Attachment 11 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part2.pdf

PDF 15 MB Posted

Attached to
Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
Solicitation number
36C77624B0015_1
Issued by

View the file

Other files

File Type Posted
Technical Questions Tracking Spreadsheet - 2-13-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0007.pdf PDF
Attachment 34 - 689A4-22-700.EHRM.Newington.Add3.20250211.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0006.pdf PDF
Attachment 27 - Wage Rates 01.31.25- Hartford.pdf PDF
Bid Opening Details - Newington CT - 36C76624B0015.pdf PDF
Site Visit Sign In Sheet 2.3.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0005.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.27.25.pdf PDF
Attachment 2 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part1.pdf PDF
Attachment 21 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part2.pdf PDF
Attachment 13 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part4.pdf PDF
Attachment 17 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part2.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0004.pdf PDF
Attachment 22 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part1.pdf PDF
Attachment 32 - 689A4-22-700.EHRM.Newington -.20250114 - Addendum 2.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 12 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part3.pdf PDF
Attachment 15 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part6.pdf PDF
Attachment 20 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part1.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.23.25.pdf PDF
Attachment 18 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part3.pdf PDF
Attachment 23 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part2.pdf PDF
Attachment 19 - 689A4-22-700.Newington.EHRM.IFC.B12.20240703.pdf PDF
Attachment 14 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part5.pdf PDF
Attachment 10 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part1.pdf PDF
Technical Questions Tracking Spreadsheet - 1-23-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT .pdf PDF
Attachment 16 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part1.pdf PDF
Attachment 24 - 689A4-22-700.Newington.EHRM.IFC.SITE.20240703.pdf PDF
Attachment 31 - EHRM Newington-Pre Bid Presentation.010725.R02.pdf PDF
Technical Questions Tracking Spreadsheet - 1-6-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0003.pdf PDF
2025-01-07 Preproposal conference sign in list.pdf PDF
Attachment 30 - Price Schedule - 36C77624B0015 - 689A4-22-700 EHRM Infrastructure Newington.pdf PDF
Attachment 28 - Site Visit Instructions - Updated 1.6.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0002.pdf PDF
Attachment 19 - Newington EHRM Drawings - Part 10 of 16 - 12.31.24.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0001.pdf PDF
Attachment 29 - 689A4-22-700.EHRM.Newington.Add1.20241213.pdf PDF
Attachment 28 - Site Visit Instructions.pdf PDF
Attachment 24 - Newington EHRM Drawings - Part 15 of 16.pdf PDF
Attachment 11 - Newington EHRM Drawings - Part 2 of 16.pdf PDF
Attachment 26 - Newington VAHC campus map.pdf PDF
Attachment 22 - Newington EHRM Drawings - Part 13 of 16.pdf PDF
Attachment 23 - Newington EHRM Drawings - Part 14 of 16.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 14 - Newington EHRM Drawings - Part 5 of 16.pdf PDF
Attachment 10 - Newington EHRM Drawings - Part 1 of 16.pdf PDF
Attachment 27 - Wage Rates 8.9.24- Hartford.pdf PDF
Attachment 9 - Underground Utility Locating.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN DOWN

WC WATER CLOSET

FLUSH VALVEFV

YH YARD HYDRANT

TD TRENCH DRAIN

FOV

FOR

FOS

FUEL OIL VENT

FUEL OIL RETURN

FUEL OIL SUPPLY

ES

EEW

EMERGENCY SHOWER

EMERGENCY EYEWASH

CWV COMBINATION WASTE AND VENT

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ACID NEUTRALIZING TANK

ACID RESISTANT VENT THROUGH ROOF

BALANCING COCK

BOTTOM OF PIPE

BRITISH THERMAL UNIT

BTU PER HOUR

CLOTHES WASHER BOX

CORROSION RESISTANT STEEL

CLEANOUT

CLEANOUT TO GRADE

CIRCULATION PUMP

DOUBLE CLEANOUT

DRINKING FOUNTAIN

ELEVATION

ELECTRIC WATER HEATER

ELECTRIC WATER COOLER

DEGREES FAHRENHEIT

FLOOR CLEANOUT

FINISHED FLOOR ELEVATION

FEET

GUTTER DRAIN

GREASE INTERCEPTOR

GALLONS PER HOUR

GALLONS PER MINUTE

GAS WATER HEATER

HORSEPOWER

HEAD

INCHES

INVERT

KILOWATT

1,000 BTUH

MIXING VALVE

NOT APPLICABLE

NOT IN CONTRACT

NUMBER

NORMALLY CLOSED

NORMALLY OPEN

OUTSIDE SCREW AND YOKE

PHASE

POUNDS PER SQUARE INCH GAUGE

STATIC PRESSURE

TYPICAL

YARD BOX

WALL CLEANOUT

AFF

AFG

ANT

AVTR

B.C.

BOP

BTU

BTUH

CWB

CRS

CO

COTG

CP

DCO

DF

EL

EWH

EWC

°F

FCO

FFE

FT

GD

GI

GPH

GPM

GWH

HP

HD

IN

INV

kW MBh

MV

NA

NIC

No. # N.C.

N.O.

OS&Y

Ph

PSIG

SP

TYP

YB

WCO

DOUBLE CLEANOUT TO GRADEDCOTG

ESEW EMERGENCY SHOWER EYE WASH

POWERS OF HARDNESS

PH

HOSE BIBBHB

DS DOWNSPOUT

DSN DOWNSPOUT NOZZLE

PLUMBING SYMBOL LEGEND

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS APPLY TO THIS PROJECT

ABBREVIATIONS

A

PENETRATION

TEST PLUG (PRESS/TEMP)

(WH) (HB)

RD/OD/DD

DCOTG

FCO/COTG

FS/FD/AD

VTR

ROOF DRAIN/OVERFLOW DRAIN/DECK DRAIN

TWO WAY OR DOUBLE CLEANOUT TO GRADE

FLOOR CLEANOUT/CLEANOUT TO GRADE

FLOOR SINK , FLOOR DRAIN , AREA DRAIN

WATER HAMMER ARREST0R

FITTING (PETE'S PLUG)

POINT OF CONNECTION TO EXISTING

AQUASTAT

PRESSURE GAUGE AND GAUGE COCK

THERMOMETER

STRAINER WITH BLOWDOWN VALVE & HOSE BIBB

NEW PIPE CONNECTION TO EXISTING PIPING

EXISTING PIPE TO BE REMOVED

EXISTING PIPING TO REMAIN

NEW PIPING

FLEXIBLE CONNECTION

UNIVERSAL TEMPERATURE-PRESSURE

ORIFICE UNION

FLANGED UNION

UNION

RISE IN PIPE

DROP IN PIPE

CAPPED OUTLET

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

ECCENTRIC REDUCER

REDUCER OR INCREASER

PIPE GUIDE

DIRECTION OF FLOW

MAV MANUAL AIR VENT (MAV)

AAV AUTOMATIC AIR VENT (AAV)

TRAP PRIMER WITH ACCESS PANELTP

SLOPE OF PIPE

VENT THROUGH ROOF

AG AIR GAP FITTING

WALL HYDRANT, HOSE BIBB

KEYED NOTE

OR

SCHEMATIC SYMBOLS

ABBREVIATIONSYMBOL DESCRIPTION

XX

255' OF 6" @ 0.15%SLOPESLOPE AND LINEAL FOOTAGE

F.D.C.FIRE DEPARTMENT INLET CONNECTION F.D.C.

