Attachment 12 - Newington EHRM Drawings - Part 3 of 16.pdf
PDF 14 MB Posted
- Attached to
- Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
- Solicitation number
- 36C77624B0015_1
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN DOWN
WC WATER CLOSET
FLUSH VALVEFV
YH YARD HYDRANT
TD TRENCH DRAIN
FOV
FOR
FOS
FUEL OIL VENT
FUEL OIL RETURN
FUEL OIL SUPPLY
ES
EEW
EMERGENCY SHOWER
EMERGENCY EYEWASH
CWV COMBINATION WASTE AND VENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ACID NEUTRALIZING TANK
ACID RESISTANT VENT THROUGH ROOF
BALANCING COCK
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BTU PER HOUR
CLOTHES WASHER BOX
CORROSION RESISTANT STEEL
CLEANOUT
CLEANOUT TO GRADE
CIRCULATION PUMP
DOUBLE CLEANOUT
DRINKING FOUNTAIN
ELEVATION
ELECTRIC WATER HEATER
ELECTRIC WATER COOLER
DEGREES FAHRENHEIT
FLOOR CLEANOUT
FINISHED FLOOR ELEVATION
FEET
GUTTER DRAIN
GREASE INTERCEPTOR
GALLONS PER HOUR
GALLONS PER MINUTE
GAS WATER HEATER
HORSEPOWER
HEAD
INCHES
INVERT
KILOWATT
1,000 BTUH
MIXING VALVE
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NORMALLY CLOSED
NORMALLY OPEN
OUTSIDE SCREW AND YOKE
PHASE
POUNDS PER SQUARE INCH GAUGE
STATIC PRESSURE
TYPICAL
YARD BOX
WALL CLEANOUT
AFF
AFG
ANT
AVTR
B.C.
BOP
BTU
BTUH
CWB
CRS
CO
COTG
CP
DCO
DF
EL
EWH
EWC
°F
FCO
FFE
FT
GD
GI
GPH
GPM
GWH
HP
HD
IN
INV
kW MBh
MV
NA
NIC
No. # N.C.
N.O.
OS&Y
Ph
PSIG
SP
TYP
YB
WCO
DOUBLE CLEANOUT TO GRADEDCOTG
ESEW EMERGENCY SHOWER EYE WASH
POWERS OF HARDNESS
PH
HOSE BIBBHB
DS DOWNSPOUT
DSN DOWNSPOUT NOZZLE
PLUMBING SYMBOL LEGEND
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS APPLY TO THIS PROJECT
ABBREVIATIONS
A
PENETRATION
TEST PLUG (PRESS/TEMP)
(WH) (HB)
RD/OD/DD
DCOTG
FCO/COTG
FS/FD/AD
VTR
ROOF DRAIN/OVERFLOW DRAIN/DECK DRAIN
TWO WAY OR DOUBLE CLEANOUT TO GRADE
FLOOR CLEANOUT/CLEANOUT TO GRADE
FLOOR SINK , FLOOR DRAIN , AREA DRAIN
WATER HAMMER ARREST0R
FITTING (PETE'S PLUG)
POINT OF CONNECTION TO EXISTING
AQUASTAT
PRESSURE GAUGE AND GAUGE COCK
THERMOMETER
STRAINER WITH BLOWDOWN VALVE & HOSE BIBB
NEW PIPE CONNECTION TO EXISTING PIPING
EXISTING PIPE TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
FLEXIBLE CONNECTION
UNIVERSAL TEMPERATURE-PRESSURE
ORIFICE UNION
FLANGED UNION
UNION
RISE IN PIPE
DROP IN PIPE
CAPPED OUTLET
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
ECCENTRIC REDUCER
REDUCER OR INCREASER
PIPE GUIDE
DIRECTION OF FLOW
MAV MANUAL AIR VENT (MAV)
AAV AUTOMATIC AIR VENT (AAV)
TRAP PRIMER WITH ACCESS PANELTP
SLOPE OF PIPE
VENT THROUGH ROOF
AG AIR GAP FITTING
WALL HYDRANT, HOSE BIBB
KEYED NOTE
OR
SCHEMATIC SYMBOLS
ABBREVIATIONSYMBOL DESCRIPTION
XX
255' OF 6" @ 0.15%SLOPESLOPE AND LINEAL FOOTAGE
F.D.C.FIRE DEPARTMENT INLET CONNECTION F.D.C.
SAS SASSANITARY MANHOLE
M.H. M.H.(E)
GM
WM
REDUCED PRESSURE BACKFLOW PREVENTER
STORM DRAIN
IRRIGATION
F.H.(E)F.H.
LP
PP
C.O.(E)C.O.
