Attachment 29 - 689A4-22-700.EHRM.Newington.Add1.20241213.pdf
PDF 680 KB Posted
- Attached to
- Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
- Solicitation number
- 36C77624B0015_1
About this file
This is Addenda No. 1 for project 689A4-22-700 EHRM Infrastructure Upgrades, dated December 13, 2024, issued by Triple C - The A&E Group, a CVE Verified Service-Disabled Veteran-Owned Small Business.
The addenda provides three key revisions to the construction drawing documents: 1) Contractors must use existing conduit where possible and consistent with NEC fill-ratio, with minimum 3/4" flexible metal conduit required only when no existing conduit is present for Work Area Outlets (WAO), 2) Removal of references to minimum 1-1/4" conduit size requirements in General Note "G" on Telecommunications series sheets, and 3) Removal of 1-1/4" conduit references in Detail B3/T-501 for all buildings. The document includes a technical drawing showing telecommunications outlet box details and general notes regarding fire stopping, cable tray installation, cabling requirements, and documentation requirements. No existing partitions are to be demolished for cable replacement under this project.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CVE Verified Service-Disabled Veteran-Owned Small Business
TRIPLE C – THE A&E GROUP
OUR REASONABLE SERVICE - TO PROVIDE YOU WITH EXEMPLARY SERVICE
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
Addenda
Project: 689A4-22-700 EHRM Infrastructure Upgrades
Subject: Addenda No. 1
Date: 12/13/2024
Revisions: Construction drawing documents for project 689A4-22-700 EHRM Infrastructure Upgrades have been revised. The following additional clarifying information is provided:
1. Contractor shall use existing conduit where possible and consistent with NEC fill-ratio. If no existing conduit is present to the Work Area Outlet (WAO), use a minimum ¾” or larger as required flexible metal conduit per VA specification 27 05 33-B-5. Include the appropriate polymer bushings to protect the cabling transition from conduit to cable tray or J-hook. Verify the number of cables and diameter serving the WAO with VA COR. No existing partitions shall be demolished to replace existing cabling with this project.
2. General Note “G” on Telecommunications series sheets shall remove reference to minimum size
1 ¼” conduit. When replacing cable at existing Work Area Outlets, existing conduit shall be retained and reused with this project.
3. Detail B3/T-501 for all buildings, remove reference to 1 ¼” conduit. Existing conduit shall be retained and reused.
Sheet Number Revision Description of / Reason for Change
T Series Rev 01 General Note “G” remove reference to 1 ¼” conduit.
T-503 Rev 01 Detail B3 remove references to 1 ¼” conduit.
Attachments: NONE
Notes
See typical detail and note revisions, below:
End of Addenda