A0002_Att_9_(New)_35_21_20_-_Stoplog_Guides_0002.pdf

PDF 340 KB Posted

Attached to
Hyrum Dam Spillway Replacement
Solicitation number
140R4024R0020
Issued by

About this file

This document is a technical specification for the fabrication and installation of stoplog guides for the Hyrum Dam Spillway Replacement project in Utah. The key details are:

The stoplog guides are structural steel components that are to be fabricated in accordance with ASTM and AWS standards. The fabricated guides will be embedded in concrete as part of the new spillway construction. Specific requirements are provided for the steel materials, fasteners, welding, finishes, and inspection/acceptance criteria. The stoplog guides will be part of the overall Hyrum Dam Spillway Replacement project, which is described in the related federal contract opportunity. That project involves the construction of a new reinforced concrete spillway, associated mechanical/electrical features, earthwork, and roadway work, with an anticipated performance period from March 2025 through January 2029. The contracting agency is the Department of Interior's Bureau of Reclamation.

View the file

Other files

File Type Posted
A0003_Att_5_(Revised)_33_46_36___Drain_Pipes_0003.pdf PDF
A0003_Att_7_Updated_Continuation_of_Section_B_in_Excel_Format_0003.xlsx XLSX spreadsheet
A0003_Att_6_Updated_Solicitation_Pages_12-14_0003.pdf PDF
Sol_140R4024R0020_Amd_0003.pdf PDF
A0003_Att_4_(Revised)_03_30_00___Cast-In-Place_Concrete_0003.pdf PDF
A0003_Att_1_Informational_Page_0003.pdf PDF
A0003_Att_2_140R4024R0020_Additional_Technical_Questions_and_Answers_0003.pdf PDF
A0003_Att_3_(Revised)_188-D-60267_0003.pdf PDF
A0002_Att_21_(New)_40-D-60001_0002.pdf PDF
A0002_Att_19_(New)_40-D-6592_0002.PDF PDF
A0002_Att_4_140R4024R0020_Technical_Questions_and_Answers_0002.pdf PDF
A0002_Att_23_Evaluations_of_Potential_Filter_Sand_and_Drain_Gravel_Sources_for_Hyrum_Dam_Modifications_0002.pdf PDF
A0002_Att_8_(Replacement)_31_03_33_-_Removal_and_Control_of_Water_0002.pdf PDF
A0002_Att_13_(Revised)_188-D-60379_Gate_Hoist_Enclosure_Panel_Schedules_0002.pdf PDF
A0002_Att_7_(Revised)_02_41_07_-_Removal_and_Disposal_of_Existing_Features_0002.pdf PDF
A0002_Att_20_(New)_40-D-7017_0002.PDF PDF
A0002_Att_6_(New)_01_46_20_-_Testing_Agency_Services_0002.pdf PDF
A0002_Att_15_(New)_40-D-4335_0002.pdf PDF
A0002_Att_16_(New)_40-D-6477_0002.pdf PDF
A0002_Att_22_(New)_40-D-60002_0002.pdf PDF
A0002_Att_25_Hyrum_Spillway_Replacement_Geological_Investigations_2022_0002.pdf PDF
A0002_Att_24_Geologic_Investigations_of_Hyrum_Dam_Spillway_2016-2019_0002.pdf PDF
Sol_140R4024R0020_Amd_0002.pdf PDF
A0002_Att_11_(Revised)_51_02_82_-_Hazardous_Materials_Survey_and_Analytical_Results_0002.pdf PDF
A0002_Att_14_(New)_40-D-4334_0002.pdf PDF
A0002_Att_18_(New)_40-D-6552_0002.pdf PDF
A0002_Att_17_(New)_40-D-6551_0002.pdf PDF
A0002_Att_1_Informational_Page_0002.pdf PDF
A0002_Att_5_(New)_01_14_20_-_Reservoir_Spillway_and_Outlet_Works_Operations_0002.pdf PDF
A0002_Att_10_(New)_51_00_20_-_Reservoir_Water_Surface_Elevation_Data_0002.pdf PDF
A0002_Att_2_140R4024R0020_Contracting_Questions_and_Answers_0002.pdf PDF
A0002_Att_3_Updated_Solicitation_Pages_62-67_0002.pdf PDF
A0002_Att_12_(New)_188-D-60215_Existing_Spillway-Dike_Plan_0002.pdf PDF
A0001_Att_1_Informational_Page_0001.pdf PDF
Sol_140R4024R0020_Amd_0001.pdf PDF
A0001_Att_2_Site_Visit_Sign-in_Sheet_0001.pdf PDF
Attachment_4_Continuation_of_Section_B_in_Excel_Format.xlsx XLSX spreadsheet
Attachment_6_Subcontracting_Plan_Template.docx DOCX document
Attachment_2_140R4024R0020_Drawings_90_.pdf PDF
Attachment_5_Construction_Wage_Rate_Requirements_for_Cache_County__UT.pdf PDF
Attachment_1_140R4024R0020_Specifications_90_.pdf PDF
Sol_140R4024R0020.pdf PDF
Attachment_3_Current_Spillway_Drawings_(Info_Only).pdf PDF
Solicitation_No__140R4024R0020_Hyrum_Dam_Spillway_Replacement.pdf PDF
Attachment_7_SF24_Bid_Bond_Form.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hyrum Dam Spillway Replacement Hyrum Project, Utah

