Attachment 33 - Site Visit Instructions - Updated 1.27.25.pdf

PDF 190 KB Posted

Attached to
Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
Solicitation number
36C77624B0015_1
Issued by

About this file

This is a site visit instruction document for the EHRM Infrastructure Upgrades project at VA Connecticut Healthcare System's Newington campus. The site visit is scheduled for Monday, February 3, 2025, at 9:00 AM ET, with attendees directed to meet in the Director's Conference Room on the 5th floor of Building 1, located at 555 Willard Ave, Newington, CT 06111.

Attendees must provide valid ID at the gate and are advised to arrive early or carpool due to limited parking availability. The document is associated with solicitation number 36C77624B0015_1, which involves construction services for IT and Communication Service Lines upgrades across multiple buildings (1C, 2E, 2C, 2W, 3, 12, 32, 33, 34, 42, 65) at the Newington VA Medical Center to prepare for a nationwide Cerner upgrade implementation.

View the file

Other files

File Type Posted
Technical Questions Tracking Spreadsheet - 2-13-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0007.pdf PDF
Attachment 34 - 689A4-22-700.EHRM.Newington.Add3.20250211.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0006.pdf PDF
Attachment 27 - Wage Rates 01.31.25- Hartford.pdf PDF
Bid Opening Details - Newington CT - 36C76624B0015.pdf PDF
Site Visit Sign In Sheet 2.3.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0005.pdf PDF
Attachment 2 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part1.pdf PDF
Attachment 21 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part2.pdf PDF
Attachment 13 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part4.pdf PDF
Attachment 17 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part2.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0004.pdf PDF
Attachment 22 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part1.pdf PDF
Attachment 32 - 689A4-22-700.EHRM.Newington -.20250114 - Addendum 2.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 12 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part3.pdf PDF
Attachment 15 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part6.pdf PDF
Attachment 20 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part1.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.23.25.pdf PDF
Attachment 18 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part3.pdf PDF
Attachment 23 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part2.pdf PDF
Attachment 19 - 689A4-22-700.Newington.EHRM.IFC.B12.20240703.pdf PDF
Attachment 14 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part5.pdf PDF
Attachment 10 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part1.pdf PDF
Technical Questions Tracking Spreadsheet - 1-23-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT .pdf PDF
Attachment 16 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part1.pdf PDF
Attachment 24 - 689A4-22-700.Newington.EHRM.IFC.SITE.20240703.pdf PDF
Attachment 11 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part2.pdf PDF
Attachment 31 - EHRM Newington-Pre Bid Presentation.010725.R02.pdf PDF
Technical Questions Tracking Spreadsheet - 1-6-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0003.pdf PDF
2025-01-07 Preproposal conference sign in list.pdf PDF
Attachment 30 - Price Schedule - 36C77624B0015 - 689A4-22-700 EHRM Infrastructure Newington.pdf PDF
Attachment 28 - Site Visit Instructions - Updated 1.6.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0002.pdf PDF
Attachment 19 - Newington EHRM Drawings - Part 10 of 16 - 12.31.24.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0001.pdf PDF
Attachment 29 - 689A4-22-700.EHRM.Newington.Add1.20241213.pdf PDF
Attachment 28 - Site Visit Instructions.pdf PDF
Attachment 24 - Newington EHRM Drawings - Part 15 of 16.pdf PDF
Attachment 11 - Newington EHRM Drawings - Part 2 of 16.pdf PDF
Attachment 26 - Newington VAHC campus map.pdf PDF
Attachment 22 - Newington EHRM Drawings - Part 13 of 16.pdf PDF
Attachment 23 - Newington EHRM Drawings - Part 14 of 16.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 14 - Newington EHRM Drawings - Part 5 of 16.pdf PDF
Attachment 10 - Newington EHRM Drawings - Part 1 of 16.pdf PDF
Attachment 27 - Wage Rates 8.9.24- Hartford.pdf PDF
Attachment 9 - Underground Utility Locating.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Newington EHRM Infrastructure Upgrades – Site Visit

An organized site visit has been scheduled for:

Monday – February 3, 2025 at 9:00 AM (ET)

Participants will meet at:

VA Connecticut Healthcare

System (VACHS) – West Haven

Campus

555 Willard Ave

Newington, CT 06111

The current entrance is:

All visitors shall park in the designated parking location indicated below. Due to parking limitations, we recommend visitors arrive early or carpooling.

All attendees shall provide a valid ID and show it at the gate.

All attendees shall report to:

To the Directors Conference Room on the 5th floor in Building 1.

Pre-Bid Conference February 3, 2025 9am

Bldg 1 – 5th Floor Directors Conference room

File details come from the government source that posted it. Updated .