yes Yes Yes Yes Yes 02E-707 ELECTRICAL SCHEDULES B2E Yes Yes Yes Yes Yes 02E-708 ELECTRICAL SCHEDULES B2E Yes Yes Yes Yes Yes 02E-709 ELECTRICAL SCHEDULES B2W Yes Yes Yes Yes Yes 02E-710 ELECTRICAL SCHEDULES B2C Yes Yes Yes Yes Yes 02E-711 ELECTRICAL SCHEDULES B2C Yes Yes Yes Yes Yes 01E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes Yes
TELECOMMUNICATION
01T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes Yes T-100 TELECOMMUNICATION PLAN - OVERALL BUILDING FLOOR PLAN - BASEMENT Yes Yes Yes Yes Yes T-101 TELECOMMUNICATION PLAN - OVERALL BUILDING FLOOR PLAN - FIRST LEVEL Yes Yes Yes Yes Yes T-102 TELECOMMUNICATION PLAN - OVERALL BUILDING FLOOR PLAN - SECOND LEVEL Yes Yes Yes Yes Yes T-103 TELECOMMUNICATION PLAN - OVERALL BUILDING FLOOR PLAN - THIRD LEVEL Yes Yes Yes Yes Yes T-104 TELECOMMUNICATION PLAN - OVERALL BUILDING FLOOR PLAN - FOURTH LEVEL Yes Yes Yes Yes Yes T-105 TELECOMMUNICATION PLAN - OVERALL BUILDING FLOOR PLAN - FIFTH LEVEL Yes Yes Yes Yes Yes T-106 TELECOMMUNICATION PLAN - OVERALL BUILDING FLOOR PLAN - SIXTH LEVEL Yes Yes Yes Yes Yes 01T-101 TELECOMMUNICATION PLAN - FIRST LEVEL - B1 Yes Yes Yes Yes Yes 01T-102 TELECOMMUNICATION PLAN - SECOND LEVEL - B1 Yes Yes Yes Yes Yes 01T-103 TELECOMMUNICATION PLAN - THIRD LEVEL - B1 Yes Yes Yes Yes Yes 01T-104 TELECOMMUNICATION PLAN - FOURTH LEVEL - B1 Yes Yes Yes Yes Yes 01T-105 TELECOMMUNICATION PLAN - FIFTH LEVEL - B1 Yes Yes Yes Yes Yes 02T-100C TELECOMMUNICATION PLAN - BASEMENT LEVEL - B2C No Yes Yes Yes Yes 02T-101C TELECOMMUNICATION PLAN - FIRST LEVEL - B2C Yes Yes Yes Yes Yes 02T-102C TELECOMMUNICATION PLAN - SECOND LEVEL - B2C Yes Yes Yes Yes Yes 02T-103C TELECOMMUNICATION PLAN - THIRD LEVEL - B2C Yes Yes Yes Yes Yes 02T-100E TELECOMMUNICATION PLAN - BASEMENT LEVEL - B2E Yes Yes Yes Yes Yes 02T-101E TELECOMMUNICATION PLAN - FIRST LEVEL - B2E Yes Yes Yes Yes Yes 02T-102E TELECOMMUNICATION PLAN - SECOND LEVEL - B2E Yes Yes Yes Yes Yes 02T-103E TELECOMMUNICATION PLAN - THIRD LEVEL - B2E Yes Yes Yes Yes Yes 02T-104E TELECOMMUNICATION PLAN - FOURTH LEVEL - B2E Yes Yes Yes Yes Yes 02T-105E TELECOMMUNICATION PLAN - FIFTH LEVEL - B2E Yes Yes Yes Yes Yes 02T-106E TELECOMMUNICATION PLAN - SIXTH LEVEL - B2E Yes Yes Yes Yes Yes 02T-101W TELECOMMUNICATION PLAN - FIRST LEVEL - B2W Yes Yes Yes Yes Yes 01T-401 TELECOMMUNICATION ENLARGED PLANS- B1 No Yes Yes Yes Yes 01T-402 TELECOMMUNICATION ENLARGED PLANS- B1 No Yes Yes Yes Yes 01T-403 TELECOMMUNICATION ENLARGED PLANS - B1 No Yes Yes Yes Yes 02T-401 TELECOMMUNICATION ENLARGED PLANS- B2C No Yes Yes Yes Yes 02T-402 TELECOMMUNICATION ENLARGED PLANS- B2C No Yes Yes Yes Yes 02T-403 TELECOMMUNICATION ENLARGED PLANS- B2E No Yes Yes Yes Yes 02T-404 TELECOMMUNICATION ENLARGED PLANS- B2E No Yes Yes Yes Yes 02T-405 TELECOMMUNICATION ENLARGED PLANS- B2E No Yes Yes Yes Yes 01T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes Yes 01T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes Yes 01T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes Yes 01T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes Yes 01T-505 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes Yes 01T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes Yes 01T-602 TELECOMMUNICATION