A0003_Att_6_Updated_Solicitation_Pages_12-14_0003.pdf

PDF 239 KB Posted

Attached to
Hyrum Dam Spillway Replacement
Solicitation number
140R4024R0020
Issued by

About this file

This document is a solicitation (Solicitation No. 140R4024R0020) for the Hyrum Dam Spillway Replacement project. The work includes construction of a new reinforced concrete spillway, removal of the existing spillway, and associated features such as drainage systems, roadways, and irrigation pipelines. The project will take place approximately 9 miles southwest of Logan, Utah. The anticipated performance period is March 2025 through January 2029. The solicitation includes a detailed construction price schedule with over 80 contract line items for various project components. Pricing is requested on a lump sum or unit price basis. The solicitation also includes two contract options for an emergency ice berm. The contracting agency is the Department of the Interior, Bureau of Reclamation.

View the file

Other files

File Type Posted
A0003_Att_5_(Revised)_33_46_36___Drain_Pipes_0003.pdf PDF
A0003_Att_7_Updated_Continuation_of_Section_B_in_Excel_Format_0003.xlsx XLSX spreadsheet
Sol_140R4024R0020_Amd_0003.pdf PDF
A0003_Att_4_(Revised)_03_30_00___Cast-In-Place_Concrete_0003.pdf PDF
A0003_Att_1_Informational_Page_0003.pdf PDF
A0003_Att_2_140R4024R0020_Additional_Technical_Questions_and_Answers_0003.pdf PDF
A0003_Att_3_(Revised)_188-D-60267_0003.pdf PDF
A0002_Att_21_(New)_40-D-60001_0002.pdf PDF
A0002_Att_19_(New)_40-D-6592_0002.PDF PDF
A0002_Att_4_140R4024R0020_Technical_Questions_and_Answers_0002.pdf PDF
A0002_Att_23_Evaluations_of_Potential_Filter_Sand_and_Drain_Gravel_Sources_for_Hyrum_Dam_Modifications_0002.pdf PDF
A0002_Att_8_(Replacement)_31_03_33_-_Removal_and_Control_of_Water_0002.pdf PDF
A0002_Att_13_(Revised)_188-D-60379_Gate_Hoist_Enclosure_Panel_Schedules_0002.pdf PDF
A0002_Att_7_(Revised)_02_41_07_-_Removal_and_Disposal_of_Existing_Features_0002.pdf PDF
A0002_Att_20_(New)_40-D-7017_0002.PDF PDF
A0002_Att_6_(New)_01_46_20_-_Testing_Agency_Services_0002.pdf PDF
A0002_Att_15_(New)_40-D-4335_0002.pdf PDF
A0002_Att_16_(New)_40-D-6477_0002.pdf PDF
A0002_Att_22_(New)_40-D-60002_0002.pdf PDF
A0002_Att_25_Hyrum_Spillway_Replacement_Geological_Investigations_2022_0002.pdf PDF
A0002_Att_24_Geologic_Investigations_of_Hyrum_Dam_Spillway_2016-2019_0002.pdf PDF
Sol_140R4024R0020_Amd_0002.pdf PDF
A0002_Att_11_(Revised)_51_02_82_-_Hazardous_Materials_Survey_and_Analytical_Results_0002.pdf PDF
A0002_Att_14_(New)_40-D-4334_0002.pdf PDF
A0002_Att_18_(New)_40-D-6552_0002.pdf PDF
A0002_Att_17_(New)_40-D-6551_0002.pdf PDF
A0002_Att_1_Informational_Page_0002.pdf PDF
A0002_Att_5_(New)_01_14_20_-_Reservoir_Spillway_and_Outlet_Works_Operations_0002.pdf PDF
A0002_Att_10_(New)_51_00_20_-_Reservoir_Water_Surface_Elevation_Data_0002.pdf PDF
A0002_Att_2_140R4024R0020_Contracting_Questions_and_Answers_0002.pdf PDF
A0002_Att_9_(New)_35_21_20_-_Stoplog_Guides_0002.pdf PDF
A0002_Att_3_Updated_Solicitation_Pages_62-67_0002.pdf PDF
A0002_Att_12_(New)_188-D-60215_Existing_Spillway-Dike_Plan_0002.pdf PDF
A0001_Att_1_Informational_Page_0001.pdf PDF
Sol_140R4024R0020_Amd_0001.pdf PDF
A0001_Att_2_Site_Visit_Sign-in_Sheet_0001.pdf PDF
Attachment_4_Continuation_of_Section_B_in_Excel_Format.xlsx XLSX spreadsheet
Attachment_6_Subcontracting_Plan_Template.docx DOCX document
Attachment_2_140R4024R0020_Drawings_90_.pdf PDF
Attachment_5_Construction_Wage_Rate_Requirements_for_Cache_County__UT.pdf PDF
Attachment_1_140R4024R0020_Specifications_90_.pdf PDF
Sol_140R4024R0020.pdf PDF
Attachment_3_Current_Spillway_Drawings_(Info_Only).pdf PDF
Solicitation_No__140R4024R0020_Hyrum_Dam_Spillway_Replacement.pdf PDF
Attachment_7_SF24_Bid_Bond_Form.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO: 140R4024R0020 TITLE: HYRUM DAM SPILLWAY REPLACEMENT