SAS SASSANITARY MANHOLE

M.H. M.H.(E)

GM

WM

REDUCED PRESSURE BACKFLOW PREVENTER

STORM DRAIN

IRRIGATION

F.H.(E)F.H.

LP

PP

C.O.(E)C.O.

LIGHT POLE

FENCING

POWER POLE

CLEANOUT

THRUST BLOCK

CONSTRUCTION

FIRE HYDRANT

VALVE WITH VALVE BOX

NATURAL GAS

FIRE PROTECTION

COLD WATER SUPPLY

SANITARY SEWER

SASSAS

WATER METER

NATURAL GAS METER

GATE VALVE

VALVE IN RISER

WM

GM

LP

PP

POST INDICATOR VALVE

PIV PIV

W

F

SD

G

IRR

S EX. S

EX. W

EX. F

EX. G

EX. SD

EX. IRR

EXISTINGNEWDESCRIPTION

SITE UTILITY SYMBOLS

CARBON DIOXIDECO2

H

HE

AC

AR

CDA

LOX

LN

DV

DA

WAGD

IA

MV

O

NO

N

MA

DENTAL VACUUM

WASTE ANESTHESIA GAS DISPOSAL

INSTRUMENT AIR

DENTAL AIR

EXISTING PIPING

LIQUID NITROGEN

LIQUID OXYGEN

HYDROGEN

HELIUM

ACETYLENE

ARGON

COMPRESSED DRY AIR

ALARM PANEL (IN WALL)

MEDICAL VALVE BOX

MEDICAL GAS DROP

MEDICAL VACUUM

OXYGEN

NITROUS OXIDE

NITROGEN

MEDICAL AIR

O OXYGEN

CDA

CO2

AR

AC

HE

H

LN

LOX

MA

N

NO

O

MV

IA

WAGD

DA

DV

O

SYMBOL ABBREVIATION DESCRIPTION

DESCRIPTIONABBREVIATIONSYMBOL

PROCESS GASES

MEDICAL GAS SYMBOLS

S

VACUUM BREAKER

ATMOSPHERIC VACUUM BREAKER

PRESSURE STYLE

FLOW SWITCH

SOLENOID VALVE

FUEL GAS PRESSURE REGULATOR

DIAPHRAGM (PROCESS SYSTEMS)

OS&Y VALVE

GATE VALVE

GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

CHECK VALVE

PLUG VALVE

WATER PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

TEMPERATURE AND PRESSURE RELIEF VALVE

2-WAY CONTROL VALVE

3-WAY MODULATING CONTROL VALVE

VALVE IN VERTICAL

REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)

DRAIN VALVE

BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE

OR OR

OR

OR

DESCRIPTIONSYMBOL

VALVE SYMBOLS

P##

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

DRAWING NUMBER WHERE DETAILED

ELEVATION LETTER

LETTER REFER TO EQUIPMENT TYPE

NUMBER REFERS TO SPECIFIC EQUIPMENT

SYMBOL INDICATES FIXTURE/EQUIPMENT

IDENTIFIED IN EQUIPMENT SCHEDULE

SECTION SYMBOL

DETAIL SYMBOL

SECTION, ELEVATION, AND DETAIL TITLES

FIXTURE & EQUIPMENT SYMBOL

P-100 A

P-500

P-200 A

P-500

P-300 A

SCALE

ELEVATION

SCALE

DETAIL

SCALE

SECTION

IRR

INDIRECT WASTEIW

TW

TWR

SAN

V

DHWR

DCW

DHW

LA

IA

INW

IHWR

IHW

ICW

PD

SCW

IRR

NGH

NGM

G

LPG

ORD

RD

DIR

DIS

NPW

MU

ROR

ROS

CD

CA

AW

AV

PUMPED DISCHARGE LINE

IRRIGATION

SOFT COLD WATER

TEMPERED WATER (TEMP °F)

TEMPERED WATER RETURN (TEMP °F)

NATURAL GAS-HIGH PRESSURE

NATURAL GAS-MEDIUM PRESSURE

LAB COMPRESSED AIR

INSTRUMENT COMPRESSED AIR

INDUSTRIAL WASTE

REVERSE OSMOSIS RETURN

INDUSTRIAL HOT WATER RETURN

INDUSTRIAL HOT WATER

INDUSTRIAL COLD WATER

NATURAL GAS-LOW PRESSURE

LIQUIFIED PETROLEUM GAS

OVERFLOW ROOF DRAIN

STORM/ROOF DRAIN

SANITARY SEWER

DEIONIZED WATER RETURN

DEIONIZED WATER SUPPLY

VENT

NON-POTABLE WATER

MAKE-UP WATER

REVERSE OSMOSIS SUPPLY

140° DOMESTIC HOT WATER

140° DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER

DOMESTIC COLD WATER

CONDENSATE DRAIN

COMPRESSED AIR

ACID WASTE

ACID VENT

SHW SOFT HOT WATER

SAN

AV

AW

CA

CD

ROS

ROR

NPW

V

DIS

DIR

RD

ORD

LPG

G

NGM

NGH

SCW

PD

INW

IA

IW

LA

SHW

GW GREASE WASTEGW

GV GREASE VENT

ABBREVIATIONSYMBOL DESCRIPTION

PIPING SYMBOLS

ICW

IHW

IHWR

TWR (_ _ _)

TW (_ _ _)

GV

DCW

DHW

DHWR

DHW 140ºF

DHWR 140ºF

MU

DHW 140ºF

DHWR 140ºF

CUBIC FEET PER HOURCFH

O OXYGENO

MA MEDICAL AIRMA

MV MEDICAL VACUUMMV

P-110

P-408

P-502

P-528

FD-R

WATER CLOSET (WALL HUNG ASME A112.19.2)

ELONGATED BOWL, SIPHON JET 4.8 L (1.28 GALLONS) PER FLUSH, WALL OUTLET WITH 10 PERCENT MAXIMUM VARIANCE, BACK

INLET SPUD. TOP OF SEAT SHALL BE 450 MM (18 INCHES) ABOVE FINISHED FLOOR.

SEAT: INSTITUTIONAL/INDUSTRIAL, EXTRA HEAVY DUTY, CHEMICAL RESISTANT, SOLID PLASTIC, OPEN FRONT LESS COVER FOR ELONGATED BOWLS, INTEGRALLY MOLDED BUMPERS, CONCEALED CHECK HINGE WITH STAINLESS STEEL POST. SEAT SHALL BE

POSTURE CONTOURED BODY DESIGN. COLOR SHALL BE WHITE.

FLUSH VALVE: 1.28 GPF, CONCEALED, LARGE CHLORAMINES RESISTANT DIAPHRAGM SEMI-RED BRASS VALVE BODY, HYDRAULIC FLUSH VALVE, NON-HOLD OPEN, PUSH BUTTON MINIMUM 40 MM (1-1/2 INCHES) DIAMETER, 25 MM (1 INCH) IPS WHEEL HANDLE BACK CHECK ANGLE VALVE, HIGH PRESSURE VACUUM BREAKER, CONCEALED BACK SPUD CONNECTION. VALVE BODY, TAILPIECE AND CONTROL STOP SHALL BE IN CONFORMANCE WITH ASTM ALLOY CLASSIFICATION FOR SEMI-RED BRASS. FLUSHOMETER VALVE SHALL BE FITTED WITH A 1-1/2” FLUSH TUBE WITH TRAP PRIMER COLLAR, SPUD COUPLING AND FLANGE FOR SPUD CONNECTION, 3/8” X 12” SUPPLY TUBE AND FITTINGS, VACUUM BREAKER TUBE NUT AND WALL ESCUTCHEON. EXTEND TRAP PRIMER LINE AS SHOWN ON PLANS. REFERENCE ZURN P6000-TPO AQUAFLUSH TRAP PRIMER ASSEMBLY. PROVIDE 300 MM BY 400 MM (12 INCHES BY 16 INCHES) STAINLESS STEEL ACCESS DOOR WITH VANDAL RESISTANT SCREWS AS SPECIFIED IN SECTION 08 31 13, ACCESS

DOORS AND FRAMES.