LIGHT POLE
FENCING
POWER POLE
CLEANOUT
THRUST BLOCK
CONSTRUCTION
FIRE HYDRANT
VALVE WITH VALVE BOX
NATURAL GAS
FIRE PROTECTION
COLD WATER SUPPLY
SANITARY SEWER
SASSAS
WATER METER
NATURAL GAS METER
GATE VALVE
VALVE IN RISER
WM
GM
LP
PP
POST INDICATOR VALVE
PIV PIV
W
F
SD
G
IRR
S EX. S
EX. W
EX. F
EX. G
EX. SD
EX. IRR
EXISTINGNEWDESCRIPTION
SITE UTILITY SYMBOLS
CARBON DIOXIDECO2
H
HE
AC
AR
CDA
LOX
LN
DV
DA
WAGD
IA
MV
O
NO
N
MA
DENTAL VACUUM
WASTE ANESTHESIA GAS DISPOSAL
INSTRUMENT AIR
DENTAL AIR
EXISTING PIPING
LIQUID NITROGEN
LIQUID OXYGEN
HYDROGEN
HELIUM
ACETYLENE
ARGON
COMPRESSED DRY AIR
ALARM PANEL (IN WALL)
MEDICAL VALVE BOX
MEDICAL GAS DROP
MEDICAL VACUUM
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
O OXYGEN
CDA
CO2
AR
AC
HE
H
LN
LOX
MA
N
NO
O
MV
IA
WAGD
DA
DV
O
SYMBOL ABBREVIATION DESCRIPTION
DESCRIPTIONABBREVIATIONSYMBOL
PROCESS GASES
MEDICAL GAS SYMBOLS
S
VACUUM BREAKER
ATMOSPHERIC VACUUM BREAKER
PRESSURE STYLE
FLOW SWITCH
SOLENOID VALVE
FUEL GAS PRESSURE REGULATOR
DIAPHRAGM (PROCESS SYSTEMS)
OS&Y VALVE
GATE VALVE
GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE
PLUG VALVE
WATER PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE
2-WAY CONTROL VALVE
3-WAY MODULATING CONTROL VALVE
VALVE IN VERTICAL
REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)
DRAIN VALVE
BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE
OR OR
OR
OR
DESCRIPTIONSYMBOL
VALVE SYMBOLS
P##
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
ELEVATION LETTER
LETTER REFER TO EQUIPMENT TYPE
NUMBER REFERS TO SPECIFIC EQUIPMENT
SYMBOL INDICATES FIXTURE/EQUIPMENT
IDENTIFIED IN EQUIPMENT SCHEDULE
SECTION SYMBOL
DETAIL SYMBOL
SECTION, ELEVATION, AND DETAIL TITLES
FIXTURE & EQUIPMENT SYMBOL
P-100 A
P-500
P-200 A
P-500
P-300 A
SCALE
ELEVATION
SCALE
DETAIL
SCALE
SECTION
IRR
INDIRECT WASTEIW
TW
TWR
SAN
V
DHWR
DCW
DHW
LA
IA
INW
IHWR
IHW
ICW
PD
SCW
IRR
NGH
NGM
G
LPG
ORD
RD
DIR
DIS
NPW
MU
ROR
ROS
CD
CA
AW
AV
PUMPED DISCHARGE LINE
IRRIGATION
SOFT COLD WATER
TEMPERED WATER (TEMP °F)
TEMPERED WATER RETURN (TEMP °F)
NATURAL GAS-HIGH PRESSURE
NATURAL GAS-MEDIUM PRESSURE
LAB COMPRESSED AIR
INSTRUMENT COMPRESSED AIR
INDUSTRIAL WASTE
REVERSE OSMOSIS RETURN
INDUSTRIAL HOT WATER RETURN
INDUSTRIAL HOT WATER
INDUSTRIAL COLD WATER
NATURAL GAS-LOW PRESSURE
LIQUIFIED PETROLEUM GAS
OVERFLOW ROOF DRAIN
STORM/ROOF DRAIN
SANITARY SEWER
DEIONIZED WATER RETURN
DEIONIZED WATER SUPPLY
VENT
NON-POTABLE WATER
MAKE-UP WATER
REVERSE OSMOSIS SUPPLY
140° DOMESTIC HOT WATER
140° DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER
DOMESTIC COLD WATER
CONDENSATE DRAIN
COMPRESSED AIR
ACID WASTE
ACID VENT
SHW SOFT HOT WATER
SAN
AV
AW
CA
CD
ROS
ROR
NPW
V
DIS
DIR
RD
ORD
LPG
G
NGM
NGH
SCW
PD
INW
IA
IW
LA
SHW
GW GREASE WASTEGW
GV GREASE VENT
ABBREVIATIONSYMBOL DESCRIPTION
PIPING SYMBOLS
ICW
IHW
IHWR
TWR (_ _ _)
TW (_ _ _)
GV
DCW
DHW
DHWR
DHW 140ºF
DHWR 140ºF
MU
DHW 140ºF
DHWR 140ºF
CUBIC FEET PER HOURCFH
O OXYGENO
MA MEDICAL AIRMA
MV MEDICAL VACUUMMV
11/09/2023
11/09/2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
01_02
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.G en er al
.S he et s.
rv t
-0
1-
2:
:0
AM
01P-001
PLUMBING ABBREVIATIONS AND SYMBOLS 689A4-22-700
11/09/2023 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
Revisions: Date:
TYP.
TYP.
TYP.
TELEPHONE
ADVICE
2E-1179
117 SF
TOILET
2E-1178A
41 SF
EXAM RM
(TB)
2E-1178
97 SF
URGENT
CARE
STATION
2E-1050
CORRIDOR
C1-34
CORRIDOR
STAFF
KITCHEN
1-324
161 SF
11/09/2023
11/09/2023
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
2W
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
2C 2E
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_0 2_
R
.rv t
-0
1-
0:
:3
01P-401
PLUMBING ENLARGED PLANS 689A4-22-700
01_02
11/09/2023 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SCALE: 1/2" = 1'-0"F7
PLUMBING ENLARGED PLAN - FIRST
LEVEL - RM 2E-1178,2E-1178A,2E-1179
- DEMO
1.
2.
3.
4.
5.
6.
DEMOLISH EXISTING LAVATORY AND ALL ASSOCIATED PIPING BACK TO MAINS.
DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED ISOLATION
VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS, LEVEL AND
FINISH TO MATCH EXISTING.
DEMOLISH EXISTING WATER CLOSET AND ALL ASSOCIATED PIPING BACK TO
MAINS. DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED
ISOLATION VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS,
LEVEL AND FINISH TO MATCH EXISTING.
DEMOLISH EXISTING FLOOR DRAIN AND ALL ASSOCIATED PIPING BACK TO
MAINS. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS, LEVEL AND
FINISH TO MATCH EXISTING.
DEMOLISH EXISTING SINK AND ALL ASSOCIATED PIPING BACK TO MAINS.
DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED ISOLATION
VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS, LEVEL AND
FINISH TO MATCH EXISTING.
DEMOLISH EXISTING DISHWASHER AND ALL ASSOCIATED PIPING BACK TO
MAINS. DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED
ISOLATION VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS,
LEVEL AND FINISH TO MATCH EXISTING.
DEMOLISH EXISTING REFRIGERATOR AND ALL ASSOCIATED PIPING BACK TO
MAINS. DEMOLITION SHALL INCLUDE THE REMOVAL OF ANY ASSOCIATED
ISOLATION VALVES. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS,
LEVEL AND FINISH TO MATCH EXISTING.
A.
B.
C.
D.
E.
F.