Stoplog Guides

35 21 20 - 1

SECTION 35 21 20

STOPLOG GUIDES

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Stoplog Guides:

1. Payment: Lump-sum price offered in Price Schedule.

1.02 REFERENCE STANDARDS

A. American Institute of Steel Construction (AISC)

1. AISC 303-22 Code of Standard Practice for Steel Buildings and Bridges

B. ASTM International (ASTM)

1. ASTM A6/A6M-22 Rolled Structural Steel Bars, Plates, Shapes, and Steel Piling

2. ASTM A36/A36M-19 Carbon Structural Steel

3. ASTM A108-18 Steel Bar, Carbon and Alloy, Cold-Finished

4. ASTM A572/A572M-21e1 High-Strength Low-Alloy Columbium- Vanadium Structural Steel

5. ASTM A992/A992M-22 Structural Steel Shapes

6. ASTM F593–22 Stainless Steel Bolts, Hex Cap Screws, and Studs

7. ASTM F594-22 Stainless Steel Nuts

C. American Welding Society, Inc. (AWS)

2. AWS D1.1/D1.1M:2020 Structural Welding Code - Steel

1.03 DELIVERY, STORAGE, AND HANDLING

A. Ship, handle, and store in a manner to prevent permanent deflection, distortion, or other damage. Any tie downs used during shipment to be positioned in a manner as not to deform the materials being shipped. Use of chains for hold down will not be permitted.

B. Protect equipment from corrosion, deformation, and other types of damage.

35 21 20 - 2

PART 2 PRODUCTS

2.01 MATERIALS

A. Structural Steel: ASTM A36.

1. At a no cost option to the government, Contractor may substitute, ASTM A992 or ASTM A572 Grade 50 steel for ASTM A36 steel.

B. Fasteners:

1. Bolts: Stainless Steel, ASTM F593.

2. Nuts: Stainless Steel, ASTM F594

3. Washers: Stainless Steel type 304 or 316.

C. Headed Anchors:

1. ASTM A108.

2. Flux-filled stud anchors for end welding to steel with automatic end welding guns or equivalent manually welded anchors.

2.02 FABRICATION

A. Fabricate stoplog guides in accordance with these specifications and as detailed on drawings 188-D-60371 and 188-D-60372.

B. Details of fabrication in accordance with AISC 303 and ASTM A6 for structural steel.

C. Welds shall be in accordance with the applicable requirements of AWS D1.1 for steel members.

2.03 FINISHES

A. Coat in accordance with Section 09 96 20 - Coatings.

2.04 CONTRACTOR QUALITY CONTROL TESTING

A. After fabrication, completely assembly the stoplog guides in the shop and inspect to ensure that the required dimensions and tolerances have been obtained.

PART 3 EXECUTION

3.01 INSTALLATION

A. Embed the stoplog guides as shown on drawings 188-D-60371 and 188-D-60372 and in accordance with the installation tolerances. Properly support metalwork during embedment.

35 21 20 - 3

B. Embedded Metalwork:

1. Before placing concrete, clean surfaces of metalwork to be in contact with or embedded in concrete in accordance with Section 09 96 20 – Coatings.

2. Properly support metalwork during embedment.

3. Ensure metalwork to be embedded is not in contact with rebar.

4. Accurately locate metalwork to be embedded in concrete. Hold metalwork in correct position and alignment and protect from damage and displacement during placing and setting of concrete.

5. Unless otherwise specified, use only metal braces, supports, and other items to position and align embedded metalwork, which will be embedded in concrete. Do not use wooden braces, supports, or other items to position and align embedded metalwork if they also will be embedded in concrete.

C. Provide all fasteners and other appurtenances of the equipment, as shown on the drawings, as necessary for a complete and functional installation.

D. Make required changes or adjustments to the satisfaction of the COR.

E. After final installation, repair any damaged coatings.

END OF SECTION

35 21 20 - 4