LAVATORY, BARRIER FREE

WALL HUNG, 30"x14 1/4", VITREOUS CHINA, FAUCET HOLES AS REQUIRED, SELF DRAINING DECK. PROVIDE CONCEALED ARM

SUPPORT CARRIER. SEE SPECIFICATION 22 40 00. ADA DESIGNED CORIAN SINK

FAUCET: 0.5 GPM, SOLID CAST BRASS CONSTRUCTION, CHROME PLATED, GOOSENECK SPOUT WITH OUTLET 102 MM TO 127 MM (4 INCHES TO 5 INCHES) ABOVE RIM. 102 MM (4 INCHES) CENTER SET MOUNTING, WIRING BOX, 120/24 VOLT SOLENOID, REMOTE MOUNTED TRANSFORMER, BACK CHECK VALVES, ANGLE STOPS, SOLID BRASS HOT-COLD WATER MIXER ADJUSTED FROM TOP DECK WITH BARRIER FREE DESIGN CONTROL HANDLE, AND INLINE FILTER. PROVIDE LAMINAR FLOW CONTROL DEVICE. BREAKING THE LIGHT BEAM SHALL ACTIVATE THE WATER FLOW. FLOW SHALL STOP WHEN USER MOVES AWAY FROM LIGHT BEAM. PROVIDE STEEL ACCESS DOOR WITH KEY OPERATED CYLINDER LOCK. SEE SECTION 08 31 13, ACCESS DOORS AND FRAMES ALL CONNECTING WIRING BETWEEN TRANSFORMER, SOLENOID VALVE AND SENSOR SHALL BE CUT TO LENGTH WITH NO EXCESS HANGING OR WRAPPED UP WIRING ALLOWED. BARRIER FREE LAVATORIES SHALL BE INSULATED WITH PLUMBEREX PRO-2000 SERIES INSULATION KITS WHICH SATISFY ANSI A117.1 REQUIREMENTS. PROVIDE COVER FOR EXPOSED PIPING, DRAIN, STOPS AND

TRAP PER A.D.A.

DRAIN: CAST OR WROUGHT BRASS WITH FLAT GRID STRAINER WITH OFFSET TAILPIECE, BRASS, CHROME PLATED.

TRAP: CAST COPPER ALLOY, 38 MM BY 32 MM (1 1/2 INCHES BY 1 1/4 INCHES) P-TRAP. ADJUSTABLE WITH CONNECTED ELBOW AND 17 GAGE TUBING EXTENSION TO WALL. EXPOSED METAL TRAP SURFACE AND CONNECTION HARDWARE SHALL BE CHROME

PLATED WITH A SMOOTH BRIGHT FINISH. SET TRAP PARALLEL TO WALL.

SERVICE SINK (CORNER, FLOOR MOUNTED)

PORCELAIN CORNER, 711 MM BY 711 MM BY 305 MM (28 INCHES BY 28 INCHES BY 12 INCHES) WITH 152 MM (6 INCHES) DROP FRONT.

TERRAZZO, COMPOSED OF MARBLE CHIPS AND WHITE PORTLAND CEMENT, SHALL DEVELOP COMPRESSIVE STRENGTH OF 20684 KPA (3000 PSIG) SEVEN DAYS AFTER CASTING. PROVIDE EXTRUDED ALUMINUM CAP ON FRONT SIDE . PROVIDE INTEGRAL STAINLESS STEEL STRAINER DRAIN, 3" CAST IRON P-TRAP, HOSE AND BRACKET, 30"LONG FLEXIBLE HEAVY DUTY 5/8" RUBBER HOSE, MFG: FIAT No. 832AA. MOP BRACKET, 24"LONG x 3" WIDE, STAINLESS STEEL WITH THREE RUBBER GRIPS, FIAT No. 889CC.

FAUCET: SOLID BRASS CONSTRUCTION, 9.5 L/M (1.5 GPM) COMBINATION FAUCET WITH REPLACEABLE MONEL SEAT, REMOVABLE REPLACEMENT UNIT CONTAINING ALL PARTS SUBJECT TO WEAR, INTEGRAL CHECK/STOPS, MOUNTED ON WALL ABOVE SINK.

SPOUT SHALL HAVE A PAIL HOOK, 19 MM (3/4 INCH) HOSE COUPLING THREADS, VACUUM BREAKER, AND TOP OR BOTTOM BRACE TO WALL. FOUR-ARM HANDLES ON FAUCETS SHALL BE CAST, FORMED, OR DROP FORGED COPPER ALLOY. ESCUTCHEONS SHALL BE EITHER FORGED COPPER ALLOY OR CRS. EXPOSED METAL PARTS, INCLUDING EXPOSED PART UNDER VALVE HANDLE WHEN IN OPEN POSITION, SHALL HAVE A SMOOTH BRIGHT FINISH. PROVIDE 914 MM (36 INCHES) HOSE WITH WALL HOOK. CENTERLINE OF

ROUGH IN IS 1219 MM (48 INCHES) ABOVE FINISHED FLOOR.

DRAIN: 3 INCHES CAST BRASS DRAIN WITH NICKEL BRONZE STRAINER. P-TRAP, DRAIN THROUGH FLOOR.

SINK (STAINLESS STEEL, SINGLE COMPARTMENT, COUNTER TOP ASME A112.19.2, KITCHEN SINKS) COUNTERTOP MOUNTED, SINGLE COMPARTMENT, THREE HOLE, CENTER DRAIN OUTLET, SELF-RIMMING, BACK FAUCET LEDGE, APPROXIMATELY 533 MM BY 559 MM (21 INCHES BY 22 INCHES) WITH SINGLE COMPARTMENT INSIDE DIMENSIONS APPROXIMATELY 406 MM BY 483 MM BY 191 MM (16 INCHES BY 19 INCHES BY 7 1/2 INCHES) DEEP. SHALL BE MINIMUM OF 1.3 MM THICK (18 GAUGE) 304 STAINLESS STEEL. CORNERS AND EDGES SHALL BE WELL ROUNDED . PROVIDE COVER FOR EXPOSED PIPING, DRAIN, STOPS AND

TRAP PER A.D.A..

FAUCET: 1.5 GPM, CHROME PLATED SOLID BRASS CONSTRUCTION, 8 ” CENTERS, 8” GOOSENECK SPOUT, 8.3 L/M (1.5 GPM) DECK MOUNTED COMBINATION FAUCET WITH MONEL OR CERAMIC SEATS, REMOVABLE REPLACEMENT UNIT CONTAINING ALL PARTS SUBJECT TO WARE, SWIVEL GOOSENECK SPOUT WITH APPROXIMATELY 203 MM (8 INCHES) REACH WITH SPOUT OUTLET 152 MM (6 INCHES ABOVE DECK AND 102 MM (4 INCHES) WRIST BLADES. FAUCET SHALL BE POLISHED CHROME PLATED.