G.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1/2" = 1'-0"F5
PLUMBING ENLARGED PLAN - THIRD
LEVEL - RM 1-324 - DEMO
A
B
M
HS
S
HWS
M
M
P
PS PS
F
PS
TS
V
D
TWS
TWR
TWB
MPS
HPS
LPS
CHR
RS
RL
HWR
R
T
H
CO2
CHS
XX-##
SDSD
ELBOW - DOWN
ELBOW - UP
PIPE RISE-DROP
TEE - DROP FROM TEE
END CAP
FLEX CONNECTION
PIPE REDUCER - CONCENTRIC
PIPE STRAINER
CHECK VALVE
GATE VALVE
PLUG VALVE
GLOBE VALVE
UNION - SCREWED
CHILLED WATER SUPPLY
CHILLED WATER RETURN
REFRIGERATION
STEAM - MEDIUM PRESSURE SUPPLY
STEAM - LOW PRESSURE SUPPLY
STEAM - HIGH PRESSURE SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
DEMO
EXISTING
TOWER WATER BYPASS
TOWER WATER RETURN
TOWER WATER RETURN
REFRIGERATION LIQUID
REFRIGERATION SUCTION
MECHANICAL PIPING
DIRECTION OF FLOW
MAKE-UP WATER
VENT
DRAIN
GEOTHERMAL SUPPLY
GEOTHERMAL RETURN
MU
CONDENSATE DRAINCD
STEAM - MEDIUM PRESSURE RETURN
STEAM - LOW PRESSURE RETURN
STEAM - HIGH PRESSURE RETURNHPR
HPR
LPR
CONDENSER WATERCND
GWS
GWR
DIRECTION PITCHDOWN
VERIFY WITH
ARCHITECTURAL
DRAWINGS
PUMPED CONDENSATEPC
PRESSURE REDUCING VALVE
3-WAY
MODULATING
CONTROL VALVE
2-WAY CONTROL VALVE
SAFETY VALVE OR
PRESSURE RELIEF
VALVE
SOLENOID VALVE
3/4" BALL VALVE WITH ADAPTER
TO 3/4" HOSE THREAD
DIAPHRAGM VALVE
BUTTERFLY VALVE
BALL VALVE
VALVE IN RISE
WATER FLOW MEASURING DEVICE
CIRCUIT SETTER
ELBOW - DROP TO TEE
PIPE REDUCER - ECCENTRIC
AIR VENT - AUTOMATIC
AIR VENT - MANUAL
GAUGE - DIFFERENTIAL
GAUGE - PRESSURE
GAUGE - PRESSURE WITH COCK
GAUGE - TEMPERATURE
PIPE ANCHOR
PIPE EXPANSION JOINT
PIPE GUIDE
SENSOR - FLOW
SWITCH - FLOW
SWITCH HUMIDITY
SWITCH - PRESSURE
SWITCH - TEMPERATURE
TEMPERATURE - PRESSURE TEST FITTING
THERMOMETER
THERMOMETER WELL
BASKET STRAINER
STEAM TRAP INVERTED BUCKET
METER - TOTALIZING BTU
METER - TOTALIZING FLOW
M301 A1
SCALE
DETAIL
SCALE
SECTIONA1
A1
X#/X###
MECHANICAL SYMBOL LEGEND
DUCT TRANSITION FROM RECTANGULAR TO ROUND
DUCT TRANSITION
SIDEWALL EXHAUST OR RETURN AIR GRILLE
OR REGISTER
SIDEWALL SUPPLY REGISTER
RETURN DUCT
SUPPLY DUCT
RISE IN DUCT
CEILING RETURN AIR REGISTER OR GRILLE
SMOKE DAMPER
ACOUSTICAL DUCT LINING
FLEXIBLE DUCT
FIRE DAMPER
MANUAL BALANCING DAMPER
12"Ø INDICATES A 12" ROUND DUCT
24x12Ø INDICATES A 24"x12" FLAT OVAL DUCT (WIDTH x DEPTH)
EXISTING DUCT TO BE REMOVED
ACCESS DOOR
24x12 INDICATES A 24"x12" RECTANGULAR DUCT (WIDTH x DEPTH)
POINT OF CONNECTION, NEW DUCT TO EXISTING DUCT
OR / POINT OF REMOVAL FROM EXISTING DUCT TO DEMO DUCT
PERFORATED FACE CEILING DIFFUSERS
DUCTWORK SYMBOLS
ROOM HUMIDISTAT/HUMIDITY TRANSMITTER LOCATION ONLY
SEE CONTROL DRAWINGS FOR TYPE
SEE CONTROL DRAWINGS FOR TYPE
ROOM THERMOSTAT/TEMP. TRANSMITTER LOCATION ONLY
LETTERS REFER TO THE EQUIPMENT TYPE
EQUIPMENT SYMBOLS
NUMBERS REFER TO SPECIFIC EQUIPMENT
DUCT MOUNTED STATIC PRESSURE PROBE
DRAWING NUMBER WHERE DETAILED
SECTION LOCATION
DRAWING NUMBER WHERE DETAILED
DETAIL LOCATION
SECTION LETTER LOCATION
SECTION SYMBOL
DETAIL SYMBOL
SECTION AND DETAIL TITLES
DETAIL NUMBER LOCATION
SYMBOL INDICATES EQUIPMENT IDENTIFIED
IN EQUIPMENT SCHEDULE
XX-#
CFM
SYMBOL INDICATES GRILLE OR DIFFUSER
IDENTIFIED IN EQUIPMENT SCHEDULE
S.DPR
F.DPR
CEILING EXHAUST REGISTER
VALVE SYMBOLS FITTING SYMBOLS
PIPING SYMBOLS
EXHAUST DUCT
2HR. SMOKE BARRIER
SMOKE BARRIER
2HR. FIRE BARRIER
1 HR. FIRE BARRIER
##x##
SIDEWALL GRILLE DIMENSION WHERE
SHOWN ON PLANS
COMBINATION FIRE/SMOKE DAMPER
F/S DPR
FLEXIBLE CONNECTION
STANDARD LONG RADIUS ELBOW
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES
EXCEPT TRANSFER AIR SOUND ELBOW)
SHORT RADIUS ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR ELBOWS WITH
VANES EXCEPT TRANSFER AIR SOUND
ELBOW)
ROOM CARBON DIOXIDE TRANSMITTER LOCATION ONLY
SEE CONTROL DRAWINGS FOR TYPE
24"x12"
24"/12"
12"Ø
DUCT MOUNTED SMOKE DETECTOR
STAMPED FACE CEILING DIFFUSERS
NOTE: NOT ALL ABBREVIATIONS AND
SYMBOLS APPLY TO THIS PROJECT.
