Attachment 17 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part2.pdf

PDF 16 MB Posted

Attached to
Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
Solicitation number
36C77624B0015_1
Issued by

View the file

Other files

File Type Posted
Technical Questions Tracking Spreadsheet - 2-13-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0007.pdf PDF
Attachment 34 - 689A4-22-700.EHRM.Newington.Add3.20250211.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0006.pdf PDF
Attachment 27 - Wage Rates 01.31.25- Hartford.pdf PDF
Bid Opening Details - Newington CT - 36C76624B0015.pdf PDF
Site Visit Sign In Sheet 2.3.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0005.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.27.25.pdf PDF
Attachment 2 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part1.pdf PDF
Attachment 21 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part2.pdf PDF
Attachment 13 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part4.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0004.pdf PDF
Attachment 22 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part1.pdf PDF
Attachment 32 - 689A4-22-700.EHRM.Newington -.20250114 - Addendum 2.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 12 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part3.pdf PDF
Attachment 15 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part6.pdf PDF
Attachment 20 - 689A4-22-700.Newington.EHRM.IFC.B32_33_34.20240703.part1.pdf PDF
Attachment 33 - Site Visit Instructions - Updated 1.23.25.pdf PDF
Attachment 18 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part3.pdf PDF
Attachment 23 - 689A4-22-700.Newington.EHRM.IFC.B65.20240703.part2.pdf PDF
Attachment 19 - 689A4-22-700.Newington.EHRM.IFC.B12.20240703.pdf PDF
Attachment 14 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part5.pdf PDF
Attachment 10 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part1.pdf PDF
Technical Questions Tracking Spreadsheet - 1-23-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT .pdf PDF
Attachment 16 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part1.pdf PDF
Attachment 24 - 689A4-22-700.Newington.EHRM.IFC.SITE.20240703.pdf PDF
Attachment 11 - 689A4-22-700.Newington.EHRM.IFC.B01_02.20241008.part2.pdf PDF
Attachment 31 - EHRM Newington-Pre Bid Presentation.010725.R02.pdf PDF
Technical Questions Tracking Spreadsheet - 1-6-25 - 36C77624B0015 - Construct EHRM Infrastructure Upgrades Newington CT.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0003.pdf PDF
2025-01-07 Preproposal conference sign in list.pdf PDF
Attachment 30 - Price Schedule - 36C77624B0015 - 689A4-22-700 EHRM Infrastructure Newington.pdf PDF
Attachment 28 - Site Visit Instructions - Updated 1.6.25.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0002.pdf PDF
Attachment 19 - Newington EHRM Drawings - Part 10 of 16 - 12.31.24.pdf PDF
Newington EHRM Infrastructure Upgrades - 36C77624B0015 Amendment - 0001.pdf PDF
Attachment 29 - 689A4-22-700.EHRM.Newington.Add1.20241213.pdf PDF
Attachment 28 - Site Visit Instructions.pdf PDF
Attachment 24 - Newington EHRM Drawings - Part 15 of 16.pdf PDF
Attachment 11 - Newington EHRM Drawings - Part 2 of 16.pdf PDF
Attachment 26 - Newington VAHC campus map.pdf PDF
Attachment 22 - Newington EHRM Drawings - Part 13 of 16.pdf PDF
Attachment 23 - Newington EHRM Drawings - Part 14 of 16.pdf PDF
Attachment 3 - 689A4-22-700.EHRM.Newington.Spec.Final.20240806.Part2.pdf PDF
Attachment 14 - Newington EHRM Drawings - Part 5 of 16.pdf PDF
Attachment 10 - Newington EHRM Drawings - Part 1 of 16.pdf PDF
Attachment 27 - Wage Rates 8.9.24- Hartford.pdf PDF
Attachment 9 - Underground Utility Locating.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

M

HS

S

HWS

M

M

P

PS PS

F

PS

TS

V

D

TWS

TWR

TWB

MPS

HPS

LPS

CHR

RS

RL

HWR

R

T

H

CO2

CHS

XX-##

SDSD

ELBOW - DOWN

ELBOW - UP

PIPE RISE-DROP

TEE - DROP FROM TEE

END CAP

FLEX CONNECTION

PIPE REDUCER - CONCENTRIC

PIPE STRAINER

CHECK VALVE

GATE VALVE

PLUG VALVE

GLOBE VALVE

UNION - SCREWED

CHILLED WATER SUPPLY

CHILLED WATER RETURN

REFRIGERATION

STEAM - MEDIUM PRESSURE SUPPLY

STEAM - LOW PRESSURE SUPPLY

STEAM - HIGH PRESSURE SUPPLY

HEATING WATER RETURN

HEATING WATER SUPPLY

DEMO

EXISTING

TOWER WATER BYPASS

TOWER WATER RETURN

TOWER WATER RETURN

REFRIGERATION LIQUID

REFRIGERATION SUCTION

MECHANICAL PIPING

DIRECTION OF FLOW

MAKE-UP WATER

VENT

DRAIN

GEOTHERMAL SUPPLY

GEOTHERMAL RETURN

MU

CONDENSATE DRAINCD

STEAM - MEDIUM PRESSURE RETURN

STEAM - LOW PRESSURE RETURN

STEAM - HIGH PRESSURE RETURNHPR

HPR

LPR

CONDENSER WATERCND

GWS

GWR

DIRECTION PITCHDOWN

VERIFY WITH

ARCHITECTURAL

DRAWINGS

PUMPED CONDENSATEPC

PRESSURE REDUCING VALVE

3-WAY

MODULATING

CONTROL VALVE

2-WAY CONTROL VALVE

SAFETY VALVE OR

PRESSURE RELIEF

VALVE

SOLENOID VALVE

3/4" BALL VALVE WITH ADAPTER

TO 3/4" HOSE THREAD

DIAPHRAGM VALVE

BUTTERFLY VALVE

BALL VALVE

VALVE IN RISE

WATER FLOW MEASURING DEVICE

CIRCUIT SETTER

ELBOW - DROP TO TEE

PIPE REDUCER - ECCENTRIC

AIR VENT - AUTOMATIC

AIR VENT - MANUAL

GAUGE - DIFFERENTIAL

GAUGE - PRESSURE

GAUGE - PRESSURE WITH COCK

GAUGE - TEMPERATURE

PIPE ANCHOR

PIPE EXPANSION JOINT

PIPE GUIDE

SENSOR - FLOW

SWITCH - FLOW

SWITCH HUMIDITY

SWITCH - PRESSURE

SWITCH - TEMPERATURE

TEMPERATURE - PRESSURE TEST FITTING

THERMOMETER

THERMOMETER WELL

BASKET STRAINER

STEAM TRAP INVERTED BUCKET

METER - TOTALIZING BTU

METER - TOTALIZING FLOW

M301 A1

SCALE

DETAIL

SCALE

SECTIONA1

A1

X#/X###

MECHANICAL SYMBOL LEGEND

DUCT TRANSITION FROM RECTANGULAR TO ROUND

DUCT TRANSITION

SIDEWALL EXHAUST OR RETURN AIR GRILLE

OR REGISTER

SIDEWALL SUPPLY REGISTER

RETURN DUCT

SUPPLY DUCT

RISE IN DUCT

CEILING RETURN AIR REGISTER OR GRILLE

SMOKE DAMPER

ACOUSTICAL DUCT LINING

FLEXIBLE DUCT

FIRE DAMPER

MANUAL BALANCING DAMPER

12"Ø INDICATES A 12" ROUND DUCT

24x12Ø INDICATES A 24"x12" FLAT OVAL DUCT (WIDTH x DEPTH)

