A0002_Att_14_(New)_40-D-4334_0002.pdf
PDF 1016 KB Posted
- Attached to
- Hyrum Dam Spillway Replacement Federal contract opportunity
- Solicitation number
- 140R4024R0020
About this file
This document appears to be a side view drawing related to the Hyrum Dam Spillway Replacement project. The overall project, as described in the associated federal contract opportunity, involves the construction of a new spillway and removal of the existing spillway at the Hyrum Dam, located approximately 9 miles southwest of Logan, Utah. The project scope includes water control, new reinforced concrete spillway, riprap, mechanical and electrical features, drainage, foundation work, a roadway bridge, gate hoist structure, embankment dike, siphons for irrigation canals, roadway realignment, and excavation of the existing spillway. The anticipated performance period is March 2025 through January 2029. The contracting agency is the Department of the Interior Bureau of Reclamation, a civilian federal agency.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIDE VIEWS
Re le as ed
File details come from the government source that posted it. Updated .