THERMOSTATIC MIXING VALVE: PROVIDE THERMOSTATIC MIXING VALVE PER ASSE REQUIREMENTS FOR ALL HOT WATER

FIXTURES. BASIS OF DESIGN FOR ALL THERMOSTATIC MIXING VALVES IS WATTS.

DRAIN: DRAIN PLUG WITH CUP STRAINER, STAINLESS STEEL.

TRAP: CAST COPPER ALLOY, 38 MM (1 1/2 INCHES) P-TRAP WITH CLEANOUT PLUG, CONTINUOUS DRAIN WITH WALL CONNECTION

AND ESCUTCHEON.

FLOOR DRAIN

CAST IRON BODY, CLAMPING DEVICE, 6" DIAMETER, ROUND OR SQUARE GRATE, TYPE A - NICKEL BRONZE ADJUSTABLE GRID STRAINER, DEEP SEAL P-TRAP. SERVICE GENERAL PURPOSE RESTROOMS, KITCHENS, LOCKER ROOMS, ETC, SIZE AS INDICATED ON DRAWINGS. ALL FLOOR DRAINS AND FLOOR SINKS SHALL HAVE A SINGLE OR MANIFOLD ELECTRONIC TRAP PRIMER SUPPLY.

THE TRAP PRIMER CONTROL BOX SHALL BE RECESSED. TRAPS PRIMER CONTROL BOX SHALL BE LOCATED A MAXIMUM

OF 6.1 M [20 FT.] FROM THE TRAPS

PLUMBING FIXTURE SCHEDULE

07/03/2024

07/03/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

01_02

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.G en er al

.S he et s.

rv t

-1

0-

6:

:3

01P-001

PLUMBING ABBREVIATIONS AND SYMBOLS 689A4-22-700

07/03/2024 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

Revisions: Date:

TYP.

TYP.

TYP.

TELEPHONE

ADVICE

2E-1179

117 SF

TOILET

2E-1178A

41 SF

EXAM RM

(TB)

2E-1178

97 SF

URGENT

CARE

STATION

2E-1050

CORRIDOR

C1-34

CORRIDOR

STAFF

KITCHEN

1-324

161 SF

07/03/2024

07/03/2024

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

2W

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

2C 2E

STAMP

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.B

_0 2_

R

.rv t

-1

0-

6:

:0

01P-401

PLUMBING ENLARGED PLANS 689A4-22-700

01_02

07/03/2024 M. Perkins T. Nakalawa

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

SCALE: 1/2" = 1'-0"F7

PLUMBING ENLARGED PLAN - FIRST

LEVEL - RM 2E-1178,2E-1178A,2E-1179

- DEMO

1.

2.

3.

4.

5.

6.

DEMOLISH EXISTING LAVATORY AND ALL ASSOCIATED PIPING BACK TO MAINS.

DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED ISOLATION

VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS, LEVEL AND

FINISH TO MATCH EXISTING.

DEMOLISH EXISTING WATER CLOSET AND ALL ASSOCIATED PIPING BACK TO

MAINS. DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED

ISOLATION VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS,

LEVEL AND FINISH TO MATCH EXISTING.

DEMOLISH EXISTING FLOOR DRAIN AND ALL ASSOCIATED PIPING BACK TO

MAINS. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS, LEVEL AND

FINISH TO MATCH EXISTING.

DEMOLISH EXISTING SINK AND ALL ASSOCIATED PIPING BACK TO MAINS.

DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED ISOLATION

VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS, LEVEL AND

FINISH TO MATCH EXISTING.

DEMOLISH EXISTING DISHWASHER AND ALL ASSOCIATED PIPING BACK TO

MAINS. DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED

ISOLATION VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS,

LEVEL AND FINISH TO MATCH EXISTING.

DEMOLISH EXISTING REFRIGERATOR AND ALL ASSOCIATED PIPING BACK TO

MAINS. DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED

ISOLATION VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS,

LEVEL AND FINISH TO MATCH EXISTING.

A.

B.

C.

D.

E.

F.

G.

CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1/2" = 1'-0"F5

PLUMBING ENLARGED PLAN - THIRD

LEVEL - RM 1-324 - DEMO

07/03/2024

07/03/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

01_02

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.G en er al

.S he et s.

rv t

-1

0-

6:

:3

01P-901

PLUMBING CUTSHEETS 689A4-22-700

07/03/2024 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

A

B

M

HS

S

HWS

M

M

P

PS PS

F

PS

TS

V

D

TWS

TWR

TWB

MPS

HPS

LPS

CHR

RS

RL

HWR

R

T

H

CO2

CHS

XX-##

SDSD

ELBOW - DOWN

ELBOW - UP

PIPE RISE-DROP

TEE - DROP FROM TEE

END CAP

FLEX CONNECTION

PIPE REDUCER - CONCENTRIC

PIPE STRAINER

CHECK VALVE

GATE VALVE

PLUG VALVE

GLOBE VALVE

UNION - SCREWED

CHILLED WATER SUPPLY

CHILLED WATER RETURN

REFRIGERATION

STEAM - MEDIUM PRESSURE SUPPLY

STEAM - LOW PRESSURE SUPPLY

STEAM - HIGH PRESSURE SUPPLY

HEATING WATER RETURN

HEATING WATER SUPPLY

DEMO

EXISTING

TOWER WATER BYPASS

TOWER WATER RETURN

TOWER WATER RETURN

REFRIGERATION LIQUID

REFRIGERATION SUCTION

MECHANICAL PIPING

DIRECTION OF FLOW

MAKE-UP WATER

VENT

DRAIN

GEOTHERMAL SUPPLY

GEOTHERMAL RETURN

MU

CONDENSATE DRAINCD

STEAM - MEDIUM PRESSURE RETURN

STEAM - LOW PRESSURE RETURN

STEAM - HIGH PRESSURE RETURNHPR

HPR

LPR

CONDENSER WATERCND

GWS

GWR

DIRECTION PITCHDOWN

VERIFY WITH

ARCHITECTURAL

DRAWINGS

PUMPED CONDENSATEPC

PRESSURE REDUCING VALVE

3-WAY

MODULATING

CONTROL VALVE

2-WAY CONTROL VALVE

SAFETY VALVE OR

PRESSURE RELIEF

VALVE

SOLENOID VALVE

3/4" BALL VALVE WITH ADAPTER

TO 3/4" HOSE THREAD

DIAPHRAGM VALVE

BUTTERFLY VALVE

BALL VALVE

VALVE IN RISE

WATER FLOW MEASURING DEVICE

CIRCUIT SETTER

ELBOW - DROP TO TEE

PIPE REDUCER - ECCENTRIC

AIR VENT - AUTOMATIC

AIR VENT - MANUAL

GAUGE - DIFFERENTIAL

GAUGE - PRESSURE

GAUGE - PRESSURE WITH COCK

GAUGE - TEMPERATURE

PIPE ANCHOR

PIPE EXPANSION JOINT

PIPE GUIDE

SENSOR - FLOW

SWITCH - FLOW

SWITCH HUMIDITY

SWITCH - PRESSURE

SWITCH - TEMPERATURE

TEMPERATURE - PRESSURE TEST FITTING

THERMOMETER

THERMOMETER WELL

BASKET STRAINER

STEAM TRAP INVERTED BUCKET

METER - TOTALIZING BTU

METER - TOTALIZING FLOW

M301 A1

SCALE

DETAIL

SCALE

SECTIONA1

A1

X#/X###

MECHANICAL SYMBOL LEGEND

DUCT TRANSITION FROM RECTANGULAR TO ROUND

DUCT TRANSITION

SIDEWALL EXHAUST OR RETURN AIR GRILLE

OR REGISTER

SIDEWALL SUPPLY REGISTER

RETURN DUCT

SUPPLY DUCT

RISE IN DUCT

CEILING RETURN AIR REGISTER OR GRILLE

SMOKE DAMPER

ACOUSTICAL DUCT LINING

FLEXIBLE DUCT

FIRE DAMPER

MANUAL BALANCING DAMPER

12"Ø INDICATES A 12" ROUND DUCT

24x12Ø INDICATES A 24"x12" FLAT OVAL DUCT (WIDTH x DEPTH)