FIBER RISER DIAGRAM - EXISTING Yes Yes Yes Yes Yes 01T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW Yes Yes Yes Yes Yes 01T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes Yes 02T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes Yes 01T-701 TELECOMMUNICATION SCHEDULES - B1 Yes Yes Yes Yes Yes 01T-702 TELECOMMUNICATION SCHEDULES - B1 Yes Yes Yes Yes Yes 01T-703 TELECOMMUNICATION SCHEDULES - B1 Yes Yes Yes Yes Yes 02T-701 TELECOMMUNICATION SCHEDULES - 2C Yes Yes Yes Yes Yes 02T-702 TELECOMMUNICATION SCHEDULES - 2C Yes Yes Yes Yes Yes 02T-703 TELECOMMUNICATION SCHEDULES - 2E Yes Yes Yes Yes Yes 02T-704 TELECOMMUNICATION SCHEDULES - 2E Yes Yes Yes Yes Yes 02T-705 TELECOMMUNICATION SCHEDULES - 2E Yes Yes Yes Yes Yes 02T-706 TELECOMMUNICATION SCHEDULES - 2E Yes Yes Yes Yes Yes 02T-707 TELECOMMUNICATION SCHEDULES - 2E Yes Yes Yes Yes Yes 02T-708 TELECOMMUNICATION SCHEDULES - 2E Yes Yes Yes Yes Yes 02T-709 TELECOMMUNICATION SCHEDULES - 2W Yes Yes Yes Yes Yes 01T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes Yes 01T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes Yes 01T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes Yes
REFERENCE
01R-900 PHOTO REFERENCES - B1 No Yes Yes Yes Yes 01R-901 PHOTO REFERENCES - B1 No Yes Yes Yes Yes 01R-902 PHOTO REFERENCES - B1 No Yes Yes Yes Yes 01R-903 PHOTO REFERENCES - B1 No Yes Yes Yes Yes 01R-904 PHOTO REFERENCES - B1 No Yes Yes Yes Yes 01R-905 PHOTO REFERENCES - 2C No Yes Yes Yes Yes 01R-906 PHOTO REFERENCES - 2C No Yes Yes Yes Yes 01R-907 PHOTO REFERENCES - 2C No Yes Yes Yes Yes 01R-908 PHOTO REFERENCES - 2E No Yes Yes Yes Yes 01R-909 PHOTO REFERENCES - 2E No Yes Yes Yes Yes 01R-910 PHOTO REFERENCES - 2E No Yes Yes Yes Yes 01R-911 PHOTO REFERENCES - B31 No Yes Yes Yes Yes Grand total: 220
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD INCLUDED IN 100% CD ISSUED FOR CONSTRUCTION
GENERAL
01G-000 COVER SHEET Yes Yes Yes Yes Yes 01G-001 DRAWING INDEX Yes Yes Yes Yes Yes 01G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes Yes 01G-011 GENERAL INFECTION CONTROL NOTES AND SYMBOLS Yes Yes Yes Yes Yes 01G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes Yes 01GC101 PROJECT PHASING PLAN No No Yes Yes Yes
HAZARDOUS
01H-100 HAZARDOUS MATERIAL ABATEMENT PLAN - BASEMENT LEVEL - B02E No Yes Yes Yes Yes 01H-101 HAZARDOUS MATERIAL ABATEMENT PLAN - 1ST LEVEL - B01 No Yes Yes Yes Yes 01H-102 HAZARDOUS MATERIAL ABATEMENT PLAN - 2ND LEVEL - B01 No Yes Yes Yes Yes 01H-103 HAZARDOUS MATERIAL ABATEMENT PLAN - 3RD LEVEL - B02C No Yes Yes Yes Yes 01H-104 HAZARDOUS MATERIAL ABATEMENT PLAN - 4TH LEVEL - B01 No Yes Yes Yes Yes
ARCHITECTURAL
01A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes Yes 01A-400 ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL - B1 No Yes Yes Yes Yes 01A-401 ARCHITECTURAL ENLARGED VIEWS - FIRST, SECOND & THIRD LEVEL - B1 No Yes Yes Yes Yes 01A-402 ARCHITECTURAL ENLARGED VIEWS - FOURTH & FIFTH LEVEL - B1 No Yes Yes Yes Yes 01A-403 ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL - STAFF RELOCATION - DEMO No Yes Yes Yes Yes 01A-404 ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL - STAFF RELOCATION - NEW No Yes Yes Yes Yes 02A-401 ARCHITECTURAL ENLARGED VIEWS - FIRST & SECOND LEVELS - B2C No Yes Yes Yes Yes 02A-402 ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL - B2C No Yes Yes Yes Yes 02A-403 ARCHITECTURAL ENLARGED VIEWS - BASEMENT & FIRST LEVELS - B2E No Yes Yes Yes Yes 02A-404 ARCHITECTURAL ENLARGED VIEWS - SECOND & THIRD LEVELS - B2E No Yes Yes Yes Yes 02A-405 ARCHITECTURAL ENLARGED VIEWS - FOURTH & FIFTH LEVELS - B2E No Yes Yes Yes Yes 02A-406 ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL - B2W No Yes Yes Yes Yes 01A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes Yes 01A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes Yes 01A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes Yes 01A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes Yes
INTERIORS
01IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes Yes
FIRE PROTECTION
01FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes Yes 01FX100 FIRE PROTECTION PLAN - BASEMENT LEVEL Yes Yes Yes Yes Yes 01FX101 FIRE PROTECTION PLAN - FIRST LEVEL Yes Yes Yes Yes Yes 01FX102 FIRE PROTECTION PLAN - SECOND LEVEL Yes Yes Yes Yes Yes 01FX103 FIRE PROTECTION PLAN - THIRD LEVEL Yes Yes Yes Yes Yes 01FX104 FIRE PROTECTION PLAN - FOURTH LEVEL Yes Yes Yes Yes Yes 01FX105 FIRE PROTECTION PLAN - FIFTH LEVEL Yes Yes Yes Yes Yes 01FX401 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes Yes 01FX402 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes Yes 01FX403 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes Yes 01FX404 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes Yes 01FX405 FIRE PROTECTION ENLARGED PLANS No Yes Yes Yes Yes 01FX406 FIRE PROTECTION ENLARGED PLANS No Yes Yes Yes Yes 01FX407 FIRE PROTECTION ENLARGED PLANS No Yes Yes Yes Yes 01FX501 FIRE PROTECTION DETAILS AND SCHEDULES No Yes Yes Yes Yes 01FX502 FIRE PROTECTION DETAILS AND SCHEDULES No Yes Yes Yes Yes 01FX503 FIRE PROTECTION DETAILS AND SCHEDULES No Yes Yes Yes Yes 01FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes Yes 01FX902 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes Yes
PLUMBING
01P-001 PLUMBING ABBREVIATIONS AND SYMBOLS No Yes Yes Yes Yes 01P-401 PLUMBING ENLARGED PLANS No Yes Yes Yes Yes 01P-901 PLUMBING CUTSHEETS No Yes Yes Yes Yes
MECHANICAL
01M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes Yes 01M-101 MECHANICAL PLAN - FIRST LEVEL - B1 No Yes Yes Yes Yes 01M-102 MECHANICAL PLAN - SECOND LEVEL - B1 No Yes Yes Yes Yes 01M-103 MECHANICAL PLAN - THIRD LEVEL - B1 No Yes Yes Yes Yes 01M-104 MECHANICAL PLAN - FOURTH LEVEL - B1 No Yes Yes Yes Yes 01M-105 MECHANICAL PLAN - FIFTH LEVEL - B1 No Yes Yes Yes Yes 02M-101C MECHANICAL PLAN - FIRST LEVEL - B2C No Yes Yes Yes Yes 02M-102C MECHANICAL PLAN - SECOND LEVEL - B2C No Yes Yes Yes Yes 02M-103C MECHANICAL PLAN - THIRD LEVEL - B2C No Yes Yes Yes Yes 02M-100E MECHANICAL PLAN - BASEMENT LEVEL - B2E No Yes Yes Yes Yes 02M-101E MECHANICAL PLAN - FIRST LEVEL - B2E No Yes Yes Yes Yes 02M-102E MECHANICAL PLAN - SECOND LEVEL - B2E No Yes Yes Yes Yes 02M-103E MECHANICAL PLAN - THIRD LEVEL - B2E No Yes Yes Yes Yes 02M-104E MECHANICAL PLAN - FOURTH LEVEL - B2E No Yes Yes Yes Yes 02M-105E MECHANICAL PLAN - FIFTH LEVEL - B2E No Yes Yes Yes Yes 02M-106E MECHANICAL PLAN - SIXTH LEVEL - B2E