EXISTING DUCT TO BE REMOVED

ACCESS DOOR

24x12 INDICATES A 24"x12" RECTANGULAR DUCT (WIDTH x DEPTH)

POINT OF CONNECTION, NEW DUCT TO EXISTING DUCT

OR / POINT OF REMOVAL FROM EXISTING DUCT TO DEMO DUCT

PERFORATED FACE CEILING DIFFUSERS

DUCTWORK SYMBOLS

ROOM HUMIDISTAT/HUMIDITY TRANSMITTER LOCATION ONLY

SEE CONTROL DRAWINGS FOR TYPE

SEE CONTROL DRAWINGS FOR TYPE

ROOM THERMOSTAT/TEMP. TRANSMITTER LOCATION ONLY

LETTERS REFER TO THE EQUIPMENT TYPE

EQUIPMENT SYMBOLS

NUMBERS REFER TO SPECIFIC EQUIPMENT

DUCT MOUNTED STATIC PRESSURE PROBE

DRAWING NUMBER WHERE DETAILED

SECTION LOCATION

DRAWING NUMBER WHERE DETAILED

DETAIL LOCATION

SECTION LETTER LOCATION

SECTION SYMBOL

DETAIL SYMBOL

SECTION AND DETAIL TITLES

DETAIL NUMBER LOCATION

SYMBOL INDICATES EQUIPMENT IDENTIFIED

IN EQUIPMENT SCHEDULE

XX-#

CFM

SYMBOL INDICATES GRILLE OR DIFFUSER

IDENTIFIED IN EQUIPMENT SCHEDULE

S.DPR

F.DPR

CEILING EXHAUST REGISTER

VALVE SYMBOLS FITTING SYMBOLS

PIPING SYMBOLS

EXHAUST DUCT

2HR. SMOKE BARRIER

SMOKE BARRIER

2HR. FIRE BARRIER

1 HR. FIRE BARRIER

##x##

SIDEWALL GRILLE DIMENSION WHERE

SHOWN ON PLANS

COMBINATION FIRE/SMOKE DAMPER

F/S DPR

FLEXIBLE CONNECTION

STANDARD LONG RADIUS ELBOW

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES

EXCEPT TRANSFER AIR SOUND ELBOW)

SHORT RADIUS ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR ELBOWS WITH

VANES EXCEPT TRANSFER AIR SOUND

ELBOW)

ROOM CARBON DIOXIDE TRANSMITTER LOCATION ONLY

SEE CONTROL DRAWINGS FOR TYPE

24"x12"

24"/12"

12"Ø

DUCT MOUNTED SMOKE DETECTOR

STAMPED FACE CEILING DIFFUSERS

NOTE: NOT ALL ABBREVIATIONS AND

SYMBOLS APPLY TO THIS PROJECT.

A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN

FURRED CHASES OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.

B. PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR

CHASES FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, COILS, FANS,

CONTROLS, ETC. THEY SHALL BE FURNISHED UNDER DIVISION 23 AND

INSTALLED UNDER THE ARCHITECTURAL SPECIFICATION. ACCESS DOOR RATING

SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING.

C. COORDINATE THE LOCATION OF ALL DIFFUSERS, GRILLES, REGISTERS, ACCESS

DOORS, ETC., WITH THE ARCHITECTURAL REFLECTED CEILING PLAN(S).

D. ALL ROUND RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL

SIZE AS THE SCHEDULED DIFFUSER NECK SIZE.

E. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR

INDICATED. ALL DUCT SIZES SHOWN ON DRAWINGS ARE NET INSIDE DIMENSIONS.

PROVIDE ONE INCH ACOUSTICAL LINING (TYPE D3 INSULATION) IN LOW VELOCITY

RECTANGULAR DUCTWORK FOR THE FIRST 10 DIAMETERS OF DUCTWORK

CONNECTED TO DEVICE, OR AS INDICATED ON DRAWINGS, WHICHEVER IS

GREATER. FOR THE REMAINDER OF THIS DUCTWORK PROVIDE AS INDICATED IN

THE INSULATION SPECIFICATIONS.

F. PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING

AND 1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS

REQUIRED TO PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES

OCCUR ABOVE CEILING AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE

PROVIDE HOSE CONNECTION ON VALVE.

G. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE

RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. PROVIDE APPROVED

FIRE DAMPERS IN ALL REQUIRED PENETRATIONS FOR DUCTWORK, GRILLES,

REGISTERS AND DIFFUSERS. ALL PIPE AND DUCTWORK PENETRATIONS OF FIRE,

SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT

STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

H. CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND

FIRE PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND

SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

EQUIPMENT ACCESS AND SERVICEABILITY.

I. CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS,

SLEEVES, AND HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND

PLUMBING EQUIPMENT, DUCTWORK AND PIPING, ETC. CONTRACTOR SHALL

COORDINATE WITH GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID

CONFLICTS AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.

J. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY

MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO

ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT

IN A MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE

BUILDING STRUCTURAL SYSTEM.

K. CONTRACTOR SHALL PROVIDE RETURN AIR OR TRANSFER AIR OPENINGS IN

FULL HEIGHT WALLS SIZED AT 350 FPM (UNLESS OTHERWISE SPECIFICALLY

SHOWN ON THE DRAWINGS) TO CREATE AND/OR MAINTAIN A RETURN AIR PATH AS

REQUIRED. FIRE DAMPERS AND/OR SMOKE DAMPERS SHALL BE PROVIDED IN

SUCH OPENINGS WHERE REQUIRED BY NOTE "J".

L. SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, DUCT WALL

PENETRATIONS AND FITTING CONNECTIONS ON ALL DUCT SYSTEMS.