EXISTING DUCT TO BE REMOVED

ACCESS DOOR

24x12 INDICATES A 24"x12" RECTANGULAR DUCT (WIDTH x DEPTH)

POINT OF CONNECTION, NEW DUCT TO EXISTING DUCT

OR / POINT OF REMOVAL FROM EXISTING DUCT TO DEMO DUCT

PERFORATED FACE CEILING DIFFUSERS

DUCTWORK SYMBOLS

ROOM HUMIDISTAT/HUMIDITY TRANSMITTER LOCATION ONLY

SEE CONTROL DRAWINGS FOR TYPE

SEE CONTROL DRAWINGS FOR TYPE

ROOM THERMOSTAT/TEMP. TRANSMITTER LOCATION ONLY

LETTERS REFER TO THE EQUIPMENT TYPE

EQUIPMENT SYMBOLS

NUMBERS REFER TO SPECIFIC EQUIPMENT

DUCT MOUNTED STATIC PRESSURE PROBE

DRAWING NUMBER WHERE DETAILED

SECTION LOCATION

DRAWING NUMBER WHERE DETAILED

DETAIL LOCATION

SECTION LETTER LOCATION

SECTION SYMBOL

DETAIL SYMBOL

SECTION AND DETAIL TITLES

DETAIL NUMBER LOCATION

SYMBOL INDICATES EQUIPMENT IDENTIFIED

IN EQUIPMENT SCHEDULE

XX-#

CFM

SYMBOL INDICATES GRILLE OR DIFFUSER

IDENTIFIED IN EQUIPMENT SCHEDULE

S.DPR

F.DPR

CEILING EXHAUST REGISTER

VALVE SYMBOLS FITTING SYMBOLS

PIPING SYMBOLS

EXHAUST DUCT

2HR. SMOKE BARRIER

SMOKE BARRIER

2HR. FIRE BARRIER

1 HR. FIRE BARRIER

##x##

SIDEWALL GRILLE DIMENSION WHERE

SHOWN ON PLANS

COMBINATION FIRE/SMOKE DAMPER

F/S DPR

FLEXIBLE CONNECTION

STANDARD LONG RADIUS ELBOW

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES

EXCEPT TRANSFER AIR SOUND ELBOW)

SHORT RADIUS ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR ELBOWS WITH

VANES EXCEPT TRANSFER AIR SOUND

ELBOW)

ROOM CARBON DIOXIDE TRANSMITTER LOCATION ONLY

SEE CONTROL DRAWINGS FOR TYPE

24"x12"

24"/12"

12"Ø

DUCT MOUNTED SMOKE DETECTOR

STAMPED FACE CEILING DIFFUSERS

NOTE: NOT ALL ABBREVIATIONS AND

SYMBOLS APPLY TO THIS PROJECT.

A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN

FURRED CHASES OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.

B. PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR

CHASES FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, COILS, FANS,

CONTROLS, ETC. THEY SHALL BE FURNISHED UNDER DIVISION 23 AND

INSTALLED UNDER THE ARCHITECTURAL SPECIFICATION. ACCESS DOOR RATING

SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING.

C. COORDINATE THE LOCATION OF ALL DIFFUSERS, GRILLES, REGISTERS, ACCESS

DOORS, ETC., WITH THE ARCHITECTURAL REFLECTED CEILING PLAN(S).

D. ALL ROUND RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL

SIZE AS THE SCHEDULED DIFFUSER NECK SIZE.

E. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR

INDICATED. ALL DUCT SIZES SHOWN ON DRAWINGS ARE NET INSIDE DIMENSIONS.

PROVIDE ONE INCH ACOUSTICAL LINING (TYPE D3 INSULATION) IN LOW VELOCITY

RECTANGULAR DUCTWORK FOR THE FIRST 10 DIAMETERS OF DUCTWORK

CONNECTED TO DEVICE, OR AS INDICATED ON DRAWINGS, WHICHEVER IS

GREATER. FOR THE REMAINDER OF THIS DUCTWORK PROVIDE AS INDICATED IN

THE INSULATION SPECIFICATIONS.

F. PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING

AND 1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS

REQUIRED TO PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES

OCCUR ABOVE CEILING AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE

PROVIDE HOSE CONNECTION ON VALVE.

G. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE

RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. PROVIDE APPROVED

FIRE DAMPERS IN ALL REQUIRED PENETRATIONS FOR DUCTWORK, GRILLES,

REGISTERS AND DIFFUSERS. ALL PIPE AND DUCTWORK PENETRATIONS OF FIRE,

SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT

STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

H. CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND

FIRE PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND

SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

EQUIPMENT ACCESS AND SERVICEABILITY.

I. CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS,

SLEEVES, AND HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND

PLUMBING EQUIPMENT, DUCTWORK AND PIPING, ETC. CONTRACTOR SHALL

COORDINATE WITH GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID

CONFLICTS AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.

J. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY

MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO

ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT

IN A MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE

BUILDING STRUCTURAL SYSTEM.

K. CONTRACTOR SHALL PROVIDE RETURN AIR OR TRANSFER AIR OPENINGS IN

FULL HEIGHT WALLS SIZED AT 350 FPM (UNLESS OTHERWISE SPECIFICALLY

SHOWN ON THE DRAWINGS) TO CREATE AND/OR MAINTAIN A RETURN AIR PATH AS

REQUIRED. FIRE DAMPERS AND/OR SMOKE DAMPERS SHALL BE PROVIDED IN

SUCH OPENINGS WHERE REQUIRED BY NOTE "J".

L. SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, DUCT WALL

PENETRATIONS AND FITTING CONNECTIONS ON ALL DUCT SYSTEMS.

M. MECHANICAL ITEMS SUCH AS ROOF DRAINS, FLOOR DRAINS, PLUMBING FIXTURES,

ETC. SHOWN ON THE ARCHITECTURAL DRAWINGS BUT NOT SHOWN ON THE

MECHANICAL DRAWINGS SHALL BE INCLUDED IN THE PROJECT. THESE ITEMS

SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR INCLUSION IN

ADDENDUM.

N. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL

SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT

AND UNCLEAR SUBMITTALS WILL BE REJECTS AND MARKED AS "REVISE AND

RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT

SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE

ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE

SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE

REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER

FROM THE BASIS OF DESIGN CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES

FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE

INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT

ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON

THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE

REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS

(FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS

DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE

PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE

DRAWINGS.

