Attachment 29 - 689A4-22-700.EHRM.Newington.Add1.20241213.pdf

PDF 680 KB Posted

Attached to
Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
Solicitation number
36C77624B0015_1
Issued by

About this file

This is Addenda No. 1 for project 689A4-22-700 EHRM Infrastructure Upgrades, dated December 13, 2024, issued by Triple C - The A&E Group, a CVE Verified Service-Disabled Veteran-Owned Small Business.

The addenda provides three key revisions to the construction drawing documents: 1) Contractors must use existing conduit where possible and consistent with NEC fill-ratio, with minimum 3/4" flexible metal conduit required only when no existing conduit is present for Work Area Outlets (WAO), 2) Removal of references to minimum 1-1/4" conduit size requirements in General Note "G" on Telecommunications series sheets, and 3) Removal of 1-1/4" conduit references in Detail B3/T-501 for all buildings. The document includes a technical drawing showing telecommunications outlet box details and general notes regarding fire stopping, cable tray installation, cabling requirements, and documentation requirements. No existing partitions are to be demolished for cable replacement under this project.

View the file

Other files

File Type Posted
Technical Questions Tracking Spreadsheet - 2-13-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0007.pdf PDF
Attachment 34 - 689A4-22-700.EHRM.Newington.Add3.20250211.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0006.pdf PDF
Attachment 27 - Wage Rates 01.31.25- Hartford.pdf PDF
Bid Opening Details - Newington CT - 36C76624B0015.pdf PDF
Site Visit Sign In Sheet 2.3.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0005.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.27.25.pdf PDF
Attachment 2 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part1.pdf PDF
Attachment 21 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part2.pdf PDF
Attachment 13 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part4.pdf PDF
Attachment 17 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part2.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0004.pdf PDF
Attachment 22 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part1.pdf PDF
Attachment 32 - 689A4-22-700.EHRM.Newington -.20250114 - Addendum 2.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 12 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part3.pdf PDF
Attachment 15 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part6.pdf PDF
Attachment 20 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part1.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.23.25.pdf PDF
Attachment 18 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part3.pdf PDF
Attachment 23 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part2.pdf PDF
Attachment 19 - 689A4-22-700.Newington.EHRM.IFC.B12.20240703.pdf PDF
Attachment 14 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part5.pdf PDF
Attachment 10 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part1.pdf PDF
Technical Questions Tracking Spreadsheet - 1-23-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT .pdf PDF
Attachment 16 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part1.pdf PDF
Attachment 24 - 689A4-22-700.Newington.EHRM.IFC.SITE.20240703.pdf PDF
Attachment 11 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part2.pdf PDF
Attachment 31 - EHRM Newington-Pre Bid Presentation.010725.R02.pdf PDF
Technical Questions Tracking Spreadsheet - 1-6-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0003.pdf PDF
2025-01-07 Preproposal conference sign in list.pdf PDF
Attachment 30 - Price Schedule - 36C77624B0015 - 689A4-22-700 EHRM Infrastructure Newington.pdf PDF
Attachment 28 - Site Visit Instructions - Updated 1.6.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0002.pdf PDF
Attachment 19 - Newington EHRM Drawings - Part 10 of 16 - 12.31.24.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0001.pdf PDF
Attachment 28 - Site Visit Instructions.pdf PDF
Attachment 24 - Newington EHRM Drawings - Part 15 of 16.pdf PDF
Attachment 11 - Newington EHRM Drawings - Part 2 of 16.pdf PDF
Attachment 26 - Newington VAHC campus map.pdf PDF
Attachment 22 - Newington EHRM Drawings - Part 13 of 16.pdf PDF
Attachment 23 - Newington EHRM Drawings - Part 14 of 16.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 14 - Newington EHRM Drawings - Part 5 of 16.pdf PDF
Attachment 10 - Newington EHRM Drawings - Part 1 of 16.pdf PDF
Attachment 27 - Wage Rates 8.9.24- Hartford.pdf PDF
Attachment 9 - Underground Utility Locating.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CVE Verified Service-Disabled Veteran-Owned Small Business

TRIPLE C – THE A&E GROUP

OUR REASONABLE SERVICE - TO PROVIDE YOU WITH EXEMPLARY SERVICE

410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053

Addenda

Project: 689A4-22-700 EHRM Infrastructure Upgrades

Subject: Addenda No. 1

Date: 12/13/2024

Revisions: Construction drawing documents for project 689A4-22-700 EHRM Infrastructure Upgrades have been revised. The following additional clarifying information is provided:

1. Contractor shall use existing conduit where possible and consistent with NEC fill-ratio. If no existing conduit is present to the Work Area Outlet (WAO), use a minimum ¾” or larger as required flexible metal conduit per VA specification 27 05 33-B-5. Include the appropriate polymer bushings to protect the cabling transition from conduit to cable tray or J-hook. Verify the number of cables and diameter serving the WAO with VA COR. No existing partitions shall be demolished to replace existing cabling with this project.

2. General Note “G” on Telecommunications series sheets shall remove reference to minimum size

1 ¼” conduit. When replacing cable at existing Work Area Outlets, existing conduit shall be retained and reused with this project.

3. Detail B3/T-501 for all buildings, remove reference to 1 ¼” conduit. Existing conduit shall be retained and reused.

Sheet Number Revision Description of / Reason for Change

T Series Rev 01 General Note “G” remove reference to 1 ¼” conduit.

T-503 Rev 01 Detail B3 remove references to 1 ¼” conduit.

Attachments: NONE

Notes

See typical detail and note revisions, below:

End of Addenda

File details come from the government source that posted it. Updated .