This document appears to be a Hazardous Materials Survey and Analytical Results related to the Hyrum Dam Spillway Replacement project. The Hyrum Dam Spillway Replacement project is a solicitation issued by the Department of the Interior Bureau of Reclamation for the construction of a new spillway and removal of the existing spillway. The work includes, but is not limited to, construction of a new reinforced concrete spillway, riprap outlet channel, riprap inlet area, associated mechanical and electrical features, drainage systems, foundation aggregate piers, roadway bridge, gate hoist structure and equipment, radial gates, embankment dike, new inverted siphons for irrigation canals, administrative access road and drainage, roadway realignment, and excavation and removal of the existing spillway structure. The anticipated performance period is March 2025 through January 2029.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hyrum Dam Spillway Replacement Hyrum Project, Utah
Hazardous Materials Survey and Analytical Results
51 02 82 - 1
SECTION 51 02 82
HAZARDOUS MATERIALS SURVEY AND ANALYTICAL RESULTS
PART 1 GENERAL
1.01 SURVEY AND ANALYTICAL RESULTS 2023
A. Hazardous Materials Survey and Analytical Results are provided.
B. The following is a summary of the analytical results collected during a hazardous materials survey conducted on the Hyrum Dam spillway in July 2023. Table 51 02 82-1 is a summary of the analytical results.
C. After the summary are pictures of the sample locations in 1.03. Table 51 02 82-2 has the entire list. Following that, are copies of the laboratory analytical reports.
D. Summary of findings:
Table 51 02 82-1. Summary of Results.
Sample ID Sample location Description Material Asbestos HYM0010 Dam spillway, 1930's concrete White/gray Concrete ND HYM0011 Dam spillway, 1930's concrete White/gray Concrete ND HYM0012 Dam spillway, 1930's concrete White/gray Concrete ND HYM0020 Dam spillway, 2000's concrete White/gray Concrete ND HYM0021 Dam spillway, 2000's concrete White/gray Concrete ND HYM0022 Dam spillway, 2000's concrete White/gray Concrete ND
Notes:
ND: tested but not detected
51 02 82 - 2
1.02 COMPLETE ANALYTICAL RESULTS
Table 51 02 82-2. Complete laboratory analytical results Sample ID Sample location Description Material Method Analysis Results Units
HYM0010 Dam spillway, 1930's concrete White/gray Concrete HYM0010 EPA 600/R-93/116 ND % HYM0011 Dam spillway, 1930's concrete White/gray Concrete HYM0011 EPA 600/R-93/116 ND % HYM0012 Dam spillway, 1930's concrete White/gray Concrete HYM0012 EPA 600/R-93/116 ND % HYM0020 Dam spillway, 2000's concrete White/gray Concrete HYM0020 EPA 600/R-93/116 ND % HYM0021 Dam spillway, 2000's concrete White/gray Concrete HYM0021 EPA 600/R-93/116 ND % HYM0022 Dam spillway, 2000's concrete White/gray Concrete HYM0022 EPA 600/R-93/116 ND %
Notes:
%: percent by volume.
ID: identification.
ND: not detected, below method detection limit.
51 02 82 - 3
1.03 SAMPLE PICTURES
Figure C-1 - General location of sample collection. The fence marks the edge of the spillway.
Figure C-2 - Location of samples HRM0010 - HRM0012.
51 02 82 - 4
Figure C-3 -Location of samples HRM0020 - HRM0022.
51 02 82 - 5
1.04 COPIES OF ANALYTICAL RESULTS
A. Asbestos bulk analysis:
51 02 82 - 6
51 02 82 - 7
51 02 82 - 8
51 02 82 - 9
2.01 SURVEY AND ANALYTICAL RESULTS 2017
A. Hazardous Materials Survey and Analytical Results are provided.
B. The following is the Travel Report results collected during a hazardous materials survey conducted on the Hyrum Dam spillway in April 2017 with pictures and summary of the analytical results.
C. Findings:
51 02 82 - 10
51 02 82 - 11
51 02 82 - 12
51 02 82 - 13
51 02 82 - 14
51 02 82 - 15
51 02 82 - 16
51 02 82 - 17
51 02 82 - 18
51 02 82 - 19
51 02 82 - 20
51 02 82 - 21
51 02 82 - 22
51 02 82 - 23
51 02 82 - 24
51 02 82 - 25
51 02 82 - 26
51 02 82 - 27
51 02 82 - 28
51 02 82 - 29
51 02 82 - 30
51 02 82 - 31
51 02 82 - 32
51 02 82 - 33
51 02 82 - 34
51 02 82 - 35
51 02 82 - 36
51 02 82 - 37
51 02 82 - 38
51 02 82 - 39
51 02 82 - 40
51 02 82 - 41
51 02 82 - 42
51 02 82 - 43
51 02 82 - 44
51 02 82 - 45
51 02 82 - 46
51 02 82 - 47
51 02 82 - 48
51 02 82 - 49
51 02 82 - 50
51 02 82 - 51
51 02 82 - 52
51 02 82 - 53
51 02 82 - 54
51 02 82 - 55
51 02 82 - 56
51 02 82 - 57
51 02 82 - 58
51 02 82 - 59
51 02 82 - 60
51 02 82 - 61
51 02 82 - 62
51 02 82 - 63
51 02 82 - 64
51 02 82 - 65
51 02 82 - 66
51 02 82 - 67
51 02 82 - 68
51 02 82 - 69
51 02 82 - 70
51 02 82 - 71
51 02 82 - 72
END OF SECTION
File details come from the government source that posted it. Updated .