Hyrum Dam Spillway Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140R4024R0020
- Agency
- Bureau of Reclamation Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Points of contact
-
- Lynette Rock lrock@usbr.gov (801) 524-3798
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Reclamation, a civilian agency within the Department of the Interior, is seeking offers for the Hyrum Dam Spillway Replacement project. The work includes the construction of a new reinforced concrete spillway, removal of the existing spillway, and associated civil, mechanical, and electrical features such as water control, riprap, drainage systems, foundation work, a roadway bridge, and irrigation canal improvements. Key objectives are mitigating dam safety concerns and enhancing the spillway's capacity. Evaluation criteria will focus on the construction schedule, work plans, past experience, and small business participation. Offers are due by November 13, 2024.
This is a full and open competition with no set-asides. The anticipated performance period is from March 2025 through January 2029. The estimated project magnitude is between $100-200 million, and the location is approximately 9 miles southwest of Logan, Utah. The North American Industry Classification System (NAICS) code is 237990 Other Heavy and Civil Engineering Construction.
Notice text
The work associated with the Hyrum Dam Spillway Replacement Project will take place approximately 9 miles southwest of Logan, Utah in Cache County, Utah. The overall work is for the construction of a new spillway and the removal of the existing spillway. This includes, but isn't limited to: removal and control of water, construction of a new reinforced concrete spillway, riprap outlet channel, riprap inlet area, associated mechanical and electrical features, associated drainage systems, associated foundation aggregate piers, roadway bridge, gate hoist structure and equipment, radial gates, embankment dike, new inverted siphons for irrigation canals, administrative access road and drainage, roadway realignment, and excavation and removal of the existing spillway structure. The anticipated performance period is March 2025 through January 2029.
Attachments
Show all 46
Notice history
| Notice | Type | Posted |
|---|---|---|
| Hyrum Dam Spillway Replacement | Award Notice | |
| Hyrum Dam Spillway Replacement | Solicitation | |
| Pre-Sol Notice Hyrum Dam Spillway Replacement | Pre-Solicitation | |
| Post Industry Day - Hyrum Dam Spillway Replacement | Special Notice | |
| Sources Sought - Hyrum Dam Spillway Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity