Attachment 17 - 689A4-22-700.Newington.EHRM.IFC.B03_42.20240703.part2.pdf
PDF 16 MB Posted
- Attached to
- Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
- Solicitation number
- 36C77624B0015_1
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
M
HS
S
HWS
M
M
P
PS PS
F
PS
TS
V
D
TWS
TWR
TWB
MPS
HPS
LPS
CHR
RS
RL
HWR
R
T
H
CO2
CHS
XX-##
SDSD
ELBOW - DOWN
ELBOW - UP
PIPE RISE-DROP
TEE - DROP FROM TEE
END CAP
FLEX CONNECTION
PIPE REDUCER - CONCENTRIC
PIPE STRAINER
CHECK VALVE
GATE VALVE
PLUG VALVE
GLOBE VALVE
UNION - SCREWED
CHILLED WATER SUPPLY
CHILLED WATER RETURN
REFRIGERATION
STEAM - MEDIUM PRESSURE SUPPLY
STEAM - LOW PRESSURE SUPPLY
STEAM - HIGH PRESSURE SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
DEMO
EXISTING
TOWER WATER BYPASS
TOWER WATER RETURN
TOWER WATER RETURN
REFRIGERATION LIQUID
REFRIGERATION SUCTION
MECHANICAL PIPING
DIRECTION OF FLOW
MAKE-UP WATER
VENT
DRAIN
GEOTHERMAL SUPPLY
GEOTHERMAL RETURN
MU
CONDENSATE DRAINCD
STEAM - MEDIUM PRESSURE RETURN
STEAM - LOW PRESSURE RETURN
STEAM - HIGH PRESSURE RETURNHPR
HPR
LPR
CONDENSER WATERCND
GWS
GWR
DIRECTION PITCHDOWN
VERIFY WITH
ARCHITECTURAL
DRAWINGS
PUMPED CONDENSATEPC
PRESSURE REDUCING VALVE
3-WAY
MODULATING
CONTROL VALVE
2-WAY CONTROL VALVE
SAFETY VALVE OR
PRESSURE RELIEF
VALVE
SOLENOID VALVE
3/4" BALL VALVE WITH ADAPTER
TO 3/4" HOSE THREAD
DIAPHRAGM VALVE
BUTTERFLY VALVE
BALL VALVE
VALVE IN RISE
WATER FLOW MEASURING DEVICE
CIRCUIT SETTER
ELBOW - DROP TO TEE
PIPE REDUCER - ECCENTRIC
AIR VENT - AUTOMATIC
AIR VENT - MANUAL
GAUGE - DIFFERENTIAL
GAUGE - PRESSURE
GAUGE - PRESSURE WITH COCK
GAUGE - TEMPERATURE
PIPE ANCHOR
PIPE EXPANSION JOINT
PIPE GUIDE
SENSOR - FLOW
SWITCH - FLOW
SWITCH HUMIDITY
SWITCH - PRESSURE
SWITCH - TEMPERATURE
TEMPERATURE - PRESSURE TEST FITTING
THERMOMETER
THERMOMETER WELL
BASKET STRAINER
STEAM TRAP INVERTED BUCKET
METER - TOTALIZING BTU
METER - TOTALIZING FLOW
M301 A1
SCALE
DETAIL
SCALE
SECTIONA1
A1
X#/X###
MECHANICAL SYMBOL LEGEND
DUCT TRANSITION FROM RECTANGULAR TO ROUND
DUCT TRANSITION
SIDEWALL EXHAUST OR RETURN AIR GRILLE
OR REGISTER
SIDEWALL SUPPLY REGISTER
RETURN DUCT
SUPPLY DUCT
RISE IN DUCT
CEILING RETURN AIR REGISTER OR GRILLE
SMOKE DAMPER
ACOUSTICAL DUCT LINING
FLEXIBLE DUCT
FIRE DAMPER
MANUAL BALANCING DAMPER
12"Ø INDICATES A 12" ROUND DUCT
24x12Ø INDICATES A 24"x12" FLAT OVAL DUCT (WIDTH x DEPTH)
EXISTING DUCT TO BE REMOVED
ACCESS DOOR
24x12 INDICATES A 24"x12" RECTANGULAR DUCT (WIDTH x DEPTH)
POINT OF CONNECTION, NEW DUCT TO EXISTING DUCT
OR / POINT OF REMOVAL FROM EXISTING DUCT TO DEMO DUCT
PERFORATED FACE CEILING DIFFUSERS
DUCTWORK SYMBOLS
ROOM HUMIDISTAT/HUMIDITY TRANSMITTER LOCATION ONLY
SEE CONTROL DRAWINGS FOR TYPE
SEE CONTROL DRAWINGS FOR TYPE
ROOM THERMOSTAT/TEMP. TRANSMITTER LOCATION ONLY
LETTERS REFER TO THE EQUIPMENT TYPE
EQUIPMENT SYMBOLS
NUMBERS REFER TO SPECIFIC EQUIPMENT
DUCT MOUNTED STATIC PRESSURE PROBE
DRAWING NUMBER WHERE DETAILED
SECTION LOCATION
DRAWING NUMBER WHERE DETAILED
DETAIL LOCATION
SECTION LETTER LOCATION
SECTION SYMBOL
DETAIL SYMBOL
SECTION AND DETAIL TITLES
DETAIL NUMBER LOCATION
SYMBOL INDICATES EQUIPMENT IDENTIFIED
IN EQUIPMENT SCHEDULE
XX-#
CFM
SYMBOL INDICATES GRILLE OR DIFFUSER
IDENTIFIED IN EQUIPMENT SCHEDULE
S.DPR
F.DPR
CEILING EXHAUST REGISTER
VALVE SYMBOLS FITTING SYMBOLS
PIPING SYMBOLS
EXHAUST DUCT
2HR. SMOKE BARRIER
SMOKE BARRIER
2HR. FIRE BARRIER
1 HR. FIRE BARRIER
##x##
SIDEWALL GRILLE DIMENSION WHERE
SHOWN ON PLANS
COMBINATION FIRE/SMOKE DAMPER
F/S DPR
FLEXIBLE CONNECTION
STANDARD LONG RADIUS ELBOW
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES
EXCEPT TRANSFER AIR SOUND ELBOW)
SHORT RADIUS ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR ELBOWS WITH
VANES EXCEPT TRANSFER AIR SOUND
ELBOW)
ROOM CARBON DIOXIDE TRANSMITTER LOCATION ONLY
SEE CONTROL DRAWINGS FOR TYPE
24"x12"
24"/12"
12"Ø
DUCT MOUNTED SMOKE DETECTOR
STAMPED FACE CEILING DIFFUSERS
NOTE: NOT ALL ABBREVIATIONS AND
SYMBOLS APPLY TO THIS PROJECT.