A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN
FURRED CHASES OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.
B. PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR
CHASES FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, COILS, FANS,
CONTROLS, ETC. THEY SHALL BE FURNISHED UNDER DIVISION 23 AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATION. ACCESS DOOR RATING
SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING.
C. COORDINATE THE LOCATION OF ALL DIFFUSERS, GRILLES, REGISTERS, ACCESS
DOORS, ETC., WITH THE ARCHITECTURAL REFLECTED CEILING PLAN(S).
D. ALL ROUND RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL
SIZE AS THE SCHEDULED DIFFUSER NECK SIZE.
E. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR
INDICATED. ALL DUCT SIZES SHOWN ON DRAWINGS ARE NET INSIDE DIMENSIONS.
PROVIDE ONE INCH ACOUSTICAL LINING (TYPE D3 INSULATION) IN LOW VELOCITY
RECTANGULAR DUCTWORK FOR THE FIRST 10 DIAMETERS OF DUCTWORK
CONNECTED TO DEVICE, OR AS INDICATED ON DRAWINGS, WHICHEVER IS
GREATER. FOR THE REMAINDER OF THIS DUCTWORK PROVIDE AS INDICATED IN
THE INSULATION SPECIFICATIONS.
F. PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING
AND 1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS
REQUIRED TO PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES
OCCUR ABOVE CEILING AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE
PROVIDE HOSE CONNECTION ON VALVE.
G. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE
RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. PROVIDE APPROVED
FIRE DAMPERS IN ALL REQUIRED PENETRATIONS FOR DUCTWORK, GRILLES,
REGISTERS AND DIFFUSERS. ALL PIPE AND DUCTWORK PENETRATIONS OF FIRE,
SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
H. CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND
FIRE PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
EQUIPMENT ACCESS AND SERVICEABILITY.
I. CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS,
SLEEVES, AND HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND
PLUMBING EQUIPMENT, DUCTWORK AND PIPING, ETC. CONTRACTOR SHALL
COORDINATE WITH GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID
CONFLICTS AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
J. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY
MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO
ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT
IN A MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE
BUILDING STRUCTURAL SYSTEM.
K. CONTRACTOR SHALL PROVIDE RETURN AIR OR TRANSFER AIR OPENINGS IN
FULL HEIGHT WALLS SIZED AT 350 FPM (UNLESS OTHERWISE SPECIFICALLY
SHOWN ON THE DRAWINGS) TO CREATE AND/OR MAINTAIN A RETURN AIR PATH AS
REQUIRED. FIRE DAMPERS AND/OR SMOKE DAMPERS SHALL BE PROVIDED IN
SUCH OPENINGS WHERE REQUIRED BY NOTE "J".
L. SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, DUCT WALL
PENETRATIONS AND FITTING CONNECTIONS ON ALL DUCT SYSTEMS.
M. MECHANICAL ITEMS SUCH AS ROOF DRAINS, FLOOR DRAINS, PLUMBING FIXTURES,
ETC. SHOWN ON THE ARCHITECTURAL DRAWINGS BUT NOT SHOWN ON THE
MECHANICAL DRAWINGS SHALL BE INCLUDED IN THE PROJECT. THESE ITEMS
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR INCLUSION IN
ADDENDUM.
N. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTS AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE
REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER
FROM THE BASIS OF DESIGN CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES
FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE
INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT
ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON
THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE
REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS
(FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS
DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE
PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE
DRAWINGS.
O. THIS PROJECT RECONFIGURATION OF EXISTING BUILDING MECHANICAL AND
PLUMBING SYSTEMS TO MAINTAIN EXISTING BUILDING UTILITY SERVICES. THIS
WORK INCLUDES: (1) RELOCATING AND REPLACING EXISTING DUCT, PIPE, AIR
TERMINALS, ETC.; (2) PROVIDING NEW STRUCTURAL SUPPORTS AND SEISMIC
BRACING FOR EXISTING MECHANICAL AND PLUMBING SYSTEMS WHERE
RECONFIGURATIONS ARE REQUIRED; (3) PROVIDING DRIP PANS WITH DRAIN
CONNECTIONS TO EXISTING FLOOR DRAINS BELOW ALL EXISTING WATER WATER
PIPES THAT ROUTE ADJACENT TO OR ABOVE ELECTRICAL AND COMMUNICATIONS
EQUIPMENT.
P. CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS PRIOR TO COMMENCING
WORK SHOWING ALL NEW AND EXISTING SYSTEMS IN THE AREA OF WORK AND
ALL PROVISIONS FOR COORDINATING ROUTING, ACCESS AND CLEARANCES.
SUBMITTALS WILL NOT BE ACCEPTED WITHOUT APPROVED COORDINATION
DRAWINGS.
A. THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING
SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE
PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION,
ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING BUILDING
MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.
B. THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING
SERVICES FOR REMOVAL WITH OWNER AUTHORIZED REPRESENTATIVE AND SHALL
CONFORM TO THEIR REQUIREMENTS.
C. DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE
MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT
THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY WHICH ARE
OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE
OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED
OUTSIDE OF THE SUITE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE
FACILITY.
D. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK ZONE
AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC. FOR ALL
WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO MINIMIZE DUST
AND FUMES.
E. THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN ADVANCE
TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE FOR
APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN
OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL
COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH
ACCEPTABLE ROUTING AND ACCESS WITHIN THE FACILITY FOR MATERIALS REQUIRED
FOR THE NEW INSTALLATION.
F. SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING OR
MECHANICAL SYSTEMS FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.
G. ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED ON
FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND MEASUREMENT DATA.
H. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES
INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND ARCHITECTURAL.
ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT PRIOR
TO START OF WORK.
I. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO
ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS
GENERAL DEMO NOTES
GENERAL NOTESABBREVIATIONS
AHU AIR HANDLING UNIT
BRAKE HORSEPOWER
BTU PER HOUR
BRITISH THERMAL UNIT
BOTTOM OF DUCT
BOTTOM OF PIPE
ACOUSTIC LINING
ABOVE FINISHED FLOOR
ACCESS DOOR
COMPRESSED AIR
DRAIN
ENTERING
EXHAUST
CONTINUATION
DIRECT EXPANSION
CUBIC FEET PER MINUTE
CONDENSATE DRAIN
AL
AFF
AD
BHP
BOD
BTU
BOP
CA
CFM
D
DX
ENT
EXH
CD
EMCS
CONT.
BTUH
FLEXIBLE
FLAT BOTTOM
FILTER GAUGE
FLOOR SINK
FLOOR DRAIN
FAN COIL UNIT
DEGREES FAHRENHEIT
FEET PER MINUTE
FEET
FLAT TOP
HOSE BIBB
INCHES
GALLONS PER MINUTE
GALLONS PER HOUR
FB
°F
FD
FCU
F.G.
FS
FPM
FT.
FT
GPM
GPH
HB
HD
IN
HEPA
FLEX
KILOWATT
MAIN AIR (CONTROLS)
KILOWATT HOUR
OPPOSED BLADE DAMPER
OUTSIDE AIR
NUMBER (QUANTITY)
NOT IN CONTRACT
NOT APPLICABLE
MOTOR CONTROL CENTER
QUANTITY
QUADRANT
REVOLUTIONS PER MINUTE
RELATIVE HUMIDITY
SMOKE CONTROL DAMPER
RETURN AIR
PRESSURE REDUCING VALVE
KW
KWH
MA
MCC
NO.
NIC
OBD
OA
NA
PRV
PSIG
QTY
Rh R.A.
RPM
SCD
QUAD
ENERGY MANAGEMENT CONTROL SYSTEM
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HAND DAMPER (VOLUME DAMPER)
POUNDS PER SQUARE INCH GAGE
TYPICAL
VOLTS
SOUND TRAP
VARIABLE AIR VOLUME
TOP OF PIPE TRAPEZE
VENT THRU ROOF
VELOCITY
ST
SP
TYP.
VAC
VAV
V
TP
VTR
VEL
SDVV
TOPT
SINGLE DUCT VARIABLE VOLUME
STATIC PRESSURE (INCHES OF WATER)
TOTAL PRESSURE (INCHES OF WATER)
VOLTS, ALTERNATING CURRENT
ACU AIR CONDITIONING UNIT
CONTRACTING OFFICER'S REPRESENTATIVECOR
RS
RL REFRIGERATION LIQUID
REFRIGERATION SUCTION
CONDENSING UNITCU
INDOOR UNITIU
11/09/2023
11/09/2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
01_02
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.G en er al
.S he et s.
rv t
-0
1-
2:
:0
AM
01M-001
MECHANICAL ABBREVIATIONS AND SYMBOLS 689A4-22-700
11/09/2023 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
UP
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
F2
T-
1C
F1
T-
1E
/F1 01T-101
CHASE
ELEV #S3
1N-115
1N-114
1N-116
PROSTHETIC
STORAGE
RM
1C-146
1-146A
ELEV
ELEV
STAIR #2
OFFICE
EXAM
171OFFICE
EXAM
OFFICE
EXAM
CONTROL
RM
174A
EXAM RM
174B
1S-175A
WAITING
ARA
1S-168
1S-170A
TOILET
1S-169
1S-170C
ISOTOPIC
ST
1S-175
OFFICE
1S-177
ELECTRICAL
RM
1S-179
CORRIDOR
1S-C1-4
MECH
1S-176
ISOTOPIC
ST
1S-178
PUMP RM
1S-180
RECEPTION
1S-171A
CORRIDOR
1S-C1-5
TELEPHONE
RM
1S-164
MECH RM
1S-167
TELEPHONE
RM
1C-143
TELECOM
ROOM
1C-142
1C-141
CORRIDOR
1C-C1-6
CORRIDOR
1C-C1-7
LOCK
SMITH
1C-145
STAIR #1
HOSPITAL
WHEEL
CHAIR
STORAGE
1C-147
CORRIDOR
1C-C1-8
ELECT.
1S-162-0
HOT
WATER
HEATERS
1S-164-0
MECH
1S-165
TOILET
1S-166
WALK IN
COOLER
1S-170B
CONTROL
RM
174C
CONTROL
RM
174F
EXAM RM
174D
EXAM RM
174E
AUDIOLOGY
TEST
BOOTH
1N-117
1N-117A
CORRIDOR
1N-C1-2
COMPUTER
RM
1C-148D
TRNG
BATH
1N-101A
TRNG
KITCHEN
1N-101OCCUPATIONAL
THERAPY
1N-109
STORAGE
1N-109B
OCCUPATIONAL
THERAPY
1N-109ACOMMUNICATION
ELECTRICAL
1N-110
1N-112
CORRIDOR
1N-C1-1
1S-170
STAFF
-CONTROL
CT
PIPE
CHASE
106A
STORAGE
CORRIDOR
STAFF
TLT
MSA
WAITING
102TOILET
INJECTION
CHANGING
ROOM
SOILED
UTILITY
CORRIDOR
TOILET
HSA
117READING
N
CU-01
7/8" RL
1 1/8" RS
PIPE RISE UP TO BC-1 ON
THIRD FLOOR
01M-401A F7
3/4" CD TYP.
01M-401A C7
01M-401C F2
01M-401C F7
TOILET
1C-148G
40 SF
11/09/2023
11/09/2023
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
2W
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
2C 2E
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_0 2_
R
.rv t
-0
1-
0:
:4
01M-101
MECHANICAL PLAN - FIRST LEVEL - B1 689A4-22-700
01_02
11/09/2023 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SCALE: 3/32" = 1'-0"F1
MECHANICAL PLAN - FIRST LEVEL -
B1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL
EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR
CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE
DEMOLISHED PRIOR TO COMMENCING WORK.
PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO
BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY
DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO
COMMENCING WORK.
SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER
CONSTRUCTION IS COMPLETE.
CONTRACTOR TO PROVIDE 2' X 2' ACCESS PANEL TO MECHANICAL CHASE.
CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE (TE-200A) AND SOFTWARE AND INTEGRATE WITH EXISTING
CONTROLS SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH
SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL
NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL
CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE
EXISTING NETWORK.
CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. REFRIGERANT SUCTION
PIPE AND REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.
PROVIDE NEW CRAC CONDENSING UNIT WITH NEW EQUIPMENT PAD.
NEW CRAC-CU REFRIGERANT PIPING, PIPE PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE ROUTING WITH ALL EXISTING CONDITIONS
PRIOR TO COMMENCEMENT OF WORK. SIZING BY VENDOR BASED ON
APPROVED SHOP DRAWINGS.
NEW CRAC UNITS SHALL BE INTEGRATED WITH FACILITY AUTOMATED LOGIC
CONTROLS BUILDING MANAGEMENT SYSTEM. ALL POINTS, ALARMS AND
CONTROLS SHALL BE ADDRESSABLE AND CONTROLLABLE FROM THE HVAC
SHOP (B10) AND CENTRAL UTILITY PLANT.
EXISTING COMPUTER ROOM AIR CONDITION (CRAC) UNIT TO BE REPLACED
WITH NEW UNIT.
PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING
AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING
STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501
FOR DETAILS AND M-803 FOR CONTROLS.
NEW TERMINAL UNITS TO BE CONNECTED TO EXISTING HEATING WATER
SUPPLY AND RETURN MAINS AND BRANCHES. BASIS OF DESIGN IS TITUS.
DEMOLISH EXISTING AIR TERMINALS, DUCT, AND ASSOSCIATED EQUIPMENT
SERVING THIS AREA.
PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS BASIS OF DESIGN IS TITUS.
A.
B.
C.
D.
E.
F.
G.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
CU-01 LOCATION
NOT TO SCALE
B1 SITE PLAN
UPUP
UPUP
UP
UP
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
F1
T-
2C
F1
T-
2E
/F1 01T-102
EYE EXAM
1S-280
EYE EXAM
1S-279
EYE EXAM
1S-277
OPTHALMOLOGIST
OFFICE
1S-278
HAC
1S-276
SPD
1S-270
OCULAR
PHOTOGRAPHY
1S-271
SHOWER
1S-272
EXAM RM
1S-273
EXAM RM
1S-274
EYE EXAM
1S-274B
REGISTRATION
1S-268
OFFICE
1S-266
OPTOMETRY
EXAM RM
1S-275A
OPTOMETRY
EXAM
RMS
1S-275B
PATIENT
TOILET
1S-269
EXAM
OPTOMETRY
1S-267
PATIENT
WAITING
RM
1S-264
UTILITY
1S-265
TOILET
1S-2618
EMPLOYEE
TOILET
1S-263
EXAM
OPTOMETRY
1S-261
OPTOMETRY
EXAM
1S-262 TELECOM
ROOM
1C-242
LOBBY
1C-241
CORRIDOR
1C-C2-1ELEV
ELEV
MAIL RM
1C-243
OPTOMETRY
OFFICE
1C-246
MECH
MAIL RM
OFFICE
1C-245
REPRODUCTION
RM
1C-244
CORRIDOR
1S-C2-2
OPTOMETRY
OFFICE
SHOP
1S-266A RECEPT
OFFICE
1N-224A
FILM
LABORATORY
1N-224
TOILET
FEMALE
1N-225
TOILET
MALE
1N-227
BATH RM
PIPE
CHASE
1N-223
OFFICE
RADIOLOGIST
RADIOLOGIST
1N-221
OFFICE
1N-219
OFFICE
RADIOLOGIST
RADIOLOGIST
1N-217 OFFICE
1N-215
ELECTRICAL
1N-206
EXAM RM
1N-222
TELEPHONE
RM
1N-220A
PASSAGE
1N-220 X-RAY RM
CHEST RM
1N-209
STORAGE
RM
1N-210
MECH
1N-211
X-RAY RM
1N-213
CONTROL
RM
IN-213A
TOILET
TOILET
CT
SCANNER
RM
1N-207
CT
SCANNER
RM
1N-205
EQUIP
CLOSET
1N-208A
PATIENTS
TOILET
1N-203
1N-201
X-RAY RM
1N-214
CONTROL
RM
1N-216A
FEMALE
LOCKER
1N-210
CONFERENCE
RM
1N-212A
EMPLOYEE
LOUNGE
1N-212
CORRIDOR
1N-C2-5
MALE
LOCKERS
1N-208
DARK RM
1N-206
CORRIDOR
1N-C2-4
DRESSING
RM
1N-204
ULTRASOUND
RM
1N-202
STAIR#2
ELEV
#S3
EXAM RM
1S-281
STAIR #1
CORRIDOR
1N-C2-4
EXAM RM
1S-274A
N
CORRIDOR
1S-C2-3
01M-401A F4
3/4" CD
TYP.
01M-401A C4
11/09/2023
11/09/2023
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
2W
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
2C 2E
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_0 2_
R
.rv t
-0
1-
0:
:4
01M-102
MECHANICAL PLAN - SECOND LEVEL - B1 689A4-22-700
01_02
11/09/2023 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SCALE: 3/32" = 1'-0"F1
MECHANICAL PLAN - SECOND LEVEL -
B1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL
EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR
CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE
DEMOLISHED PRIOR TO COMMENCING WORK.
PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO
BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY
DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO
COMMENCING WORK.
SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER
CONSTRUCTION IS COMPLETE.
CONTRACTOR TO PROVIDE 2' X 2' ACCESS PANEL TO MECHANICAL CHASE.
CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE (TE-200A) AND SOFTWARE AND INTEGRATE WITH EXISTING
CONTROLS SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH
SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL
NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL
CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE
EXISTING NETWORK.
CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. REFRIGERANT SUCTION
PIPE AND REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.
PROVIDE NEW CRAC CONDENSING UNIT WITH NEW EQUIPMENT PAD.
NEW CRAC-CU REFRIGERANT PIPING, PIPE PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE ROUTING WITH ALL EXISTING CONDITIONS
PRIOR TO COMMENCEMENT OF WORK. SIZING BY VENDOR BASED ON
APPROVED SHOP DRAWINGS.
NEW CRAC UNITS SHALL BE INTEGRATED WITH FACILITY AUTOMATED LOGIC
CONTROLS BUILDING MANAGEMENT SYSTEM. ALL POINTS, ALARMS AND
CONTROLS SHALL BE ADDRESSABLE AND CONTROLLABLE FROM THE HVAC
SHOP (B10) AND CENTRAL UTILITY PLANT.
EXISTING COMPUTER ROOM AIR CONDITION (CRAC) UNIT TO BE REPLACED
WITH NEW UNIT.
PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING
AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING
STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501
FOR DETAILS AND M-803 FOR CONTROLS.
NEW TERMINAL UNITS TO BE CONNECTED TO EXISTING HEATING WATER
SUPPLY AND RETURN MAINS AND BRANCHES. BASIS OF DESIGN IS TITUS.
DEMOLISH EXISTING AIR TERMINALS, DUCT, AND ASSOSCIATED EQUIPMENT
SERVING THIS AREA.
PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS BASIS OF DESIGN IS TITUS.
A.
B.
C.
D.
E.
F.
G.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
UPUP
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
F2
T-
3C
F1
T-
3E
/F1 01T-102 /F1 01T-103
MECH
1-345
MENTAL
HEALTH
OFFICE
1-343
DIRECTOR
OF
HEARING
AND
RECOVERY
PGM
1-344
MENTAL
HEALTH
OFFICE
1-342
MENTAL
HEALTH
GROUP
RM
1-337
MENTAL
HEALTH
OT
1-337A
MENTAL
HEALTH
THERAPIST
1-336
MENTAL
HEALTH
OFFICE
1-335
MENTAL
HEALTH
NURSE
CASE
MANAGE
1-334 MENTAL
HEALTH
OFFICE
1-333
MENTAL
HEALTH
GROUP
RM
1-339
STAIR#2
CHASE
TOILET
1-338
TOILET
1-34
ELECTRICAL
1-341
CORRIDOR
1S-C3-12
CORRIDOR
1S-C3-10
WAITING
1-C3-11
CORRIDOR
1S-C3-9
CORRIDOR
1S-C3-7
W/D
1-327A
MENTAL
HEALTH
OFFICE
1-327
MENTAL
HEALTH
DAY RM
AND
DINING
1-322
ELEV
LOBBY
1C-C3-6
MENTAL
HEALTH
OFFICE
1-323
ELEV
ELEV
STAIR#1
MENTAL
HEALTH
OFFICE
1-321
TOILET
1-320A
MENTAL
HEALTH
OFFICE
1-326
MENTAL
HEALTH
OFFICE
1-328
MENTAL
HEALTH
OFFICE
1-329
MENTAL
HEALTH
OFFICE
1-331
MENTAL
HEALTH
OFFICE
1-330
MENTAL
HEALTH
OFFICE
1-332
MENTAL
HEALTH
OFFICE
1-319
MENTAL
HEALTH
OFFICE
1-320 MENTAL
HEALTH
OFFICE
1-318
MENTAL
HEALTH
OFFICE
1-315
MENTAL
HEALTH
OFFICE
1-313
MENTAL
HEALTH
OFFICE
1-309
MENTAL
HEALTH
OFFICE
1-310
MENTAL
HEALTH
OFFICE
1-312
STORAGE
1-314
MENTAL
HEALTH
EXAM RM
1-316
HAC
1-317
TOILET
1-311
ELECTRICAL
1-310A
COMMUNICATION
1-304A
GROUP
RM-B
1-304
RECEPTION
MENTAL
HEALTH
1-C3-5
CORRIDOR
1N-C3-2
WAITING
RM
1-302
DR
OFFICES
1-300
MENTAL
HEALTH
OFFICE
1-301
GROUP
RM-A
1-303
CHASE
CHASE
ROOM
1N-C3-3
TOILET
RM
1-305
CHASE
DIRECTOR
MENTAL
HEALTH
1-306
TOILET
1-306A
COPY RM
1-308
STORAGE
RM
1-307A
MENTAL
HEALTH
OFFICE
1-307
CORRIDOR
1N-C3-4
N
CORRIDOR
1N-C3-1
01M-401A F1
7/8" RL
1 1/8" RS
1" RL
1¼" RS
PIPE DROP DOWN TO
CU-01 ON FIRST FLOOR
3/4" CD
TYP.
TYP.
TELECOM
ROOM
1-324 01M-401A C1
01P-401 F5
11/09/2023
11/09/2023
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
2W
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
2C 2E
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_0 2_
R
.rv t
-0
1-
0:
:4
01M-103
MECHANICAL PLAN - THIRD LEVEL - B1 689A4-22-700
01_02
11/09/2023 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SCALE: 3/32" = 1'-0"F1
MECHANICAL PLAN - THIRD LEVEL -
B1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL
EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR
CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE
DEMOLISHED PRIOR TO COMMENCING WORK.
PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO
BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY
DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO
COMMENCING WORK.
SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER
CONSTRUCTION IS COMPLETE.
CONTRACTOR TO PROVIDE 2' X 2' ACCESS PANEL TO MECHANICAL CHASE.
CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE (TE-200A) AND SOFTWARE AND INTEGRATE WITH EXISTING
CONTROLS SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH
SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL
NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL
CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE
EXISTING NETWORK.
CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. REFRIGERANT SUCTION
PIPE AND REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.
PROVIDE NEW CRAC CONDENSING UNIT WITH NEW EQUIPMENT PAD.
NEW CRAC-CU REFRIGERANT PIPING, PIPE PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE ROUTING WITH ALL EXISTING CONDITIONS
PRIOR TO COMMENCEMENT OF WORK. SIZING BY VENDOR BASED ON
APPROVED SHOP DRAWINGS.