O. THIS PROJECT RECONFIGURATION OF EXISTING BUILDING MECHANICAL AND

PLUMBING SYSTEMS TO MAINTAIN EXISTING BUILDING UTILITY SERVICES. THIS

WORK INCLUDES: (1) RELOCATING AND REPLACING EXISTING DUCT, PIPE, AIR

TERMINALS, ETC.; (2) PROVIDING NEW STRUCTURAL SUPPORTS AND SEISMIC

BRACING FOR EXISTING MECHANICAL AND PLUMBING SYSTEMS WHERE

RECONFIGURATIONS ARE REQUIRED; (3) PROVIDING DRIP PANS WITH DRAIN

CONNECTIONS TO EXISTING FLOOR DRAINS BELOW ALL EXISTING WATER WATER

PIPES THAT ROUTE ADJACENT TO OR ABOVE ELECTRICAL AND COMMUNICATIONS

EQUIPMENT.

P. CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS PRIOR TO COMMENCING

WORK SHOWING ALL NEW AND EXISTING SYSTEMS IN THE AREA OF WORK AND

ALL PROVISIONS FOR COORDINATING ROUTING, ACCESS AND CLEARANCES.

SUBMITTALS WILL NOT BE ACCEPTED WITHOUT APPROVED COORDINATION

DRAWINGS.

A. THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING

SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE

PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION,

ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING BUILDING

MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.

B. THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING

SERVICES FOR REMOVAL WITH OWNER AUTHORIZED REPRESENTATIVE AND SHALL

CONFORM TO THEIR REQUIREMENTS.

C. DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE

MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT

THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY WHICH ARE

OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE

OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED

OUTSIDE OF THE SUITE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE

FACILITY.

D. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK ZONE

AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC. FOR ALL

WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO MINIMIZE DUST

AND FUMES.

E. THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN ADVANCE

TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE FOR

APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN

OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL

COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH

ACCEPTABLE ROUTING AND ACCESS WITHIN THE FACILITY FOR MATERIALS REQUIRED

FOR THE NEW INSTALLATION.

F. SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING OR

MECHANICAL SYSTEMS FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.

G. ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED ON

FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND MEASUREMENT DATA.

H. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES

INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND ARCHITECTURAL.

ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT PRIOR

TO START OF WORK.

I. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO

ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS

GENERAL DEMO NOTES

GENERAL NOTESABBREVIATIONS

AHU AIR HANDLING UNIT

BRAKE HORSEPOWER

BTU PER HOUR

BRITISH THERMAL UNIT

BOTTOM OF DUCT

BOTTOM OF PIPE

ACOUSTIC LINING

ABOVE FINISHED FLOOR

ACCESS DOOR

COMPRESSED AIR

DRAIN

ENTERING

EXHAUST

CONTINUATION

DIRECT EXPANSION

CUBIC FEET PER MINUTE

CONDENSATE DRAIN

AL

AFF

AD

BHP

BOD

BTU

BOP

CA

CFM

D

DX

ENT

EXH

CD

EMCS

CONT.

BTUH

FLEXIBLE

FLAT BOTTOM

FILTER GAUGE

FLOOR SINK

FLOOR DRAIN

FAN COIL UNIT

DEGREES FAHRENHEIT

FEET PER MINUTE

FEET

FLAT TOP

HOSE BIBB

INCHES

GALLONS PER MINUTE

GALLONS PER HOUR

FB

°F

FD

FCU

F.G.

FS

FPM

FT.

FT

GPM

GPH

HB

HD

IN

HEPA

FLEX

KILOWATT

MAIN AIR (CONTROLS)

KILOWATT HOUR

OPPOSED BLADE DAMPER

OUTSIDE AIR

NUMBER (QUANTITY)

NOT IN CONTRACT

NOT APPLICABLE

MOTOR CONTROL CENTER

QUANTITY

QUADRANT

REVOLUTIONS PER MINUTE

RELATIVE HUMIDITY

SMOKE CONTROL DAMPER

RETURN AIR

PRESSURE REDUCING VALVE

KW

KWH

MA

MCC

NO.

NIC

OBD

OA

NA

PRV

PSIG

QTY

Rh R.A.

RPM

SCD

QUAD

ENERGY MANAGEMENT CONTROL SYSTEM

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HAND DAMPER (VOLUME DAMPER)

POUNDS PER SQUARE INCH GAGE

TYPICAL

VOLTS

SOUND TRAP

VARIABLE AIR VOLUME

TOP OF PIPE TRAPEZE

VENT THRU ROOF

VELOCITY

ST

SP

TYP.

VAC

VAV

V

TP

VTR

VEL

SDVV

TOPT

SINGLE DUCT VARIABLE VOLUME

STATIC PRESSURE (INCHES OF WATER)

TOTAL PRESSURE (INCHES OF WATER)

VOLTS, ALTERNATING CURRENT

ACU AIR CONDITIONING UNIT

CONTRACTING OFFICER'S REPRESENTATIVECOR

RS

RL REFRIGERATION LIQUID

REFRIGERATION SUCTION

CONDENSING UNITCU

INDOOR UNITIU

07/03/2024

07/03/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

01_02

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.G en er al

.S he et s.

rv t

-1

0-

6:

:4

01M-001

MECHANICAL ABBREVIATIONS AND SYMBOLS 689A4-22-700

07/03/2024 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

UP

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

F2

T-

1C

F1

T-

1E

/F1 01T-101

CHASE

ELEV #S3

1N-115

1N-114

1N-116

PROSTHETIC

STORAGE

RM

1C-146

1-146A

ELEV

ELEV

STAIR #2

OFFICE

EXAM

171OFFICE

EXAM

OFFICE

EXAM

CONTROL

RM

174A

EXAM RM

174B

1S-175A

WAITING

ARA

1S-168

1S-170A

TOILET

1S-169

1S-170C

ISOTOPIC

ST

1S-175

OFFICE

1S-177

ELECTRICAL

RM

1S-179

CORRIDOR

1S-C1-4

MECH

1S-176

ISOTOPIC

ST

1S-178

PUMP RM

1S-180

RECEPTION

1S-171A

CORRIDOR

1S-C1-5

TELEPHONE

RM

1S-164

MECH RM

1S-167

TELEPHONE

RM

1C-143

TELECOM

ROOM

1C-142

1C-141

CORRIDOR

1C-C1-6

CORRIDOR

1C-C1-7

LOCK

SMITH

1C-145

STAIR #1

HOSPITAL

WHEEL

CHAIR

STORAGE

1C-147

CORRIDOR

1C-C1-8

ELECT.

1S-162-0

HOT

WATER

HEATERS

1S-164-0

MECH

1S-165

TOILET

1S-166

WALK IN

COOLER

1S-170B

CONTROL

RM

174C

CONTROL

RM

174F

EXAM RM

174D

EXAM RM

174E

AUDIOLOGY

TEST

BOOTH

1N-117

1N-117A

CORRIDOR

1N-C1-2

COMPUTER

RM

1C-148D

TRNG

BATH

1N-101A

TRNG

KITCHEN

1N-101OCCUPATIONAL

THERAPY

1N-109

STORAGE

1N-109B

OCCUPATIONAL

THERAPY

1N-109ACOMMUNICATION

ELECTRICAL

1N-110

1N-112

CORRIDOR

1N-C1-1

1S-170

STAFF

-CONTROL

CT

PIPE

CHASE

106A

STORAGE

CORRIDOR

STAFF

TLT

MSA

WAITING

102TOILET

INJECTION

CHANGING

ROOM

SOILED

UTILITY

CORRIDOR

TOILET

HSA

117READING

N

CU-01

3/4" RL

7/8" RS

PIPE RISE UP TO BC-1 ON

THIRD FLOOR

01M-401A F7

3/4" CD TYP.