No Yes Yes Yes Yes 02M-101W MECHANICAL PLAN - FIRST & SECOND LEVELS - B2W No Yes Yes Yes Yes 01M-400 MECHANICAL ENLARGED PLANS - BUILDING 01 No Yes Yes Yes Yes 01M-401A MECHANICAL ENLARGED PLANS - BUILDING 01 No Yes Yes Yes Yes 01M-401B MECHANICAL ENLARGED PLANS - BUILDING 01 No Yes Yes Yes Yes 01M-401C MECHANICAL ENLARGED PLANS - BUILDING 01 No Yes Yes Yes Yes 01M-402E MECHANICAL ENLARGED PLANS - BUILDING 01 No Yes Yes Yes Yes 02M-401C MECHANICAL ENLARGED PLANS - BUILDINGS 02C No Yes Yes Yes Yes 02M-401EA MECHANICAL ENLARGED PLANS - BUILDING 02E No Yes Yes Yes Yes 02M-401EB MECHANICAL ENLARGED PLANS - BUILDING 02E No Yes Yes Yes Yes 02M-401W MECHANICAL ENLARGED PLANS - BUILDINGS 02W No Yes Yes Yes Yes 01M-501 MECHANICAL DETAILS No Yes Yes Yes Yes 01_02M-701 MECHANICAL SCHEDULES No Yes Yes Yes Yes 01_02M-702 MECHANICAL SCHEDULES No Yes Yes Yes Yes 01_02M-703 MECHANICAL SCHEDULES No No No Yes Yes 01M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes Yes 01M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes Yes 01M-803 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes Yes 01M-804 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes Yes 01M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes Yes 01M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes Yes
ELECTRICAL
01E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes Yes 01E-100 ELECTRICAL PLAN - OVERALL BUILDING FLOOR PLAN - BASEMENT No Yes Yes Yes Yes E-101 ELECTRICAL PLAN - OVERALL BUILDING FLOOR PLAN - FIRST LEVEL No Yes Yes Yes Yes E-102 ELECTRICAL PLAN - OVERALL BUILDING FLOOR PLAN - SECOND LEVEL No Yes Yes Yes Yes E-103 ELECTRICAL PLAN - OVERALL BUILDING FLOOR PLAN - THIRD LEVEL No Yes Yes Yes Yes E-104 ELECTRICAL PLAN - OVERALL BUILDING FLOOR PLAN - FOURTH LEVEL No Yes Yes Yes Yes E-105 ELECTRICAL PLAN - OVERALL BUILDING FLOOR PLAN - FIFTH LEVEL No Yes Yes Yes Yes E-106 ELECTRICAL PLAN - OVERALL BUILDING FLOOR PLAN - SIXTH LEVEL No Yes Yes Yes Yes 01E-101 ELECTRICAL PLAN - FIRST LEVEL - B1 No Yes Yes Yes Yes 01E-102 ELECTRICAL PLAN - SECOND LEVEL - B1 No Yes Yes Yes Yes 01E-103 ELECTRICAL PLAN - THIRD LEVEL - B1 No Yes Yes Yes Yes 01E-104 ELECTRICAL PLAN - FOURTH LEVEL - B1 No Yes Yes Yes Yes 01E-105 ELECTRICAL PLAN - FIFTH LEVEL - B1 No Yes Yes Yes Yes 02E-100C ELECTRICAL PLAN - BASEMENT LEVEL - B2C No Yes Yes Yes Yes 02E-101C ELECTRICAL PLAN - FIRST LEVEL - B2C No Yes Yes Yes Yes 02E-102C ELECTRICAL PLAN - SECOND LEVEL - B2C No Yes Yes Yes Yes 02E-103C ELECTRICAL PLAN - THIRD LEVEL - B2C No Yes Yes Yes Yes 02E-100E ELECTRICAL PLAN - BASEMENT LEVEL - B2E No Yes Yes Yes Yes 02E-101E ELECTRICAL PLAN - FIRST LEVEL - B2E No Yes Yes Yes Yes 02E-102E ELECTRICAL PLAN - SECOND LEVEL - B2E No Yes Yes Yes Yes 02E-103E ELECTRICAL PLAN - THIRD LEVEL - B2E No Yes Yes Yes Yes 02E-104E ELECTRICAL PLAN - FOURTH LEVEL - B2E No Yes Yes Yes Yes 02E-105E ELECTRICAL PLAN - FIFTH LEVEL - B2E No Yes Yes Yes Yes
Revisions: Date:
GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTES
GENERAL DIMENSIONING NOTES
GENERAL PAINTING NOTES
GENERAL SEALANT / CAULKING NOTES
GENERAL DEMOLITION AND PHASING NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE,
ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.
ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR
TO FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS
AND THESE DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK DESCRIBED IN
CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND
COR IMMEDIATELY.
GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES
AND LOCATIONS.
ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL
KNOWLEDGE.
WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER
AND PLUMB.
THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS
NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF
WORK.
DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR.
FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL
VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.
REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK
RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL
CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE
CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY TIME, METHOD, SYSTEM,
PRODUCT, SUBCONTRACT AND/OR MATERIAL.
NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE CONTRACT.
HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS NIC.
SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER, INCLUDING STAGING
AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,
INTERRUPTION OF UTILITIES, ETC. SEE SPECIFICATIONS.
TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S
WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION
IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH
FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.
PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO ARCHITECT AND COR, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE
SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR
MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER
MATERIAL AS APPROVED BY ARCHITECT AND COR.
EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,
MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR, MECHANICAL
AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.
ALL APPLICABLE PERMITS SHALL BE KEPT ON SITE AT ALL TIMES DURING PERMITTED WORK.
WORK SHALL BE COORDINATED WITH COR, SUBMIT CERTIFICATIONS AS REQUIRED BY THE
SPECIFICATIONS. REQUIRED PERMITS INCLUDE, BUT ARE NOT LIMITED TO; DAILY BURN PERMITS
FOR ANY CUTTING/WELDING, LOCK-OUT-TAG-OUT AND LIVE ELECTRICAL PERMITS FOR ANY
ELECTRICAL WORK, CONFINED SPACE ENTRY PERMITS FOR ACCESSING TUNNELS, PIPE
CHASES, ETC., AND DIG PERMITS FOR SITE WORK.
1.
2.
3.
FIRE LIFE SAFETY NOTES
FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED DURING CONSTRUCTION
MUST BE RESTORED TO THEIR ORIGINAL CONDITION.
FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF EGRESS
MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN FIRE RESISTIVE
ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS OF EGRESS, TEMPORARY
CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.
VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED SEPTEMBER 5,
2023, REQUIRES VA MASTER SPECIFICATIONS, DIVISION 1 - GENERAL REQUIREMENTS,
SECTION 01 35 26 - SAFETY REQUIREMENTS MADE SPECIFIC FOR THE ASSOCIATED
CONSTRUCTION WORK.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION
FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL TIMES
PER LOCAL FIRE DEPARTMENT.
FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT ALL TIMES
AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.
FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION. THE
NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE STATE FIRE MARSHAL
OR LOCAL FIRE DEPARTMENT.
COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.
CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH VA FIRE DEPARTMENT
REQUIREMENTS.
FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER LOCAL
FIRE CODES.
REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES.
TEMPORARY EXITING SHALL BE APPROVED BY THE PROVIDENCE VA FIRE DEPARTMENT.
FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.
PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE FLAME RETARDANT.
SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS. WHEN
REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT DETECTORS MAY
BE SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.
ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT VEHICLE
ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE PRIOR TO AND
DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE COORDINATED WITH LOCAL
FIRE DEPARTMENT IN THE FIELD.