NEW CRAC UNITS SHALL BE INTEGRATED WITH FACILITY AUTOMATED LOGIC
CONTROLS BUILDING MANAGEMENT SYSTEM. ALL POINTS, ALARMS AND
CONTROLS SHALL BE ADDRESSABLE AND CONTROLLABLE FROM THE HVAC
SHOP (B10) AND CENTRAL UTILITY PLANT.
EXISTING COMPUTER ROOM AIR CONDITION (CRAC) UNIT TO BE REPLACED
WITH NEW UNIT.
PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING
AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING
STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501
FOR DETAILS AND M-803 FOR CONTROLS.
NEW TERMINAL UNITS TO BE CONNECTED TO EXISTING HEATING WATER
SUPPLY AND RETURN MAINS AND BRANCHES. BASIS OF DESIGN IS TITUS.
DEMOLISH EXISTING AIR TERMINALS, DUCT, AND ASSOSCIATED EQUIPMENT
SERVING THIS AREA.
PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS BASIS OF DESIGN IS TITUS.
A.
B.
C.
D.
E.
F.
G.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48 ” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
UPUP
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
VBA
STORAGE
1-401
VBA
STORAGE
1-403
HAC
1-404
OPEN
OFFICE
1-405
1-406
COMMUNICATION
1-407
POLICE
STORAGE
1-408
EQUIP
STORAGE
1-409
UTILITY
1-410
VBA
STORAGE
1-411
CLEAN/
STERILE
SUPPLIES
1-412
ELECTRICAL
1-413
POLICE
LOCKER
1-414
VBA
STORAGE
1-415
POLICE
LOCKER
1-416
ROOM
1-417
TOILET
1-416A
ACUPUNCTURE
CLINIC
1-419
ROOM
1-420
ELEV
LOBBY
1C-C4-7
STAIR #1
4-ST-1
HOME
BASE
HEALTH
CARE
1-423
MENS
TOILET
1-425
ROOM
1-426
FEMALE
TOILET
1-427
SUICIDE
PREVENTION
1-429
VISUAL
IMPAIRMENT
SVC
1-428
ROOM
1-430
CORRIDOR
1C-C4-12A
STAIR #2
4-ST-2
CORRIDOR
1C-C4-5
STORAGE
1-434
CONFERENCE
ROOM
1-438
MECH
1-446
CONFERENCE
1-445
ELECTRICAL
1-444
TOILET
1-414A
SCRUB
1-411D
WOMEN
SHOWER
1-411B
FEMALE
SHOWER
1-410A
CORRIDOR
1N-C4-4
CORRIDOR
1N-C4-3
ELEV
E1
ELEV
E2
CHASE
CHASE
NOURISHMENT
1N-C4-6
N
01M-401B F6
3/4" CD
TYP.
01M-401B C6
OFFICE
1-401
OFFICE
1-400
01M-400 C3
TYP.
01M-400 F3
/F1 02M-104E
TELECOM
ROOM
1-424
11/09/2023
11/09/2023
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
2W
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
2C 2E
STAMP
Au to de sk
D oc s:
//6
A4
-2 2-
0_
N ew in gt on _V
AM
C
_E H
R M
_I U
-1
2/
9A 4-
-7
.N ew in gt on
.E H
R M
.M
EP
.B
_0 2_
R
.rv t
-0
1-
0:
:4
01M-104
MECHANICAL PLAN - FOURTH LEVEL - B1 689A4-22-700
01_02
11/09/2023 M. Perkins T. Nakalawa
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
555 Willard Avenue, Newington, CT 06111
SCALE: 3/32" = 1'-0"F1
MECHANICAL PLAN - FOURTH LEVEL -
B1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 23 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE NEW CONDENSATE LINE FOR NEW MECHANICAL
EQUIPMENT, COORDINATE WITH VA. PROVIDE ELECTRICAL SERVICE FOR
CONDENSATE PUMP IF NOT FED FROM INDOOR UNIT. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL EQUIPMENT TO BE
DEMOLISHED PRIOR TO COMMENCING WORK.
PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE 2" OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO
BE CUT AT 90 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY
DRAIN LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO
COMMENCING WORK.
SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REBALANCE AIRFLOW TO PRE READING CFM AFTER
CONSTRUCTION IS COMPLETE.
CONTRACTOR TO PROVIDE 2' X 2' ACCESS PANEL TO MECHANICAL CHASE.
CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE (TE-200A) AND SOFTWARE AND INTEGRATE WITH EXISTING
CONTROLS SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH
SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL
NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL
CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE
EXISTING NETWORK.
CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. REFRIGERANT SUCTION
PIPE AND REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.
PROVIDE NEW CRAC CONDENSING UNIT WITH NEW EQUIPMENT PAD.
NEW CRAC-CU REFRIGERANT PIPING, PIPE PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE ROUTING WITH ALL EXISTING CONDITIONS
PRIOR TO COMMENCEMENT OF WORK. SIZING BY VENDOR BASED ON
APPROVED SHOP DRAWINGS.
NEW CRAC UNITS SHALL BE INTEGRATED WITH FACILITY AUTOMATED LOGIC
CONTROLS BUILDING MANAGEMENT SYSTEM. ALL POINTS, ALARMS AND
CONTROLS SHALL BE ADDRESSABLE AND CONTROLLABLE FROM THE HVAC
SHOP (B10) AND CENTRAL UTILITY PLANT.
EXISTING COMPUTER ROOM AIR CONDITION (CRAC) UNIT TO BE REPLACED
WITH NEW UNIT.
PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING
AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING
STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501
FOR DETAILS AND M-803 FOR CONTROLS.
NEW TERMINAL UNITS TO BE CONNECTED TO EXISTING HEATING WATER
SUPPLY AND RETURN MAINS AND BRANCHES. BASIS OF DESIGN IS TITUS.
DEMOLISH EXISTING AIR TERMINALS, DUCT, AND ASSOSCIATED EQUIPMENT
SERVING THIS AREA.
PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS BASIS OF DESIGN IS TITUS.
A.
B.
C.
D.
E.
F.
G.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT,…