01M-401A C7

01M-401C F2

01M-401C F7

TOILET

1C-148G

40 SF

07/03/2024

07/03/2024

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

2W

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

2C 2E

STAMP

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.B

_0 2_

R

.rv t

-1

0-

6:

:0

01M-101

MECHANICAL PLAN - FIRST LEVEL - B1 689A4-22-700

01_02

07/03/2024 M. Perkins T. Nakalawa

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

SCALE: 3/32" = 1'-0"F1

MECHANICAL PLAN - FIRST LEVEL -

B1

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.

NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO INDOOR UNIT.

PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL

EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR

CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE

DEMOLISHED PRIOR TO COMMENCING WORK.

PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO

BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY

DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO

COMMENCING WORK.

SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER

CONSTRUCTION IS COMPLETE.

CONTRACTOR TO PROVIDE 2' X 2' ACCESS PANEL TO MECHANICAL CHASE.

CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM

HARDWARE (TE-200A) AND SOFTWARE AND INTEGRATE WITH EXISTING

CONTROLS SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH

SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL

NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL

CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE

EXISTING NETWORK.

CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. REFRIGERANT SUCTION

PIPE AND REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.

PROVIDE NEW CRAC CONDENSING UNIT WITH NEW EQUIPMENT PAD.

NEW CRAC-CU REFRIGERANT PIPING, PIPE PER MANUFACTURER'S

RECOMMENDATIONS. COORDINATE ROUTING WITH ALL EXISTING CONDITIONS

PRIOR TO COMMENCEMENT OF WORK. SIZING BY VENDOR BASED ON

APPROVED SHOP DRAWINGS.

NEW CRAC UNITS SHALL BE INTEGRATED WITH FACILITY AUTOMATED LOGIC

CONTROLS BUILDING MANAGEMENT SYSTEM. ALL POINTS, ALARMS AND

CONTROLS SHALL BE ADDRESSABLE AND CONTROLLABLE FROM THE HVAC

SHOP (B10) AND CENTRAL UTILITY PLANT.

EXISTING COMPUTER ROOM AIR CONDITION (CRAC) UNIT TO BE REPLACED

WITH NEW UNIT.

PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING

AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING

STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501

FOR DETAILS AND M-803 FOR CONTROLS.

NEW TERMINAL UNITS TO BE CONNECTED TO EXISTING HEATING WATER

SUPPLY AND RETURN MAINS AND BRANCHES. BASIS OF DESIGN IS TITUS.

DEMOLISH EXISTING AIR TERMINALS, DUCT, AND ASSOSCIATED EQUIPMENT

SERVING THIS AREA.

PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS BASIS OF DESIGN IS TITUS.

VERTICAL ROUTE FOR TELECOM RISER. SEAL ALL FLOOR PENETRATIONS TO

MAINTAIN FIRE RATING.

A.

B.

C.

D.

E.

F.

G.

CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

CU-01 LOCATION

NOT TO SCALE

B1 SITE PLAN

UPUP

UPUP

UP

UP

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

F1

T-

2C

F1

T-

2E

/F1 01T-102

EYE EXAM

1S-280

EYE EXAM

1S-279

EYE EXAM

1S-277

OPTHALMOLOGIST

OFFICE

1S-278

HAC

1S-276

SPD

1S-270

OCULAR

PHOTOGRAPHY

1S-271

SHOWER

1S-272

EXAM RM

1S-273

EXAM RM

1S-274

EYE EXAM

1S-274B

REGISTRATION

1S-268

OFFICE

1S-266

OPTOMETRY

EXAM RM

1S-275A

OPTOMETRY

EXAM

RMS

1S-275B

PATIENT

TOILET

1S-269

EXAM

OPTOMETRY

1S-267

PATIENT

WAITING

RM

1S-264

UTILITY

1S-265

TOILET

1S-2618

EMPLOYEE

TOILET

1S-263

EXAM

OPTOMETRY

1S-261

OPTOMETRY

EXAM

1S-262

TELECOM

ROOM

1C-242

LOBBY

1C-241

CORRIDOR

1C-C2-1ELEV

ELEV

MAIL RM

1C-243

OPTOMETRY

OFFICE

1C-246

MECH

MAIL RM

OFFICE

1C-245

REPRODUCTION

RM

1C-244

CORRIDOR

1S-C2-2

OPTOMETRY

OFFICE

SHOP

1S-266A RECEPT

OFFICE

1N-224A

FILM

LABORATORY

1N-224

TOILET

FEMALE

1N-225

TOILET

MALE

1N-227

BATH RM

PIPE

CHASE

1N-223

OFFICE

RADIOLOGIST

RADIOLOGIST

1N-221

OFFICE

1N-219

OFFICE

RADIOLOGIST

RADIOLOGIST

1N-217 OFFICE

1N-215

ELECTRICAL

1N-206

EXAM RM

1N-222

TELEPHONE

RM

1N-220A

PASSAGE

1N-220 X-RAY RM

CHEST RM

1N-209

STORAGE

RM

1N-210

MECH

1N-211

X-RAY RM

1N-213

CONTROL

RM

IN-213A

TOILET

TOILET

CT

SCANNER

RM

1N-207

CT

SCANNER

RM

1N-205

EQUIP

CLOSET

1N-208A

PATIENTS

TOILET

1N-203

1N-201

X-RAY RM

1N-214

CONTROL

RM

1N-216A

FEMALE

LOCKER

1N-210

CONFERENCE

RM

1N-212A

EMPLOYEE

LOUNGE

1N-212

CORRIDOR

1N-C2-5

MALE

LOCKERS

1N-208

DARK RM

1N-206

CORRIDOR

1N-C2-4

DRESSING

RM

1N-204

ULTRASOUND

RM

1N-202

STAIR#2

ELEV

#S3

EXAM RM

1S-281

STAIR #1

CORRIDOR

1N-C2-4

EXAM RM

1S-274A

N

CORRIDOR

1S-C2-3

01M-401A F4

3/4" CD

TYP.

01M-401A C4

07/03/2024

07/03/2024

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

2W

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

2C 2E

STAMP

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.B

_0 2_

R

.rv t

-1

0-

6:

:1

01M-102

MECHANICAL PLAN - SECOND LEVEL - B1 689A4-22-700

01_02

07/03/2024 M. Perkins T. Nakalawa

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

SCALE: 3/32" = 1'-0"F1

MECHANICAL PLAN - SECOND LEVEL -

B1

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.

NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO INDOOR UNIT.

PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL

EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR

CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE

DEMOLISHED PRIOR TO COMMENCING WORK.

PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO

BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY

DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO

COMMENCING WORK.

SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER

CONSTRUCTION IS COMPLETE.

CONTRACTOR TO PROVIDE 2' X 2' ACCESS PANEL TO MECHANICAL CHASE.

CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM

HARDWARE (TE-200A) AND SOFTWARE AND INTEGRATE WITH EXISTING

CONTROLS SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH

SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL

NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL

CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE

EXISTING NETWORK.

CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. REFRIGERANT SUCTION

PIPE AND REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.

PROVIDE NEW CRAC CONDENSING UNIT WITH NEW EQUIPMENT PAD.

NEW CRAC-CU REFRIGERANT PIPING, PIPE PER MANUFACTURER'S

RECOMMENDATIONS. COORDINATE ROUTING WITH ALL EXISTING CONDITIONS

PRIOR TO COMMENCEMENT OF WORK. SIZING BY VENDOR BASED ON

APPROVED SHOP DRAWINGS.

NEW CRAC UNITS SHALL BE INTEGRATED WITH FACILITY AUTOMATED LOGIC

CONTROLS BUILDING MANAGEMENT SYSTEM. ALL POINTS, ALARMS AND

CONTROLS SHALL BE ADDRESSABLE AND CONTROLLABLE FROM THE HVAC

SHOP (B10) AND CENTRAL UTILITY PLANT.

EXISTING COMPUTER ROOM AIR CONDITION (CRAC) UNIT TO BE REPLACED

WITH NEW UNIT.

PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING

AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING

STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501

FOR DETAILS AND M-803 FOR CONTROLS.

NEW TERMINAL UNITS TO BE CONNECTED TO EXISTING HEATING WATER

SUPPLY AND RETURN MAINS AND BRANCHES. BASIS OF DESIGN IS TITUS.

DEMOLISH EXISTING AIR TERMINALS, DUCT, AND ASSOSCIATED EQUIPMENT

SERVING THIS AREA.

PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS BASIS OF DESIGN IS TITUS.

VERTICAL ROUTE FOR TELECOM RISER. SEAL ALL FLOOR PENETRATIONS TO

MAINTAIN FIRE RATING.

A.

B.

C.

D.

E.

F.

G.

CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

UPUP

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

F2

T-

3C

F1

T-

3E

/F1 01T-102 /F1 01T-103

MECH

1-345

MENTAL

HEALTH

OFFICE

1-343

DIRECTOR

OF

HEARING

AND

RECOVERY

PGM

1-344

MENTAL

HEALTH

OFFICE

1-342

MENTAL

HEALTH

GROUP

RM

1-337

MENTAL

HEALTH

OT

1-337A

MENTAL

HEALTH

THERAPIST

1-336

MENTAL

HEALTH

OFFICE

1-335

MENTAL

HEALTH

NURSE

CASE

MANAGE

1-334 MENTAL

HEALTH

OFFICE

1-333

MENTAL

HEALTH

GROUP

RM

1-339

STAIR#2

CHASE

TOILET

1-338

TOILET

1-34

ELECTRICAL

1-341

CORRIDOR

1S-C3-12

CORRIDOR

1S-C3-10

WAITING

1-C3-11

CORRIDOR

1S-C3-9

CORRIDOR

1S-C3-7

W/D

1-327A

MENTAL

HEALTH

OFFICE

1-327

MENTAL

HEALTH

DAY RM

AND

DINING

1-322

ELEV

LOBBY

1C-C3-6

MENTAL

HEALTH

OFFICE

1-323

ELEV

ELEV

STAIR#1

MENTAL

HEALTH

OFFICE

1-321

TOILET

1-320A

MENTAL

HEALTH

OFFICE

1-326

MENTAL

HEALTH

OFFICE

1-328

MENTAL

HEALTH

OFFICE

1-329

MENTAL

HEALTH

OFFICE

1-331

MENTAL

HEALTH

OFFICE

1-330

MENTAL

HEALTH

OFFICE

1-332

MENTAL

HEALTH

OFFICE

1-319

MENTAL

HEALTH

OFFICE

1-320 MENTAL

HEALTH

OFFICE

1-318

MENTAL

HEALTH

OFFICE

1-315

MENTAL

HEALTH

OFFICE

1-313

MENTAL

HEALTH

OFFICE

1-309

MENTAL

HEALTH

OFFICE

1-310

MENTAL

HEALTH

OFFICE

1-312

STORAGE

1-314

MENTAL

HEALTH

EXAM RM

1-316

HAC

1-317

TOILET

1-311

ELECTRICAL

1-310A

COMMUNICATION

1-304A

GROUP

RM-B

1-304

RECEPTION

MENTAL

HEALTH

1-C3-5

CORRIDOR

1N-C3-2

WAITING

RM

1-302

DR

OFFICES

1-300

MENTAL

HEALTH

OFFICE

1-301

GROUP

RM-A

1-303

CHASE

CHASE

ROOM

1N-C3-3

TOILET

RM

1-305

CHASE

DIRECTOR

MENTAL

HEALTH

1-306

TOILET

1-306A

COPY RM

1-308

STORAGE

RM

1-307A

MENTAL

HEALTH

OFFICE

1-307

CORRIDOR

1N-C3-4

N

CORRIDOR

1N-C3-1

01M-401A F1

3/4" RL

7/8" RS

3/4" RL

7/8" RS

PIPE DROP DOWN TO

CU-01 ON FIRST FLOOR

3/4" CD

TYP.

TYP.

TELECOM

ROOM

1-324

01M-401A C1

01P-401 F5

07/03/2024

07/03/2024

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

2W

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

2C 2E

STAMP

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.B

_0 2_

R

.rv t

-1

0-

6:

:1

01M-103

MECHANICAL PLAN - THIRD LEVEL - B1 689A4-22-700

01_02

07/03/2024 M. Perkins T. Nakalawa

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

SCALE: 3/32" = 1'-0"F1

MECHANICAL PLAN - THIRD LEVEL -

B1

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.

NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO INDOOR UNIT.

PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL

EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR

CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE

DEMOLISHED PRIOR TO COMMENCING WORK.

PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO

BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY

DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO

COMMENCING WORK.

SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER

CONSTRUCTION IS COMPLETE.

CONTRACTOR TO PROVIDE 2' X 2' ACCESS PANEL TO MECHANICAL CHASE.

CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM

HARDWARE (TE-200A) AND SOFTWARE AND INTEGRATE WITH EXISTING

CONTROLS SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH

SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL

NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL

CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE

EXISTING NETWORK.

CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. REFRIGERANT SUCTION

PIPE AND REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.

PROVIDE NEW CRAC CONDENSING UNIT WITH NEW EQUIPMENT PAD.

NEW CRAC-CU REFRIGERANT PIPING, PIPE PER MANUFACTURER'S

RECOMMENDATIONS. COORDINATE ROUTING WITH ALL EXISTING CONDITIONS

PRIOR TO COMMENCEMENT OF WORK. SIZING BY VENDOR BASED ON

APPROVED SHOP DRAWINGS.

NEW CRAC UNITS SHALL BE INTEGRATED WITH FACILITY AUTOMATED LOGIC

CONTROLS BUILDING MANAGEMENT SYSTEM. ALL POINTS, ALARMS AND

CONTROLS SHALL BE ADDRESSABLE AND CONTROLLABLE FROM THE HVAC

SHOP (B10) AND CENTRAL UTILITY PLANT.

EXISTING COMPUTER ROOM AIR CONDITION (CRAC) UNIT TO BE REPLACED

WITH NEW UNIT.

PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING

AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING

STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501

FOR DETAILS AND M-803 FOR CONTROLS.

NEW TERMINAL UNITS TO BE CONNECTED TO EXISTING HEATING WATER

SUPPLY AND RETURN…

This is the start of the file's text. The full file is on GovTribe.