M. MECHANICAL ITEMS SUCH AS ROOF DRAINS, FLOOR DRAINS, PLUMBING FIXTURES,

ETC. SHOWN ON THE ARCHITECTURAL DRAWINGS BUT NOT SHOWN ON THE

MECHANICAL DRAWINGS SHALL BE INCLUDED IN THE PROJECT. THESE ITEMS

SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR INCLUSION IN

ADDENDUM.

N. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL

SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT

AND UNCLEAR SUBMITTALS WILL BE REJECTS AND MARKED AS "REVISE AND

RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT

SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE

ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE

SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE

REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER

FROM THE BASIS OF DESIGN CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES

FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE

INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT

ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON

THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE

REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS

(FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS

DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE

PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE

DRAWINGS.

O. THIS PROJECT RECONFIGURATION OF EXISTING BUILDING MECHANICAL AND

PLUMBING SYSTEMS TO MAINTAIN EXISTING BUILDING UTILITY SERVICES. THIS

WORK INCLUDES: (1) RELOCATING AND REPLACING EXISTING DUCT, PIPE, AIR

TERMINALS, ETC.; (2) PROVIDING NEW STRUCTURAL SUPPORTS AND SEISMIC

BRACING FOR EXISTING MECHANICAL AND PLUMBING SYSTEMS WHERE

RECONFIGURATIONS ARE REQUIRED; (3) PROVIDING DRIP PANS WITH DRAIN

CONNECTIONS TO EXISTING FLOOR DRAINS BELOW ALL EXISTING WATER WATER

PIPES THAT ROUTE ADJACENT TO OR ABOVE ELECTRICAL AND COMMUNICATIONS

EQUIPMENT.

P. CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS PRIOR TO COMMENCING

WORK SHOWING ALL NEW AND EXISTING SYSTEMS IN THE AREA OF WORK AND

ALL PROVISIONS FOR COORDINATING ROUTING, ACCESS AND CLEARANCES.

SUBMITTALS WILL NOT BE ACCEPTED WITHOUT APPROVED COORDINATION

DRAWINGS.

A. THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING

SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE

PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION,

ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING BUILDING

MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.

B. THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING

SERVICES FOR REMOVAL WITH OWNER AUTHORIZED REPRESENTATIVE AND SHALL

CONFORM TO THEIR REQUIREMENTS.

C. DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE

MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT

THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY WHICH ARE

OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE

OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED

OUTSIDE OF THE SUITE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE

FACILITY.

D. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK ZONE

AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC. FOR ALL

WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO MINIMIZE DUST

AND FUMES.

E. THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN ADVANCE

TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE FOR

APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN

OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL

COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH

ACCEPTABLE ROUTING AND ACCESS WITHIN THE FACILITY FOR MATERIALS REQUIRED

FOR THE NEW INSTALLATION.

F. SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING OR

MECHANICAL SYSTEMS FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.

G. ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED ON

FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND MEASUREMENT DATA.

H. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES

INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND ARCHITECTURAL.

ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT PRIOR

TO START OF WORK.

I. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO

ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS

GENERAL DEMO NOTES

GENERAL NOTESABBREVIATIONS

AHU AIR HANDLING UNIT

BRAKE HORSEPOWER

BTU PER HOUR

BRITISH THERMAL UNIT

BOTTOM OF DUCT

BOTTOM OF PIPE

ACOUSTIC LINING

ABOVE FINISHED FLOOR

ACCESS DOOR

COMPRESSED AIR

DRAIN

ENTERING

EXHAUST

CONTINUATION

DIRECT EXPANSION

CUBIC FEET PER MINUTE

CONDENSATE DRAIN

AL

AFF

AD

BHP

BOD

BTU

BOP

CA

CFM

D

DX

ENT

EXH

CD

EMCS

CONT.

BTUH

FLEXIBLE

FLAT BOTTOM

FILTER GAUGE

FLOOR SINK

FLOOR DRAIN

FAN COIL UNIT

DEGREES FAHRENHEIT

FEET PER MINUTE

FEET

FLAT TOP

HOSE BIBB

INCHES

GALLONS PER MINUTE

GALLONS PER HOUR

FB

°F

FD

FCU

F.G.

FS

FPM

FT.

FT

GPM

GPH

HB

HD

IN

HEPA

FLEX

KILOWATT

MAIN AIR (CONTROLS)

KILOWATT HOUR

OPPOSED BLADE DAMPER

OUTSIDE AIR

NUMBER (QUANTITY)

NOT IN CONTRACT

NOT APPLICABLE

MOTOR CONTROL CENTER

QUANTITY

QUADRANT

REVOLUTIONS PER MINUTE

RELATIVE HUMIDITY

SMOKE CONTROL DAMPER

RETURN AIR

PRESSURE REDUCING VALVE

KW

KWH

MA

MCC

NO.

NIC

OBD

OA

NA

PRV

PSIG

QTY

Rh R.A.

RPM

SCD

QUAD

ENERGY MANAGEMENT CONTROL SYSTEM

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HAND DAMPER (VOLUME DAMPER)

POUNDS PER SQUARE INCH GAGE

TYPICAL

VOLTS

SOUND TRAP

VARIABLE AIR VOLUME

TOP OF PIPE TRAPEZE

VENT THRU ROOF

VELOCITY

ST

SP

TYP.

VAC

VAV

V

TP

VTR

VEL

SDVV

TOPT

SINGLE DUCT VARIABLE VOLUME

STATIC PRESSURE (INCHES OF WATER)

TOTAL PRESSURE (INCHES OF WATER)

VOLTS, ALTERNATING CURRENT

ACU AIR CONDITIONING UNIT

CONTRACTING OFFICER'S REPRESENTATIVECOR

RS

RL REFRIGERATION LIQUID

REFRIGERATION SUCTION

CONDENSING UNITCU

INDOOR UNITIU

07/03/2024

07/03/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

03_42

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.G en er al

.S he et s.

rv t

-0

7-

8:

:3

03M-001

MECHANICAL ABBREVIATIONS AND SYMBOLS 689A4-22-700

07/03/2024 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

Revisions: Date:

DN

UP

UP

UP

UP

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

IRM STORAGE

3-101

REFRIGERATION

MACH RM

3-102

STORAGE

3-103

HAC

3-104

TELECOM

ROOM

3-105

IRM STORAGE

3-106

STORAGE

3-107

STORAGE

3-108

LOCK SMITH

SHOP

3-109

ELECTRICAL

3-110

FMS LOCKER

RM

3-111

ROADS AND

GROUNDS

STORAGE

3-112

ELECT

3-113

PAINT

STORAGE

3-114

CONFERENCE

ROOM

3-115

CORRIDOR

C1-3

TOILET/

SHOWER

ROOM

3-117

ROADS AND

GROUNDS

OFFICE

3-118

CARPENTER

SHOP

3-119

PAINT SHOP

3-120

PLUMBING

SHOP

3-121

A/C SHOP

3-122

ELECTRIC

SHOP

3-123

STORAGE

3-124

CORRIDOR

C1-6

PUMP RM

11-101

EMERGENCY

GENERATOR

11-101A

BOILER

PLANT

3-128

INCINERATOR

3-128A

LOCKER

ROOM

3-128B

TOILET

3-128C

EQUIP RM

3-128D

EMERGENCY

GENERATOR

RM

3-128E

EMERGENCY

GENERATOR

HOUSE

3-128F

GENERATOR

3-128G

INCINERATOR

CHARGING RM

BOILER

CONTROL

OFFICE

3-128I

CORRIDOR

C1-7

OFFICE

3-125

VACANT

3-126

CHAPEL

3-127

SACRISTY

3-127B

DEVOTIONAL

RM

3-127A

MASONS

SHOP

3-119A

ELECTRIC

SHOP

STORAGE

3-123A

STAIR #1

S1

CORRIDOR

C1-4

CORRIDOR

C1-2

CORRIDOR

C1-1

STORAGE

3-108B

IRM TRAINING

3-101A

STORAGE

3-108A

CORRIDOR

C1-5

STAIR #2

S2

ELEV

E1

/F7 42M-101

03M-101 E1

PIPE RISE TO CU-3-01

ON LOW ROOF

03M-101 F1

CU-3-04

1/2" RS 1/4" RL

3/4" CD

1/2" RS 1/4" RL

TYP.

IU-3-01

3TELECOM

ROOM

3-105

80 SF

TYP.

7 104

¾" CD UP TO

SECOND FLOOR.

1/2" RS

1/4" RL

3/4" CD

IRM STORAGE

3-112A

36 SF

HAC

3-105

32 SF

07/03/2024

07/03/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.B

_R

.rv t

-0

7-

8:

:3

03M-101

MECHANICAL PLAN - BUILDING 3 - FIRST LEVEL 689A4-22-700

03_42

07/03/2024 M. Perkins T. Nakalawa

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

SCALE: 1/8" = 1'-0"F3

MECHANICAL PLAN - BUILDING 3 -

FIRST LEVEL

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO CONDENSER UNIT.

NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO INDOOR UNIT.

PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL

EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR

CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

PROVIDE BACNET ADAPTER MOUNTED ADJACENT TO UNIT IN TELECOM ROOM.

CONNECT WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL CLOSET

TO BE ADDRESSABLE ON VA NETWORK/HVAC FMS.

PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO

BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY

DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO

COMMENCING WORK.

SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR TERMINALS TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER

CONSTRUCTION IS COMPLETE.

CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE

DEMOLISHED PRIOR TO COMMENCING WORK.

PROVIDE CRICKET WITH NEW EQUIPMENT CURB. COORDINATE WITH EXISTING

ROOFING SYSTEM. REFER TO DETAIL F7/A-501 AND F6/M501 FOR MORE

INFORMATION.

A.

B.

C.

D.

E.

F.

G.

CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1/2" = 1'-0"F1

MECHANICAL ENLARGED PLAN -

FIRST LEVEL-ROOM-3-112A/3-106 -

DEMO

SCALE: 1/2" = 1'-0"E1

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM 3-105-NEW

UPUP

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

CART

STORAGE

3-202

STORAGE

3-203

Room

3-204

STORAGE

3-205

EMS BREAK

ROOM

3-203B

GYM

3-207

STORAGE

3-208

WOMENS

TOILET

3-209

MENS TOILET

3-210

STORAGE

3-211

EMS

3-212

BIO-MED

3-214

TELECOM

ROOM

3-213A

STORAGE

3-216

OFFICE

3-217

OFFICE

3-214A

ELEV

E1

CORRIDOR

C2-1

CORRIDOR

C2-2

CORRIDOR

C2-3

LOBBY

C2-3A

CORRIDOR

C2-4

STORAGE

3-212C

3-208A

3-208B

STAIR #2

S2

STAIR #1

S1

STORAGE

3-201

MECH

3-203A

STORAGE

3-212A

VOLUNTEER

EMS

3-212B

EMS

ROOM

3-218

CU-3-03

CU-3-02

03M-102 E1

1/4" RL

1/2" RS

2 12

UP TO IU-3-03

ON 3RD LEVEL

1/2" RS & 1/4" RL

DOWN TO IU-3-01

ON 1ST LEVEL

03M-102 C1

1/2" RS

1/4" RL

/C7 42M-101

CU-3-01

1/2" RS

1/4" RL

1/2" RS & 1/4" RL

UP TO IU-3-02 ON

2ND LEVEL

03M-102 C6

03M-102 C3

8 118 11

TELECOM

ROOM

3-213A

123 SF

IU-3-02

1/4" RL

1/2" RS

TYP.

3/4" CD

7 10

¾" CD DN TO TIE-

IN TO CD ON

FIRST FLOOR

1 3

7 10

EMS BREAK

ROOM

3-203B

277 SF

1/4" RL

1/2" RS

3/4" CD

IU-3-04

500 CFM

STORAGE

3-203B

369 SF

CORRIDOR

C2-1

STORAGE

3-203A

IT

3-213A

75 SF

OFFICE

3-214A

144 SF

ROOM

3-213

24 SF

07/03/2024

07/03/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.B

_R

.rv t

-0

7-

8:

:4

03M-102

MECHANICAL PLAN - BUILDING 3 - SECOND LEVEL 689A4-22-700

03_42

07/03/2024 M. Perkins T. Nakalawa

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

SCALE: 1/8" = 1'-0"F3

MECHANICAL PLAN - BUILDING 3 -

SECOND LEVEL

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO CONDENSER UNIT.

NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO INDOOR UNIT.

PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL

EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR

CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

PROVIDE BACNET ADAPTER MOUNTED ADJACENT TO UNIT IN TELECOM ROOM.

CONNECT WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL CLOSET

TO BE ADDRESSABLE ON VA NETWORK/HVAC FMS.

PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO

BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY

DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO

COMMENCING WORK.

SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR TERMINALS TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER

CONSTRUCTION IS COMPLETE.

CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE

DEMOLISHED PRIOR TO COMMENCING WORK.

PROVIDE CRICKET WITH NEW EQUIPMENT CURB. COORDINATE WITH EXISTING

ROOFING SYSTEM. REFER TO DETAIL F7/A-501 AND F6/M501 FOR MORE

INFORMATION.

A.

B.

C.

D.

E.

F.

G.

CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

CU-3-01

CU-3-02

CU-3-03 LOCATIONS

NOT TO SCALE

F1 SITE PLAN

SCALE: 1/2" = 1'-0"C1

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - ROOM

3-213A/3-214A/3-213 DEMO

SCALE: 1/2" = 1'-0"E1

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - ROOM 3-213A NEW

SCALE: 1/2" = 1'-0"C6

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - ROOM 3-203B NEW

SCALE: 1/2" = 1'-0"C3

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - ROOM 3-203B DEMO

CU-3-04 LOCATION

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

CORRIDOR

C3-3

INTERIOR

DESIGN

3-301A

SAFETY

OFFICE

3-301B

SAFETY

OFFICE

3-301C

AFGE RN

UNION OFFICE

3-301D

OFFICE

3-301E

SIGNAGE

3-301F

CLOSET

3-301G

SAFETY

CONFERENCE

RM

3-301H

CLOSET

3-301I

CONFERENCE

ROOM

3-301

WOMENS

LOCKER

3-302

HAC

3-303

CORRIDOR

C3-2

SECY

3-305

WOMENS

TOILET

3-302A

TOILET &

SHOWER

3-304A

LOGISTICS

OFFICE

3-304B

TOILET &

SHOWER

3-304C

CONTRACTING

OFFICE

3-304D

CONTRACTING

OFFICE

3-304E

ELECTRICAL

3-304

CHIEF

ENGINEER

3-305A

ASST CHIEF

ENGINEER

3-305B

STAFF

ENGINEER

3-305C

PROJECT AND

PLANNING

3-305D

TELECOM

ROOM

3-305E

REPRODUCTION

3-305F

FMS OFFICE

3-305G

OFFICE

3-305H

CLOSET

3-305I

STAIR #1

S1

CORRIDOR

C3-1

ELEV

E1

03M-103 F3

3/4" CD

TYP.

PIPE DROP TO

CU-3-03 ON LOW

ROOF

1/2" RS

1/4" RL

03M-103 D3

TELECOM

ROOM

3-305E

77 SF

IU-3-03

3/4" CD

1/2" RS

1/4" RL

TYP.

1 3

8 11

TELEPHONE

3-305E

50 SF

PROJECT AND

PLANNING

3-305D

PROJECT AND

PLANNING

3-305D

07/03/2024

07/03/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.B

_R

.rv t

-0

7-

8:

:4

03M-103

MECHANICAL PLAN - BUILDING 3 - THIRD LEVEL 689A4-22-700

03_42

07/03/2024 M. Perkins T. Nakalawa

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

SCALE: 1/8" = 1'-0"F5

MECHANICAL PLAN - BUILDING 3 -

THIRD LEVEL

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO CONDENSER UNIT.

NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO INDOOR UNIT.

PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL

EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR

CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

PROVIDE BACNET ADAPTER MOUNTED ADJACENT TO UNIT IN TELECOM ROOM.

CONNECT WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL CLOSET

TO BE ADDRESSABLE ON VA NETWORK/HVAC FMS.

PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO

BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY

DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO

COMMENCING WORK.

SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR TERMINALS TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER

CONSTRUCTION IS COMPLETE.

CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE

DEMOLISHED PRIOR TO COMMENCING WORK.

PROVIDE CRICKET WITH NEW EQUIPMENT CURB. COORDINATE WITH EXISTING

ROOFING SYSTEM. REFER TO DETAIL F7/A-501 AND F6/M501 FOR MORE

INFORMATION.

A.

B.

C.

D.

E.

F.

G.

CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1/2" = 1'-0"F3

ENLARGED MECHANICAL PLAN -

THIRD LEVEL - ROOM -3-305E NEW

SCALE: 1/2" = 1'-0"D3

ENLARGED MECHANICAL PLAN -

THIRD LEVEL - ROOM - 3-305E DEMO

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

EMS OFFICE

42-100

TELEPHONE

CLOSET

42-101

MALE TOILET

42-102

EMS SUPPLY

STORAGE

42-103

JANITOR

CLOSET

42-104

CLEAN LINEN

STORAGE

42-105

LINEN RM

42-106

SOILED LINEN

STORAGE

42-107

EMS SUPV

OFFICE

42-108

EMS

STORAGE

42-109

EMS OFFICE

42-100A

CORRIDOR

42-C1-2

EMS OFFICE

42-100B

CLOTHING

STORAGE

42-106A

42-105A 42-108A

/F3 03M-101

CORRIDOR

42-C1-1

ATRIUM

GAS BOTTLE

STORAGE

CORRIDOR

42-C1-3

42M-101 F4

3/4" CD

TYP.

TELECOM

ROOM

42-107A

1/2" RS

1/4" RL

42M-101 F2

PIPE RISE FROM

CU-42-01

STORAGE

42-216

TELECOM

ROOM

42-217

LABOR

RELATIONS

42-201

WAITING

42-202

PASSAGE

42-203

GRANT

42-204

VOCATIONAL

42-205

TEAM

42-206

PASSAGE

42-207

TOILET

42-208

HUD/ VASH

42-209

42-210

SUPERVISOR

42-211

42-212

STORAGE

42-213

MECH SP

42-219

HAC

42-214

PASSAGE

42-215

STORAGE

42-201A

/F3 03M-102

CORRIDOR

42-C2

HUD/ VASH

42-218

42M-101 C4

CU-42-01

CU-42-02

3/4" CD

PIPE RISE FROM

IU-42-01 ON 1ST LEVEL

BELOW

42M-101 C2

1/2" RS

1/4" RL

TELECOM

ROOM

42-217

130 SF

IU-42-02

1/4" RL

1/2" RS

3/4" CD TYP.

1 3

HUD/ VASH

42-218

PASSAGE

42-215

STORAGE

42-216

IU-42-011 3

7 10

TELECOM

ROOM

42-107A

81 SF

1/2" RS

1/4" RL

TYP.

8 11

8 11

HUD/ VASH

42-217

133 SF

PASSAGE

42-215

STORAGE

42-218STORAGE

42-216

SOILED LINEN

STORAGE

42-107

202 SF

EMS SUPV

OFFICE

42-108

CLEAN LINEN

STORAGE

42-105

07/03/2024

07/03/2024

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

B42

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.B

_R

.rv t

-0

7-

8:

:4

42M-101

MECHANICAL PLAN - BUILDING 42 - SITE PLAN,

FIRST & SECOND LEVEL

689A4-22-700

03_42

07/03/2024 M. Perkins T. Nakalawa

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

SCALE: 1/8" = 1'-0"F7

MECHANICAL PLAN - BUILDING 42 -

FIRST LEVEL

SCALE: 1/8" = 1'-0"C7

MECHANICAL PLAN - BUILDING 42 -

SECOND LEVEL

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO CONDENSER UNIT.

NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO INDOOR UNIT.

PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL

EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR

CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

PROVIDE BACNET ADAPTER MOUNTED ADJACENT TO UNIT IN TELECOM ROOM.

CONNECT WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL CLOSET

TO BE ADDRESSABLE ON VA NETWORK/HVAC FMS.

PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO

BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY

DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO

COMMENCING WORK.

SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR TERMINALS TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER

CONSTRUCTION IS COMPLETE.

CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE

DEMOLISHED PRIOR TO COMMENCING WORK.

PROVIDE CRICKET WITH NEW EQUIPMENT CURB. COORDINATE WITH EXISTING

ROOFING SYSTEM. REFER TO DETAIL F7/A-501 AND F6/M501 FOR MORE

INFORMATION.

A.

B.

C.

D.

E.

F.

G.

CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1/2" = 1'-0"C4

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - ROOM 42-217 NEW

SCALE: 1/2" = 1'-0"F4

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM 42-107

CU-42-01

CU-42-02 LOCATIONS

NOT TO SCALE

C1 SITE PLAN

SCALE: 1/2" = 1'-0"C2

MECHANICAL ENLARGED PLAN -

SECOND LEVEL -ROOM-42-217 DEMO

SCALE: 1/2" = 1'-0"F2

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM-42-107 - DEMO

PREPOSITIONED SLEEVE PREPOSITIONED SLEEVE

CORE DRILLED SLEEVE CORE DRILLED SLEEVE

FOR 1-1/4" AND LARGER

1 3

6 7

CONCRETE STRUCTURE

PIPE SLEEVE SIZED FOR PIPE WITH INSULATION

WATERSTOP

EXTEND SLEEVE 4" ABOVE FINISHED FLOOR LEVEL

MINIMUM 18" LONG ALUMINUM

INSULATION JACKET

INSULATION - SEE SPECS FOR

THICKNESS

PIPE

SEAL WITH WATERPROOF

CAULKING

MINIMUM 3/4" POURED LEAD

MULTI-COMPONENT PLASTIC CEMENT

PIPE SLEEVE (I.D. MIN. 1" LARGER THAN O.D. OF PIPE)

WATERPROOF GROUT

CORE DRILL MIN. 1" LARGER

HOLE THAN O.D. OF PIPE SLEEVE

(12" MAXIMUM CORE DRILL SIZE)

13NOTES:

1. SEAL SLEEVE WITH UL RATED SEALANT TO MATCH

RATING OF WALL OR CEILING. MAINTAIN REQUIRED

MINIMUM CONTACT OF SEALANT AND CLEARANCES OF

PIPE IN PENETRATION.

2. PROVIDE ESCUTCHEON PLATES AT ALL EXPOSED

PENETRATIONS.

ROOF

PIPE CLAMP

SEE PLANS FOR

PIPE TYPE , SIZE,

AND LOCATION

ROOF SUPPORT AS

MANUFACTURED BY C-PORT,

CB10, 28" LONG OR EQUIVALENT.

SEE SPECIFICATION FOR

SPACING

NOTE:

SEE PLANS FOR PIPE

SIZE.

8 7

BASE FLASHING.

FIBER CANT STRIP SET IN

BITUMEN

FASTENERS APPROXIMATELY 6"

O.C.

12" X 12" X 12" MIN. ROOF CURB

WITH FLANGED REMOVABLE TOP

PER SPECIFICATION

23 23 00

SLOPE PIPES AWAY FROM

HOOD.

SHEET METAL, SEAL WATERTIGHT

PENETRATIONS.

SHEET METAL HOOD.

PROVIDE 1 1/2" THICK, 3 LB/CU.FT.

DENSITY RIGID MINERAL

FIBERBOARD INSULATION WITH

METAL LINER

15 3 2

ROOF MOUNTED OUTDOOR HEAT

PUMP UNIT MOUNTED ON ROOF CURB WITH

NEOPRENE

VIBRATION ISOLATION PADS, SEE ROOF PLANS.

INDOOR UNIT, DIRECT EXPANSION

(DX) COIL

DISTRIBUTION NOZZLE

GLOBE VALVES AT OUTDOOR UNIT

SWING JOINT

PIPE PENETRATION THROUGH ROOF,

SEE PIPING THRU ROOF DETAIL ON THIS SHEET

REFRIGERANT SUCTION LINE

REFRIGERANT LIQUID LINE

SIGHT GLASS

REMOTE BULB

FILTER

LIQUID CHARGING VALVE

STRAINER

SOLENOID VALVE TO BE LOCATED AS

CLOSE TO EXPANSION VALVE AS POSSIBLE

EXPANSION VALVE

RL RS

5 FT

6 8 10

9 1110 12

-1312 14 -16 -

1614 17 2219 23

2725 28 3230

20 241814 16128 1064 532 2 1/21 1/21 1 1/4THRU 3/4

7 7

7 98

SIDE VIEW TRAPEZE HANGER FOR UP

TO

1000 LB. UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

IN.

FT.

FT.

1" M

AX

PROVIDE INSULATION

SHIELD

& INSERT FOR ALL PIPING

(8" MIN.)

BAND

1-5/8" 12 GAUGE

CHANNEL OR

2"x2"x1/4"

ANGLE

1/2" DIA.

HANGER RODS

WITH

36" MAX.

SPACING ON EACH

CHANNEL

WELD

SADDLE

INSULATION

SHIELD

AT HANGER

PROVIDE HIGH

COMPRESSIVE

STRENGTH INSULATION (9

PSF MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE

PIPE)

HANGER ROD

NOTES:

SEE SPECIFER FOR

DETAILED

HANGER REQUIREMENTS

L

W

A

A

B B

PLAN SECTION

B-B

5D

5D

2D

CONCRETE

BASE

D

ANCHOR BOLT

(TYP.)

PIPE SLEEVE (5D, 3"

[75mm] MIN. )

FLOOR

WELD HEAD TO PLATE OR BEND

OVER END 5D

SECTION A-A (BASE POURED WITH

FLOOR SLAB)

TYPICAL ANCHOR BOLT NUT

& WASHER

PROVIDE DOUBLE SLAB

REINFORCING IN BASE AREA

EQUIPMENT BASE PLATE

16" [400 mm]

5" M

IN

[1 m m

L/

SECTION A-A (BASE NOT POURED

WITH FLOOR SLAB)

TYPICAL ANCHOR BOLT NUT

& WASHER

EQUIPMENT BASE PLATE

PROVIDE #3 BARS 12" [300 mm] O.C.