CULTURAL RESOURCE PROPERTIES - CONSTRUCTION AND ALTERATION OPERATIONS WITHIN
CULTURAL RESOURCE PROPERTIES SHALL BE PERFORMED IN ACCORDANCE WITH OTHER
CHAPTERS OF THIS STANDARD AND NFPA 909.
1.
2.
3.
4.
5.
ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE, CONTACT ARCHITECT AND COR PRIOR
TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER THE BID, CONTRACTOR SHALL CONFIRM
DIMENSIONS WITH ARCHITECT AND COR PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE
THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP DRAWINGS
CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS
REQUIRED.
ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED
CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR
ELEVATIONS.
ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL
DRAWINGS. MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN
DIMENSIONAL INFORMATION RELATED TO EQUIPMENT SIZES AND CLEARANCES.
DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
1.
2.
3.
4.
5.
6.
7.
8.
FLOOR PLAN DIMENSIONS
THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM
OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS SHOWN.
DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.
WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").
DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY
SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR
MAKES THE PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.
DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH"
OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS
ARE THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE
HEAD/SILL DIMENSIONS.
"TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR
WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS
(2.5"-DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=4.0")
SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE
COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN
TO THE FACES OF FINISHES.
DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
1.
ROOF PLAN DIMENSIONS
UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE
DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE
TO A FIXED WALL AND LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT
PENETRATIONS BETWEEN JOISTS.
1.
2.
3.
4.
5.
VERTICAL DIMENSIONS
UNLESS OTHERWISE NOTED, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS
REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).
BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATHING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.
WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN
LOAD-BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS).
HEIGHT REFERENCES SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION
LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UON.
EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UON.
SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
1.
2.
3.
4.
5.
6.
7.
HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.
TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.
CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE WALL AND/OR ROOF.
THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA WITH TEMPORARY ACCESSIBLE PARKING AND PUBLIC ACCESS WITH OWNER PRIOR TO CONSTRUCTION. PROTECT PARKING SIGNAGE WITHIN PROJECT AREA.
SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.
CONTRACTOR TO PROVIDE INFECTION CONTROL PLAN AS REQUIRED BY MEMORANDUM 111-40, SUBJ: VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED APRIL 6, 2017. SUBMIT TO COR PRIOR TO START OF
WORK.
1.
2.
3.
4.
5.
1.
2.
1.
2.
3.
1.
2.
1.
2.
3.
1.
1.
2.
1.
2.
3.
4.
A.
B.
C.
5.
6.
FIRE ALARM
DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, 2021
AND NFPA 72, 2022.
SUBMIT FOUR SETS OF PLANS TO VA (AHJ) FOR APPROVAL PRIOR TO THE INSTALLATION.
SUBMITTAL SHALL INCLUDE FM LISTING NUMBER FOR ALL COMPONENTS, A SINGLE-LINE DIAGRAM SHOWING PRIMARY POWER, EMERGENCY POWER RISER DIAGRAM, DETAILS OF TROUBLE SUPERVISION & POWER LIMITED/NON POWER LIMITED CIRCUITRY, FLOOR PLANS SHOWING LOCATION OF ALL COMPONENTS AND METHOD OF ALARM TRANSMISSION TO STATE FIRE MARSHAL OR
LOCAL FIRE DEPARTMENT.
THE FIRE ALARM SYSTEM SHALL CONFORM TO APPLICABLE NFPA STANDARDS. FIRE ALARM SHOP DRAWINGS SHALL BE SUBMITTED TO VA FOR APPROVAL PRIOR TO INSTALLATION. UPON COMPLETION OF THE INSTALLATION OF THE FIRE ALARM SYSTEM, A SATISFACTORY TEST OF THE ENTIRE SYSTEM WILL BE PERFORMED IN THE PRESENCE OF THE ENFORCING AGENCY.
THE ADDITION OF NEW DEVICES TO THE EXISTING BUILDING FIRE ALARM SYSTEM SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. DEVICE LOCATION AND WIRING RUNS SHOWN ON THE DRAWINGS ARE FOR REFERENCE ONLY. ACTUAL LOCATIONS SHALL BE IN ACCORDANCE WITH NFPA 72 AND PROJECT SPECIFICATIONS. THE FIRE ALARM SYSTEM IN THE MAIN COMPUTER ROOM SHALL INTERFACE WITH THE NEW CLEAN AGENT FIRE SUPPRESSION SYSTEM. THE EXISTING FIRE ALARM SYSTEMS IN ALL OTHER BUILDINGS SHALL INTERFACE WITH THE NEW DEVICES SHOWN ON
THE DRAWINGS.