A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN
FURRED CHASES OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.
B. PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR
CHASES FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, COILS, FANS,
CONTROLS, ETC. THEY SHALL BE FURNISHED UNDER DIVISION 23 AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATION. ACCESS DOOR RATING
SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING.
C. COORDINATE THE LOCATION OF ALL DIFFUSERS, GRILLES, REGISTERS, ACCESS
DOORS, ETC., WITH THE ARCHITECTURAL REFLECTED CEILING PLAN(S).
D. ALL ROUND RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL
SIZE AS THE SCHEDULED DIFFUSER NECK SIZE.
E. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR
INDICATED. ALL DUCT SIZES SHOWN ON DRAWINGS ARE NET INSIDE DIMENSIONS.
PROVIDE ONE INCH ACOUSTICAL LINING (TYPE D3 INSULATION) IN LOW VELOCITY
RECTANGULAR DUCTWORK FOR THE FIRST 10 DIAMETERS OF DUCTWORK
CONNECTED TO DEVICE, OR AS INDICATED ON DRAWINGS, WHICHEVER IS
GREATER. FOR THE REMAINDER OF THIS DUCTWORK PROVIDE AS INDICATED IN
THE INSULATION SPECIFICATIONS.
F. PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING
AND 1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS
REQUIRED TO PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES
OCCUR ABOVE CEILING AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE
PROVIDE HOSE CONNECTION ON VALVE.
G. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE
RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. PROVIDE APPROVED
FIRE DAMPERS IN ALL REQUIRED PENETRATIONS FOR DUCTWORK, GRILLES,
REGISTERS AND DIFFUSERS. ALL PIPE AND DUCTWORK PENETRATIONS OF FIRE,
SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
H. CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND
FIRE PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
EQUIPMENT ACCESS AND SERVICEABILITY.
I. CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS,
SLEEVES, AND HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND
PLUMBING EQUIPMENT, DUCTWORK AND PIPING, ETC. CONTRACTOR SHALL
COORDINATE WITH GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID
CONFLICTS AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
J. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY
MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO
ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT
IN A MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE
BUILDING STRUCTURAL SYSTEM.
K. CONTRACTOR SHALL PROVIDE RETURN AIR OR TRANSFER AIR OPENINGS IN
FULL HEIGHT WALLS SIZED AT 350 FPM (UNLESS OTHERWISE SPECIFICALLY
SHOWN ON THE DRAWINGS) TO CREATE AND/OR MAINTAIN A RETURN AIR PATH AS
REQUIRED. FIRE DAMPERS AND/OR SMOKE DAMPERS SHALL BE PROVIDED IN
SUCH OPENINGS WHERE REQUIRED BY NOTE "J".
L. SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, DUCT WALL
PENETRATIONS AND FITTING CONNECTIONS ON ALL DUCT SYSTEMS.
M. MECHANICAL ITEMS SUCH AS ROOF DRAINS, FLOOR DRAINS, PLUMBING FIXTURES,
ETC. SHOWN ON THE ARCHITECTURAL DRAWINGS BUT NOT SHOWN ON THE
MECHANICAL DRAWINGS SHALL BE INCLUDED IN THE PROJECT. THESE ITEMS
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR INCLUSION IN
ADDENDUM.
N. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTS AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE
REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER
FROM THE BASIS OF DESIGN CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES
FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE
INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT
ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON
THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE
REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS
(FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS
DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE
PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE
DRAWINGS.
O. THIS PROJECT RECONFIGURATION OF EXISTING BUILDING MECHANICAL AND
PLUMBING SYSTEMS TO MAINTAIN EXISTING BUILDING UTILITY SERVICES. THIS
WORK INCLUDES: (1) RELOCATING AND REPLACING EXISTING DUCT, PIPE, AIR
TERMINALS, ETC.; (2) PROVIDING NEW STRUCTURAL SUPPORTS AND SEISMIC
BRACING FOR EXISTING MECHANICAL AND PLUMBING SYSTEMS WHERE
RECONFIGURATIONS ARE REQUIRED; (3) PROVIDING DRIP PANS WITH DRAIN
CONNECTIONS TO EXISTING FLOOR DRAINS BELOW ALL EXISTING WATER WATER
PIPES THAT ROUTE ADJACENT TO OR ABOVE ELECTRICAL AND COMMUNICATIONS
EQUIPMENT.
P. CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS PRIOR TO COMMENCING
WORK SHOWING ALL NEW AND EXISTING SYSTEMS IN THE AREA OF WORK AND
ALL PROVISIONS FOR COORDINATING ROUTING, ACCESS AND CLEARANCES.
SUBMITTALS WILL NOT BE ACCEPTED WITHOUT APPROVED COORDINATION
DRAWINGS.
A. THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING
SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE
PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION,
ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING BUILDING
MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.
B. THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING
SERVICES FOR REMOVAL WITH OWNER AUTHORIZED REPRESENTATIVE AND SHALL
CONFORM TO THEIR REQUIREMENTS.
C. DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE
MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT
THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY WHICH ARE
OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE
OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED
OUTSIDE OF THE SUITE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE
FACILITY.
D. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK ZONE
AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC. FOR ALL
WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO MINIMIZE DUST
AND FUMES.
E. THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN ADVANCE
TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE FOR
APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN
OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL
COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH
ACCEPTABLE ROUTING AND ACCESS WITHIN THE FACILITY FOR MATERIALS REQUIRED
FOR THE NEW INSTALLATION.
F. SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING OR
MECHANICAL SYSTEMS FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.
G. ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED ON
FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND MEASUREMENT DATA.
H. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES
INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND ARCHITECTURAL.
ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT PRIOR
TO START OF WORK.
I. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO
ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS
GENERAL DEMO NOTES
GENERAL NOTESABBREVIATIONS
AHU AIR HANDLING UNIT
BRAKE HORSEPOWER
BTU PER HOUR
BRITISH THERMAL UNIT
BOTTOM OF DUCT
BOTTOM OF PIPE
ACOUSTIC LINING
ABOVE FINISHED FLOOR
ACCESS DOOR
COMPRESSED AIR
DRAIN
ENTERING
EXHAUST
CONTINUATION
DIRECT EXPANSION
CUBIC FEET PER MINUTE
CONDENSATE DRAIN
AL
AFF
AD
BHP
BOD
BTU
BOP
CA
CFM
D
DX
ENT
EXH
CD
EMCS
CONT.
BTUH
FLEXIBLE
FLAT BOTTOM
FILTER GAUGE
FLOOR SINK
FLOOR DRAIN
FAN COIL UNIT
DEGREES FAHRENHEIT
FEET PER MINUTE
FEET
FLAT TOP
HOSE BIBB
INCHES
GALLONS PER MINUTE
GALLONS PER HOUR
FB
°F
FD
FCU
F.G.
FS
FPM
FT.
FT
GPM
GPH
HB
HD
IN
HEPA
FLEX
KILOWATT
MAIN AIR (CONTROLS)
KILOWATT HOUR
OPPOSED BLADE DAMPER
OUTSIDE AIR
NUMBER (QUANTITY)
NOT IN CONTRACT
NOT APPLICABLE
MOTOR CONTROL CENTER
QUANTITY
QUADRANT
REVOLUTIONS PER MINUTE
RELATIVE HUMIDITY
SMOKE CONTROL DAMPER
RETURN AIR
PRESSURE REDUCING VALVE
KW
KWH
MA
MCC
NO.
NIC
OBD
OA
NA
PRV
PSIG
QTY
Rh R.A.
RPM
SCD
QUAD
ENERGY MANAGEMENT CONTROL SYSTEM
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HAND DAMPER (VOLUME DAMPER)
POUNDS PER SQUARE INCH GAGE
TYPICAL
VOLTS
SOUND TRAP
VARIABLE AIR VOLUME
TOP OF PIPE TRAPEZE
VENT THRU ROOF
VELOCITY
ST
SP
TYP.
VAC
VAV
V
TP
VTR
VEL
SDVV
TOPT
SINGLE DUCT VARIABLE VOLUME
STATIC PRESSURE (INCHES OF WATER)
TOTAL PRESSURE (INCHES OF WATER)
VOLTS, ALTERNATING CURRENT
ACU AIR CONDITIONING UNIT
CONTRACTING OFFICER'S REPRESENTATIVECOR
RS
RL REFRIGERATION LIQUID
REFRIGERATION SUCTION
CONDENSING UNITCU
INDOOR UNITIU
07/03/2024
07/03/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
03_42
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.G en er al
.S he et s.
rv t
-0
7-
8:
:3
03M-001
MECHANICAL ABBREVIATIONS AND SYMBOLS 689A4-22-700
07/03/2024 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
Revisions: Date:
DN
UP
UP
UP
UP
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
IRM STORAGE
3-101
REFRIGERATION
MACH RM
3-102
STORAGE
3-103
HAC
3-104
TELECOM
ROOM
3-105
IRM STORAGE
3-106
STORAGE
3-107
STORAGE
3-108
LOCK SMITH
SHOP
3-109
ELECTRICAL
3-110
FMS LOCKER
RM
3-111
ROADS AND
GROUNDS
STORAGE
3-112
ELECT
3-113
PAINT
STORAGE
3-114
CONFERENCE
ROOM
3-115
CORRIDOR
C1-3
TOILET/
SHOWER
ROOM
3-117
ROADS AND
GROUNDS
OFFICE
3-118
CARPENTER
SHOP
3-119
PAINT SHOP
3-120
PLUMBING
SHOP
3-121
A/C SHOP
3-122
ELECTRIC
SHOP
3-123
STORAGE
3-124
CORRIDOR
C1-6
PUMP RM
11-101
EMERGENCY
GENERATOR
11-101A
BOILER
PLANT
3-128
INCINERATOR
3-128A
LOCKER
ROOM
3-128B
TOILET
3-128C
EQUIP RM
3-128D
EMERGENCY
GENERATOR
RM
3-128E
EMERGENCY
GENERATOR
HOUSE
3-128F
GENERATOR
3-128G
INCINERATOR
CHARGING RM
BOILER
CONTROL
OFFICE
3-128I
CORRIDOR
C1-7
OFFICE
3-125
VACANT
3-126
CHAPEL
3-127
SACRISTY
3-127B
DEVOTIONAL
RM
3-127A
MASONS
SHOP
3-119A
ELECTRIC
SHOP
STORAGE
3-123A
STAIR #1
S1
CORRIDOR
C1-4
CORRIDOR
C1-2
CORRIDOR
C1-1
STORAGE
3-108B
IRM TRAINING
3-101A
STORAGE
3-108A
CORRIDOR
C1-5
STAIR #2
S2
ELEV
E1
/F7 42M-101
03M-101 E1
PIPE RISE TO CU-3-01
ON LOW ROOF
03M-101 F1
CU-3-04
1/2" RS 1/4" RL
3/4" CD
1/2" RS 1/4" RL
TYP.
IU-3-01
3TELECOM
ROOM
3-105
80 SF
TYP.
7 104
¾" CD UP TO
SECOND FLOOR.
1/2" RS
1/4" RL
3/4" CD
IRM STORAGE
3-112A
36 SF
HAC
3-105
32 SF
07/03/2024
07/03/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_R
.rv t
-0
7-
8:
:3
03M-101
MECHANICAL PLAN - BUILDING 3 - FIRST LEVEL 689A4-22-700
03_42
07/03/2024 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SCALE: 1/8" = 1'-0"F3
MECHANICAL PLAN - BUILDING 3 -
FIRST LEVEL
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO CONDENSER UNIT.
NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO INDOOR UNIT.
PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL
EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR
CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
PROVIDE BACNET ADAPTER MOUNTED ADJACENT TO UNIT IN TELECOM ROOM.
CONNECT WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL CLOSET
TO BE ADDRESSABLE ON VA NETWORK/HVAC FMS.
PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO
BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY
DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO
COMMENCING WORK.
SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR TERMINALS TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER
CONSTRUCTION IS COMPLETE.
CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE
DEMOLISHED PRIOR TO COMMENCING WORK.
PROVIDE CRICKET WITH NEW EQUIPMENT CURB. COORDINATE WITH EXISTING
ROOFING SYSTEM. REFER TO DETAIL F7/A-501 AND F6/M501 FOR MORE
INFORMATION.
A.
B.
C.
D.
E.
F.
G.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1/2" = 1'-0"F1
MECHANICAL ENLARGED PLAN -
FIRST LEVEL-ROOM-3-112A/3-106 -
DEMO
SCALE: 1/2" = 1'-0"E1
MECHANICAL ENLARGED PLAN -
FIRST LEVEL - ROOM 3-105-NEW
UPUP
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
CART
STORAGE
3-202
STORAGE
3-203
Room
3-204
STORAGE
3-205
EMS BREAK
ROOM
3-203B
GYM
3-207
STORAGE
3-208
WOMENS
TOILET
3-209
MENS TOILET
3-210
STORAGE
3-211
EMS
3-212
BIO-MED
3-214
TELECOM
ROOM
3-213A
STORAGE
3-216
OFFICE
3-217
OFFICE
3-214A
ELEV
E1
CORRIDOR
C2-1
CORRIDOR
C2-2
CORRIDOR
C2-3
LOBBY
C2-3A
CORRIDOR
C2-4
STORAGE
3-212C
3-208A
3-208B
STAIR #2
S2
STAIR #1
S1
STORAGE
3-201
MECH
3-203A
STORAGE
3-212A
VOLUNTEER
EMS
3-212B
EMS
ROOM
3-218
CU-3-03
CU-3-02
03M-102 E1
1/4" RL
1/2" RS
2 12
UP TO IU-3-03
ON 3RD LEVEL
1/2" RS & 1/4" RL
DOWN TO IU-3-01
ON 1ST LEVEL
03M-102 C1
1/2" RS
1/4" RL
/C7 42M-101
CU-3-01
1/2" RS
1/4" RL
1/2" RS & 1/4" RL
UP TO IU-3-02 ON
2ND LEVEL
03M-102 C6
03M-102 C3
8 118 11
TELECOM
ROOM
3-213A
123 SF
IU-3-02
1/4" RL
1/2" RS
TYP.
3/4" CD
7 10
¾" CD DN TO TIE-
IN TO CD ON
FIRST FLOOR
1 3
7 10
EMS BREAK
ROOM
3-203B
277 SF
1/4" RL
1/2" RS
3/4" CD
IU-3-04
500 CFM
STORAGE
3-203B
369 SF
CORRIDOR
C2-1
STORAGE
3-203A
IT
3-213A
75 SF
OFFICE
3-214A
144 SF
ROOM
3-213
24 SF
07/03/2024
07/03/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_R
.rv t
-0
7-
8:
:4
03M-102
MECHANICAL PLAN - BUILDING 3 - SECOND LEVEL 689A4-22-700
03_42
07/03/2024 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SCALE: 1/8" = 1'-0"F3
MECHANICAL PLAN - BUILDING 3 -
SECOND LEVEL
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO CONDENSER UNIT.
NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO INDOOR UNIT.
PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL
EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR
CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
PROVIDE BACNET ADAPTER MOUNTED ADJACENT TO UNIT IN TELECOM ROOM.
CONNECT WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL CLOSET
TO BE ADDRESSABLE ON VA NETWORK/HVAC FMS.
PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO
BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY
DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO
COMMENCING WORK.
SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR TERMINALS TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER
CONSTRUCTION IS COMPLETE.
CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE
DEMOLISHED PRIOR TO COMMENCING WORK.
PROVIDE CRICKET WITH NEW EQUIPMENT CURB. COORDINATE WITH EXISTING
ROOFING SYSTEM. REFER TO DETAIL F7/A-501 AND F6/M501 FOR MORE
INFORMATION.
A.
B.
C.
D.
E.
F.
G.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
CU-3-01
CU-3-02
CU-3-03 LOCATIONS
NOT TO SCALE
F1 SITE PLAN
SCALE: 1/2" = 1'-0"C1
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - ROOM
3-213A/3-214A/3-213 DEMO
SCALE: 1/2" = 1'-0"E1
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - ROOM 3-213A NEW
SCALE: 1/2" = 1'-0"C6
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - ROOM 3-203B NEW
SCALE: 1/2" = 1'-0"C3
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - ROOM 3-203B DEMO
CU-3-04 LOCATION
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
CORRIDOR
C3-3
INTERIOR
DESIGN
3-301A
SAFETY
OFFICE
3-301B
SAFETY
OFFICE
3-301C
AFGE RN
UNION OFFICE
3-301D
OFFICE
3-301E
SIGNAGE
3-301F
CLOSET
3-301G
SAFETY
CONFERENCE
RM
3-301H
CLOSET
3-301I
CONFERENCE
ROOM
3-301
WOMENS
LOCKER
3-302
HAC
3-303
CORRIDOR
C3-2
SECY
3-305
WOMENS
TOILET
3-302A
TOILET &
SHOWER
3-304A
LOGISTICS
OFFICE
3-304B
TOILET &
SHOWER
3-304C
CONTRACTING
OFFICE
3-304D
CONTRACTING
OFFICE
3-304E
ELECTRICAL
3-304
CHIEF
ENGINEER
3-305A
ASST CHIEF
ENGINEER
3-305B
STAFF
ENGINEER
3-305C
PROJECT AND
PLANNING
3-305D
TELECOM
ROOM
3-305E
REPRODUCTION
3-305F
FMS OFFICE
3-305G
OFFICE
3-305H
CLOSET
3-305I
STAIR #1
S1
CORRIDOR
C3-1
ELEV
E1
03M-103 F3
3/4" CD
TYP.