EACH WAY IN THE BASE & DOWEL

BASE TO FLOOR

5" M

IN

[1 m m

L/

07/03/2024

07/03/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

03_42

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.G en er al

.S he et s.

rv t

-0

7-

8:

:0

03M-501

MECHANICAL DETAILS 689A4-22-700

07/03/2024 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

NTSD8 PIPE PENETRATION DETAIL

NTSB6 ABOVE ROOF PIPE SUPPORT

NTSF6 PIPING THRU ROOF DETAIL

NTSF8 SPLIT SYSTEM HEAT PUMP REFRIGERANT PIPING

NTSD6 TYPICAL CONDENSATE DRAIN TRAP

F3 PIPE PENETRATION DETAIL

SCALE: 12" = 1'-0"F1 CONCRETE EQUIPMENT PAD

07/03/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

A4

-2 2-

0_

N ew in gt on _V

AM

C

_E H

R M

_I U

-1

2/

9A 4-

-7

.N ew in gt on

.E H

R M

.M

EP

.B

_R

.rv t

-0

7-

8:

:5

03M-701

MECHANICAL SCHEDULES 689A4-22-700

03_42

07/03/2024 M. Perkins T. Nakalawa

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

555 Willard Avenue, Newington, CT 06111

SPLIT SYSTEM INDOOR UNIT SCHEDULE

SYMBOL

NO.

MANUFACTURER/MODEL NO. TYPE

TOTAL

COOLING

CAPACITY

(BTU/H)

SENSIBLE

COOLING

CAPACITY

(BTU/H)

SUPPLY

AIRFLOW

(CFM)

SOUND

(dBA)

ELECTRICAL DATA

WIDTH (IN)

HEIGHT

(IN)

WEIGHT

(LBS)VOLTS PHASE HZ MCA

IU-3-01 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28 IU-3-02 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28 IU-3-03 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28 IU-3-04 TRANE TPLA0A0121EA80A CEILING MOUNTED 12,000 11,600 530 30 208 1 60 1 33 10 46

IU-42-01 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28 IU-42-02 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28

SPLIT SYSTEM OUTDOOR UNIT SCHEDULE

SYMBOL

NO.

MANUFACTURER/MODEL

NO.

COOLING

AMBIENT

(F)

TOTAL

COOLING

CAPACITY

(BTU/H)

SENSIBLE

COOLING

CAPACITY

(BTU/H)

ELECTRICAL DATA

WIDTH

(IN)

HEIGHT

(IN)

WEIGHT

(LBS)VOLTS PHASE HZ MCA MOCP

CU-3-01 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100

CU-3-02 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100

CU-3-03 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100

CU-3-04 TRANE TRUZA0121KA70NA 115 12,000 11,600 208 1 60 11 28 32 25 93

CU-42-01 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100

CU-42-02 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100

SYMBOL NO. IU-3-01 THROUGH IU-42-02, SPLIT SYSTEM INDOOR HEAT PUMP UNIT / A/C UNIT: UNIT SHALL CONSIST OF A SLIM SILHOUETTE COMPACT WALL MOUNTED EVAPORATOR SECTION, CONCEALED HORIZONTAL DUCTED, OR CEILING MOUNTED EVAPORATOR SECTION, WITH WIRED CONTROL. UNIT CASING SHALL HAVE A WHITE FINISH. FAN SHALL BE AN ASSEMBLY WITH IN LINE-FLOW DIRECT DRIVEN MOTOR, STATICALLY & DYNAMICALLY BALANCED WITH PERMANENTLY LUBRICATED BEARINGS. PROVIDE A MOTORIZED AIR SWEEP FLOW LOUVER FOR AN AUTOMATIC CHANGE IN AIR FLOW BY DIRECTING AIR UP AND DOWN TO PROVIDE A UNIFORM AIR DISTRIBUTION, INDOOR FAN SHALL HAVE TWO (2) SPEED, HIGH AND LOW, RETURN FILTER SHALL BE EASILY REMOVABLE, & WASHABLE. PROVIDE A SLOPED CONDENSATE DRAIN PAN TO PREVENT STANDING WATER ACCUMULATION. UNIT TO BE MANUFACTURED BY SAME MANUFACTURER AS SPLIT SYSTEM AIR CONDITIONING OUTDOOR UNIT. UNIT SHALL BE COMPLETELY FACTORY ASSEMBLED AND ARI RATED. THE CEILING MOUNTED CASSETTE TYPE EVAPORATOR SECTION SHALL BE PROVIDED WITH AN OUTSIDE AIR CONNECTION.

EACH REFRIGERATION CIRCUIT ON EACH UNIT IS TO BE CONTROLLED BY A FACTORY INSTALLED THERMAL EXPANSION VALVE. THE EVAPORATOR COIL SHALL BE CONSTRUCTED OF NON FERROUS CONSTRUCTION FINS, MECHANICALLY BONDED TO SEAMLESS

COPPER TUBES.

PROVIDE A FACTORY WIRED AND INSTALLED CONTROL SYSTEM, INCLUDING EVAPORATOR FAN CONTRACTOR, TERMINAL STRIP, AND A 24 VOLT (COOLING AND DRY FAN OPERATION, THERMOSTAT SETTING, TIMER MODE, HIGH-LOW FAN SPEED) THE CONTROL SYSTEM SHALL CONSIST OF TWO (2) MICROPROCESSORS INTERCONNECTED BY A SINGLE NON POLAR TWO WIRE CABLE. THE UNIT SHALL BE CAPABLE OF AUTOMATIC RESTART WHEN POWER IS RESTORED AFTER POWER INTERRUPTION. ALL CONTROL WIRING

SHALL BE RESPONSIBILITY OF DIV. 23.

PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH PUMPING CAPACITY.

UNIT SHALL BE MANUFACTURED SHALL BE MITSUBISHI TRANE. SEE SCHEDULE FOR PERFORMANCE.

SYMBOL NO. CU-3-01 THROUGH CU-42-02, SPLIT SYSTEM HEAT PUMP OUTDOOR UNIT / A/C UNIT: OUTDOOR MOUNTED UNIT, ELECTRICALLY CONTROLLED AIR COOLED SPLIT AIR CONDITIONING SYSTEM. THE UNIT SHALL FUNCTION AS THE OUTDOOR COMPONENT OF AN AIR-TO-AIR ELECTRIC AIR CONDITION SYSTEM, AND SHALL BE UL LISTED, COMPLETELY FACTORY ASSEMBLED AND TESTED, AND CHARGED WITH REFRIGERANT. THE UNIT SHALL BE MANUFACTURED BY THE SAME MANUFACTURER AS SPLIT SYSTEM AIR CONDITIONING INDOOR UNIT. THE UNIT SHALL CONSIST OF AN INTERNALLY ISOLATED, HIGH PERFORMANCE ROTARY TYPE COMPRESSOR, A CRANKCASE HEATER, VERTICAL DISCHARGE PROPELLER TYPE FAN, WEATHERPROOF FAN MOTOR, REFRIGERATION DEVICES, AND A CONTROL BOX, (OU-1 AND OU-2 ONLY). UNIT COIL SHALL HAVE SEAMLESS COPPER TUBES AND MECHANICALLY BONDED FINS.