SECTION B – CONTINUATION OF SUPPLIES OR SERVICES AND PRICES/COSTS

UPDATED (AMENDMENT 0003)

CONTINUATION OF SECTION B

CONSTRUCTION PRICE SCHEDULE

(a) Offers will be considered for award on the following price schedule, but no offer will be considered for award on only a part of the price schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the price schedule are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns and underruns. The Contract Clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to the lump sum items.

(d) See the contract clause at WBR 1452.232-81 AI, Payment for Mobilization and Preparatory Work – Bureau of Reclamation AI for CLIN 00010-01.

(e) Definitions

(1) CLIN – Contract Line Item Number

CLIN Section Supplies or Services Quantity Unit Unit

Price Amount

00010-01 WBR

1452.232-81 A1 Mobilization and Preparatory Work For the Lump Sum of $

00010-02 01 31 30 Contract Document Management System For the Lump Sum of $ 00010-03 02 41 07 Removal and Disposal of Existing Features For the Lump Sum of $

00010-04 02 83 33 Removal and Disposal of Equipment with Coatings Containing Regulated Metals For the Lump Sum of $

00010-05 03 11 10 Concrete Forming 110,000 ft² $ $ 00010-05 03 15 12 6-inch PVC Waterstops 5,900 LF $ $

00010-06 03 20 00 Concrete Reinforcing 6,000,00 0 lb $ $

00010-07 03 20 00 Weldable Concrete Reinforcing 2,200 lb $ $ 00010-08 03 30 00 Cast-In-Place Concrete 3,330 yd³ $ $ 00010-09 03 30 00 Reinforced Structural Mass Concrete (RSMC) 16,000 yd³ $ $ 00010-10 03 30 00 Spillway Test Section For the Lump Sum of $ 00010-11 03 30 00 Mud Mat 465 yd³ $ $ 00010-12 03 30 39 Precast Concrete Deck Panels For the Lump Sum of $ 00010-13 03 41 33 Pretensioned Concrete Bridge Beams For the Lump Sum of $ 00010-14 03 81 10 Saw/Wire Cut Existing Concrete 750 LF $ $ 00010-15 03 81 10 Concrete Removal 3,280 yd³ $ $ 00010-16 03 81 10 Existing Bridge Removal For the Lump Sum of $ 00010-17 05 50 00 Miscellaneous Metalwork For the Lump Sum of $ 00010-18 07 21 20 Extruded Polystyrene Rigid Foam Insulation 30,000 ft² $ $ 00010-19 07 92 00 Joint Sealants For the Lump Sum of $ 00010-20 13 34 20 Metal Building System For the Lump Sum of $ 00010-21 26 05 02 Complete Electrical System For the Lump Sum of $ 00010-22 26 32 10 Diesel Engine-Generator Set For the Lump Sum of $