PIPE DROP TO
CU-3-03 ON LOW
ROOF
1/2" RS
1/4" RL
03M-103 D3
TELECOM
ROOM
3-305E
77 SF
IU-3-03
3/4" CD
1/2" RS
1/4" RL
TYP.
1 3
8 11
TELEPHONE
3-305E
50 SF
PROJECT AND
PLANNING
3-305D
PROJECT AND
PLANNING
3-305D
07/03/2024
07/03/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_R
.rv t
-0
7-
8:
:4
03M-103
MECHANICAL PLAN - BUILDING 3 - THIRD LEVEL 689A4-22-700
03_42
07/03/2024 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SCALE: 1/8" = 1'-0"F5
MECHANICAL PLAN - BUILDING 3 -
THIRD LEVEL
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO CONDENSER UNIT.
NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO INDOOR UNIT.
PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL
EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR
CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
PROVIDE BACNET ADAPTER MOUNTED ADJACENT TO UNIT IN TELECOM ROOM.
CONNECT WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL CLOSET
TO BE ADDRESSABLE ON VA NETWORK/HVAC FMS.
PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO
BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY
DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO
COMMENCING WORK.
SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR TERMINALS TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER
CONSTRUCTION IS COMPLETE.
CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE
DEMOLISHED PRIOR TO COMMENCING WORK.
PROVIDE CRICKET WITH NEW EQUIPMENT CURB. COORDINATE WITH EXISTING
ROOFING SYSTEM. REFER TO DETAIL F7/A-501 AND F6/M501 FOR MORE
INFORMATION.
A.
B.
C.
D.
E.
F.
G.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1/2" = 1'-0"F3
ENLARGED MECHANICAL PLAN -
THIRD LEVEL - ROOM -3-305E NEW
SCALE: 1/2" = 1'-0"D3
ENLARGED MECHANICAL PLAN -
THIRD LEVEL - ROOM - 3-305E DEMO
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
EMS OFFICE
42-100
TELEPHONE
CLOSET
42-101
MALE TOILET
42-102
EMS SUPPLY
STORAGE
42-103
JANITOR
CLOSET
42-104
CLEAN LINEN
STORAGE
42-105
LINEN RM
42-106
SOILED LINEN
STORAGE
42-107
EMS SUPV
OFFICE
42-108
EMS
STORAGE
42-109
EMS OFFICE
42-100A
CORRIDOR
42-C1-2
EMS OFFICE
42-100B
CLOTHING
STORAGE
42-106A
42-105A 42-108A
/F3 03M-101
CORRIDOR
42-C1-1
ATRIUM
GAS BOTTLE
STORAGE
CORRIDOR
42-C1-3
42M-101 F4
3/4" CD
TYP.
TELECOM
ROOM
42-107A
1/2" RS
1/4" RL
42M-101 F2
PIPE RISE FROM
CU-42-01
STORAGE
42-216
TELECOM
ROOM
42-217
LABOR
RELATIONS
42-201
WAITING
42-202
PASSAGE
42-203
GRANT
42-204
VOCATIONAL
42-205
TEAM
42-206
PASSAGE
42-207
TOILET
42-208
HUD/ VASH
42-209
42-210
SUPERVISOR
42-211
42-212
STORAGE
42-213
MECH SP
42-219
HAC
42-214
PASSAGE
42-215
STORAGE
42-201A
/F3 03M-102
CORRIDOR
42-C2
HUD/ VASH
42-218
42M-101 C4
CU-42-01
CU-42-02
3/4" CD
PIPE RISE FROM
IU-42-01 ON 1ST LEVEL
BELOW
42M-101 C2
1/2" RS
1/4" RL
TELECOM
ROOM
42-217
130 SF
IU-42-02
1/4" RL
1/2" RS
3/4" CD TYP.
1 3
HUD/ VASH
42-218
PASSAGE
42-215
STORAGE
42-216
IU-42-011 3
7 10
TELECOM
ROOM
42-107A
81 SF
1/2" RS
1/4" RL
TYP.
8 11
8 11
HUD/ VASH
42-217
133 SF
PASSAGE
42-215
STORAGE
42-218STORAGE
42-216
SOILED LINEN
STORAGE
42-107
202 SF
EMS SUPV
OFFICE
42-108
CLEAN LINEN
STORAGE
42-105
07/03/2024
07/03/2024
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
B42
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_R
.rv t
-0
7-
8:
:4
42M-101
MECHANICAL PLAN - BUILDING 42 - SITE PLAN,
FIRST & SECOND LEVEL
689A4-22-700
03_42
07/03/2024 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SCALE: 1/8" = 1'-0"F7
MECHANICAL PLAN - BUILDING 42 -
FIRST LEVEL
SCALE: 1/8" = 1'-0"C7
MECHANICAL PLAN - BUILDING 42 -
SECOND LEVEL
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO CONDENSER UNIT.
NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO INDOOR UNIT.
PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL
EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR
CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
PROVIDE BACNET ADAPTER MOUNTED ADJACENT TO UNIT IN TELECOM ROOM.
CONNECT WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL CLOSET
TO BE ADDRESSABLE ON VA NETWORK/HVAC FMS.
PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO
BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY
DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO
COMMENCING WORK.
SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR TERMINALS TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER
CONSTRUCTION IS COMPLETE.
CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE
DEMOLISHED PRIOR TO COMMENCING WORK.
PROVIDE CRICKET WITH NEW EQUIPMENT CURB. COORDINATE WITH EXISTING
ROOFING SYSTEM. REFER TO DETAIL F7/A-501 AND F6/M501 FOR MORE
INFORMATION.
A.
B.
C.
D.
E.
F.
