A0002_Att_13_(Revised)_188-D-60379_Gate_Hoist_Enclosure_Panel_Schedules_0002.pdf

PDF 1 MB Posted

Attached to
Hyrum Dam Spillway Replacement
Solicitation number
140R4024R0020
Issued by

About this file

This document appears to be a set of panel schedules for the gate hoist enclosure as part of the Hyrum Dam Spillway Replacement project. The key details include:

The Hyrum Dam Spillway Replacement project involves the construction of a new reinforced concrete spillway, associated mechanical and electrical features, gate hoist structure and equipment, radial gates, and removal of the existing spillway structure. The overall project is located approximately 9 miles southwest of Logan, Utah and has an anticipated performance period of March 2025 through January 2029. The panel schedules provided in this document are for the gate hoist enclosure and include notes on circuit breaker sizing per NFPA 70. The document references other related drawings for the outlet works building, spillway single line diagram, cable and conduit schedule, and hoist enclosure lighting and receptacles layout.

View the file

Other files

File Type Posted
A0003_Att_5_(Revised)_33_46_36___Drain_Pipes_0003.pdf PDF
A0003_Att_7_Updated_Continuation_of_Section_B_in_Excel_Format_0003.xlsx XLSX spreadsheet
A0003_Att_6_Updated_Solicitation_Pages_12-14_0003.pdf PDF
Sol_140R4024R0020_Amd_0003.pdf PDF
A0003_Att_4_(Revised)_03_30_00___Cast-In-Place_Concrete_0003.pdf PDF
A0003_Att_1_Informational_Page_0003.pdf PDF
A0003_Att_2_140R4024R0020_Additional_Technical_Questions_and_Answers_0003.pdf PDF
A0003_Att_3_(Revised)_188-D-60267_0003.pdf PDF
A0002_Att_21_(New)_40-D-60001_0002.pdf PDF
A0002_Att_19_(New)_40-D-6592_0002.PDF PDF
A0002_Att_4_140R4024R0020_Technical_Questions_and_Answers_0002.pdf PDF
A0002_Att_23_Evaluations_of_Potential_Filter_Sand_and_Drain_Gravel_Sources_for_Hyrum_Dam_Modifications_0002.pdf PDF
A0002_Att_8_(Replacement)_31_03_33_-_Removal_and_Control_of_Water_0002.pdf PDF
A0002_Att_7_(Revised)_02_41_07_-_Removal_and_Disposal_of_Existing_Features_0002.pdf PDF
A0002_Att_20_(New)_40-D-7017_0002.PDF PDF
A0002_Att_6_(New)_01_46_20_-_Testing_Agency_Services_0002.pdf PDF
A0002_Att_15_(New)_40-D-4335_0002.pdf PDF
A0002_Att_16_(New)_40-D-6477_0002.pdf PDF
A0002_Att_22_(New)_40-D-60002_0002.pdf PDF
A0002_Att_25_Hyrum_Spillway_Replacement_Geological_Investigations_2022_0002.pdf PDF
A0002_Att_24_Geologic_Investigations_of_Hyrum_Dam_Spillway_2016-2019_0002.pdf PDF
Sol_140R4024R0020_Amd_0002.pdf PDF
A0002_Att_11_(Revised)_51_02_82_-_Hazardous_Materials_Survey_and_Analytical_Results_0002.pdf PDF
A0002_Att_14_(New)_40-D-4334_0002.pdf PDF
A0002_Att_18_(New)_40-D-6552_0002.pdf PDF
A0002_Att_17_(New)_40-D-6551_0002.pdf PDF
A0002_Att_1_Informational_Page_0002.pdf PDF
A0002_Att_5_(New)_01_14_20_-_Reservoir_Spillway_and_Outlet_Works_Operations_0002.pdf PDF
A0002_Att_10_(New)_51_00_20_-_Reservoir_Water_Surface_Elevation_Data_0002.pdf PDF
A0002_Att_2_140R4024R0020_Contracting_Questions_and_Answers_0002.pdf PDF
A0002_Att_9_(New)_35_21_20_-_Stoplog_Guides_0002.pdf PDF
A0002_Att_3_Updated_Solicitation_Pages_62-67_0002.pdf PDF
A0002_Att_12_(New)_188-D-60215_Existing_Spillway-Dike_Plan_0002.pdf PDF
A0001_Att_1_Informational_Page_0001.pdf PDF
Sol_140R4024R0020_Amd_0001.pdf PDF
A0001_Att_2_Site_Visit_Sign-in_Sheet_0001.pdf PDF
Attachment_4_Continuation_of_Section_B_in_Excel_Format.xlsx XLSX spreadsheet
Attachment_6_Subcontracting_Plan_Template.docx DOCX document
Attachment_2_140R4024R0020_Drawings_90_.pdf PDF
Attachment_5_Construction_Wage_Rate_Requirements_for_Cache_County__UT.pdf PDF
Attachment_1_140R4024R0020_Specifications_90_.pdf PDF
Sol_140R4024R0020.pdf PDF
Attachment_3_Current_Spillway_Drawings_(Info_Only).pdf PDF
Solicitation_No__140R4024R0020_Hyrum_Dam_Spillway_Replacement.pdf PDF
Attachment_7_SF24_Bid_Bond_Form.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AL

W

AY

S

TH

IN

K

SA

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

8- D

-6

P

A N

EL

S

C H

ED

U

LE

S .D

W G

LA

S T

S A V

ED

D A

TE

-0 9-

LA

S T

S A V

ED

B Y

JK

EL

LY

H

YR

U M

P R O

JE

C T

H

YR

U M

D A M

S

PI

LL

W

A Y

R

EP

LA

C

EM

EN

T

GATE HOIST ENCLOSURE

PANEL SCHEDULES

DENVER

188-D-60379

2024-12-02

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER -

Cameron Wierzbanowski

Cameron Wierzbanowski

Antonio Robles

Electrical Engineer

Supervisory Electrical Engineer

NOTES

1. Size circuit breakers to comply with the latest version of NFPA 70.

REFERENCE DRAWINGS

OUTLET WORKS BUILDING SECTION VIEWS AND

LAYOUTS 188-D-60342

SPILLWAY SINGLE LINE DIAGRAM 188-D-60373

CABLE AND CONDUIT SCHEDULE 188-D-60374

HOIST ENCLOSURE LIGHTING AND RECEPTACLES

LAYOUT 188-D-60377

Sheets and Views
22 x 34
2024-09-27T08:28:21-0600
JOHN KELLY
2024-09-27T11:03:55-0600
ERIC MENDLIN

File details come from the government source that posted it. Updated .