FIRE EXTINGUISHERS
TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.
FOR TELECOMMUNICATION ROOMS (TR), THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET AWAY FROM THE NEW TR AND THEY MUST BE CLEAN AGENT OR CARBON DIOXIDE TYPE. CONTRACTOR TO COORDINATE THE NEW LOCATION WITH THE COR.
FIRE SPRINKLER SYSTEM
EXISTING FIRE SPRINKLER MAIN PIPES AND BRANCH LINES TO BE RETAINED AND REUSED. NEW SPRINKLERS WILL BE PROVIDED AT EACH TR AND MCR LOCATION. CONTRACTOR TO VERIFY THE EXACT SIZE AND LOCATION IN FIELD.
THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH 2022 NFPA 13.
ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.
FIRE & SMOKE DAMPERS
EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.
THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM AND FIRE SPRINKLER SYSTEM.
EXIT AND EMERGENCY LIGHTING
WHERE APPLICABLE, EXISTING AND/OR NEW EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW
THE THRESHOLD.
WHERE APPLICABLE, EXISTING AND/OR NEW EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE NFPA 101 AND THE VA
FIRE PROTECTION DESIGN MANUAL.
EMERGENCY LIGHTING SHALL BE PROVIDED FOR THE MAIN COMPUTER ROOM.
RATED DOOR AND WINDOW ASSEMBLIES
THE BUILDING IS EQUIPPED WITH RATED DOOR ASSEMBLIES. EXISTING RATINGS ARE TO BE MAINTAINED. NEW RATED DOORS
SHALL CLEARLY LABEL DOOR AND FRAME RATING, DO NOT PAINT.
FIRE STOPPING
FIRE STOPPING IS REQUIRED IN ALL FLOOR PENETRATIONS AND IN ALL PENETRATIONS OF RATED WALLS.ALL FIRE STOPPING
SHALL BE LISTED IN ACCORDANCE WITH NFPA REQUIREMENTS.
TEMPORARY FIRESTOPPING: IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED
PENETRATION.
GENERAL
INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING
INSULATION, FACING MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH
ASTM E 84.
HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE LATCH, MEASURED FROM THE LEADING EDGE OF THE DOOR.
COMPLY WITH NFPA REQUIREMENT FOR NEW AND EXISTING DOORS. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT
EXCEED:
INTERIOR DOORS - 5 lbs.
EXTERIOR DOORS - 8.5 lbs.
FIRE DOORS - 15 lbs.
ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A UL APPROVED
METHOD AND MATERIAL APPROVED BY BUILDING.
IF MULTIPLE CEILING TILES MUST BE REMOVED IN THE CORRIDOR SYSTEM AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER MIGHT NEED TO BE CONSTRUCTED; THE ALTERNATIVE IS TO INSTALL TEMPORARY
UPRIGHT SPRINKLER.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE
PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION
MANUAL FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION
OR REPAINTING WORK.
PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR
SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING,
SURFACE TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND
REMOVAL OF OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER
TYPES OF PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT
INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT
PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT
LIMITED TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND
FITTINGS (INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE
SEALED, UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING
SCOPE ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND
PAINTING GENERAL NOTES. THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY
EXCLUSIVE.
MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND
EXTERIOR EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED
METAL SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND
ELECTRICAL WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND
MECHANICAL WORK IN ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS
NOTED OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL
AND PLUMBING WORK IS COVERED IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.
APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF
MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE
INTENDED OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.
TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT
TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE
SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE
MATCHED, THE ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.
DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED
FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT
PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET
PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS
AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT
AN ITEM OR SURFACE, CONTACT THE ARCHITECT FOR INSTRUCTIONS PRIOR TO PAINTING.
EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL
SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER,
BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.
CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS
WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING
FURRED AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF
SEAL CONCRETE IN PIPE SPACE.
OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT
MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES,
MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION
PROPERLY IF PAINTED.
CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.
ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO FACILITATE WEATHER…