G.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1/2" = 1'-0"C4
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - ROOM 42-217 NEW
SCALE: 1/2" = 1'-0"F4
MECHANICAL ENLARGED PLAN -
FIRST LEVEL - ROOM 42-107
CU-42-01
CU-42-02 LOCATIONS
NOT TO SCALE
C1 SITE PLAN
SCALE: 1/2" = 1'-0"C2
MECHANICAL ENLARGED PLAN -
SECOND LEVEL -ROOM-42-217 DEMO
SCALE: 1/2" = 1'-0"F2
MECHANICAL ENLARGED PLAN -
FIRST LEVEL - ROOM-42-107 - DEMO
PREPOSITIONED SLEEVE PREPOSITIONED SLEEVE
CORE DRILLED SLEEVE CORE DRILLED SLEEVE
FOR 1-1/4" AND LARGER
1 3
6 7
CONCRETE STRUCTURE
PIPE SLEEVE SIZED FOR PIPE WITH INSULATION
WATERSTOP
EXTEND SLEEVE 4" ABOVE FINISHED FLOOR LEVEL
MINIMUM 18" LONG ALUMINUM
INSULATION JACKET
INSULATION - SEE SPECS FOR
THICKNESS
PIPE
SEAL WITH WATERPROOF
CAULKING
MINIMUM 3/4" POURED LEAD
MULTI-COMPONENT PLASTIC CEMENT
PIPE SLEEVE (I.D. MIN. 1" LARGER THAN O.D. OF PIPE)
WATERPROOF GROUT
CORE DRILL MIN. 1" LARGER
HOLE THAN O.D. OF PIPE SLEEVE
(12" MAXIMUM CORE DRILL SIZE)
13NOTES:
1. SEAL SLEEVE WITH UL RATED SEALANT TO MATCH
RATING OF WALL OR CEILING. MAINTAIN REQUIRED
MINIMUM CONTACT OF SEALANT AND CLEARANCES OF
PIPE IN PENETRATION.
2. PROVIDE ESCUTCHEON PLATES AT ALL EXPOSED
PENETRATIONS.
ROOF
PIPE CLAMP
SEE PLANS FOR
PIPE TYPE , SIZE,
AND LOCATION
ROOF SUPPORT AS
MANUFACTURED BY C-PORT,
CB10, 28" LONG OR EQUIVALENT.
SEE SPECIFICATION FOR
SPACING
NOTE:
SEE PLANS FOR PIPE
SIZE.
8 7
BASE FLASHING.
FIBER CANT STRIP SET IN
BITUMEN
FASTENERS APPROXIMATELY 6"
O.C.
12" X 12" X 12" MIN. ROOF CURB
WITH FLANGED REMOVABLE TOP
PER SPECIFICATION
23 23 00
SLOPE PIPES AWAY FROM
HOOD.
SHEET METAL, SEAL WATERTIGHT
PENETRATIONS.
SHEET METAL HOOD.
PROVIDE 1 1/2" THICK, 3 LB/CU.FT.
DENSITY RIGID MINERAL
FIBERBOARD INSULATION WITH
METAL LINER
15 3 2
ROOF MOUNTED OUTDOOR HEAT
PUMP UNIT MOUNTED ON ROOF CURB WITH
NEOPRENE
VIBRATION ISOLATION PADS, SEE ROOF PLANS.
INDOOR UNIT, DIRECT EXPANSION
(DX) COIL
DISTRIBUTION NOZZLE
GLOBE VALVES AT OUTDOOR UNIT
SWING JOINT
PIPE PENETRATION THROUGH ROOF,
SEE PIPING THRU ROOF DETAIL ON THIS SHEET
REFRIGERANT SUCTION LINE
REFRIGERANT LIQUID LINE
SIGHT GLASS
REMOTE BULB
FILTER
LIQUID CHARGING VALVE
STRAINER
SOLENOID VALVE TO BE LOCATED AS
CLOSE TO EXPANSION VALVE AS POSSIBLE
EXPANSION VALVE
RL RS
5 FT
6 8 10
9 1110 12
-1312 14 -16 -
1614 17 2219 23
2725 28 3230
20 241814 16128 1064 532 2 1/21 1/21 1 1/4THRU 3/4
7 7
7 98
SIDE VIEW TRAPEZE HANGER FOR UP
TO
1000 LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
FT.
FT.
1" M
AX
PROVIDE INSULATION
SHIELD
& INSERT FOR ALL PIPING
(8" MIN.)
BAND
1-5/8" 12 GAUGE
CHANNEL OR
2"x2"x1/4"
ANGLE
1/2" DIA.
HANGER RODS
WITH
36" MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION
SHIELD
AT HANGER
PROVIDE HIGH
COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE
PIPE)
HANGER ROD
NOTES:
SEE SPECIFER FOR
DETAILED
HANGER REQUIREMENTS
L
W
A
A
B B
PLAN SECTION
B-B
5D
5D
2D
CONCRETE
BASE
D
ANCHOR BOLT
(TYP.)
PIPE SLEEVE (5D, 3"
[75mm] MIN. )
FLOOR
WELD HEAD TO PLATE OR BEND
OVER END 5D
SECTION A-A (BASE POURED WITH
FLOOR SLAB)
TYPICAL ANCHOR BOLT NUT
& WASHER
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
EQUIPMENT BASE PLATE
16" [400 mm]
5" M
IN
[1 m m
L/
SECTION A-A (BASE NOT POURED
WITH FLOOR SLAB)
TYPICAL ANCHOR BOLT NUT
& WASHER
EQUIPMENT BASE PLATE
PROVIDE #3 BARS 12" [300 mm] O.C.
EACH WAY IN THE BASE & DOWEL
BASE TO FLOOR
5" M
IN
[1 m m
L/
07/03/2024
07/03/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
03_42
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.G en er al
.S he et s.
rv t
-0
7-
8:
:0
03M-501
MECHANICAL DETAILS 689A4-22-700
07/03/2024 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
NTSD8 PIPE PENETRATION DETAIL
NTSB6 ABOVE ROOF PIPE SUPPORT
NTSF6 PIPING THRU ROOF DETAIL
NTSF8 SPLIT SYSTEM HEAT PUMP REFRIGERANT PIPING
NTSD6 TYPICAL CONDENSATE DRAIN TRAP
F3 PIPE PENETRATION DETAIL
SCALE: 12" = 1'-0"F1 CONCRETE EQUIPMENT PAD
07/03/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_R
.rv t
-0
7-
8:
:5
03M-701
MECHANICAL SCHEDULES 689A4-22-700
03_42
07/03/2024 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SPLIT SYSTEM INDOOR UNIT SCHEDULE
SYMBOL
NO.