THE UNIT HOUSING SHALL BE CONSTRUCTED OF GALVANIZED STEEL COATED WITH A BAKED ENAMEL FINISH.

THE UNIT SHALL BE FURNISHED WITH THERMAL EXPANSION VALVES, METERING DEVICE, SUCTION AND DISCHARGE SERVICE VALVES, AND AN ACCUMULATOR WITH FUSIBLE PLUG RELIEF.

THE COOLING CAPACITIES LISTED ARE FOR 105 DEGREE F SUMMER AND 20 DEGREE F WINTER OUTDOOR AMBIENT CONDITIONS. THE UNIT COMPRESSOR SHALL BE CAPABLE OF OPERATING DOWN TO ZERO (0) DEGREE F OUTDOOR AMBIENT, AND WARRANTED FOR FIVE YEARS. UNIT SHALL HAVE EFFICIENCY RATING EQUIVALENT TO 12.0 SEER PER IECC, 2009, CHAPTER 5.

UNIT OPERATING CONTROLS AND SAFETIES SHALL INCLUDE COMPRESSOR SHORT CYCLE PREVENTION CONTROL, DEFROST CONTROL, HIGH DISCHARGE PRESSURE CUTOFF, LOSS-OF-CHARGE CUTOFF, TIME-DELAY RESTART, COMPRESSOR MOTOR CURRENT

AND TEMPERATURE OVERLOAD CUTOFFS.

UNIT SHALL HAVE SINGLE POINT POWER CONNECTION AND SHALL BE FURNISHED WITH 24 VOLT CONTROL TRANSFORMER. UNIT SHALL BE MANUFACTURED BY MITSUBISHI. SEE SCHEDULE FOR PERFORMANCE.

CONTRACTOR SHALL SUBMIT INSTALLER QUALIFICATIONS SHOWING OEM SPECIFIC TRAINING AND CERTIFICATION WITH MITSUBISHI TRANE SPLIT-SYSTEM AND VRF SYSTEMS. INSTALLER SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE WITH MITSUBISHI

EQUIPMENT.

1.

2.

3.

4.

5.

6.

NOTES & OPTIONS

NOMINAL COOLING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 80/67°F (DB/WB), OUTDOOR OF 95°F (DB).

NOMINAL HEATING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 70°F (DB), OUTDOOR OF 43°F (WB).

SEE OUTDOOR UNIT SCHEDULE FOR OUTDOOR AMBIENT CONDITIONS, CONNECTED CAPACITY, AND OTHER FACTORS ASSOCIATED WITH CORRECTED CAPACITIES.

SEE SCHEMATIC PIPING/CONTROL DIAGRAM FOR INDICATION OF REQUIRED INDOOR UNIT REMOTE CONTROLLERS, SYSTEM CONTROLLERS, AND INTEGRATION DEVICES.

FULL DEMAND CORRECTED CAPACITY INCLUDES DE-RATE ASSOCIATED WITH INDOOR VS. OUTDOOR CONNECTED CAPACITY INDICATED ON OUTDOOR UNIT SCHEDULE FOR ASSOCIATED SYSTEM. PARTIAL CORRECTED CAPACITY ASSUMES SUFFICIENT DIVERSITY EXISTS SUCH THAT THE CONNECTED CAPACITY DE-RATE DOES NOT APPLY.

IT IS RECOMMENDED TO ALWAYS BASE HEATING CORRECTED CAPACITY ON FULL DEMAND.

NOTES & OPTIONS

1. NOMINAL COOLING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 80/67°F (DB/WB), OUTDOOR OF 95°F (DB).

2. NOMINAL HEATING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 70°F (DB), OUTDOOR OF 43°F (WB).

3. EFFICIENCY VALUES FOR EER, IEER, COP ARE BASED ON AHRI 1230 TEST METHOD FOR MIXTURE OF DUCTED & NON-DUCTED INDOOR UNITS.

4. FOR SYSTEMS WITH MULTIPLE MODULES, REFRIGERANT PIPE DIMENSIONS INDICATE TOTAL SYSTEM COMBINED PIPING DOWNSTREAM OF MODULE TWINNING.

5. ADDED FIELD CHARGE LISTED IS IN ADDITION TO FACTORY CHARGE, THIS MUST BE UPDATED BASED UPON FINAL AS-BUILT PIPING LAYOUT.

6. FACTORY REPRESENTATIVES SHALL STARTUP AND COMMISSION CITY MULTI EQUIPMENT UPON COMPLETION OF EQUIPMENT INSTALLATIONS.

LA LEVEL ALARM

AT ANALYTICAL TRANSMITTER

AY ANALYTICAL SIGNAL CONVERTER

ACV ANALYTICAL CONTROL VALVE

AIT ANALYTICAL INDICATING CONTROLLER

EY VOLTAGE SIGNAL CONVERTER

IY CURRENT SIGNAL CONVERTER

HS HAND SWITCH

FIT FLOW INDICATING TRANSMITTER

FET FLOW ELEMENT\TRANSMITTER

ESL VOLTAGE SWITCH LOW (24 VAC OR LESS)

II CURRENT INDICATOR

IT CURRENT TRANSMITTER

IS CURRENT SWITCH

IA CURRENT ALARM

FA FLOW ALARM

HSI HAND SWITCH INDICATOR

HK MANUAL VARIABLE CONTROL

FY FLOW SIGNAL CONVERTER

FT FLOW TRANSMITTER

FS FLOW SWITCH

FI FLOW INDICATOR

FE FLOW ELEMENT

FCV FLOW CONTROL VALVE

ET VOLTAGE TRANSMITTER

ES VOLTAGE SWITCH (CONTROL RELAY)

EA VOLTAGE ALARM

EI VOLTAGE INDICATOR

PY PRESSURE SIGNAL CONVERTER

PDT PRESSURE DIFFERENTIAL TRANSMITTER

PS PRESSURE SWITCH

PA PRESSURE ALARM

PT PRESSURE TRANSMITTER

PIT PRESSURE INDICATING TRANSMITTER

PIS PRESSURE INDICATING SWITCH

PI PRESSURE INDICATOR

PDS PRESSURE DIFFERENTIAL SWITCH

PDI PRESSURE DIFFERENTIAL INDICATOR

PCV PRESSURE CONTROL VALVE

MV MANUAL HAND VALVE

LT LEVEL TRANSMITTER

LS LEVEL SWITCH

LE LEVEL ELEMENT

LY LEVEL SIGNAL CONVERTER

LIT…