Attachment 30 - Price Schedule - 36C77624B0015 - 689A4-22-700 EHRM Infrastructure Newington.pdf
PDF 122 KB Posted
- Attached to
- Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
- Solicitation number
- 36C77624B0015_1
About this file
This is a Price/Cost Schedule template for line item 0001 (General Construction) under solicitation 36C77624B0015 for the Department of Veterans Affairs Medical Center in Newington, CT. The schedule contains one line item for general construction services with a quantity of 1.00 JB (Job), with blank spaces for unit price and total amount to be filled in by bidders.
The scope includes furnishing all tools, labor, materials, equipment, permits, licenses, supervision, and quality control for construction work that addresses IT and communications infrastructure deficiencies per the PSRDM (Physical Security Design and Resiliency Manual) 2021 VA Standard. The work covers buildings 1C, 2E, 2C, 2W, 3, 12, 32, 33, 34, 42, 65 and site improvements to prepare for a Cerner upgrade. The contractor must complete all work within 540 calendar days after receiving the Notice to Proceed. Additional buildings may be added if found integral to patient services, with all required connectivity to be installed before the "Go Live" date.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
?.## PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Line Item 0001 (General Construction): The general contractor shall furnish all necessary tools, labor, materials, equipment, permits, license, supervision, and quality control to complete construction, in accordance with the drawings and specifications. In addition to ensuring adequate capacity for planned growth and maintenance, this project addresses deficiencies as defined by the PSRDM (Physical Security Design and Resiliency Manual) 2021 VA Standard. Like all standards, they are to be implemented to the greatest extent possible within the framework of available budgets and without negatively impacting the overall mission of serving the health and welfare of the veteran population served by the Newington, CT VA Medical Center. The following buildings have been identified as having deficiencies to address:1C, 2E, 2C, 2W, 3, 12, 32, 33, 34, 42, 65 and the site. If additional buildings are found to be integral to patient services, they will be included in the survey and design to ensure that this program is successful and all required connectivity is installed prior to the Go Live date. To date all buildings have been surveyed.
The Contractor (herein referred to as “GC”) shall provide construction services for a construction project at the Newington VA Medical Center (VAMC) in accordance with this statement of work.
The contractor shall complete the entire project no later than 540 calendar days after the contractor receives the NOTICE TO PROCEED.
GRAND TOTAL __________________
File details come from the government source that posted it. Updated .