MANUFACTURER/MODEL NO. TYPE
TOTAL
COOLING
CAPACITY
(BTU/H)
SENSIBLE
COOLING
CAPACITY
(BTU/H)
SUPPLY
AIRFLOW
(CFM)
SOUND
(dBA)
ELECTRICAL DATA
WIDTH (IN)
HEIGHT
(IN)
WEIGHT
(LBS)VOLTS PHASE HZ MCA
IU-3-01 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28 IU-3-02 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28 IU-3-03 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28 IU-3-04 TRANE TPLA0A0121EA80A CEILING MOUNTED 12,000 11,600 530 30 208 1 60 1 33 10 46
IU-42-01 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28 IU-42-02 TRANE TPKA0A0181LA00A WALL MOUNTED 18,000 17,400 455 48 208 1 60 1 35 1/2 12 28
SPLIT SYSTEM OUTDOOR UNIT SCHEDULE
SYMBOL
NO.
MANUFACTURER/MODEL
NO.
COOLING
AMBIENT
(F)
TOTAL
COOLING
CAPACITY
(BTU/H)
SENSIBLE
COOLING
CAPACITY
(BTU/H)
ELECTRICAL DATA
WIDTH
(IN)
HEIGHT
(IN)
WEIGHT
(LBS)VOLTS PHASE HZ MCA MOCP
CU-3-01 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100
CU-3-02 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100
CU-3-03 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100
CU-3-04 TRANE TRUZA0121KA70NA 115 12,000 11,600 208 1 60 11 28 32 25 93
CU-42-01 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100
CU-42-02 TRANE TRUYA0181KA70BA 115 18,000 17,400 208 1 60 11 28 32 25 100
SYMBOL NO. IU-3-01 THROUGH IU-42-02, SPLIT SYSTEM INDOOR HEAT PUMP UNIT / A/C UNIT: UNIT SHALL CONSIST OF A SLIM SILHOUETTE COMPACT WALL MOUNTED EVAPORATOR SECTION, CONCEALED HORIZONTAL DUCTED, OR CEILING MOUNTED EVAPORATOR SECTION, WITH WIRED CONTROL. UNIT CASING SHALL HAVE A WHITE FINISH. FAN SHALL BE AN ASSEMBLY WITH IN LINE-FLOW DIRECT DRIVEN MOTOR, STATICALLY & DYNAMICALLY BALANCED WITH PERMANENTLY LUBRICATED BEARINGS. PROVIDE A MOTORIZED AIR SWEEP FLOW LOUVER FOR AN AUTOMATIC CHANGE IN AIR FLOW BY DIRECTING AIR UP AND DOWN TO PROVIDE A UNIFORM AIR DISTRIBUTION, INDOOR FAN SHALL HAVE TWO (2) SPEED, HIGH AND LOW, RETURN FILTER SHALL BE EASILY REMOVABLE, & WASHABLE. PROVIDE A SLOPED CONDENSATE DRAIN PAN TO PREVENT STANDING WATER ACCUMULATION. UNIT TO BE MANUFACTURED BY SAME MANUFACTURER AS SPLIT SYSTEM AIR CONDITIONING OUTDOOR UNIT. UNIT SHALL BE COMPLETELY FACTORY ASSEMBLED AND ARI RATED. THE CEILING MOUNTED CASSETTE TYPE EVAPORATOR SECTION SHALL BE PROVIDED WITH AN OUTSIDE AIR CONNECTION.
EACH REFRIGERATION CIRCUIT ON EACH UNIT IS TO BE CONTROLLED BY A FACTORY INSTALLED THERMAL EXPANSION VALVE. THE EVAPORATOR COIL SHALL BE CONSTRUCTED OF NON FERROUS CONSTRUCTION FINS, MECHANICALLY BONDED TO SEAMLESS
COPPER TUBES.
PROVIDE A FACTORY WIRED AND INSTALLED CONTROL SYSTEM, INCLUDING EVAPORATOR FAN CONTRACTOR, TERMINAL STRIP, AND A 24 VOLT (COOLING AND DRY FAN OPERATION, THERMOSTAT SETTING, TIMER MODE, HIGH-LOW FAN SPEED) THE CONTROL SYSTEM SHALL CONSIST OF TWO (2) MICROPROCESSORS INTERCONNECTED BY A SINGLE NON POLAR TWO WIRE CABLE. THE UNIT SHALL BE CAPABLE OF AUTOMATIC RESTART WHEN POWER IS RESTORED AFTER POWER INTERRUPTION. ALL CONTROL WIRING
SHALL BE RESPONSIBILITY OF DIV. 23.
PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH PUMPING CAPACITY.
UNIT SHALL BE MANUFACTURED SHALL BE MITSUBISHI TRANE. SEE SCHEDULE FOR PERFORMANCE.
SYMBOL NO. CU-3-01 THROUGH CU-42-02, SPLIT SYSTEM HEAT PUMP OUTDOOR UNIT / A/C UNIT: OUTDOOR MOUNTED UNIT, ELECTRICALLY CONTROLLED AIR COOLED SPLIT AIR CONDITIONING SYSTEM. THE UNIT SHALL FUNCTION AS THE OUTDOOR COMPONENT OF AN AIR-TO-AIR ELECTRIC AIR CONDITION SYSTEM, AND SHALL BE UL LISTED, COMPLETELY FACTORY ASSEMBLED AND TESTED, AND CHARGED WITH REFRIGERANT. THE UNIT SHALL BE MANUFACTURED BY THE SAME MANUFACTURER AS SPLIT SYSTEM AIR CONDITIONING INDOOR UNIT. THE UNIT SHALL CONSIST OF AN INTERNALLY ISOLATED, HIGH PERFORMANCE ROTARY TYPE COMPRESSOR, A CRANKCASE HEATER, VERTICAL DISCHARGE PROPELLER TYPE FAN, WEATHERPROOF FAN MOTOR, REFRIGERATION DEVICES, AND A CONTROL BOX, (OU-1 AND OU-2 ONLY). UNIT COIL SHALL HAVE SEAMLESS COPPER TUBES AND MECHANICALLY BONDED FINS.
THE UNIT HOUSING SHALL BE CONSTRUCTED OF GALVANIZED STEEL COATED WITH A BAKED ENAMEL FINISH.
