A0002_Att_6_(New)_01_46_20_-_Testing_Agency_Services_0002.pdf

PDF 324 KB Posted

Attached to
Hyrum Dam Spillway Replacement
Solicitation number
140R4024R0020
Issued by

About this file

This document is a section from the Specifications for the Hyrum Dam Spillway Replacement project, which is a federal contract opportunity solicited by the Department of the Interior Bureau of Reclamation. The section covers the requirements for testing agency services, including that the Contractor must employ an accredited independent testing agency to perform required sampling, testing, and reporting. The testing agency must meet the qualifications specified in ASTM standards for testing construction materials, concrete, soil, and rock. The Government may also perform quality assurance testing during the course of the work. The Contractor's testing agency services plan, including agency accreditation, personnel resumes, and report samples, must be submitted and approved. Testing agency costs are to be included in the Contractor's price quotes, and failure to submit timely test reports may result in payment withholding.

View the file

Other files

File Type Posted
A0003_Att_5_(Revised)_33_46_36___Drain_Pipes_0003.pdf PDF
A0003_Att_7_Updated_Continuation_of_Section_B_in_Excel_Format_0003.xlsx XLSX spreadsheet
A0003_Att_6_Updated_Solicitation_Pages_12-14_0003.pdf PDF
Sol_140R4024R0020_Amd_0003.pdf PDF
A0003_Att_4_(Revised)_03_30_00___Cast-In-Place_Concrete_0003.pdf PDF
A0003_Att_1_Informational_Page_0003.pdf PDF
A0003_Att_2_140R4024R0020_Additional_Technical_Questions_and_Answers_0003.pdf PDF
A0003_Att_3_(Revised)_188-D-60267_0003.pdf PDF
A0002_Att_21_(New)_40-D-60001_0002.pdf PDF
A0002_Att_19_(New)_40-D-6592_0002.PDF PDF
A0002_Att_4_140R4024R0020_Technical_Questions_and_Answers_0002.pdf PDF
A0002_Att_23_Evaluations_of_Potential_Filter_Sand_and_Drain_Gravel_Sources_for_Hyrum_Dam_Modifications_0002.pdf PDF
A0002_Att_8_(Replacement)_31_03_33_-_Removal_and_Control_of_Water_0002.pdf PDF
A0002_Att_13_(Revised)_188-D-60379_Gate_Hoist_Enclosure_Panel_Schedules_0002.pdf PDF
A0002_Att_7_(Revised)_02_41_07_-_Removal_and_Disposal_of_Existing_Features_0002.pdf PDF
A0002_Att_20_(New)_40-D-7017_0002.PDF PDF
A0002_Att_15_(New)_40-D-4335_0002.pdf PDF
A0002_Att_16_(New)_40-D-6477_0002.pdf PDF
A0002_Att_22_(New)_40-D-60002_0002.pdf PDF
A0002_Att_25_Hyrum_Spillway_Replacement_Geological_Investigations_2022_0002.pdf PDF
A0002_Att_24_Geologic_Investigations_of_Hyrum_Dam_Spillway_2016-2019_0002.pdf PDF
Sol_140R4024R0020_Amd_0002.pdf PDF
A0002_Att_11_(Revised)_51_02_82_-_Hazardous_Materials_Survey_and_Analytical_Results_0002.pdf PDF
A0002_Att_14_(New)_40-D-4334_0002.pdf PDF
A0002_Att_18_(New)_40-D-6552_0002.pdf PDF
A0002_Att_17_(New)_40-D-6551_0002.pdf PDF
A0002_Att_1_Informational_Page_0002.pdf PDF
A0002_Att_5_(New)_01_14_20_-_Reservoir_Spillway_and_Outlet_Works_Operations_0002.pdf PDF
A0002_Att_10_(New)_51_00_20_-_Reservoir_Water_Surface_Elevation_Data_0002.pdf PDF
A0002_Att_2_140R4024R0020_Contracting_Questions_and_Answers_0002.pdf PDF
A0002_Att_9_(New)_35_21_20_-_Stoplog_Guides_0002.pdf PDF
A0002_Att_3_Updated_Solicitation_Pages_62-67_0002.pdf PDF
A0002_Att_12_(New)_188-D-60215_Existing_Spillway-Dike_Plan_0002.pdf PDF
A0001_Att_1_Informational_Page_0001.pdf PDF
Sol_140R4024R0020_Amd_0001.pdf PDF
A0001_Att_2_Site_Visit_Sign-in_Sheet_0001.pdf PDF
Attachment_4_Continuation_of_Section_B_in_Excel_Format.xlsx XLSX spreadsheet
Attachment_6_Subcontracting_Plan_Template.docx DOCX document
Attachment_2_140R4024R0020_Drawings_90_.pdf PDF
Attachment_5_Construction_Wage_Rate_Requirements_for_Cache_County__UT.pdf PDF
Attachment_1_140R4024R0020_Specifications_90_.pdf PDF
Sol_140R4024R0020.pdf PDF
Attachment_3_Current_Spillway_Drawings_(Info_Only).pdf PDF
Solicitation_No__140R4024R0020_Hyrum_Dam_Spillway_Replacement.pdf PDF
Attachment_7_SF24_Bid_Bond_Form.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hyrum Dam Spillway Replacement Hyrum Project, Utah

Testing Agency Services

01 46 20 - 1

SECTION 01 46 20

TESTING AGENCY SERVICES

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedules for items of work requiring applicable testing agency services.

B. Progress Payments: If test reports are not submitted in a timely manner, Contractor will be considered to be in non-compliance and delaying that phase of the work to which testing applies. CO may retain appropriate amounts of applicable progress payments.

1.02 REFERENCE STANDARDS

A. ASTM International (ASTM)

1. ASTM C1077-16a Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation

2. ASTM D3666-16 Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials

3. ASTM D3740-12a Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction

4. ASTM E329-14a Agencies Engaged in Construction Inspection, Testing, or Special Inspection

5. ASTM E543-15 Agencies Performing Nondestructive Testing

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 – Submittals.

Hyrum Dam Spillway Replacement Hyrum Project, Utah

Testing Agency Services

01 46 20 - 2

B. RSN 01 46 20-1, Testing Agency Services Plan:

1. Include:

a. Names of agencies to perform sampling and testing.

b. Agency accreditation to perform specified testing or agency qualifications to perform specified testing.

c. Resumes of personnel performing tests.

d. Samples of report forms.

2. No change in the approved plan may be made without written concurrence by

COR.

1.04 QUALIFICATIONS

A. Testing agency organization:

1. Agencies testing construction materials: Meet requirements of ASTM E329.

2. Agencies testing concrete and concrete aggregates: Meet requirements of ASTM C1077.

3. Agencies testing soil and rock: Meet requirements of ASTM D3740.

B. Equipment:

1. Calibrate measuring devices, laboratory equipment, and instruments at established intervals.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 CONTRACTOR QUALITY TESTING

A. Employ accredited independent agency to perform sampling, testing, and reporting as required in the following Sections:

3.02 GOVERNMENT CONTRACT QUALITY ASSURANCE

A. During the course of work, Government may perform quality assurance tests. Tests performed by Government will be used to ensure compliance with contract requirements and not as replacement for specified Contractor quality testing.

END OF SECTION