00010-23 26 42 13 Galvanic Anode Cathodic Protection System For the Lump Sum of $ 00010-24 31 02 10 Water for Dust Abatement For the Lump Sum of $ 00010-25 31 03 23 New Spillway Cofferdam For the Lump Sum of $ 00010-26 31 03 33 Stilling Basin Unwatering For the Lump Sum of $ 00010-27 31 03 33 Crest Structure Unwatering For the Lump Sum of $ 00010-28 31 03 33 Upper Chute Unwatering For the Lump Sum of $ 00010-29 31 03 33 Deep Wells 3,400 LF $ $ 00010-30 31 03 33 Deep Wells Operation and Power For the Lump Sum of $ 00010-31 31 03 33 Well Points 1,000 LF $ $ 00010-32 31 03 33 Well Points Operation and Power For the Lump Sum of $ 00010-33 31 03 33 Passive Wells 2,300 LF $ $ 00010-34 31 03 33 Temporary Observation Wells 1,350 LF $ $ 00010-35 31 09 10 Abandoning Existing Piezometers For the Lump Sum of $ 00010-36 31 09 26 Temporary Measurement Points (TMP) 26 EA $ $ 00010-37 31 09 26 Spillway Measurement Points (SMP) 110 EA $ $ 00010-38 31 09 26 Monitoring During Construction For the Lump Sum of $ 00010-39 31 14 10 Stripping 46 acre $ $ 00010-40 31 23 30 Excavation 300,000 yd³ $ $ 00010-41 31 23 51 Sand Filter 18,000 yd³ $ $ 00010-42 31 23 52 Gravel Drain Material 3,800 yd³ $ $ 00010-43 31 23 54 Miscellaneous Fill 82,000 yd³ $ $ 00010-44 31 23 56 Structural Fill 2,500 yd³ $ $ 00010-45 31 24 10 Impervious Fill 35,000 yd³ $ $ 00010-46 31 24 20 Additional Embankment Materials 500 yd³ $ $ 00010-47 31 32 26 Single Pier Modulus Tests For the Lump Sum of $ 00010-48 31 32 26 Multiple Pier Modulus Test For the Lump Sum of $ 00010-49 31 32 26 Installed Piers 18,500 LF $ $ 00010-50 31 32 52 Inspection Well at the Existing Spillway For the Lump Sum of $ 00010-51 31 37 00 Type 1 Riprap 2,900 yd³ $ $ 00010-52 31 37 00 Type 2 Riprap 3,900 yd³ $ $ 00010-53 31 37 00 Type 3 Riprap 15,500 yd³ $ $ 00010-54 31 37 10 Type 1 Riprap Bedding 3,400 yd³ $ $ 00010-55 31 37 10 Type 2 Riprap Bedding 1,400 yd³ $ $ 00010-55 31 37 10 Type 3 Riprap Bedding 6,900 yd³ $ $ 00010-57 31 41 16 Steel Sheet Piles 18,000 ft² $ $ 00010-56 31 56 20 Cutoff 37,000 ft² $ $ 00010-57 32 12 00 County Road 2,800 yd² $ $ 00010-58 32 12 00 Access Roads 2,200 yd² $ $ 00010-59 32 12 00 Demolition of Existing County Road 2,800 yd² $ $ 00010-60 32 15 10 Gravel Surfacing 2,200 yd² $ $ 00010-61 32 31 10 Chain Link Fence For the Lump Sum of $ 00010-64 32 31 30 Barbed Wire Fence 1,600 LF $ $

00010-62 32 91 19 Placing Topsoil 6 acre $ $ 00010-63 32 91 60 Topsoil Erosion Control Matting 15,700 yd² $ $ 00010-64 32 92 20 Seeding 7.5 acre $ $ 00010-65 33 05 33 Spillway Stilling Well For the Lump Sum of $ 00010-66 33 11 14 East Field Inverted Siphon For the Lump Sum of $ 00010-67 33 11 14 Hyrum Feeder Ditch Pipeline Inverted Siphon For the Lump Sum of $ 00010-68 33 11 16 Line Pipe – PVC 50 LF $ $ 00010-69 33 11 16 Filling, Testing, and Draining Pipe For the Lump Sum of $

00010-73 33 46 36 4-inch-Diameter Non-perforated HDPE Air Vent Pipe 93 LF $ $

00010-70 33 46 36 8-inch-Diameter Perforated HDPE Pipe 1,500 LF $ $ 00010-71 33 46 36 8-inch-Diameter Non-perforated HDPE Pipe 54 LF $ $ 00010-72 33 46 36 10-inch-Diameter Perforated HDPE Pipe 5,200 LF $ $ 00010-73 33 46 36 10-inch-Diameter Non-perforated HDPE Pipe 2,000 LF $ $ 00010-74 33 46 36 12-inch-Diameter Perforated HDPE Pipe 790 LF $ $ 00010-75 33 46 36 12-inch-Diameter Non-perforated HDPE Pipe 220 LF $ $ 00010-76 33 46 36 18-inch-Diameter Non-perforated HDPE Pipe 32 LF $ $ 00010-77 33 46 36 Cleanouts 39 EA $ $ 00010-78 33 46 36 Air Vents 10 EA $ $ 00010-79 33 46 42 Perimeter Drain Weir Boxes For the Lump Sum of $ 00010-80 34 71 10 Guardrail 2,900 LF $ $ 00010-81 35 21 20 Stoplog Guides For the Lump Sum of $ 00010-82 35 23 50 Radial Gates For the Lump Sum of $ 00010-83 41 22 32 Radial Gate Hoists For the Lump Sum of $

TOTAL FOR CONSTRUCTION PRICE SCHEDULE $

OPTION 1

Price Amount

00110 31 03 23 New Spillway Cofferdam Emergency Ice Berm – Year One For the Lump Sum of $

TOTAL FOR OPTION 1 $

OPTION 2

Price Amount

00120 31 03 23 New Spillway Cofferdam Emergency Ice Berm – Year Two For the Lump Sum of $

TOTAL FOR OPTION 2 $

SECTION A – SOLICITATION/CONTRACT FORM
SECTION B – CONTINUATION OF SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
SECTION F – DELIVERIES OR PERFORMANCE
SECTION G – CONTRACT ADMINISTRATION DATA
SECTION H – SPECIAL CONTRACT REQUIREMENTS
SECTION I – CONTRACT CLAUSES
SECTION J – LIST OF ATTACHMENTS
SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
SECTION M – EVALUATION FACTORS FOR AWARD

File details come from the government source that posted it. Updated .