THE UNIT SHALL BE FURNISHED WITH THERMAL EXPANSION VALVES, METERING DEVICE, SUCTION AND DISCHARGE SERVICE VALVES, AND AN ACCUMULATOR WITH FUSIBLE PLUG RELIEF.
THE COOLING CAPACITIES LISTED ARE FOR 105 DEGREE F SUMMER AND 20 DEGREE F WINTER OUTDOOR AMBIENT CONDITIONS. THE UNIT COMPRESSOR SHALL BE CAPABLE OF OPERATING DOWN TO ZERO (0) DEGREE F OUTDOOR AMBIENT, AND WARRANTED FOR FIVE YEARS. UNIT SHALL HAVE EFFICIENCY RATING EQUIVALENT TO 12.0 SEER PER IECC, 2009, CHAPTER 5.
UNIT OPERATING CONTROLS AND SAFETIES SHALL INCLUDE COMPRESSOR SHORT CYCLE PREVENTION CONTROL, DEFROST CONTROL, HIGH DISCHARGE PRESSURE CUTOFF, LOSS-OF-CHARGE CUTOFF, TIME-DELAY RESTART, COMPRESSOR MOTOR CURRENT
AND TEMPERATURE OVERLOAD CUTOFFS.
UNIT SHALL HAVE SINGLE POINT POWER CONNECTION AND SHALL BE FURNISHED WITH 24 VOLT CONTROL TRANSFORMER. UNIT SHALL BE MANUFACTURED BY MITSUBISHI. SEE SCHEDULE FOR PERFORMANCE.
CONTRACTOR SHALL SUBMIT INSTALLER QUALIFICATIONS SHOWING OEM SPECIFIC TRAINING AND CERTIFICATION WITH MITSUBISHI TRANE SPLIT-SYSTEM AND VRF SYSTEMS. INSTALLER SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE WITH MITSUBISHI
EQUIPMENT.
1.
2.
3.
4.
5.
6.
NOTES & OPTIONS
NOMINAL COOLING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 80/67°F (DB/WB), OUTDOOR OF 95°F (DB).
NOMINAL HEATING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 70°F (DB), OUTDOOR OF 43°F (WB).
SEE OUTDOOR UNIT SCHEDULE FOR OUTDOOR AMBIENT CONDITIONS, CONNECTED CAPACITY, AND OTHER FACTORS ASSOCIATED WITH CORRECTED CAPACITIES.
SEE SCHEMATIC PIPING/CONTROL DIAGRAM FOR INDICATION OF REQUIRED INDOOR UNIT REMOTE CONTROLLERS, SYSTEM CONTROLLERS, AND INTEGRATION DEVICES.
FULL DEMAND CORRECTED CAPACITY INCLUDES DE-RATE ASSOCIATED WITH INDOOR VS. OUTDOOR CONNECTED CAPACITY INDICATED ON OUTDOOR UNIT SCHEDULE FOR ASSOCIATED SYSTEM. PARTIAL CORRECTED CAPACITY ASSUMES SUFFICIENT DIVERSITY EXISTS SUCH THAT THE CONNECTED CAPACITY DE-RATE DOES NOT APPLY.
IT IS RECOMMENDED TO ALWAYS BASE HEATING CORRECTED CAPACITY ON FULL DEMAND.
NOTES & OPTIONS
1. NOMINAL COOLING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 80/67°F (DB/WB), OUTDOOR OF 95°F (DB).
2. NOMINAL HEATING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 70°F (DB), OUTDOOR OF 43°F (WB).
3. EFFICIENCY VALUES FOR EER, IEER, COP ARE BASED ON AHRI 1230 TEST METHOD FOR MIXTURE OF DUCTED & NON-DUCTED INDOOR UNITS.
4. FOR SYSTEMS WITH MULTIPLE MODULES, REFRIGERANT PIPE DIMENSIONS INDICATE TOTAL SYSTEM COMBINED PIPING DOWNSTREAM OF MODULE TWINNING.
5. ADDED FIELD CHARGE LISTED IS IN ADDITION TO FACTORY CHARGE, THIS MUST BE UPDATED BASED UPON FINAL AS-BUILT PIPING LAYOUT.
6. FACTORY REPRESENTATIVES SHALL STARTUP AND COMMISSION CITY MULTI EQUIPMENT UPON COMPLETION OF EQUIPMENT INSTALLATIONS.
LA LEVEL ALARM
AT ANALYTICAL TRANSMITTER
AY ANALYTICAL SIGNAL CONVERTER
ACV ANALYTICAL CONTROL VALVE
AIT ANALYTICAL INDICATING CONTROLLER
EY VOLTAGE SIGNAL CONVERTER
IY CURRENT SIGNAL CONVERTER
HS HAND SWITCH
FIT FLOW INDICATING TRANSMITTER
FET FLOW ELEMENT\TRANSMITTER
ESL VOLTAGE SWITCH LOW (24 VAC OR LESS)
II CURRENT INDICATOR
IT CURRENT TRANSMITTER
IS CURRENT SWITCH
IA CURRENT ALARM
FA FLOW ALARM
HSI HAND SWITCH INDICATOR
HK MANUAL VARIABLE CONTROL
FY FLOW SIGNAL CONVERTER
FT FLOW TRANSMITTER
FS FLOW SWITCH
FI FLOW INDICATOR
FE FLOW ELEMENT
FCV FLOW CONTROL VALVE
ET VOLTAGE TRANSMITTER
ES VOLTAGE SWITCH (CONTROL RELAY)
EA VOLTAGE ALARM
EI VOLTAGE INDICATOR
PY PRESSURE SIGNAL CONVERTER
PDT PRESSURE DIFFERENTIAL TRANSMITTER
PS PRESSURE SWITCH
PA PRESSURE ALARM
PT PRESSURE TRANSMITTER
PIT PRESSURE INDICATING TRANSMITTER
PIS PRESSURE INDICATING SWITCH
PI PRESSURE INDICATOR
PDS PRESSURE DIFFERENTIAL SWITCH
PDI PRESSURE DIFFERENTIAL INDICATOR
PCV PRESSURE CONTROL VALVE
MV MANUAL HAND VALVE
LT LEVEL TRANSMITTER
LS LEVEL SWITCH
LE LEVEL ELEMENT
LY LEVEL SIGNAL CONVERTER
LIT…